Aditi Infratech

ADITI INFRATECH · Medak · RERA P01000010813

ADITI INFRATECH is a plotted development / open-plots layout at NARSAPUR A, Narsapur Mandal, Medak District, developed by the registered promoter ADITI INFRATECH. The registered site extent is 138007.53 sq. m, and the draft layout shows 516 plot numbers; building floors and plot configurations are not stated. The project is registered with TG-RERA under P01000010813, with registration validity from 07/01/2026 to 07/01/2029. The declared proposed completion date is 07.01.2029.

01What we found

RegisteredTG-RERA - valid till 7 Jan 2029
74documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameADITI INFRATECH RERA record
Project typePlotted development / open-plots layout RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration describes the listed land as the project
TG-RERA registrationP01000010813 RERA record
Registration validity07/01/2026 to 07/01/2029 Approvals record
Registered promoterADITI INFRATECH RERA record
RERA statusRegistered; the certificate is valid for the stated period unless extended by the Authority

Land and geographic identity

ItemProject record
Locality / revenue villageNarsapur / NARSAPUR A; the layout letter describes the site as Narsapur Village RERA record RERA filing
MandalNarsapur RERA record
DistrictMedak RERA record
PIN502313 RERA record RERA filing
Survey numbers and subdivisions627P, 628P, 630P, 631P, 632, 633, 634, 635P, 636P, 637P, 638/P, 639P, 640P, 641P, 642P, 644P, 649P, 650P, 651P, 652, 653, 654, 655P, 656P, 661, 662, 663P, 664, 665P, 740P, 756P, 757, 758P, 759, 760, 761P, 767P, 768, 769, 770 and 776P
Registered site extent138007.53 sq. m net layout area RERA filing
Layout-plan areasTotal layout area 144018.42 sq. m; net layout area 138007.53 sq. m
BoundariesEast, west, north and south: OTHERS LAND in the RERA filing RERA filing
Road-affected areaLayout drawing records 1975.44 sq. m road widening; RERA land details report 0 area affected in road widening/FTL/Nala widening RERA filing

Development identity

ItemProject record
Sanctioning authority / approval referenceHMDA layout permission; draft layout letter records Layout Permit No. 1405/HMDA/SWDL/2026 and application/file reference 009894/HMDA/02906/SWDL/MDL1/2025, dated 07/01/2026 Approvals record
Approval stage stated in documentDraft Layout / draft layout permission
Approved built-up area77863.68 sq. m is shown in the RERA filing as “Approved Built up Area”; the layout drawing identifies 77863.68 sq. m as plotted area RERA filing
Buildings / floorsNot applicable to the plotted-layout offering; no house construction or building floors are established by the supplied project record
Plot count516 plot numbers are shown on the draft layout drawing; the extracted plot schedule is incomplete
ParkingLayout land-use schedule records 0.00 sq. m common parking area; individual plot parking allocations are not disclosed

Offering and status

ItemProject record
OfferingOpen plots; the drawing numbers plots 1–516
Plot size range / RERA saleable-area scheduleNot available in the supplied extracted data
Booked / available plotsNot available in the supplied data RERA record
Construction / development stageRERA record labels this a New Project; the supplied layout documents describe a draft layout and provide no independently verified site-progress measurement RERA record
Completion dateForm B declares project completion by 07.01.2029; the layout letter requires development works within THREE (3) YEARS
Registration validity vs completionRegistration validity ends 07/01/2029; the Form B completion undertaking is 07.01.2029
Occupancy / completion certificateNo completion or occupancy certificate is recorded in the supplied documents; the layout letter describes a draft layout and sets out steps preceding final layout release

2. The project story

ADITI INFRATECH is registered with TG-RERA as a plotted-development project at Narsapur A, Narsapur Mandal, Medak District. The registered land schedule covers the survey numbers listed above; the project is presented as an open-plots layout rather than a development of flats or completed houses. RERA record

The draft layout drawing depicts 516 numbered plots, internal roads, open spaces, social-infrastructure land, buffer areas and utility land. The layout letter calls for the roads and designated open, social-infrastructure, utility and buffer areas to be transferred to the local body by registered gift deed, and for development works to be completed within three years. These are document-stated requirements; the supplied material does not establish that the works or transfers have been completed.

The promoter’s Form B states a completion undertaking of 07.01.2029. The record does not provide a verified construction-progress percentage or an occupancy/completion certificate. The drawing’s extracted plot count is available, but the plot schedule is incomplete and does not establish individual plot dimensions or availability. RERA record

3. Master plan, architecture & building design

This is a plotted layout, so the relevant design evidence is the draft layout plan rather than apartment floor plans.

The drawing states a total layout area of 144018.42 sq. m and net layout area of 138007.53 sq. m. Its land-use schedule identifies 77863.68 sq. m (56.42%) as plotted area, 41059.06 sq. m (29.75%) as road area, 10521.47 sq. m (7.62%) as open space, 4387.84 sq. m (3.18%) as buffer area, 3504.32 sq. m (2.54%) as social-infrastructure area and 667.49 sq. m (0.48%) as utility area. It records 0.00 sq. m for common parking, facilities, amenities and green-belt areas. These are drawing-stated allocations, not a report of completed works.

The drawing lists a 30 m wide main road and internal road widths including 18.29 m, 12.19 m, 9.14 m and 9 m. It also labels nala buffers and walking/inspection paths. The extracted plan identifies 516 plot numbers, but the detailed plot schedule is incomplete; plot-specific dimensions cannot be set out from the supplied extraction.

