Hanuman Nagar Colony
YELKUR · Mahabubnagar · RERA P01400010384
HANUMAN NAGAR COLONY is a plotted development in Boyapally Village, Mahabubnagar Rural mandal, Mahabubnagar district, developed by registered promoter YELKUR SUNITHA. The project covers 3,642.17 sq. m and comprises 13 plots, with drawing-derived plot sizes of 93.26–243.8 sq. m. It is registered under TG-RERA No. P01400010384, with a proposed completion date of 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | HANUMAN NAGAR COLONY RERA record |
| Project type | Plotted development RERA record |
| Phase / registered portion | No separate phase name disclosed; the registration concerns the plotted layout RERA record Approvals record |
| TG-RERA registration number | P01400010384 |
| Registration validity | 10/03/2022 to 10/03/2026; certificate states four years and no extension is recorded in the supplied certificate |
| Registered promoter | YELKUR SUNITHA |
| RERA project status | “On-Going Project” in the RERA project record RERA record |
| Project completion date | 30/11/2026, recorded as both proposed and revised in the project record RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / address | Boyapally Village; RERA address field also records Mahabubnagar Municipality RERA filing |
| Revenue village | Boyapally Revenue Village |
| Mandal | Mahabubnagar Rural in the RERA record; the layout approval document states MAHABOOBNAGAR Mandal RERA filing |
| District | Mahabubnagar RERA filing |
| PIN | 509002 RERA filing |
| Survey number / subdivision | Sy. No. 426/2 Land records |
| Registered site extent | 3,642.17 sq. m in the RERA land record Land records |
| Layout approval extent | “0 Acer 36 Gts 4356 Sq. Yds” |
| Net / total land area | RERA record states total area 3,642.17 sq. m, affected area 0 and net area 3,642.17 sq. m Land records |
| Boundaries | East: 18M WIDE ROAD; South: 10M WIDE ROAD; North and West: OTHERS V R RAGHAVENDER RAO LAND Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | MAHABOOBNAGAR Municipality/Municipal Corporation; RERA approval fields identify DTCP Approvals record |
| Principal layout approval | Tentative layout approval LP No. 0057/LO/3063/2022, dated 10 March 2022 |
| Application number | 003837/LO/DTCP/3063/0051/2021 |
| Approved built-up area | 2,485.81 sq. m recorded in the RERA project fields; the project is a plotted layout, and no building-floor configuration is supplied RERA filing |
| Layout size | 13 plots, as stated in the approval record |
| Layout land-use figures | Plotted area 2,485.51 sq. m (72.39%); roads 512.15 sq. m (14.92%); park/open space 310.25 sq. m (9.04%); utilities 35.24 sq. m (1.03%); social infrastructure 90.45 sq. m (2.63%); amenities 0.00 sq. m (0.00%) Layout record |
| Mortgage area | 390.10 sq. m in the RERA fields; the approval document identifies Plot Nos. 1 and 2 as mortgaged to the Municipality under document No. 3030/2022 RERA filing |
| Buildings / floors / parking levels | Not disclosed; this is a plotted layout, and no building-floor or parking-level schedule is supplied RERA filing |
Offering and status
| Field | Record |
|---|---|
| Offering | 13 plots |
| Plot-size range | 93.26–243.8 sq. m (software-measured from the approved layout drawing); the drawing-derived median is 184.45 sq. m Layout record |
| Booked / available plots | Counts not available in the supplied evidence RERA filing |
| Development stage | RERA record labels the project “On-Going Project”; the supplied data records 70% completeness, without an independently verified site measurement RERA record |
| Completion timeline | Proposed and revised date: 30/11/2026 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project evidence; no phase- or plot-level certificate status is established Document index Approvals record |
| Registration validity vs completion | Registration certificate validity ends 10/03/2026, while the project record shows a proposed completion date of 30/11/2026 RERA record |
2. The project story
HANUMAN NAGAR COLONY is a 13-plot layout on Sy. No. 426/2 in Boyapally Revenue Village, Mahabubnagar Rural, Mahabubnagar. The RERA-filed land record identifies a site of 3,642.17 sq. m, with access boundaries on an 18M-wide road to the east and a 10M-wide road to the south. The layout approval describes a tentative plotted development and records the same survey number and village. RERA record Land records
The approved layout drawing’s extracted schedule shows 13 plots, roads, park/open space, utility land and social-infrastructure land. The RERA record lists the project as on-going and shows 70% completeness; this is a recorded project status, not independent verification of current physical works. The registered completion date in the project record is 30/11/2026. No occupancy or completion certificate is supplied. Layout record RERA record Document index
