MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS is a plotted development with open plots in VISHNUPURI VENKATADRI NAGAR, KAZIPET MANDAL, HANUMAKONDA DISTRICT. The registered promoter is MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS. The layout covers 21,699.39 sq m and provides for 77 plots; no building count, floors or plot configurations are stated. It is registered with TG-RERA under P00300009200, with a promoter-declared completion date of 07/08/2026.

01What we found

Period endedTG-RERA registration ran to 7 Aug 2026 - check its extension on TG-RERA
26documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS RERA record
Project typePlotted development / layout with open plots RERA record RERA filing
Phase / registered portionNo separate phase is identified in the supplied record; the registered development is the layout RERA record
TG-RERA registrationP00300009200 RERA record
Registration validity07/08/2024–07/08/2026; this is the registration period, not the project completion or occupancy status RERA record
Registered promoterMY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS RERA record RERA filing
RERA statusThe supplied certificate records registration. The evidence snapshot lists its validity through 07/08/2026; no extension order is supplied. Approvals record

Land and geographic identity

FieldProject record
LocalityVISHNUPURI VENKATADRI NAGAR in the layout-plan extraction; the RERA header identifies the locality as GWMC MANDAL. RERA record
Revenue villageSOMIDI VILLAGE / SOMIDI Revenue Village
MandalKAZIPET MANDAL in the layout-plan extraction; GWMC Mandal in the tentative-layout approval.
DistrictHANUMAKONDA DISTRICT in the layout-plan extraction; Warangal(Urban) District in the tentative-layout approval.
PIN506003 in the RERA project record RERA record
Survey numbers and subdivisions166/F/1, 166/F/2, 166/F/3, 166/G, 167/A/1, 167/A/2, 171/B/1/1, 171/B/1/2, 171/B/1/3, 171/B/2/1, 171/B/2/2, 171/B/3, 171/B/5/1, 171/B/5/2, 171/B/6, 171/B bifurcated as 171/B/7, 171/B/9, 171/B/10, 171/B/11, 172/C1, 172/C3 RERA record
Site extent21,699.39 sq m; the tentative-layout approval also states 5 Acer 14.48 Gts / 25,953 Sq. Yds. RERA filing
Road-affected area2,049.58 sq m RERA filing
Net area19,649.81 sq m RERA filing
BoundariesEast: APPROVED KUDA LAYOUT; West: LAND OF OTHERS; North: ROAD; South: FCI GODOWNS. RERA filing

Development identity

FieldProject record
Sanctioning authorityLayout application identifies TS-DTCP; tentative layout approval is issued by GWMC Municipality/Municipal Corporation. Approvals record
Principal approvalTentative layout plan No. 0385/LO/3006/2024, approved 07 August 2024; application No. 007579/LO/DTCP/3006/0270/2023.
Other filed plan identifier007579/LO/DTCP/3006/0270/2023 RERA record
Approved built-up area0.00 proposed built-up area, both excluding and including parking, in the layout-plan parameters; this is a plotted layout.
Buildings / floorsNo building count or building floor configuration is established in the supplied layout evidence.
Approved plot count77 individual plots
RERA-declared plot count77 plots are identified in the filed layout materials.

Offering and status

FieldProject record
Unit typeOpen plots RERA record
Plot sizesThe layout drawing’s plot schedule was software-read as 77 plots, ranging from 93.32 sq m to 688.72 sq m; these are drawing-derived measurements, not a RERA unit schedule. Layout record
Booked / availableNot established by the supplied evidence.
Construction stageThe RERA filing identifies a new project and records a promoter undertaking to complete by 07/08/2026; a current, independently verified site-progress report is not supplied. RERA record
Completion deadlinePromoter-declared completion date: 07/08/2026. The tentative layout conditions also set a two-year infrastructure-and-amenities completion period from approval on 07 August 2024, with a stated possible extension subject to request and payment.
Occupancy / completion certificateNot applicable as an apartment-building OC on the supplied evidence; no final layout release or layout completion certificate is supplied.

