SAI NEST is a residential apartment project in Balasaraswathi Nagar, Malkajgiri, Medchal-Malkajgiri. The registered promoter is BANURU. The project has a site area of 1,542.66 sq. m and one building with 1 Cellar + Stilt + 5 Upper Floors, comprising 40 2BHK homes. It is registered under TG-RERA number P02200010954, and the proposed completion date is 12 May 2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SAI NEST RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Registered scope is recorded as one building; no separate phase name is disclosed. RERA record |
| TG-RERA registration | P02200010954 RERA record |
| Registration validity | 12/05/2026 to 12/05/2029; the certificate states a three-year term, subject to any extension by the Authority. This is registration validity, not the completion deadline. RERA record |
| Registered promoter | BANURU in the project identity record; the Form C certificate names BANURU RAGHAVENDER, and the Form B declaration is signed by Raghavendra Banuru. RERA record Corporate record |
| RERA status | Recorded as a New Project; registration certificate is filed. RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / street | Balasaraswathi Nagar; project address records Malkajigiri Municipality. RERA record RERA filing |
| Revenue village | B S Nagar in the project identity record; approval and title documents also describe the locality/village as Balasaraswathi Nagar or Malkajgiri Village (Balasaraswathi Nagar). RERA record Land records |
| Mandal / district / PIN | Malkajgiri / Medchal-Malkajgiri / 500047. RERA record RERA filing |
| Project survey numbers | 501 and 509; no subdivision numbers are disclosed in the project identity record. RERA record Land records |
| Plot numbers | 49, 50, 51, 58, 59, 60, 65, 66 and 67. RERA filing |
| Registered site extent | The registration record gives 1,542.66 sq. m total area, 181.51 sq. m affected by road widening and 1,361.15 sq. m net area. RERA filing |
| Boundaries | East and north: neighbours’ houses; west: 25 feet wide road; south: existing 40 feet wide road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Building permit documents are issued by Malkajgiri Municipal Corporation; the filed plan record identifies GHMC as authority. Approvals record |
| Principal building approval | 0093/MMC/SWBP/MKG1/2026, approved 12/05/2026. RERA record Approvals record |
| Revised-plan file number | 016680/MMC/00284/SWBP/MKG1/2026-REV. Approvals record |
| Building count and floors | One residential apartment building: 1 Cellar + Stilt + 5 Upper Floors. RERA record |
| Approved built-up area | 3,802.50 sq. m is recorded as net BUA after alteration; the filed plan also lists 1,968.6 sq. m proposed BUA excluding parking and 2,654.91 sq. m including parking. These are distinct plan figures. RERA filing |
| Parking provision in plan | 34.00 car parking spaces are listed in the revised plan; parking is provided at cellar and stilt levels. |
| Unit count | 40 dwelling units in the building permit; the project filing records 40 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 40 units. RERA unit table RERA unit table |
| RERA-filed saleable area | 105.62 sq. m per unit. RERA unit table RERA unit table |
| Booked / available | Portal-derived record shows 0 booked / 40 available; no as-of date is supplied, so counts are indicative. RERA unit table |
| Construction stage | Project is registered as a new project; the supplied documents do not establish current construction progress or independently verified site status. RERA record Document index |
| Completion deadline | Promoter’s Form B declares completion by 12 May 2029; the building permit also says construction is to be completed before 12/05/2029. |
| Occupancy / completion certificate | No completion certificate or occupancy certificate is recorded in the supplied project documents. |
2. The project story
SAI NEST is a single-building residential apartment project registered under TG-RERA number P02200010954. The filed location is B S Nagar, Malkajgiri, Medchal-Malkajgiri, PIN 500047, on Survey Nos. 501 and 509, covering Plot Nos. 49, 50, 51, 58, 59, 60, 65, 66, 67. RERA record
The revised building permit describes one building with a cellar and stilt for parking and five upper residential floors, with 40 dwelling units. The RERA unit record lists the homes as 2BHK. The record establishes approval and registration, but the supplied evidence does not verify how much construction has actually been completed on site. The promoter’s stated completion date is 12 May 2029; no occupancy or completion certificate is supplied. RERA unit table
3. Master plan, architecture & building design
The building permit records a gross plot area of 1,542.66 sq. m, a road-affected area of 181.51 sq. m, and a net plot area of 1,361.15 sq. m. It lists proposed coverage of 852.23 sq. m (63%) and vacant plot area of 499.85 sq. m. The building is sanctioned as one residential apartment building with 1 Cellar + Stilt + 5 Upper Floors.
