SAI SRINIVASAM is a residential apartment project in Vivek Nagar, Jillelaguda, Balapur Mandal, Ranga Reddy District, developed by registered promoter SIRI SAMPADA HOMES. The project has a site area of 735.65 m² and one building with 20 2BHK units. It is registered under TG-RERA number P02400000928, with a proposed completion date of 21/06/2022.

More from Siri Sampada Homes · 12 projects →

01What we found

Period endedTG-RERA registration ran to 21 Jun 2022 - check its extension on TG-RERA
7documents on file - each fact links to its page
1court case on this project's land (survey 89, 90, Jillelaguda)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered project nameSAI SRINIVASAM
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied records; registration is for the project at the listed site
TG-RERA registrationP02400000928, issued 22/06/2019; valid for three years, through 21/06/2022
Registered promoterSIRI SAMPADA HOMES, a partnership RERA record Corporate record
RERA statusRegistration certificate records the stated validity period. No extension is recorded in the supplied certificate; current registration status is not independently verified here.

Land and geographic identity

FieldProject record
LocalityVivek Nagar; RERA certificate identifies the project location as Jillelaguda, Balapur RERA record
Revenue villageJillelaguda RERA record Land records
Mandal / district / PINBalapur / Ranga Reddy / 500097 RERA record
Survey numbersSy. Nos. 89 and 90; no subdivision is stated in the supplied project records
Plot numbers53, 54, 70 and 71
Site area735.65 m² total; 16.68 m² road-affected area; 718.97 m² net area
Boundaries recorded in the RERA filingEast: 25 FT WIDE ROAD; West: 30 FT WIDE ROAD; North: 30 FT WIDE ROAD; South: PLOT NO 52 AND 72 RERA record

Development identity

FieldProject record
Sanctioning authorityJillelguda Municipality; the building-permission record follows HMDA technical approval
Principal building approvalB.A.No. 906/2019-20, approved 21/05/2019
Technical approval008840/SMD/R1/U6/HMDA/24022018, dated 24/02/2018
Approved built-up area2,145.24 m², identified in the RERA filing as approved built-up area RERA record
Building countOne building is recorded in the RERA filing RERA record
Floor configuration recorded in the approval extractionGround: residential apartment; Stilt: commercial. The supplied extraction does not set out a complete floor-by-floor schedule.
Stilt area / building heightStilt area: 357.54 m²; height: 14.95 m
Units20 units in the RERA filing; the supplied building-permission extraction does not give an approved unit count for comparison RERA unit table

Offering and status

FieldProject record
Unit type2BHK RERA unit table
RERA-filed saleable area340.2 m² per unit RERA unit table
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so these figures are indicative RERA unit table
RERA-filed completion undertaking21/06/2022
Registration validity22/06/2019–21/06/2022; this is the registration period, not a statement of current completion or occupancy status
Construction stageNo independently verified site-progress record is supplied. RERA amenity entries show 0% progress for the listed items; this is not a verified overall construction-progress measure. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents; certificate status has not been independently verified. Document index

The project story

  • SAI SRINIVASAM is recorded with TG-RERA as a residential apartment project on Plot Nos. 53, 54, 70 and 71 in Sy. Nos. 89 and 90, Jillelaguda Village, Balapur Mandal, Ranga Reddy District. The RERA record identifies one building and 20 proposed 2BHK units. RERA record RERA unit table
  • The building-permission extraction describes a ground-level residential apartment and a stilt level labelled commercial, with a sanctioned height of 14.95 m. The record gives a 21/06/2022 promoter completion undertaking and a registration period ending that day. Neither establishes present construction completion or occupancy certification. No independently verified construction-stage evidence is supplied.

Master plan, architecture & building design

  • The RERA-filed site area is 735.65 m², including a 16.68 m² road-affected portion; the recorded net area is 718.97 m². The building-permission extraction records 2,145.24 m² for the ground residential apartment and 357.54 m² for the stilt area, and states a building height of 14.95 m. These are approval-record figures; no FSI-counted area, gross built-up-area breakdown, or carpet-area schedule is supplied. RERA record
  • One building is recorded, but the available extraction does not establish a complete floor schedule, flats per floor, lifts, stairs, building footprint, or residential/commercial/common-area distribution beyond the ground-residential and stilt-commercial labels. It lists four rainwater-harvesting structures and eight trees. The building-permission record also requires periphery planting and maintenance of a greenery strip. RERA record

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020340.2 m²Not measured in supplied drawingsNot supplied

Unit counts, booking figures and saleable area are from the TG-RERA filing; the portal record does not provide an as-of date for booking availability. The two supplied floor-plan drawings are scans pending measurement, so no software-measured carpet area or room dimensions are available. Saleable area and carpet area are different measures; no carpet-area or loading figure is established by this evidence. RERA unit table RERA unit details Floor plans

Parking & vehicle circulation

The supplied project records do not establish sanctioned parking counts, visitor or accessible spaces, parking allocation to individual units, or vehicle-circulation arrangements. The approval extraction identifies a stilt level but does not state that it is a parking level or specify parking capacity. Document index

Amenities, recreation & open spaces

The TG-RERA amenity record lists the following items. The listed progress values are 0%; they do not establish independent site inspection or completion status.