3. Master plan, architecture & building design
This is a plotted layout rather than a supplied apartment or multi-building plan. The RERA project fields report an approved built-up area of 2,485.81 sq. m, but do not provide a building count, floor configuration, building footprint, or height schedule. RERA filing RERA filing
The layout drawing extraction reports a 3,433.6 sq. m land-use-table base and the following software-measured areas: 2,485.51 sq. m for plots, 512.15 sq. m for roads, 310.25 sq. m for parks/open space, 35.24 sq. m for utilities and 90.45 sq. m for social infrastructure; amenities are recorded as 0.00 sq. m. The drawing-derived schedule identifies 13 plots. The area figures are extracted from the approved layout drawing and should be checked against the drawing itself. Layout record
The layout approval is expressly described as tentative. It requires infrastructure and amenities to be completed and identifies roads, open space and utilities for handover to the Municipality before release of the final layout; its detailed conditions are addressed in the approvals review.
4. Homes, configurations & floor plans
The offering is plotted: the approval record states 13 plots. Drawing-derived plot sizes are software-measured, not RERA-filed saleable or carpet areas. The supplied evidence does not give booked/available counts or plot-wise RERA saleable areas. Layout record RERA filing
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 13 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
| Drawing-derived plot measurement | Figure |
|---|---|
| Smallest plot | 93.26 sq. m (111.5 sq. yd) |
| Median plot | 184.45 sq. m (220.6 sq. yd) |
| Largest plot | 243.8 sq. m (291.6 sq. yd) |
| Most common recorded size | 183.71 sq. m (4 plots) |
The layout extraction reports that all 13 plot sizes were read from the drawing and that their total matches the drawing’s plotted-area statement. No apartment floor plans or room measurements are supplied. Layout record Floor plans
5. Parking & vehicle circulation
The layout approval’s land-use table records 0% common parking space. No sanctioned parking count, visitor or accessible parking provision, plot-wise parking allocation, EV provision, parking structure, ramp or dedicated vehicle-circulation plan is supplied. Layout record Document index
The approval conditions require roads to be opened for access to neighbouring sites and prohibit enclosing the layout with a compound wall or fencing. The layout drawing extraction records 512.15 sq. m of road area (14.92% of its stated land-use-table base); this does not establish individual plot parking rights or exclusive parking ownership. Layout record
6. Amenities, recreation & open spaces
The layout approval calls for the applicant to provide infrastructure and amenities. Its drawing-derived land-use table identifies park/open space, utilities and social infrastructure; the RERA amenity record separately reports progress percentages for several services and facilities. These percentages are declared progress figures, not independent completion verification. Layout record RERA amenities
| Facility | Park / open space |
|---|---|
| Description / size | 310.25 sq. m in the drawing-derived land-use table; approval states 9.04% and “0 Acer 3.07 Gts 371 Sq. Yds” |
| Evidence source | Approved layout drawing extraction and tentative layout approval |
| Declared progress / verified status | RERA amenity record reports Green Strip/TOT LOT/Park at 90%; not independently verified complete Layout record RERA amenities |
| Facility | Social infrastructure |
|---|---|
| Description / size | 90.45 sq. m in the drawing-derived land-use table; approval states 2.63% |
| Evidence source | Approved layout drawing extraction and tentative layout approval |
| Declared progress / verified status | No facility detail or completion verification supplied Layout record |
| Facility | Community buildings |
|---|---|
| Description / size | No size or description supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0% reported RERA amenities |
No clubhouse or indoor facility, sports facility, or separately identified amenity area is established in the supplied evidence. The layout drawing records amenity area as 0.00 sq. m. Layout record
7. Utilities, building services & safety
The layout approval lists a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste-management provision among the utilities and works required of the applicant. This is approval-condition evidence; it does not establish that those works are complete or operational.