Area figures in the filed plan are not interchangeable: it lists proposed BUA excluding parking of 1,968.6 sq. m, proposed BUA including parking of 2,654.91 sq. m, and net BUA after alteration of 3,802.50 sq. m. The project record also lists approved built-up area as 3,802.50 sq. m. The supplied information does not provide a separate FSI-counted area, carpet-area schedule by drawing, or a complete floor-by-floor unit arrangement. RERA filing
The plan identifies a tot-lot, green strip, sump, rainwater-harvesting structure, transformer space, garbage house, lift and fire-escape staircase. It does not provide a documented count of lifts, stairs beyond the listed fire-escape staircase, or detailed circulation and landscape drawings in the supplied extract.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 105.62 sq. m | 59.0–69.0 sq. m; median 62.6 sq. m (software-measured) | 41% |
RERA records the 2BHK configuration, unit count and saleable area. The booked/available figures are portal-derived and supplied without an as-of date. RERA unit table RERA unit table
The carpet-area range and median were measured by software from the approved floor-plan drawing geometry; 24 flat designs were measured and the results are marked as needing review. They are not RERA-filed carpet-area disclosures and should be checked against the drawing. The RERA saleable area is a separate filed figure and includes a different area basis; the supplied data does not provide a verified breakdown of unit carpet, balcony/utility and common-area loading. Floor plans RERA unit details
The drawing-derived sample includes a living/dining area, kitchen, two bedrooms, toilets and a balcony. One extracted room schedule lists dimensions for flat 05 on the second-floor plan, including a balcony measured at 3.22 sq. m; these are drawing measurements, not RERA area disclosures. RERA unit details
5. Parking & vehicle circulation
The revised plan includes cellar and stilt parking and lists 34.00 car parking spaces. A separate plan figure records 1,502.78 sq. m proposed parking area, with 867.29 sq. m at basement level and 761.52 sq. m at stilt level in the building-permit extract; the same extract also lists total parking area of 1,628.81 sq. m. These are the figures as recorded in the supplied plan extracts.
The permit condition says the applicant shall provide 1 car parking for every flat and that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. It also requires EV charging infrastructure in building parking areas. The supplied evidence does not establish visitor-space counts beyond the plan’s area entries, individual unit parking allocations, accessible spaces, two-wheeler counts, ramp details, or whether any drawn bay is allocated to a particular buyer.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | Tot-lot recorded as 81.0 sq. m; plan conditions also require it to be fenced and maintained as greenery. | Sanctioned / required; no completion evidence supplied. | |
| Trees | 60 trees listed in the building-permit extract. | Plan-listed; no independent completion verification supplied. | |
| Green strip | Peripheral greenery is identified in the plan and its conditions. | Required by plan; no completion evidence supplied. | |
| Rainwater harvesting | 8 rainwater-harvesting pits listed in the building-permit extract; the revised plan also requires a percolation pit. | Sanctioned / required; no completion evidence supplied. | |
| Lift and fire-escape staircase | Listed among building services and plan features. | Plan-listed; no completion evidence supplied. |
The vendor record lists a swimming pool, gym, children’s play area, clubhouse, power backup, treated water supply, security, CCTV and other facilities. These are third-party listing claims, not established as sanctioned or delivered by the supplied TG-RERA documents, and are not treated as confirmed project facilities here. Promoter website
7. Utilities, building services & safety
The building permit identifies a sump, transformer space, garbage house, rainwater-harvesting provision, lift and fire-escape staircase. It also lists water supply, sewerage, storm-water drains, treatment/disposal of sewage and sullage water, water conservation, energy management, and electrical meter/substation/receiving-station provision as available in the RERA amenities record; progress is shown as 0% for the listed items. This is a filed status, not independent confirmation of completed services. RERA amenities
The permit conditions require fire-safety installations and an occupancy Fire NOC before issue of the occupancy certificate. They also require a garbage house, rainwater-harvesting structure and transformer space. No supplied record establishes water-source capacity, storage capacity, STP capacity or operation, backup-power capacity, lift count or capacity, CCTV/access-control installation, or completed accessibility provisions.
