Milestone Enclave
MILESTONE ESTATES · Medchal-Malkajgiri · RERA P02200009974
MILESTONE ENCLAVE is a plotted development / residential open layout at Shamirpet, Shamirpet Mandal, Medchal-Malkajgiri district. The registered promoter is MILESTONE ESTATES. The project has a registered site extent of 21,112.47 sq.m and comprises 74 plots, with software-measured plot sizes of 87.76–351.68 sq.m (105.0–420.6 sq. yd.); towers and building floors are not disclosed. Its TG-RERA registration number is P02200009974, and the project header records proposed completion as 28/09/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MILESTONE ENCLAVE RERA record |
| Project type | Plotted development / residential open layout RERA record |
| Phase or registered portion | New project; the registration record does not identify a separate phase RERA record |
| TG-RERA registration | P02200009974 |
| Registration validity | 29/05/2025 to 28/05/2028, unless extended by the Authority |
| Registered promoter | MILESTONE ESTATES |
| RERA status | Registered; the record describes the project as a new project RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | TG-RERA identifies Shamirpet; the HMDA layout documents identify Bomraspet village. Both names are retained as stated in the records. |
| Mandal | Shamirpet / Shamirpet 1 RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 501401 RERA record |
| Project survey numbers | Sy. Nos. 477 Part, 478 Part, 479, 480 Part & 483 |
| Registered site extent | 21,112.47 sq.m total site area |
| Layout-area figures | 20,228.64 sq.m net site/layout area in the HMDA draft layout record; the drawing’s area statement also gives net layout area as 20,228.64 sq.m. |
| Road-affected area | 574.72 sq.m |
| Boundaries | East: neighbours’ land; West: 12 19 MT WIDE EXISTING ROAD; North: neighbours’ land; South: neighbours’ land RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter records delegation to Bommarasipet Gram Panchayat |
| Principal approval | 012090/LO/HMDA/3216/MED/2024, dated 29 May, 2025; the record is identified as a TG-bPASS draft layout letter |
| Approved built-up area | 12,326.8 sq.m in the RERA filing; the layout drawing labels this as plotted area, not building floor area. RERA filing |
| Plots | 74 in the layout drawing and draft layout record |
| Towers / building floors / parking levels | Not disclosed for this plotted-layout project in the supplied RERA and approval records. |
| Layout roads and open space | Layout roads: 5,197.96 sq.m; open space/park: 1,535.85 sq.m |
| Mortgage area | 1,861.68 sq.m, comprising 10 identified plots in favour of HMDA |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots in a residential open layout; the drawing records 74 individual sub-plots |
| Plot count / size range | 74 plots; software-measured from the layout drawing: 87.76–351.68 sq.m (105.0–420.6 sq. yd.) Layout record |
| Booked / available counts | Not established in the supplied project record. |
| Construction or development stage | The approval document is a draft layout and makes final layout release conditional on development and handover requirements. No independently verified on-site completion status is supplied. |
| Completion date | The RERA Form B declaration states 28/05/2028 as the promoter’s completion undertaking; the project header records proposed completion as 28/09/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. For a plotted layout, the supplied records instead describe draft layout permission and conditions for final layout release. |
Registration validity is the TG-RERA registration period, not a statement that the layout works are complete. The completion date is a promoter undertaking; no completion certificate is evidenced in this pack.
2. The project story
MILESTONE ENCLAVE is registered as a plotted residential development at Shamirpet, in Medchal-Malkajgiri district. The TG-RERA certificate identifies the project land as Sy. Nos. 477 PART, 478 PART, 479, 480 PART and 483; HMDA’s draft layout documents describe the site as being at Bomraspet village, Shamirpet Mandal.
The approved layout drawing depicts 74 plots, with internal roads, park/open space, social-infrastructure land and utility land. The HMDA record is expressly a draft layout permission and requires infrastructure works and the handover of specified roads and open areas before final layout plans are released. The evidence pack contains no independently verified construction-progress report or occupancy/completion certificate, so physical completion cannot be confirmed from these records.