The project record reports 77863.68 sq. m as approved built-up area, while the layout drawing labels the same figure as plotted area. This Overview preserves the RERA filing label and the drawing’s land-use label separately; it does not treat either as a building-area or plot-area measurement beyond what each source states. RERA filing

4. Homes, configurations & floor plans

This project is a plotted layout, not an apartment or villa configuration schedule.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Open plots516 plot numbers shown on the draft layoutNot disclosedNot disclosedPlot-by-plot schedule not suppliedNot applicableNot supplied

The layout drawing extraction is incomplete, with no plot sizes available in the supplied plot schedule. The RERA registration certificate identifies the project’s land and registration but does not provide a plot-wise inventory in the supplied material.

5. Parking & vehicle circulation

The layout land-use schedule records 0.00 sq. m as common parking area. The drawing includes internal roads and sub-roads, but the supplied material does not establish parking-space counts, visitor or accessible parking, vehicle-allocation terms, or exclusive parking rights for individual plots. A plot buyer should not infer an allocated parking space from the road or plot drawing.

6. Amenities, recreation & open spaces

The RERA filing lists layout-level infrastructure and amenities at 0% progress in the supplied amenities record; this is a declared progress field, not independent confirmation of completion. The draft layout letter and plan set out proposed land and utility provisions as follows. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open spaces / parksOpen-space allocation 10521.47 sq. m (7.62%); the plan labels several individual open-space areasLayout provision shown; completion not verified
Social infrastructure3504.32 sq. m (2.54%)Layout provision shown; completion not verified
Utility area667.49 sq. m (0.48%)Layout provision shown; completion not verified
Tot-lotIdentified in the draft drawing and listed among the approval conditionsRequired/proposed; completion not verified
Avenue plantation / park developmentListed in the layout-letter infrastructure itemsProposed; completion not verified
Clubhouse, gym, swimming pool, children’s play areaListed on the promoter’s website/material, not established as a RERA-filed or sanctioned facility in the supplied layout recordPromoter websitePromoter-marketed; completion not verified

7. Utilities, building services & safety

The draft layout letter lists proposed layout services including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits, protected water supply, sumps, underground utility ducting and solid-waste/bio-compost provision. It also refers to culverts and transformer space in the drawing. These are document-listed provisions; the supplied record does not verify their installation, operating capacity or commissioning.

The approval conditions also call for a garbage house, rainwater-harvesting structure and utility/service provision. The promoter’s marketing material mentions borewell water, but the supplied RERA layout documents do not establish the water source or a verified water-supply capacity. No completed-service certifications or safety-clearance documents are included in the supplied material. Promoter website

8. Location, access & connectivity

The registered location is Narsapur A, Narsapur Mandal, Medak District, Telangana, PIN 502313. The layout documents describe the site as Narsapur Village, Narsapur Mandal, Medak District. The supplied cadastral centroid is 17.74243, 78.27507. RERA record RERA filing Cadastral map

The draft plan shows a 30 m wide main road and internal roads of 18.29 m, 12.19 m, 9.14 m and 9 m. A separate location record lists the nearest sampled Outer Ring Road interchange at 23.7 km. Promoter-provided connectivity material states 550 m Narsapur X Roads; 3 km Anamkara Resort; 4 km Urban Forest Park; 6 km Proposed RRR; 25 km ORR Exit 5; these are attributed marketing claims, not independently verified distances in the supplied project record. Location record Promoter website

9. Developer & development status

The registered promoter is ADITI INFRATECH, identified in the filing as a partnership. Its GSTIN is 36ABZFA2451P1ZO. The registered address in the project filing is Flat No. 401, Sai Residency, Plot Nos. 160 & 161, Narsapur, Medak, Telangana 502313. The registration certificate separately records an address at Miyapur, Serilingampally, Ranga Reddy District, PIN 500072. RERA record RERA filing RERA filing

The RERA filing names RAGHUVEER REDDY RAMREDDYGARI as authorized signatory and MANIK REDDY EDLA and MANOJ TALLA as partners; Form B is dated 23 February 2026 and declares completion by 07.01.2029. The supplied material does not report a verified site-progress percentage. Parties record

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA certificateProject P01000010813, ADITI INFRATECH, stated location and survey schedule; validity 07/01/2026–07/01/2029
Layout permission / draft layout letterHMDA Layout Permit 1405/HMDA/SWDL/2026; application/file reference 009894/HMDA/02906/SWDL/MDL1/2025; dated 07/01/2026. The document describes draft layout permission and conditions preceding final layout release
Layout drawingDraft open-plots layout showing land-use schedule, roads, open spaces, utilities, buffers and numbered plots
Promoter Form B declarationForm B affidavit dated 23 February 2026, including promoter declarations on title, encumbrances, project account and completion by 07.01.2029
Completion / occupancy recordNo completion or occupancy certificate is present in the supplied materials

The HMDA layout letter states that the permission is not proof of land title, requires designated roads and areas to be handed over by registered gift deed, and bars construction on plots until final layout is issued. This is a summary of the document’s stated conditions, not confirmation that the conditions have been fulfilled.

Frequently asked questions

Is ADITI INFRATECH registered with Telangana RERA?

Yes. ADITI INFRATECH is registered with the Telangana Real Estate Regulatory Authority as P01000010813; the registration status is New Project.

Who is the developer of ADITI INFRATECH?

The promoter named in the RERA registration is ADITI INFRATECH.

Where is ADITI INFRATECH located?

ADITI INFRATECH is in NARSAPUR, NARSAPUR A, Medak, Telangana (502313).

When will ADITI INFRATECH be completed?

The promoter's proposed date of completion filed with RERA is 07/05/2029. This is the promoter's declaration, not a guarantee.