8. Location, access & connectivity
The registered project location is B S Nagar, Malkajgiri, Medchal-Malkajgiri, Telangana 500047; the filed approval and title material also identifies Balasaraswathi Nagar and Malkajgiri Village. The site boundaries identify an existing 40 feet wide road to the south and a 25 feet wide road to the west. The revised building permit refers to existing and proposed road widths, including 12.0 m existing; 20.11 m proposed and 7.62 m existing; 9 m proposed. RERA record RERA filing RERA filing
The supplied location record gives an approximate Outer Ring Road nearest sampled interchange distance of 6.6 km. No verified public-transport, landmark, or travel-time measurements are supplied in the project location data. Location record
9. Developer & development status
The RERA project identity records the promoter as BANURU. The Form C certificate names BANURU RAGHAVENDER, and the Form B declaration is signed by Raghavendra Banuru. The entity type and a verified corporate registration identifier are not disclosed in the supplied identity records. The registration certificate lists the promoter address as House No. 3-5-143/A/35/37, Nampally, Hyderabad, PIN 500001; the project record separately gives a promoter address in Ramkoti, Balasaraswathi Nagar, Malkajgiri. RERA record Corporate record
The promoter’s Form B declares a completion date of 12 May 2029. The building permit sets the same completion deadline and requires construction commencement before 08/11/2026. The supplied records do not establish construction progress, a revised completion date, or an occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P02200010954; valid 12/05/2026–12/05/2029 |
|---|---|
| What the supplied record establishes | Form C certificate for SAI NEST; identifies the project and promoter and states registration conditions. |
| Identifier / date | 0093/MMC/SWBP/MKG1/2026; approved 12/05/2026 |
|---|---|
| What the supplied record establishes | Permit for one residential building with 1 Cellar + Stilt + 5 Upper Floors and 40 dwelling units. |
| Identifier / date | 016680/MMC/00284/SWBP/MKG1/2026-REV |
|---|---|
| What the supplied record establishes | Plan extract records site areas, proposed building parameters, parking and conditions. |
| Identifier / date | Dated 15 May 2026 |
|---|---|
| What the supplied record establishes | Promoter-declared title, encumbrance, project-fund and completion undertakings, including completion by 12 May 2029. |
| Identifier / date | Portal-derived; registration captured 09/09/2026 |
|---|---|
| What the supplied record establishes | Project identity and unit configuration/counts; booking figures have no supplied as-of date. Approvals record RERA unit table |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied records do not establish issuance. Document index |
1. Project at a glance
Project identity
Registered project name: SAI NEST
Project type: Residential apartment project
Phase / registered portion: Registered scope is recorded as one building; no separate phase name is disclosed.
TG-RERA registration: P02200010954
Registration validity: 12/05/2026 to 12/05/2029; the certificate states a three-year term, subject to any extension by the Authority. This is registration validity, not the completion deadline.
Registered promoter: BANURU in the project identity record; the Form C certificate names BANURU RAGHAVENDER, and the Form B declaration is signed by Raghavendra Banuru.
RERA status: Recorded as a New Project; registration certificate is filed.
Land and geographic identity
Locality / street: Balasaraswathi Nagar; project address records Malkajigiri Municipality.
Revenue village: B S Nagar in the project identity record; approval and title documents also describe the locality/village as Balasaraswathi Nagar or Malkajgiri Village (Balasaraswathi Nagar).
Mandal / district / PIN: Malkajgiri / Medchal-Malkajgiri / 500047.
Project survey numbers: 501 and 509; no subdivision numbers are disclosed in the project identity record.
Plot numbers: 49, 50, 51, 58, 59, 60, 65, 66 and 67.
Registered site extent: The registration record gives 1,542.66 sq. m total area, 181.51 sq. m affected by road widening and 1,361.15 sq. m net area.
Boundaries: East and north: neighbours’ houses; west: 25 feet wide road; south: existing 40 feet wide road.
Development identity
Sanctioning authority: Building permit documents are issued by Malkajgiri Municipal Corporation; the filed plan record identifies GHMC as authority.
Principal building approval: 0093/MMC/SWBP/MKG1/2026, approved 12/05/2026.
Revised-plan file number: 016680/MMC/00284/SWBP/MKG1/2026-REV.
Building count and floors: One residential apartment building: 1 Cellar + Stilt + 5 Upper Floors.
Approved built-up area: 3,802.50 sq. m is recorded as net BUA after alteration; the filed plan also lists 1,968.6 sq. m proposed BUA excluding parking and 2,654.91 sq. m including parking. These are distinct plan figures.
