Sign in

Jubilee Mangalam A

JUBILEE CONSTRUCTIONS · Hanamkonda · RERA P00300004813

JUBILEE MANGALAM A is a residential apartment project in SHAYAMPET, Hanamkonda mandal, Warangal Urban district. The registered promoter is Jubilee Constructions. The project records 313.54 sq m of land, one residential building with 1 Stilt + 5 upper floors, and 10 2BHK apartments. Its TG-RERA registration number is P00300004813, and its proposed completion date is 27/12/2024.

More from Jubilee Constructions · 8 projects →

01What we found

Period endedTG-RERA registration ran to 27 Dec 2024 - check its extension on TG-RERA
16documents on file - each fact links to its page
3court cases on this project's land (survey 9, 14, 15, Shayampet)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameJUBILEE MANGALAM A. RERA record
Project type / phaseResidential apartment project; registered phase or portion is not separately identified in the supplied record. RERA record
TG-RERA registrationP00300004813. The certificate states validity from 01/08/2022 through 27/12/2024; no extension is recorded in the supplied certificate extract. Registration validity is not the same as the project’s completion deadline. RERA record
Registered promoterJubilee Constructions (also named M/s. JUBILEE CONSTRUCTIONS in filed documents); entity type: Partnership. RERA record RERA filing Corporate record
RERA-record statusThe supplied registration certificate records the project as registered under the number above. Its stated validity ended on 27/12/2024; current registration status is not established by the supplied certificate. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageLocality: SHAYAMPET; revenue village in the land/title records: Shayampet Jagir Revenue (V). The approval document also identifies HANAMKONDA. RERA record Land records
Mandal / district / PINHanamkonda / Warangal Urban / 506319. RERA record RERA filing
Project survey numbersSurvey Nos. 8, 9, 14 and 15. No subdivisions are disclosed in the supplied project identity. RERA record Land records
Registered site extentRERA land details record 313.54 sq m total and net area. The building approval records site area and net area as 313.41 m². RERA filing
Boundaries filed with RERAEast: project under development by Jubilee Constructions; west: road; north: open plot of Mr Krishna Reddy; south: project under development by Jubilee Construction. RERA filing

Development identity

ItemProject record
Sanctioning authorityBuilding approval identifies GWMC Municipality/Municipal Corporation; the RERA project record lists DTCP as authority. Approvals record
Principal approvalBuilding approval 0064/BP/3006/2021, dated 27 December, 2021. Approvals record
Approved building configurationOne residential building; approval states 1 Stilt + 5 upper floors.
Approved areas stated in the building approvalResidential area: 867.10 m2; stilt area: 159.55 m2; cellar area: 0.00 m2; approved built-up area in the RERA project fields: 313.41 sq m. These are the figures as labelled in their respective records. RERA filing
UnitsBuilding approval records 1 total building unit and 1 proposed building unit as per agreement; the TG-RERA unit inventory records 10 apartments. RERA filing RERA unit table
ParkingParking count and allocation are not established by the supplied extracts. The approval records a 90.43 m² second-floor area as handed over/mortgaged; this is not a parking disclosure. RERA unit table

Offering and status

ItemProject record
Configuration2BHK, 10 units. RERA unit table RERA unit details
RERA-filed saleable area99.87 sq m per unit. RERA unit table RERA unit table
Booking / availabilityTG-RERA portal data supplied records 0 booked and 10 available. The portal extract has no as-of date, so counts are indicative. RERA unit table
Completion deadlinePromoter’s Form B declares completion by 27.12.2024; the RERA project record gives proposed completion date 27/12/2024. RERA record
Construction stageNo independently verified construction stage is supplied. The RERA amenity entries show 0% progress for the listed items; that is portal-reported data, not an independent site inspection. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. The status is therefore not established from this evidence. Document index

2. The project story

JUBILEE MANGALAM A is a RERA-registered residential apartment project on land identified in the project records as Survey Nos. 8, 9, 14 and 15 in Shayampet, Hanamkonda, Warangal Urban. The building approval describes one residential building, with one stilt level and five upper floors. RERA record Land records

The offering recorded in the TG-RERA inventory is ten 2BHK apartments. The promoter’s Form B sets a completion undertaking of 27.12.2024, but the supplied material does not establish current construction progress or completion. No occupancy or completion certificate is included, so no portion can be described here as occupancy-certified. RERA unit table Document index

3. Master plan, architecture & building design

The building-construction approval describes a residential building at Survey Nos. 8, 9, 14 and 15, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. It records a residential area of 867.10 m2, stilt area of 159.55 m2, and cellar area of 0.00 m2. The RERA project fields separately state approved built-up area of 313.41 sq mts; the figures are presented as recorded and are not interchangeable area measures. RERA filing

The approval lists a transformer space, garbage house, tot-lot and rainwater-harvesting pits. It also states that the construction is to follow the sanctioned plan, that no balcony or structure projection is allowed in the setback area, and that the approval does not confer ownership rights.

The supplied layout-plan document is not extracted, and the material does not provide a sufficiently legible drawing-based account of the building footprint, flats per floor, lift and stair arrangements, circulation, entrances, or open-space dimensions. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001099.87 sq mSoftware-measured range: 62.6–68.7 sq m; median 64.7 sq m35%

The unit counts, booking status and saleable area are TG-RERA figures; the portal extract has no as-of date. Carpet measurements are software-measured from the supplied drawing record, are not RERA-filed disclosures, and are flagged as needing review. RERA unit table RERA unit details Floor plans

One typical 2BHK plan record lists a living area, dining area, kitchen, two bedrooms, two toilets and a balcony labelled 1.11 M. WIDE BALC. The supplied room dimensions include living 2.8 × 5.12 m, dining 3.03 × 3.32 m, kitchen 2.5 × 2.9 m, and bedrooms 2.9 × 3.5 m and 2.8 × 4.02 m. These are drawing-based measurements, not RERA area disclosures.

