SRI VAIBHAV RESIDENCY is a residential apartment project in Khanapuram Haveli, Khammam (Urban) Mandal, Khammam district. It is being developed by registered promoter ABC DEVELOPERS, a partnership, on a site with a total/gross area of 635.28 sq.m. The project has one building with Stilt + 5 Upper Floors and 10 3BHK units, each with a RERA-filed saleable area of 204.38 sq.m. Its TG-RERA registration number is P00800011245, valid 01/06/2026–31/05/2029, and the promoter’s Form B undertaking states completion by 31/05/2029.
More from Abc Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI VAIBHAV RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No phase name is stated; the registration covers the project on Survey No. 114. RERA record |
| TG-RERA registration | P00800011245; granted under section 5. RERA record |
| Registration validity | 01/06/2026–31/05/2029. This is the registration period, not a statement that construction is complete or that an occupancy certificate (OC) has been issued. RERA record |
| Registered promoter | ABC DEVELOPERS, a partnership. RERA record RERA filing Corporate record |
| RERA status | The supplied certificate records registration as granted; its issue date is 22/09/2026. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Khanapuram Haveli RERA record RERA filing |
| Revenue village | Khanapuram Haveli; also described in filed approval material as Khanapuram / Khanapuram Haveli Revenue. RERA record |
| Mandal / district / PIN | Khammam (Urban) Mandal / Khammam / 507002 RERA record |
| Project survey number(s) | Survey No. 114; no subdivision is identified in the supplied project identity. The plan describes the site as Open Plot No. 15 Part and Open Plot No. 15 Part out of Survey No. 114. RERA record Land records |
| Site area | Total/gross 635.28 sq.m; road-affected area 58.14 sq.m; net plot area 577.14 sq.m. RERA filing |
| Boundaries | East: Plot No. 14; West: 10 m wide main road; North: Police Colony plots; South: 9 m wide sub road. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | The filed building-permit material identifies Khammam Municipal Corporation as the issuing authority and DTCP in the project filing for the principal plan approval. Approvals record |
| Principal approval | Plan / file number 013574/KHAM/00249/SWBP/2026, dated 01/06/2026. The building-permit order also carries approval number 0188/KHAM/SWBP/2026, dated 01/06/2026. Approvals record |
| Approved built-up area | 1,730.25 sq.m excluding parking; 2,082.52 sq.m including parking, as stated in the plan extraction. |
| Building count and configuration | The registration data records one building. The plan material describes Stilt + 5 Upper Floors and 10 dwelling units. RERA record RERA filing |
| Parking provision | The plan extraction records 10.00 car parking spaces, parking area 319.48 sq.m and visitor parking area 32.79 sq.m. |
| Unit counts | 10 units in the sanctioned plan and 10 RERA-filed 3BHK units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Configuration | 3BHK; RERA-filed saleable area 204.38 sq.m per unit. RERA unit table RERA unit details |
| Booked / available | Portal-derived counts are 0 booked / 10 available; the portal record has no as-of date, so treat these as indicative rather than a current reservation confirmation. RERA unit table RERA unit details |
| Construction stage | No construction-progress percentage or independently verified site-stage evidence is supplied. Document index RERA amenities |
| Completion dates | Promoter’s Form B undertaking states completion by 31/05/2029; the building-permit order states construction to be completed before 01/06/2029. |
| OC status | No OC or completion certificate is included in the supplied documents; OC status is therefore not established. Document index |
2. The project story
SRI VAIBHAV RESIDENCY is a proposed residential apartment building in Khanapuram Haveli, on Open Plot No. 15 Part and Open Plot No. 15 Part out of Survey No. 114. The filed project record describes one building with stilt parking and five upper floors, for 10 dwelling units. RERA record RERA filing
The RERA-filed offering is 10 3BHK units. The portal-derived inventory shows all 10 as available and none booked, but the extract has no as-of date. RERA unit table RERA unit details
The supplied record does not establish construction progress or an OC for any floor or portion of the building; the completion dates are stated deadlines, not evidence of completion. Document index
3. Master plan, architecture & building design
The filed plan describes a 635.28 sq.m gross site, including 58.14 sq.m affected by road, with a 577.14 sq.m net plot area. The plan extraction records proposed coverage of 352.27 sq.m (61 %) and vacant plot area of 222.23 sq.m. It gives proposed built-up area as 1,730.25 sq.m excluding parking and 2,082.52 sq.m including parking. These are plan-extraction figures; they are not carpet or saleable-area figures.