Parking provision in plan: 34.00 car parking spaces are listed in the revised plan; parking is provided at cellar and stilt levels.
Unit count: 40 dwelling units in the building permit; the project filing records 40 units.
Offering and status
RERA-filed configuration: 2BHK, 40 units.
RERA-filed saleable area: 105.62 sq. m per unit.
Booked / available: Portal-derived record shows 0 booked / 40 available; no as-of date is supplied, so counts are indicative.
Construction stage: Project is registered as a new project; the supplied documents do not establish current construction progress or independently verified site status.
Completion deadline: Promoter’s Form B declares completion by 12 May 2029; the building permit also says construction is to be completed before 12/05/2029.
Occupancy / completion certificate: No completion certificate or occupancy certificate is recorded in the supplied project documents.
2. The project story
SAI NEST is a single-building residential apartment project registered under TG-RERA number P02200010954. The filed location is B S Nagar, Malkajgiri, Medchal-Malkajgiri, PIN 500047, on Survey Nos. 501 and 509, covering Plot Nos. 49, 50, 51, 58, 59, 60, 65, 66, 67.
The revised building permit describes one building with a cellar and stilt for parking and five upper residential floors, with 40 dwelling units. The RERA unit record lists the homes as 2BHK. The record establishes approval and registration, but the supplied evidence does not verify how much construction has actually been completed on site. The promoter’s stated completion date is 12 May 2029; no occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The building permit records a gross plot area of 1,542.66 sq. m, a road-affected area of 181.51 sq. m, and a net plot area of 1,361.15 sq. m. It lists proposed coverage of 852.23 sq. m (63%) and vacant plot area of 499.85 sq. m. The building is sanctioned as one residential apartment building with 1 Cellar + Stilt + 5 Upper Floors.
Area figures in the filed plan are not interchangeable: it lists proposed BUA excluding parking of 1,968.6 sq. m, proposed BUA including parking of 2,654.91 sq. m, and net BUA after alteration of 3,802.50 sq. m. The project record also lists approved built-up area as 3,802.50 sq. m. The supplied information does not provide a separate FSI-counted area, carpet-area schedule by drawing, or a complete floor-by-floor unit arrangement.
The plan identifies a tot-lot, green strip, sump, rainwater-harvesting structure, transformer space, garbage house, lift and fire-escape staircase. It does not provide a documented count of lifts, stairs beyond the listed fire-escape staircase, or detailed circulation and landscape drawings in the supplied extract.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 105.62 sq. m | 59.0–69.0 sq. m; median 62.6 sq. m (software-measured) | 41% |
RERA records the 2BHK configuration, unit count and saleable area. The booked/available figures are portal-derived and supplied without an as-of date.
The carpet-area range and median were measured by software from the approved floor-plan drawing geometry; 24 flat designs were measured and the results are marked as needing review. They are not RERA-filed carpet-area disclosures and should be checked against the drawing. The RERA saleable area is a separate filed figure and includes a different area basis; the supplied data does not provide a verified breakdown of unit carpet, balcony/utility and common-area loading.
The drawing-derived sample includes a living/dining area, kitchen, two bedrooms, toilets and a balcony. One extracted room schedule lists dimensions for flat 05 on the second-floor plan, including a balcony measured at 3.22 sq. m; these are drawing measurements, not RERA area disclosures.
5. Parking & vehicle circulation
The revised plan includes cellar and stilt parking and lists 34.00 car parking spaces. A separate plan figure records 1,502.78 sq. m proposed parking area, with 867.29 sq. m at basement level and 761.52 sq. m at stilt level in the building-permit extract; the same extract also lists total parking area of 1,628.81 sq. m. These are the figures as recorded in the supplied plan extracts.
The permit condition says the applicant shall provide 1 car parking for every flat and that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. It also requires EV charging infrastructure in building parking areas. The supplied evidence does not establish visitor-space counts beyond the plan’s area entries, individual unit parking allocations, accessible spaces, two-wheeler counts, ramp details, or whether any drawn bay is allocated to a particular buyer.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | Tot-lot recorded as 81.0 sq. m; plan conditions also require it to be fenced and maintained as greenery. | Sanctioned / required; no completion evidence supplied. | |
| Trees | 60 trees listed in the building-permit extract. | Plan-listed; no independent completion verification supplied. | |
| Green strip | Peripheral greenery is identified in the plan and its conditions. | Required by plan; no completion evidence supplied. | |
| Rainwater harvesting | 8 rainwater-harvesting pits listed in the building-permit extract; the revised plan also requires a percolation pit. | Sanctioned / required; no completion evidence supplied. | |
| Lift and fire-escape staircase | Listed among building services and plan features. | Plan-listed; no completion evidence supplied. |
The vendor record lists a swimming pool, gym, children’s play area, clubhouse, power backup, treated water supply, security, CCTV and other facilities. These are third-party listing claims, not established as sanctioned or delivered by the supplied TG-RERA documents, and are not treated as confirmed project facilities here.