2. The project story

This is a plotted layout registered with TG-RERA as MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS, under registration P00300009200. The filed layout materials describe land in Somidi Revenue Village and provide for 77 individual plots, internal roads, park/open space, social infrastructure and utility land. The tentative layout plan is identified as 0385/LO/3006/2024. RERA record

The promoter’s Form B declares completion by 07/08/2026. The layout approval conditions place responsibility for infrastructure and amenity works on the layout applicant and specify a two-year period from the 07 August 2024 approval. Those are declared/approval-record timelines, not independent verification that construction or site works have reached a particular stage.

3. Master plan, architecture & building design

The layout drawing records a total site area of 21,699.39 sq m, a road-affected area of 2,049.58 sq m, and a net layout area of 19,649.81 sq m. It provides for 77 plots and records no proposed built-up area. This is a plotted layout rather than a building plan; the supplied evidence does not establish building footprints, floor levels, tower heights, lifts or apartment arrangements. Layout record

Layout componentAreaShare stated in plan
Plotted area12,964.13 sq m65.98%
Roads4,222.56 sq m21.49%
Organized open space / park1,773.21 sq m9.02%
Social infrastructure492.36 sq m2.51%
Utility area197.49 sq m1.01%
Amenity area0.00 sq m0.00%

The approval material specifies road widths including 9.14M, 12.19M, 14.19M and proposed 80'-0" and 60'-0" roads; it also identifies the 12.19MT wide main road as an access road. The drawing lists internal road and open-space allocations, but does not establish the completed condition of these works.

The layout approval records 14 plots—Plot Nos. 14, 13, 12, 11, 10, 9, 8, 1, 2, 3, 4, 5, 6, 7—as mortgaged to the Municipality/Municipal Corporation, with the mortgage deed identified as 15480/2024.

4. Homes, configurations & floor plans

This project offers plots, not apartments. The approved layout-plan material states 77 individual plots. The software-read plot schedule also contains 77 plots with sizes; those measurements are drawing-derived and should be checked against the approved drawing. Layout record

Plot schedule measureDrawing-derived value
Plot count77
Smallest plot93.32 sq m (111.6 sq yd)
Median plot164.85 sq m (197.2 sq yd)
Largest plot688.72 sq m (823.7 sq yd)

Layout record

The plot-size bands read from the drawing are: 8 plots in 100–150 sq yd; 47 in 150–200 sq yd; 17 in 200–250 sq yd; 2 in 250–300 sq yd; 2 in 300–400 sq yd; and 1 in 500–1000 sq yd. These are software-measured drawing categories, not a supplied RERA unit-type schedule. Layout record

No RERA-filed saleable-area schedule, booked/available inventory figures or measured carpet-area data is supplied. The floor-plan record says the two supplied drawing sheets are layout sheets with no flats, so apartment room plans and carpet-area comparisons are not applicable. Floor plans Layout record

5. Parking & vehicle circulation

The layout-plan parameters record 0.00 common parking area. No sanctioned parking-space count, visitor or accessible parking allocation, parking level, vehicle ramp, EV-charging provision or plot-specific parking allocation is established by the supplied evidence.

The layout plan identifies internal roads and road widths, including 12.19MT WIDE MAINROAD (Access Road), and the tentative approval requires roads to remain open for access to neighbouring sites. This describes the approved layout circulation framework; it does not establish the current completed condition of roads.

6. Amenities, recreation & open spaces

The layout drawing reserves land for open space, social infrastructure and utilities. The amenities record identifies several items as available in the RERA amenities fields, but reports 0% progress; no independent completion verification is supplied. The tentative-layout approval also lists infrastructure and site works that the applicant is required to develop. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space1,773.21 sq m; 9.02%RERA amenities field lists Green Strip/TOT LOT/Park as YES, 0%; completion not independently verified. RERA amenities
Social infrastructure492.36 sq m; 2.51%Area reserved in the layout; no completed facility or use is established.
Tot-lotListed in layout amenities/utilitiesReserved/listed; completed status not established.
Internal roads and footpathsRoad area: 4,222.56 sq m; road widths shown on planRERA amenities field lists YES, 0%; no independent completion verification. RERA amenities
Avenue plantationRequired in the tentative layout development worksRequired work; completed status not established.
Community buildingsRERA amenities fieldRERA amenitiesNo availability value or completed status supplied; progress shown as 0%.

The approved layout materials list no separate amenity-area allocation (0.00 sq m); park, social infrastructure and utilities are separately identified.