The building is described as Stilt + 5 Upper Floors, with a total height of 17.85 m in the sanctioned-parameters extraction. The plan identifies one residential apartment building and 10 dwelling units. The supplied records do not establish a floor-by-floor unit arrangement, flats per floor, lift or stair count, building footprint beyond the stated proposed coverage, or a detailed internal-road or landscape plan. RERA record
The plan lists rainwater harvesting, a transformer space, a garbage house, a tot-lot and parking. Conditions also require a peripheral greenery strip, tree planting, maintenance of the tot-lot as greenery, and a rainwater-harvesting structure. These are approval-plan provisions or conditions; the supplied evidence does not verify that they have been completed.
4. Homes, configurations & floor plans
The RERA filing records 10 3BHK units, each with a saleable area of 204.38 sq.m. Software measurement of the approved floor-plan drawing gives a 3BHK carpet-area median of 119.9 sq.m, with a measured range of 119.6–120.5 sq.m. The drawing-based measurements cover four flat designs and are marked as needing review; they are not RERA-filed carpet-area disclosures. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 204.38 sq.m | Software-measured median 119.9 sq.m; range 119.6–120.5 sq.m | 41% (software-measured) |
Carpet area is the drawing-measured usable internal area; saleable area is the filed unit area and is not interchangeable with carpet area. The supplied drawing measurement excludes no identified room from carpet area and includes the listed internal rooms; the RERA saleable-area record is presented separately. Verify drawing measurements against the approved plan before relying on them. RERA unit details Floor plans
The extracted fifth-floor drawing includes a 3BHK flat plan. A room schedule identifies living, dining and kitchen, three bedrooms, foyer, wash area and toilets; several room dimensions are shown in the drawing extraction. The supplied evidence does not provide a complete dimensioned schedule for every flat design. RERA unit details
5. Parking & vehicle circulation
The plan extraction records 10.00 car parking spaces, 319.48 sq.m parking area and 32.79 sq.m visitor parking area. The building-permit order states that the stilt and any cellar approved for parking must be used exclusively for vehicle parking; the supplied project material describes the building as Stilt + 5 Upper Floors. No separate cellar level is identified in that configuration.
The supplied records do not establish two-wheeler counts, accessible spaces, EV-charger installation, ramp configuration, internal driveway design, pedestrian separation, or legally documented parking allocation to individual units. A sanctioned parking provision does not, by itself, establish exclusive ownership or a particular unit’s allocation.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot is listed; plan conditions require it to be fenced and maintained as greenery before OC, alongside peripheral greenery and tree planting. |
|---|---|
| Evidence source | Approval-plan conditions |
| Declared progress / verified status | Completion not verified; supplied amenity progress shows 0%. |
| Description / size | 20 trees listed in the building-permit extraction. |
|---|---|
| Evidence source | Building-permit extraction |
| Declared progress / verified status | Listed in the approval record; planting not independently verified. |
| Description / size | Listed in the RERA amenity record; no dimensions supplied. RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. |
| Description / size | Listed in the RERA amenity record; no building or size details supplied. RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. |
| Description / size | Listed in the RERA amenity record; no area supplied. RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. |
The supplied material does not identify a clubhouse, indoor recreation facility, or separate sports facility. Amenity entries are declarations/records, not evidence of delivered facilities. RERA amenities
7. Utilities, building services & safety
The building-permit extraction specifies a separate underground static water storage tank of 25,000 L and a separate terrace tank of 25,000 litres for residential buildings. The RERA amenity record lists water supply, sewerage and storm-water drains, but does not give their sources, capacities or completion status. RERA amenities
Rainwater harvesting is included in the plan conditions; the building-permit extraction lists 1 rainwater-harvesting pit. The RERA amenity record also lists water conservation and rainwater harvesting. No STP capacity, treated-water reuse scheme, or storm-water system design details are supplied. RERA amenities
The plan provides for transformer space, and the RERA amenity record lists an electrical meter room, sub-station or receiving station. The supplied evidence does not specify power-backup capacity, lift number or capacity, CCTV, access-control arrangements, accessibility features, or a completed fire-safety installation. The approval conditions require fire-safety measures and an occupancy fire NOC before OC; these conditions do not establish that such measures or clearances have been completed or issued. RERA amenities