3. Master plan, architecture & building design
This is a plotted layout rather than a tower or apartment scheme. The drawing identifies 74 plots and divides the recorded net layout area into plotted land, roads, park/open space, social infrastructure, utilities and buffer land. Its stated figures are:
| Layout component | Area | Drawing-stated share |
|---|---|---|
| Plotted area | 12,326.80 sq.m | 60.94% |
| Road area | 5,197.96 sq.m | 25.70% |
| Organized open space / park | 1,535.85 sq.m | 7.59% |
| Social infrastructure area | 506.08 sq.m | 2.50% |
| Utility area | 173.26 sq.m | 0.86% |
| Buffer zone area | 488.65 sq.m | 2.42% |
| Total net layout | 20,228.60 sq.m | 100.00% |
The draft-layout record separately states a net site area of 20,228.64 sq.m, and identifies a 574.72 sq.m master-plan road-affected area. The layout drawing lists 12.19 MT and 9.14 MT internal roads, a 12.19 MT existing road, a 30MT proposed master-plan road and a 40' village road.
No tower arrangement, building footprint, floor configuration, apartment distribution or building-height information is applicable or disclosed in the supplied records. The 12,326.8 sq.m figure is identified in the layout records as plotted area; it is not presented here as apartment built-up area.
4. Homes, configurations & floor plans
The RERA-filed offering is plots, not apartments. The layout drawing states 74 plots; the software-measured plot sizes span 87.76–351.68 sq.m (105.0–420.6 sq. yd.). These measurements are drawing-derived and are not RERA-filed individual saleable-area disclosures. Layout record
| Plot-size band | Plots |
|---|---|
| 100–150 sq. yd. | 3 |
| 150–200 sq. yd. | 51 |
| 200–250 sq. yd. | 13 |
| 250–300 sq. yd. | 3 |
| 300–400 sq. yd. | 3 |
| 400–500 sq. yd. | 1 |
The layout schedule contains measurements for all 74 plots; the most common printed plot size is 153.29 sq.m, appearing for 32 plots. Drawing-measured plot area is not the same as an apartment’s carpet or saleable area. Booked and available plot counts are not disclosed in the supplied evidence. Layout record
5. Parking & vehicle circulation
The layout area statement records 0.00 sq.m of common parking area; the supplied project records do not establish a sanctioned count of parking bays, individual plot parking allocations or visitor parking.
Internal roads are shown at 12.19 MT and 9.14 MT widths, alongside the listed existing, proposed master-plan and village roads. The approval conditions also require roads to be opened for access to neighbouring sites. No evidence is supplied on separate pedestrian routes, ramps, EV charging or a parking-allotment arrangement.
6. Amenities, recreation & open spaces
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,535.85 sq.m | HMDA draft layout record and layout drawing | Shown in the layout record; no independent completion verification supplied |
| Tot-lot / green strip | Listed as a layout feature; no separate size supplied | Layout drawing | No completion status supplied |
| Cycling tracks | Listed in the draft-layout document’s amenities/utilities extraction; no size supplied | No completion status supplied |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Social infrastructure area | 506.08 sq.m | HMDA draft layout record | Land allocation shown; no facility-specific completion evidence supplied |
| Utility area | 173.26 sq.m | HMDA draft layout record | Land allocation shown; no completion evidence supplied |
The layout records show 0 sq.m for an amenity area. No clubhouse or indoor recreation facility is established in the supplied project records.
7. Utilities, building services & safety
The HMDA draft-layout conditions specify layout infrastructure including black-top roads, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines and street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions, not evidence that the works have been completed.
| Evidence in the project record | Internal water-supply pipelines, overhead tank and an assured supply source are specified in the draft-layout conditions. The layout drawing also lists an OHT with below-ground sump. |
|---|---|
| Status evidenced | Required / listed; completion not independently verified |
| Evidence in the project record | Underground drainage lines, common septic tank/STP and storm-water drains are specified. |
|---|---|
| Status evidenced | Required / listed; completion not independently verified |
| Evidence in the project record | Electrical supply lines, transformer and street lights are specified; a transformer is also listed on the layout drawing. |
|---|---|
| Status evidenced | Required / listed; completion not independently verified |
| Evidence in the project record | A garbage bin is listed on the layout drawing. |
|---|---|
| Status evidenced | Listed; no operational status supplied |
| Evidence in the project record | No project-specific fire-system, fire-access, CCTV or security installation details are established by the supplied RERA and layout records. |
|---|---|
| Status evidenced | Not disclosed / not verified |
| Evidence in the project record | No accessible-route or accessibility specifications are supplied. |
|---|---|
| Status evidenced | Not disclosed |
8. Location, access & connectivity
The TG-RERA project record gives the location as Shamirpet, Shamirpet, Medchal-Malkajgiri, 501401. The HMDA layout documents place it at Bomraspet village, Shamirpet Mandal. The registered survey identifiers are 477 Part, 478 Part, 479, 480 Part and 483.