7. Utilities, building services & safety
The building permit identifies a sump, transformer space, garbage house, rainwater-harvesting provision, lift and fire-escape staircase. It also lists water supply, sewerage, storm-water drains, treatment/disposal of sewage and sullage water, water conservation, energy management, and electrical meter/substation/receiving-station provision as available in the RERA amenities record; progress is shown as 0% for the listed items. This is a filed status, not independent confirmation of completed services.
The permit conditions require fire-safety installations and an occupancy Fire NOC before issue of the occupancy certificate. They also require a garbage house, rainwater-harvesting structure and transformer space. No supplied record establishes water-source capacity, storage capacity, STP capacity or operation, backup-power capacity, lift count or capacity, CCTV/access-control installation, or completed accessibility provisions.
8. Location, access & connectivity
The registered project location is B S Nagar, Malkajgiri, Medchal-Malkajgiri, Telangana 500047; the filed approval and title material also identifies Balasaraswathi Nagar and Malkajgiri Village. The site boundaries identify an existing 40 feet wide road to the south and a 25 feet wide road to the west. The revised building permit refers to existing and proposed road widths, including 12.0 m existing; 20.11 m proposed and 7.62 m existing; 9 m proposed.
The supplied location record gives an approximate Outer Ring Road nearest sampled interchange distance of 6.6 km. No verified public-transport, landmark, or travel-time measurements are supplied in the project location data.
9. Developer & development status
The RERA project identity records the promoter as BANURU. The Form C certificate names BANURU RAGHAVENDER, and the Form B declaration is signed by Raghavendra Banuru. The entity type and a verified corporate registration identifier are not disclosed in the supplied identity records. The registration certificate lists the promoter address as House No. 3-5-143/A/35/37, Nampally, Hyderabad, PIN 500001; the project record separately gives a promoter address in Ramkoti, Balasaraswathi Nagar, Malkajgiri.
The promoter’s Form B declares a completion date of 12 May 2029. The building permit sets the same completion deadline and requires construction commencement before 08/11/2026. The supplied records do not establish construction progress, a revised completion date, or an occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P02200010954; valid 12/05/2026–12/05/2029 |
|---|---|
| What the supplied record establishes | Form C certificate for SAI NEST; identifies the project and promoter and states registration conditions. |
| Identifier / date | 0093/MMC/SWBP/MKG1/2026; approved 12/05/2026 |
|---|---|
| What the supplied record establishes | Permit for one residential building with 1 Cellar + Stilt + 5 Upper Floors and 40 dwelling units. |
| Identifier / date | 016680/MMC/00284/SWBP/MKG1/2026-REV |
|---|---|
| What the supplied record establishes | Plan extract records site areas, proposed building parameters, parking and conditions. |
| Identifier / date | Dated 15 May 2026 |
|---|---|
| What the supplied record establishes | Promoter-declared title, encumbrance, project-fund and completion undertakings, including completion by 12 May 2029. |
| Identifier / date | Portal-derived; registration captured 09/09/2026 |
|---|---|
| What the supplied record establishes | Project identity and unit configuration/counts; booking figures have no supplied as-of date. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied records do not establish issuance. |
Frequently asked questions
Is SAI NEST registered with Telangana RERA?
Yes. SAI NEST is registered with the Telangana Real Estate Regulatory Authority as P02200010954; the registration status is New Project.
Who is the developer of SAI NEST?
The promoter named in the RERA registration is BANURU.
Where is SAI NEST located?
SAI NEST is in Malkajigiri Municipality, B S Nagar, Malkajgiri, Medchal-Malkajgiri, Telangana (500047).
When will SAI NEST be completed?
The promoter's proposed date of completion filed with RERA is 12/09/2029. This is the promoter's declaration, not a guarantee.