The plan also lists a garbage house and requires one within the premises. The RERA amenity record lists solid-waste management and disposal, without further system details or verified progress. RERA amenities
8. Location, access & connectivity
The registered project location is Khanapuram Haveli, Khanapuram Haveli revenue village, Khammam (Urban) Mandal, Khammam district, PIN 507002. The filed site boundaries identify a 10 m wide main road on the west and a 9 m wide sub road on the south. The approval material also lists road widths of 10.0 m, 12.0 m, 9 m, 12 m and 18 m; the supplied extracts do not map each listed width to a specific project-side route. RERA record RERA filing RERA filing
The available location connectivity record contains a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and nearby-point distances, but it is not corroborated in the supplied evidence as the project’s verified Khammam location. It is therefore not used here to make neighbourhood-access or travel-distance claims. Location record
9. Developer & development status
The registered promoter is ABC DEVELOPERS, identified in the filing as a partnership. The supplied corporate identifier is GSTIN 36ABXFA1107C1ZQ. The RERA filing lists CHIRUMAMILLA ASHOK BABU as authorized signatory and CHIRUMAMILLA SIREESHA KUMARI as partner. The promoter address on file is JAGRUTHI NILAYAM, KHANAPURAM HAVELI, KHANAPURAM VILLAGE, KHANAPURAM HAVELI, Khammam (Urban) Mandal, Khammam, 507002. RERA filing Corporate record Parties record
The promoter’s Form B declaration undertakes completion by 31/05/2029. The building-permit material states that construction is to be completed before 01/06/2029. No construction-progress update or independent site verification is supplied, and no OC is included; the project’s current physical stage and OC status are therefore not established by this record. Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for SRI VAIBHAV RESIDENCY, registration P00800011245, valid 01/06/2026–31/05/2029; issued 22/09/2026. |
| Principal plan / building permission | File/plan number 013574/KHAM/00249/SWBP/2026, dated 01/06/2026; filed under DTCP and extracted as a building-permit/sanctioned-plan record. Approvals record |
| Building-permit order | Khammam Municipal Corporation approval number 0188/KHAM/SWBP/2026, dated 01/06/2026; includes the Stilt + 5 Upper Floors, 10-unit building description and conditions. |
| Approved plan material | Drawing/plan extraction for the residential apartment project on Survey No. 114, including site area, proposed built-up area, parking and plan conditions. |
| Promoter declaration | Form B affidavit by authorized signatory CHIRUMAMILLA ASHOK BABU, including the promoter’s stated completion undertaking and declarations. |
| Commencement / OC / completion evidence | The supplied building-permit order is a conditional construction permission and contains conditions requiring commencement and completion notices and an OC. No separate OC or completion certificate is supplied. |
1. Project at a glance
Project identity
Registered project name: SRI VAIBHAV RESIDENCY
Project type: Residential apartment project
Phase / registered portion: No phase name is stated; the registration covers the project on Survey No. 114.
TG-RERA registration: P00800011245; granted under section 5.
Registration validity: 01/06/2026–31/05/2029. This is the registration period, not a statement that construction is complete or that an occupancy certificate (OC) has been issued.
Registered promoter: ABC DEVELOPERS, a partnership.
RERA status: The supplied certificate records registration as granted; its issue date is 22/09/2026.
Land and geographic identity
Locality: Khanapuram Haveli
Revenue village: Khanapuram Haveli; also described in filed approval material as Khanapuram / Khanapuram Haveli Revenue.
Mandal / district / PIN: Khammam (Urban) Mandal / Khammam / 507002
Project survey number(s): Survey No. 114; no subdivision is identified in the supplied project identity. The plan describes the site as Open Plot No. 15 Part and Open Plot No. 15 Part out of Survey No. 114.
Site area: Total/gross 635.28 sq.m; road-affected area 58.14 sq.m; net plot area 577.14 sq.m.
Boundaries: East: Plot No. 14; West: 10 m wide main road; North: Police Colony plots; South: 9 m wide sub road.
Development identity
Sanctioning authority: The filed building-permit material identifies Khammam Municipal Corporation as the issuing authority and DTCP in the project filing for the principal plan approval.
Principal approval: Plan / file number 013574/KHAM/00249/SWBP/2026, dated 01/06/2026. The building-permit order also carries approval number 0188/KHAM/SWBP/2026, dated 01/06/2026.
Approved built-up area: 1,730.25 sq.m excluding parking; 2,082.52 sq.m including parking, as stated in the plan extraction.
Building count and configuration: The registration data records one building. The plan material describes Stilt + 5 Upper Floors and 10 dwelling units.
Parking provision: The plan extraction records 10.00 car parking spaces, parking area 319.48 sq.m and visitor parking area 32.79 sq.m.
Unit counts: 10 units in the sanctioned plan and 10 RERA-filed 3BHK units.