The layout drawing identifies internal roads of 12.19 MT and 9.14 MT, a 12.19 MT existing road, a 30MT proposed master-plan road and a 40' village road. The nearest sampled Outer Ring Road interchange is recorded as approximately 9.0 km from the cadastral parcel centroid. Location record
9. Developer & development status
The registered promoter is MILESTONE ESTATES, identified in the project filing as a partnership. Its GSTIN is 36ABSFM6033G1Z0. The RERA certificate lists the promoter address as Village: Mandal: Gandipet, District: Ranga Reddy, PIN 500032; the project filing separately provides an address at Jayabheri Pine Valley, Telecom Nagar, Bomraspet Village, Shamirpet 1 Mandal, Shamirpet, Medchal-Malkajgiri, PIN 501401. Corporate record RERA filing
The RERA filing names GADDAM RAMAKRISHNA REDDY as authorized signatory and identifies ALLADI VENKAT NARSAIAH as a partner. The promoter’s Form B declaration, dated 10 JUN 2025, undertakes completion by 28/05/2028. Parties record
The supplied approval is a draft layout permission with infrastructure and handover conditions. No project-specific, independently verified construction-progress assessment or completion/occupancy certificate is included.
10. Approvals, official records & documents
| Record | What the supplied record establishes |
|---|---|
| TG-RERA certificate, P02200009974 | Form C certificate for MILESTONE ENCLAVE; registration period 29/05/2025–28/05/2028, unless extended. |
| HMDA draft layout letter, approval/proceedings no. 012090/LO/HMDA/3216/MED/2024 | Dated 29 May, 2025; records draft layout permission for 74 plots in the stated survey numbers and sets development and handover conditions. |
| Layout plan and area statement | Drawing records plot count, plot sizes, roads, park/open space, social infrastructure, utilities and buffer-zone area. |
| HMDA mortgage record | The draft-layout record identifies 10 plots—Nos. 68, 67, 66, 65, 64, 63, 73, 72, 71 and 69—with 1,861.68 sq.m stated as mortgaged to the Metropolitan Commissioner, HMDA. |
| RERA Form B declaration | Promoter declaration dated 10 JUN 2025, including completion undertaking, project-account and approvals disclosures. |
| Occupancy / completion certificate | None supplied. The available layout document is described as draft permission, with final layout release conditional on development and handover requirements. |
1. Project at a glance
Project identity
Registered project name: MILESTONE ENCLAVE
Project type: Plotted development / residential open layout
Phase or registered portion: New project; the registration record does not identify a separate phase
TG-RERA registration: P02200009974
Registration validity: 29/05/2025 to 28/05/2028, unless extended by the Authority
Registered promoter: MILESTONE ESTATES
RERA status: Registered; the record describes the project as a new project
Land and geographic identity
Locality / revenue village: TG-RERA identifies Shamirpet; the HMDA layout documents identify Bomraspet village. Both names are retained as stated in the records.
Mandal: Shamirpet / Shamirpet 1
District: Medchal-Malkajgiri
PIN: 501401
Project survey numbers: Sy. Nos. 477 Part, 478 Part, 479, 480 Part & 483
Registered site extent: 21,112.47 sq.m total site area
Layout-area figures: 20,228.64 sq.m net site/layout area in the HMDA draft layout record; the drawing’s area statement also gives net layout area as 20,228.64 sq.m.
Road-affected area: 574.72 sq.m
Boundaries: East: neighbours’ land; West: 12 19 MT WIDE EXISTING ROAD; North: neighbours’ land; South: neighbours’ land
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter records delegation to Bommarasipet Gram Panchayat
Principal approval: 012090/LO/HMDA/3216/MED/2024, dated 29 May, 2025; the record is identified as a TG-bPASS draft layout letter
Approved built-up area: 12,326.8 sq.m in the RERA filing; the layout drawing labels this as plotted area, not building floor area.
Plots: 74 in the layout drawing and draft layout record
Towers / building floors / parking levels: Not disclosed for this plotted-layout project in the supplied RERA and approval records.
Layout roads and open space: Layout roads: 5,197.96 sq.m; open space/park: 1,535.85 sq.m
Mortgage area: 1,861.68 sq.m, comprising 10 identified plots in favour of HMDA
Offering and status
Offering: Plots in a residential open layout; the drawing records 74 individual sub-plots
Plot count / size range: 74 plots; software-measured from the layout drawing: 87.76–351.68 sq.m (105.0–420.6 sq. yd.)