Carpet area concerns the measured interior of the home; the RERA-filed saleable area is a separate measure and may include the home’s share of common areas. The supplied records do not provide a unit-specific breakdown of balcony, utility or common-area loading beyond the software-measured loading figure above. Floor plans RERA unit details

5. Parking & vehicle circulation

The supplied RERA unit record marks the 2BHK configuration as mortgaged, while the building approval records a 90.43 m² area on the second floor as handed over/mortgaged. Neither entry establishes a parking count or a buyer’s exclusive parking allocation. RERA unit table

No sanctioned car or two-wheeler counts, visitor or accessible parking provision, parking-level layout, ramps, driveway arrangements, EV charging provision, or unit-by-unit parking allocation are established by the supplied extracts. Document index RERA unit table

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists the facilities below. It reports 0% progress for each listed item; those entries do not independently verify on-site completion. The building approval separately names some site features and requirements. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsListed; no size or description suppliedTG-RERA amenities0%; not independently verified
Green strip / tot-lot / parkListed; approval also refers to a tot-lotTG-RERA amenities; building approval0% in amenity record; completion not independently verified
Internal roads & footpathsListed; no dimensions suppliedTG-RERA amenities0%; not independently verified
Street lightingListed; no specification suppliedTG-RERA amenities0%; not independently verified
Aggregate recreational open spaceListed; no area suppliedTG-RERA amenities0%; not independently verified
Water conservation / rainwater harvestingListed; approval requires rainwater-harvesting pitsTG-RERA amenities; building approval0% in amenity record; installation not independently verified

The supplied records do not provide a specific clubhouse, indoor recreation or sports-facility inventory. RERA amenities Document index

7. Utilities, building services & safety

The TG-RERA amenity record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and an electrical meter room/sub-station/receiving station. Water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical room/sub-station entry are marked “YES”; the record shows 0% progress for the listed items. It does not state capacities, sources, system designs or completed status. RERA amenities

The building approval requires rainwater-harvesting pits and a transformer space, and calls for a garbage house with dry and wet waste segregation. It states that public water and electricity connections will be provided only on production of an occupancy certificate. These are approval conditions, not evidence that the works or connections have been completed.

The supplied material does not establish water storage or treatment capacity, an STP design or reuse arrangements, electrical backup, lift count or capacity, fire-system specifications, escape-stair or fire-access details, CCTV or access-control systems, or accessible circulation. RERA amenities Document index

8. Location, access & connectivity

The project is recorded in SHAYAMPET, Hanamkonda mandal, Warangal Urban district, PIN 506319. The land and title material identifies the revenue village as Shayampet Jagir Revenue (V). The building approval identifies the site as Survey Nos. 8, 9, 14 and 15. RERA record Land records

The RERA-filed boundary information describes a road on the west and adjoining project development by Jubilee Constructions to the east and south; the north boundary is an open plot of Mr Krishna Reddy. The supplied connectivity record gives a distance of 1.2 km to Financial District (Nanakramguda), but provides no route or method for that distance; no other road, public-transport or landmark distances are supplied. RERA filing Location record

9. Developer & development status

The registered promoter is Jubilee Constructions, identified in the RERA record as a partnership. Its listed address is CHANDRA COMPLEX, OLD BUS ROAD, SHAYAMPET, SHAYAMPET, Hanamkonda, Warangal Urban, 506319. The supplied corporate identifier is GSTIN 36AAMFJ1746L1ZY. No official contact details or promoter website are established in the RERA evidence supplied for this section. Parties record Corporate record RERA filing

The promoter’s Form B declares that the project will be completed by 27.12.2024. No independently verified construction-stage evidence, revised completion date, or completion/occupancy certificate is supplied. The registered project record therefore does not establish that construction is complete or that any building portion has an occupancy certificate. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for JUBILEE MANGALAM A, registration P00300004813; stated validity 01/08/2022–27/12/2024.
Building sanction / commencementBuilding-construction approval 0064/BP/3006/2021, dated 27 December, 2021; approval document names GWMC Municipality/Municipal Corporation and file no. /004675/BP/DTCP/3006/0130/2021.
Promoter declarationForm B identifies Jubilee Constructions, states a title basis and declares completion by 27.12.2024.
Layout planA layout-plan document is listed in the RERA file, but its supplied record is not extracted.
Occupancy / completion certificateNo such certificate is identified in the supplied documents. Document index
Other project-filed recordsThe supplied register includes encumbrance statements, title reports, agreement/allotment forms and a partner resolution; this overview does not assess their title or legal effect. Document index

Frequently asked questions

Is JUBILEE MANGALAM A registered with Telangana RERA?

Yes. JUBILEE MANGALAM A is registered with the Telangana Real Estate Regulatory Authority as P00300004813; the registration status is New Project.

Who is the developer of JUBILEE MANGALAM A?

The promoter named in the RERA registration is JUBILEE CONSTRUCTIONS.

Where is JUBILEE MANGALAM A located?

JUBILEE MANGALAM A is in SHAYAMPET, Hanamkonda, Telangana (506319).

When will JUBILEE MANGALAM A be completed?

The promoter's proposed date of completion filed with RERA is 27/12/2024. This is the promoter's declaration, not a guarantee.

More projects in Shayampet