Offering and status
Configuration: 3BHK; RERA-filed saleable area 204.38 sq.m per unit.
Booked / available: Portal-derived counts are 0 booked / 10 available; the portal record has no as-of date, so treat these as indicative rather than a current reservation confirmation.
Construction stage: No construction-progress percentage or independently verified site-stage evidence is supplied.
Completion dates: Promoter’s Form B undertaking states completion by 31/05/2029; the building-permit order states construction to be completed before 01/06/2029.
OC status: No OC or completion certificate is included in the supplied documents; OC status is therefore not established.
2. The project story
SRI VAIBHAV RESIDENCY is a proposed residential apartment building in Khanapuram Haveli, on Open Plot No. 15 Part and Open Plot No. 15 Part out of Survey No. 114. The filed project record describes one building with stilt parking and five upper floors, for 10 dwelling units.
The RERA-filed offering is 10 3BHK units. The portal-derived inventory shows all 10 as available and none booked, but the extract has no as-of date.
The supplied record does not establish construction progress or an OC for any floor or portion of the building; the completion dates are stated deadlines, not evidence of completion.
3. Master plan, architecture & building design
The filed plan describes a 635.28 sq.m gross site, including 58.14 sq.m affected by road, with a 577.14 sq.m net plot area. The plan extraction records proposed coverage of 352.27 sq.m (61 %) and vacant plot area of 222.23 sq.m. It gives proposed built-up area as 1,730.25 sq.m excluding parking and 2,082.52 sq.m including parking. These are plan-extraction figures; they are not carpet or saleable-area figures.
The building is described as Stilt + 5 Upper Floors, with a total height of 17.85 m in the sanctioned-parameters extraction. The plan identifies one residential apartment building and 10 dwelling units. The supplied records do not establish a floor-by-floor unit arrangement, flats per floor, lift or stair count, building footprint beyond the stated proposed coverage, or a detailed internal-road or landscape plan.
The plan lists rainwater harvesting, a transformer space, a garbage house, a tot-lot and parking. Conditions also require a peripheral greenery strip, tree planting, maintenance of the tot-lot as greenery, and a rainwater-harvesting structure. These are approval-plan provisions or conditions; the supplied evidence does not verify that they have been completed.
4. Homes, configurations & floor plans
The RERA filing records 10 3BHK units, each with a saleable area of 204.38 sq.m. Software measurement of the approved floor-plan drawing gives a 3BHK carpet-area median of 119.9 sq.m, with a measured range of 119.6–120.5 sq.m. The drawing-based measurements cover four flat designs and are marked as needing review; they are not RERA-filed carpet-area disclosures.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 204.38 sq.m | Software-measured median 119.9 sq.m; range 119.6–120.5 sq.m | 41% (software-measured) |
Carpet area is the drawing-measured usable internal area; saleable area is the filed unit area and is not interchangeable with carpet area. The supplied drawing measurement excludes no identified room from carpet area and includes the listed internal rooms; the RERA saleable-area record is presented separately. Verify drawing measurements against the approved plan before relying on them.
The extracted fifth-floor drawing includes a 3BHK flat plan. A room schedule identifies living, dining and kitchen, three bedrooms, foyer, wash area and toilets; several room dimensions are shown in the drawing extraction. The supplied evidence does not provide a complete dimensioned schedule for every flat design.
5. Parking & vehicle circulation
The plan extraction records 10.00 car parking spaces, 319.48 sq.m parking area and 32.79 sq.m visitor parking area. The building-permit order states that the stilt and any cellar approved for parking must be used exclusively for vehicle parking; the supplied project material describes the building as Stilt + 5 Upper Floors. No separate cellar level is identified in that configuration.
The supplied records do not establish two-wheeler counts, accessible spaces, EV-charger installation, ramp configuration, internal driveway design, pedestrian separation, or legally documented parking allocation to individual units. A sanctioned parking provision does not, by itself, establish exclusive ownership or a particular unit’s allocation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Tot-lot is listed; plan conditions require it to be fenced and maintained as greenery before OC, alongside peripheral greenery and tree planting. | Approval-plan conditions | Completion not verified; supplied amenity progress shows 0%. |
| Trees | 20 trees listed in the building-permit extraction. | Building-permit extraction | Listed in the approval record; planting not independently verified. |
| Internal roads and footpaths | Listed in the RERA amenity record; no dimensions supplied. | RERA amenity record | Progress recorded as 0%. |
| Community buildings | Listed in the RERA amenity record; no building or size details supplied. | RERA amenity record | Progress recorded as 0%. |
| Aggregate recreational open space | Listed in the RERA amenity record; no area supplied. | RERA amenity record | Progress recorded as 0%. |
The supplied material does not identify a clubhouse, indoor recreation facility, or separate sports facility. Amenity entries are declarations/records, not evidence of delivered facilities.