Booked / available counts: Not established in the supplied project record.
Construction or development stage: The approval document is a draft layout and makes final layout release conditional on development and handover requirements. No independently verified on-site completion status is supplied.
Completion date: The RERA Form B declaration states 28/05/2028 as the promoter’s completion undertaking; the project header records proposed completion as 28/09/2028.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. For a plotted layout, the supplied records instead describe draft layout permission and conditions for final layout release.
Registration validity is the TG-RERA registration period, not a statement that the layout works are complete. The completion date is a promoter undertaking; no completion certificate is evidenced in this pack.
2. The project story
MILESTONE ENCLAVE is registered as a plotted residential development at Shamirpet, in Medchal-Malkajgiri district. The TG-RERA certificate identifies the project land as Sy. Nos. 477 PART, 478 PART, 479, 480 PART and 483; HMDA’s draft layout documents describe the site as being at Bomraspet village, Shamirpet Mandal.
The approved layout drawing depicts 74 plots, with internal roads, park/open space, social-infrastructure land and utility land. The HMDA record is expressly a draft layout permission and requires infrastructure works and the handover of specified roads and open areas before final layout plans are released. The evidence pack contains no independently verified construction-progress report or occupancy/completion certificate, so physical completion cannot be confirmed from these records.
3. Master plan, architecture & building design
This is a plotted layout rather than a tower or apartment scheme. The drawing identifies 74 plots and divides the recorded net layout area into plotted land, roads, park/open space, social infrastructure, utilities and buffer land. Its stated figures are:
| Layout component | Area | Drawing-stated share |
|---|---|---|
| Plotted area | 12,326.80 sq.m | 60.94% |
| Road area | 5,197.96 sq.m | 25.70% |
| Organized open space / park | 1,535.85 sq.m | 7.59% |
| Social infrastructure area | 506.08 sq.m | 2.50% |
| Utility area | 173.26 sq.m | 0.86% |
| Buffer zone area | 488.65 sq.m | 2.42% |
| Total net layout | 20,228.60 sq.m | 100.00% |
The draft-layout record separately states a net site area of 20,228.64 sq.m, and identifies a 574.72 sq.m master-plan road-affected area. The layout drawing lists 12.19 MT and 9.14 MT internal roads, a 12.19 MT existing road, a 30MT proposed master-plan road and a 40' village road.
No tower arrangement, building footprint, floor configuration, apartment distribution or building-height information is applicable or disclosed in the supplied records. The 12,326.8 sq.m figure is identified in the layout records as plotted area; it is not presented here as apartment built-up area.
4. Homes, configurations & floor plans
The RERA-filed offering is plots, not apartments. The layout drawing states 74 plots; the software-measured plot sizes span 87.76–351.68 sq.m (105.0–420.6 sq. yd.). These measurements are drawing-derived and are not RERA-filed individual saleable-area disclosures.
100–150 sq. yd.: 3
150–200 sq. yd.: 51
200–250 sq. yd.: 13
250–300 sq. yd.: 3
300–400 sq. yd.: 3
400–500 sq. yd.: 1
The layout schedule contains measurements for all 74 plots; the most common printed plot size is 153.29 sq.m, appearing for 32 plots. Drawing-measured plot area is not the same as an apartment’s carpet or saleable area. Booked and available plot counts are not disclosed in the supplied evidence.
5. Parking & vehicle circulation
The layout area statement records 0.00 sq.m of common parking area; the supplied project records do not establish a sanctioned count of parking bays, individual plot parking allocations or visitor parking.
Internal roads are shown at 12.19 MT and 9.14 MT widths, alongside the listed existing, proposed master-plan and village roads. The approval conditions also require roads to be opened for access to neighbouring sites. No evidence is supplied on separate pedestrian routes, ramps, EV charging or a parking-allotment arrangement.
6. Amenities, recreation & open spaces
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,535.85 sq.m | HMDA draft layout record and layout drawing | Shown in the layout record; no independent completion verification supplied |
| Tot-lot / green strip | Listed as a layout feature; no separate size supplied | Layout drawing | No completion status supplied |
| Cycling tracks | Listed in the draft-layout document’s amenities/utilities extraction; no size supplied | No completion status supplied |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Social infrastructure area | 506.08 sq.m | HMDA draft layout record | Land allocation shown; no facility-specific completion evidence supplied |
| Utility area | 173.26 sq.m | HMDA draft layout record | Land allocation shown; no completion evidence supplied |
The layout records show 0 sq.m for an amenity area. No clubhouse or indoor recreation facility is established in the supplied project records.