| Evidence in the project record | Approval conditions refer to a water reservoir and require an overhead tank or sump, as applicable; the RERA amenity record lists Water Supply |
|---|---|
| Declared progress / verified status | Water Supply: 50% reported; no independent completion or capacity evidence supplied RERA amenities |
| Evidence in the project record | Approval conditions list a septic tank and sewerage treatment plant; RERA amenity record lists sewerage chambers, lines, septic tank/STP and storm-water drains |
|---|---|
| Declared progress / verified status | Sewerage: 80%; Storm Water Drains: 75%; these are reported progress figures, not independently verified RERA amenities |
| Evidence in the project record | Approval conditions require sufficient harvesting pits; RERA amenity record lists water conservation/rainwater harvesting |
|---|---|
| Declared progress / verified status | 70% reported; no independent completion evidence supplied RERA amenities |
| Evidence in the project record | Approval conditions identify an electric transformer; RERA amenity record lists electrical meter room, sub-station and receiving station |
|---|---|
| Declared progress / verified status | Electrical facilities: 10% reported; no capacity or operational evidence supplied RERA amenities |
| Evidence in the project record | Approval conditions list solid-waste management; RERA amenity record lists solid-waste management and disposal |
|---|---|
| Declared progress / verified status | 0% reported RERA amenities |
| Evidence in the project record | Listed in the RERA amenity record |
|---|---|
| Declared progress / verified status | 0% reported; no specification supplied RERA amenities |
| Evidence in the project record | Listed in the RERA amenity record; no system details supplied |
|---|---|
| Declared progress / verified status | 0% reported; no independent compliance evidence supplied RERA amenities |
| Evidence in the project record | No project-specific details supplied |
|---|---|
| Declared progress / verified status | Not established Document index RERA amenities |
8. Location, access & connectivity
The registered location is Boyapally Village, Mahabubnagar Rural, Mahabubnagar district, Telangana, PIN 509002; the RERA address fields also identify Mahabubnagar Municipality. The layout boundaries identify an 18M-wide road to the east and a 10M-wide road to the south. RERA filing
A location record gives the nearest sampled Outer Ring Road interchange as approximately 80.4 km. This is a supplied geospatial measurement; no route, travel time, public-transport service or additional landmark distances are established. Location record
9. Developer & development status
The TG-RERA certificate names YELKUR SUNITHA as promoter. The RERA project header and registration fields use “YELKUR” as the promoter name. The legal entity type, corporate registration identifiers, registered office and official contact details are not established in the supplied evidence; the certificate records the promoter’s office as House No. 9-34, Village Dharur, Mandal Dharoor, District Jogulamba Gadwal, PIN 509125. RERA record Corporate record
The project record reports 70% completeness and an on-going status. These are recorded project data, not an independently verified construction inspection. The proposed and revised completion date shown in the project record is 30/11/2026; the supplied registration certificate states validity through 10/03/2026 and records no extension. No occupancy or completion certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Supplied evidence | Form C, registration No. P01400010384 |
|---|---|
| What it establishes | Registration certificate states validity from 10/03/2022 through 10/03/2026 |
| Supplied evidence | Tentative layout approval, LP No. 0057/LO/3063/2022, dated 10 March 2022; application No. 003837/LO/DTCP/3063/0051/2021 |
|---|---|
| What it establishes | Tentative approval for 13 plots in Sy. No. 426/2, Boyapally Revenue Village; the document says the approval is not proof of title |
| Supplied evidence | Approved layout drawing extraction, document ID 629038 |
|---|---|
| What it establishes | Drawing-derived plot schedule and land-use figures; layout sheets are extracted, and measurements are software-read Layout record |
| Supplied evidence | Promoter affidavit dated 28 November 2025 |
|---|---|
| What it establishes | Promoter-declared title basis, encumbrance position, fund-account obligations and completion undertaking; these are declarations, not independent verification |
| Supplied evidence | Not present in supplied project documents Document index |
|---|---|
| What it establishes | Certificate status is not established by the supplied records Document index |