7. Utilities, building services & safety
The building-permit extraction specifies a separate underground static water storage tank of 25,000 L and a separate terrace tank of 25,000 litres for residential buildings. The RERA amenity record lists water supply, sewerage and storm-water drains, but does not give their sources, capacities or completion status.
Rainwater harvesting is included in the plan conditions; the building-permit extraction lists 1 rainwater-harvesting pit. The RERA amenity record also lists water conservation and rainwater harvesting. No STP capacity, treated-water reuse scheme, or storm-water system design details are supplied.
The plan provides for transformer space, and the RERA amenity record lists an electrical meter room, sub-station or receiving station. The supplied evidence does not specify power-backup capacity, lift number or capacity, CCTV, access-control arrangements, accessibility features, or a completed fire-safety installation. The approval conditions require fire-safety measures and an occupancy fire NOC before OC; these conditions do not establish that such measures or clearances have been completed or issued.
The plan also lists a garbage house and requires one within the premises. The RERA amenity record lists solid-waste management and disposal, without further system details or verified progress.
8. Location, access & connectivity
The registered project location is Khanapuram Haveli, Khanapuram Haveli revenue village, Khammam (Urban) Mandal, Khammam district, PIN 507002. The filed site boundaries identify a 10 m wide main road on the west and a 9 m wide sub road on the south. The approval material also lists road widths of 10.0 m, 12.0 m, 9 m, 12 m and 18 m; the supplied extracts do not map each listed width to a specific project-side route.
The available location connectivity record contains a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and nearby-point distances, but it is not corroborated in the supplied evidence as the project’s verified Khammam location. It is therefore not used here to make neighbourhood-access or travel-distance claims.
9. Developer & development status
The registered promoter is ABC DEVELOPERS, identified in the filing as a partnership. The supplied corporate identifier is GSTIN 36ABXFA1107C1ZQ. The RERA filing lists CHIRUMAMILLA ASHOK BABU as authorized signatory and CHIRUMAMILLA SIREESHA KUMARI as partner. The promoter address on file is JAGRUTHI NILAYAM, KHANAPURAM HAVELI, KHANAPURAM VILLAGE, KHANAPURAM HAVELI, Khammam (Urban) Mandal, Khammam, 507002.
The promoter’s Form B declaration undertakes completion by 31/05/2029. The building-permit material states that construction is to be completed before 01/06/2029. No construction-progress update or independent site verification is supplied, and no OC is included; the project’s current physical stage and OC status are therefore not established by this record.
10. Approvals, official records & documents
TG-RERA registration: Form C for SRI VAIBHAV RESIDENCY, registration P00800011245, valid 01/06/2026–31/05/2029; issued 22/09/2026.
Principal plan / building permission: File/plan number 013574/KHAM/00249/SWBP/2026, dated 01/06/2026; filed under DTCP and extracted as a building-permit/sanctioned-plan record.
Building-permit order: Khammam Municipal Corporation approval number 0188/KHAM/SWBP/2026, dated 01/06/2026; includes the Stilt + 5 Upper Floors, 10-unit building description and conditions.
Approved plan material: Drawing/plan extraction for the residential apartment project on Survey No. 114, including site area, proposed built-up area, parking and plan conditions.
Promoter declaration: Form B affidavit by authorized signatory CHIRUMAMILLA ASHOK BABU, including the promoter’s stated completion undertaking and declarations.
Commencement / OC / completion evidence: The supplied building-permit order is a conditional construction permission and contains conditions requiring commencement and completion notices and an OC. No separate OC or completion certificate is supplied.
Frequently asked questions
Is SRI VAIBHAV RESIDENCY registered with Telangana RERA?
Yes. SRI VAIBHAV RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P00800011245; the registration status is New Project.
Who is the developer of SRI VAIBHAV RESIDENCY?
The promoter named in the RERA registration is ABC DEVELOPERS.
Where is SRI VAIBHAV RESIDENCY located?
SRI VAIBHAV RESIDENCY is in KHANAPURAM HAVELI, Khammam (Urban) Mandal, Khammam, Telangana (507002).
When will SRI VAIBHAV RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 31/05/2029. This is the promoter's declaration, not a guarantee.