7. Utilities, building services & safety

The tentative layout approval describes required layout infrastructure: internal water-supply pipelines, an assured water-supply source, an overhead tank and/or sump, a water reservoir, septic tank/common septic tank or STP, underground drainage, storm-water drains, electrical supply lines, street lighting, transformer, solid-waste management, rainwater-harvesting pits and park development. These are approval-condition descriptions, not evidence that each facility has been installed or is operating.

ServiceSupplied evidence
WaterInternal water-supply pipelines, assured water source, reservoir, and overhead tank and/or sump are specified in the tentative layout conditions. Capacity and completed status are not supplied.
Sewerage and drainageUnderground drainage lines, common septic tank and/or STP, and storm-water drains are specified. No capacity or independent completion evidence is supplied.
Electrical and lightingElectrical supply lines, transformer and street lights are specified. No capacity or completed status is supplied.
WasteSolid Waste Management is listed as an amenity; the layout conditions also refer to its provision. Completed status is not established. RERA amenities
Rainwater harvestingRainwater-harvesting pits are specified in the layout conditions; their number and completed status are not supplied.
Fire and life safetyThe supplied layout materials do not establish project-specific fire systems or clearances.
Accessibility and securityNo project-specific accessibility, CCTV or access-control provision is established by the supplied evidence.

8. Location, access & connectivity

The official project record identifies the site with Somidi Revenue Village, district as Warangal Urban in the RERA record, and PIN 506003. The layout-plan extraction identifies locality VISHNUPURI VENKATADRI NAGAR and mandal KAZIPET MANDAL; the tentative-layout approval describes the location as Somidi Revenue Village, GWMC Mandal, Warangal(Urban) District. RERA record

The layout drawing identifies a 12.19MT WIDE MAINROAD (Access Road) and internal roads, and the tentative approval states roads are to remain open for neighbouring-site access. A supplied connectivity record lists Financial District (Nanakramguda) at 1.2 km from a cadastral parcel centroid; the evidence does not establish a travel time or public-transport access. Location record

9. Developer & development status

The registered promoter is MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS, identified in the RERA filing as a partnership. Its RERA-recorded address is SRI NILAYAM, SIDHARTHA NAGAR, SOMIDI, GWMC MANDAL, Warangal Urban, 506003. The supplied corporate document records firm number No: 422 of 2017. RERA record RERA filing Corporate record

The tentative layout application names MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS and AMIGOS CONSTRUCTIONS as applicants. The RERA record identifies MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS as the registered promoter; the supplied evidence does not provide an official project contact or website. RERA record

The promoter’s Form B declares the project completion date as 07/08/2026. The evidence does not include independently verified construction progress, a current site report or booked/available plot counts.

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP00300009200; valid 07/08/2024 to 07/08/2026
What the supplied document establishesRegistration, promoter, listed land identity and stated registration conditions.
Layout application / plan record
Identifier / date007579/LO/DTCP/3006/0270/2023
What the supplied document establishesFiled layout-plan identifier and site/layout information.
Tentative layout approval
Identifier / date0385/LO/3006/2024, 07 August 2024
What the supplied document establishesGWMC tentative layout approval for 77 plots, with land-use allocations and development conditions.
Mortgage deed referenced in tentative approval
Identifier / date15480/2024, 12 July 2024
What the supplied document establishesApproval document identifies 14 plots mortgaged to the Municipality/Municipal Corporation.
Form B declaration
Identifier / dateCompletion undertaking: 07/08/2026
What the supplied document establishesPromoter affidavit with title, encumbrance and project-compliance declarations.
Final layout release / completion record
Identifier / dateNot supplied
What the supplied document establishesNo final layout release or completed-layout certificate is included in the supplied documents.

The registration certificate, layout-plan drawing, tentative layout approval and promoter declaration are the key supplied records for this overview. The tentative approval expressly states that layout approval is not proof of land title.

Frequently asked questions

Is MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS registered with Telangana RERA?

Yes. MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P00300009200; the registration status is New Project.

Who is the developer of MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS?

The promoter named in the RERA registration is MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS.

Where is MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS located?

MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS is in GWMC MANDAL, Hanamkonda, Telangana (506003).

When will MY HOME DREAMS INFRASTRUCTURES AND DEVELOPERS be completed?

The promoter's proposed date of completion filed with RERA is 07/08/2026. This is the promoter's declaration, not a guarantee.