| Supplied evidence | No building-level approval or commencement schedule is established; the supplied approval concerns a tentative plotted layout Approvals record |
|---|---|
| What it establishes | Building configuration and building-specific approvals are not established in this overview Approvals record |
1. Project at a glance
Project identity
Registered project name: HANUMAN NAGAR COLONY
Project type: Plotted development
Phase / registered portion: No separate phase name disclosed; the registration concerns the plotted layout
TG-RERA registration number: P01400010384
Registration validity: 10/03/2022 to 10/03/2026; certificate states four years and no extension is recorded in the supplied certificate
Registered promoter: YELKUR SUNITHA
RERA project status: “On-Going Project” in the RERA project record
Project completion date: 30/11/2026, recorded as both proposed and revised in the project record
Land and geographic identity
Locality / address: Boyapally Village; RERA address field also records Mahabubnagar Municipality
Revenue village: Boyapally Revenue Village
Mandal: Mahabubnagar Rural in the RERA record; the layout approval document states MAHABOOBNAGAR Mandal
District: Mahabubnagar
PIN: 509002
Survey number / subdivision: Sy. No. 426/2
Registered site extent: 3,642.17 sq. m in the RERA land record
Layout approval extent: “0 Acer 36 Gts 4356 Sq. Yds”
Net / total land area: RERA record states total area 3,642.17 sq. m, affected area 0 and net area 3,642.17 sq. m
Boundaries: East: 18M WIDE ROAD; South: 10M WIDE ROAD; North and West: OTHERS V R RAGHAVENDER RAO LAND
Development identity
Sanctioning authority: MAHABOOBNAGAR Municipality/Municipal Corporation; RERA approval fields identify DTCP
Principal layout approval: Tentative layout approval LP No. 0057/LO/3063/2022, dated 10 March 2022
Application number: 003837/LO/DTCP/3063/0051/2021
Approved built-up area: 2,485.81 sq. m recorded in the RERA project fields; the project is a plotted layout, and no building-floor configuration is supplied
Layout size: 13 plots, as stated in the approval record
Layout land-use figures: Plotted area 2,485.51 sq. m (72.39%); roads 512.15 sq. m (14.92%); park/open space 310.25 sq. m (9.04%); utilities 35.24 sq. m (1.03%); social infrastructure 90.45 sq. m (2.63%); amenities 0.00 sq. m (0.00%)
Mortgage area: 390.10 sq. m in the RERA fields; the approval document identifies Plot Nos. 1 and 2 as mortgaged to the Municipality under document No. 3030/2022
Buildings / floors / parking levels: Not disclosed; this is a plotted layout, and no building-floor or parking-level schedule is supplied
Offering and status
Offering: 13 plots
Plot-size range: 93.26–243.8 sq. m (software-measured from the approved layout drawing); the drawing-derived median is 184.45 sq. m
Booked / available plots: Counts not available in the supplied evidence
Development stage: RERA record labels the project “On-Going Project”; the supplied data records 70% completeness, without an independently verified site measurement
Completion timeline: Proposed and revised date: 30/11/2026
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project evidence; no phase- or plot-level certificate status is established
Registration validity vs completion: Registration certificate validity ends 10/03/2026, while the project record shows a proposed completion date of 30/11/2026
2. The project story
HANUMAN NAGAR COLONY is a 13-plot layout on Sy. No. 426/2 in Boyapally Revenue Village, Mahabubnagar Rural, Mahabubnagar. The RERA-filed land record identifies a site of 3,642.17 sq. m, with access boundaries on an 18M-wide road to the east and a 10M-wide road to the south. The layout approval describes a tentative plotted development and records the same survey number and village.
The approved layout drawing’s extracted schedule shows 13 plots, roads, park/open space, utility land and social-infrastructure land. The RERA record lists the project as on-going and shows 70% completeness; this is a recorded project status, not independent verification of current physical works. The registered completion date in the project record is 30/11/2026. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
This is a plotted layout rather than a supplied apartment or multi-building plan. The RERA project fields report an approved built-up area of 2,485.81 sq. m, but do not provide a building count, floor configuration, building footprint, or height schedule.
The layout drawing extraction reports a 3,433.6 sq. m land-use-table base and the following software-measured areas: 2,485.51 sq. m for plots, 512.15 sq. m for roads, 310.25 sq. m for parks/open space, 35.24 sq. m for utilities and 90.45 sq. m for social infrastructure; amenities are recorded as 0.00 sq. m. The drawing-derived schedule identifies 13 plots. The area figures are extracted from the approved layout drawing and should be checked against the drawing itself.