7. Utilities, building services & safety
The HMDA draft-layout conditions specify layout infrastructure including black-top roads, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines and street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions, not evidence that the works have been completed.
| Evidence in the project record | Internal water-supply pipelines, overhead tank and an assured supply source are specified in the draft-layout conditions. The layout drawing also lists an OHT with below-ground sump. |
|---|---|
| Status evidenced | Required / listed; completion not independently verified |
| Evidence in the project record | Underground drainage lines, common septic tank/STP and storm-water drains are specified. |
|---|---|
| Status evidenced | Required / listed; completion not independently verified |
| Evidence in the project record | Electrical supply lines, transformer and street lights are specified; a transformer is also listed on the layout drawing. |
|---|---|
| Status evidenced | Required / listed; completion not independently verified |
| Evidence in the project record | A garbage bin is listed on the layout drawing. |
|---|---|
| Status evidenced | Listed; no operational status supplied |
| Evidence in the project record | No project-specific fire-system, fire-access, CCTV or security installation details are established by the supplied RERA and layout records. |
|---|---|
| Status evidenced | Not disclosed / not verified |
| Evidence in the project record | No accessible-route or accessibility specifications are supplied. |
|---|---|
| Status evidenced | Not disclosed |
8. Location, access & connectivity
The TG-RERA project record gives the location as Shamirpet, Shamirpet, Medchal-Malkajgiri, 501401. The HMDA layout documents place it at Bomraspet village, Shamirpet Mandal. The registered survey identifiers are 477 Part, 478 Part, 479, 480 Part and 483.
The layout drawing identifies internal roads of 12.19 MT and 9.14 MT, a 12.19 MT existing road, a 30MT proposed master-plan road and a 40' village road. The nearest sampled Outer Ring Road interchange is recorded as approximately 9.0 km from the cadastral parcel centroid.
9. Developer & development status
The registered promoter is MILESTONE ESTATES, identified in the project filing as a partnership. Its GSTIN is 36ABSFM6033G1Z0. The RERA certificate lists the promoter address as Village: Mandal: Gandipet, District: Ranga Reddy, PIN 500032; the project filing separately provides an address at Jayabheri Pine Valley, Telecom Nagar, Bomraspet Village, Shamirpet 1 Mandal, Shamirpet, Medchal-Malkajgiri, PIN 501401.
The RERA filing names GADDAM RAMAKRISHNA REDDY as authorized signatory and identifies ALLADI VENKAT NARSAIAH as a partner. The promoter’s Form B declaration, dated 10 JUN 2025, undertakes completion by 28/05/2028.
The supplied approval is a draft layout permission with infrastructure and handover conditions. No project-specific, independently verified construction-progress assessment or completion/occupancy certificate is included.
10. Approvals, official records & documents
TG-RERA certificate, P02200009974: Form C certificate for MILESTONE ENCLAVE; registration period 29/05/2025–28/05/2028, unless extended.
HMDA draft layout letter, approval/proceedings no. 012090/LO/HMDA/3216/MED/2024: Dated 29 May, 2025; records draft layout permission for 74 plots in the stated survey numbers and sets development and handover conditions.
Layout plan and area statement: Drawing records plot count, plot sizes, roads, park/open space, social infrastructure, utilities and buffer-zone area.
HMDA mortgage record: The draft-layout record identifies 10 plots—Nos. 68, 67, 66, 65, 64, 63, 73, 72, 71 and 69—with 1,861.68 sq.m stated as mortgaged to the Metropolitan Commissioner, HMDA.
RERA Form B declaration: Promoter declaration dated 10 JUN 2025, including completion undertaking, project-account and approvals disclosures.
Occupancy / completion certificate: None supplied. The available layout document is described as draft permission, with final layout release conditional on development and handover requirements.
Frequently asked questions
Is MILESTONE ENCLAVE registered with Telangana RERA?
Yes. MILESTONE ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02200009974; the registration status is New Project.
Who is the developer of MILESTONE ENCLAVE?
The promoter named in the RERA registration is MILESTONE ESTATES.
Where is MILESTONE ENCLAVE located?
MILESTONE ENCLAVE is in SHAMIRPET 1 MANDAL, Shamirpet, Medchal-Malkajgiri, Telangana (501401).
When will MILESTONE ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 28/09/2028. This is the promoter's declaration, not a guarantee.