Clubhouse / indoor
Description / sizeNo clubhouse or indoor facility specified in the supplied record
Evidence sourceRERA amenities
Declared progress / verified statusNot disclosed
Sports / recreation
Description / sizeGreen Strip/TOT LOT/Park; no area or quantity stated
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified
Landscape / open space
Description / sizeAggregate area of recreational open space; no area stated. The building-permission extraction lists 08 trees and requires periphery planting and maintenance of a greenery strip.
Evidence sourceRERA amenities
Declared progress / verified statusAmenity progress 0%; tree and landscape completion not independently verified
Convenience / community
Description / sizeCommunity buildings; no facility description or size stated
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified

Utilities, building services & safety

  • The RERA amenity schedule identifies water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire-protection and fire-safety requirements, and an electrical meter room/substation/receiving station. It does not provide system capacities, detailed designs, or evidence of completed installation. Listed amenity progress is 0%, except that the form records “YES” for water supply, storm-water drains, rainwater harvesting and the electrical meter room/substation/receiving station; these entries are not independent verification of operational status. RERA amenities
  • The building-permission extraction specifies four rainwater-harvesting structures and includes a rainwater-harvesting structure (percolation pit) condition. It does not specify water source or storage capacity, an STP design or reuse capacity, backup power, lift provision, fire-system details, waste-security arrangements, or accessibility features.

Location, access & connectivity

The registered project location is Vivek Nagar, Jillelaguda Village, Balapur Mandal, Ranga Reddy District, Telangana, PIN 500097. The recorded site boundaries include 25 FT WIDE ROAD to the east and 30 FT WIDE ROAD to the west and north. RERA record

The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 10.2 km. No public-transport details or other measured landmark distances are supplied. Location record

Developer & development status

  • The registered promoter is SIRI SAMPADA HOMES, identified as a partnership in the RERA filing. Its recorded GSTIN is 36ACBFS6025Q1ZO. The filing lists the promoter address as Rakesh Complex, Hastinapuram, Opp Heritage, Vivek Nagar, Balapur, Ranga Reddy, 500097. Corporate record RERA record
  • The RERA Form B declaration records the promoter’s completion undertaking as 21/06/2022 and its declaration that 70% of amounts realised would be deposited in a separate scheduled-bank account for construction and land cost. The supplied declaration’s title basis is stated in alternatives, and its place and date fields are blank. These are promoter declarations, not independently verified completion or financial-performance evidence.

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for SAI SRINIVASAM, P02400000928, issued 22/06/2019; stated validity through 21/06/2022
Building permissionBuilding-permission order B.A.No. 906/2019-20, Jillelguda Municipality, approved 21/05/2019
Technical approval008840/SMD/R1/U6/HMDA/24022018, dated 24/02/2018
Project site and building detailsApproval extraction records Sy. Nos. 89 and 90; Plot Nos. 53, 54, 70 and 71; site area, affected area, net area, building areas, height, setbacks and conditions
Promoter declarationRERA Form B declaration by SIRI SAMPADA HOMES, with completion and separate-account undertakings
Occupancy / completion certificateNot included in the supplied document set; current certificate status is not established here Document index
Layout-plan recordA layout-plan upload entry is present, but its document is not extracted in the supplied evidence Document index

The supplied approval extraction records that the permission does not confer ownership rights and includes conditions concerning compliance with the sanctioned plan, rainwater harvesting, greenery, road-affected land surrender, and registration of mortgaged built-up area only after an occupancy certificate is produced.

Frequently asked questions

Is SAI SRINIVASAM registered with Telangana RERA?

Yes. SAI SRINIVASAM is registered with the Telangana Real Estate Regulatory Authority as P02400000928; the registration status is New Project.

Who is the developer of SAI SRINIVASAM?

The promoter named in the RERA registration is SIRI SAMPADA HOMES.

Where is SAI SRINIVASAM located?

SAI SRINIVASAM is in VIVEK NAGAR, Jillelaguda, Balapur, Rangareddy, Telangana (500097).

When will SAI SRINIVASAM be completed?

The promoter's proposed date of completion filed with RERA is 21/06/2022. This is the promoter's declaration, not a guarantee.

More projects in Jillelaguda