The layout approval is expressly described as tentative. It requires infrastructure and amenities to be completed and identifies roads, open space and utilities for handover to the Municipality before release of the final layout; its detailed conditions are addressed in the approvals review.
4. Homes, configurations & floor plans
The offering is plotted: the approval record states 13 plots. Drawing-derived plot sizes are software-measured, not RERA-filed saleable or carpet areas. The supplied evidence does not give booked/available counts or plot-wise RERA saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 13 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Smallest plot: 93.26 sq. m (111.5 sq. yd)
Median plot: 184.45 sq. m (220.6 sq. yd)
Largest plot: 243.8 sq. m (291.6 sq. yd)
Most common recorded size: 183.71 sq. m (4 plots)
The layout extraction reports that all 13 plot sizes were read from the drawing and that their total matches the drawing’s plotted-area statement. No apartment floor plans or room measurements are supplied.
5. Parking & vehicle circulation
The layout approval’s land-use table records 0% common parking space. No sanctioned parking count, visitor or accessible parking provision, plot-wise parking allocation, EV provision, parking structure, ramp or dedicated vehicle-circulation plan is supplied.
The approval conditions require roads to be opened for access to neighbouring sites and prohibit enclosing the layout with a compound wall or fencing. The layout drawing extraction records 512.15 sq. m of road area (14.92% of its stated land-use-table base); this does not establish individual plot parking rights or exclusive parking ownership.
6. Amenities, recreation & open spaces
The layout approval calls for the applicant to provide infrastructure and amenities. Its drawing-derived land-use table identifies park/open space, utilities and social infrastructure; the RERA amenity record separately reports progress percentages for several services and facilities. These percentages are declared progress figures, not independent completion verification.
| Facility | Park / open space |
|---|---|
| Description / size | 310.25 sq. m in the drawing-derived land-use table; approval states 9.04% and “0 Acer 3.07 Gts 371 Sq. Yds” |
| Evidence source | Approved layout drawing extraction and tentative layout approval |
| Declared progress / verified status | RERA amenity record reports Green Strip/TOT LOT/Park at 90%; not independently verified complete |
| Facility | Social infrastructure |
|---|---|
| Description / size | 90.45 sq. m in the drawing-derived land-use table; approval states 2.63% |
| Evidence source | Approved layout drawing extraction and tentative layout approval |
| Declared progress / verified status | No facility detail or completion verification supplied |
| Facility | Community buildings |
|---|---|
| Description / size | No size or description supplied |
| Evidence source | RERA amenity record |
| Declared progress / verified status | 0% reported |
No clubhouse or indoor facility, sports facility, or separately identified amenity area is established in the supplied evidence. The layout drawing records amenity area as 0.00 sq. m.
7. Utilities, building services & safety
The layout approval lists a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste-management provision among the utilities and works required of the applicant. This is approval-condition evidence; it does not establish that those works are complete or operational.
| Evidence in the project record | Approval conditions refer to a water reservoir and require an overhead tank or sump, as applicable; the RERA amenity record lists Water Supply |
|---|---|
| Declared progress / verified status | Water Supply: 50% reported; no independent completion or capacity evidence supplied |
| Evidence in the project record | Approval conditions list a septic tank and sewerage treatment plant; RERA amenity record lists sewerage chambers, lines, septic tank/STP and storm-water drains |
|---|---|
| Declared progress / verified status | Sewerage: 80%; Storm Water Drains: 75%; these are reported progress figures, not independently verified |
| Evidence in the project record | Approval conditions require sufficient harvesting pits; RERA amenity record lists water conservation/rainwater harvesting |
|---|---|
| Declared progress / verified status | 70% reported; no independent completion evidence supplied |
| Evidence in the project record | Approval conditions identify an electric transformer; RERA amenity record lists electrical meter room, sub-station and receiving station |
|---|---|
| Declared progress / verified status | Electrical facilities: 10% reported; no capacity or operational evidence supplied |
| Evidence in the project record | Approval conditions list solid-waste management; RERA amenity record lists solid-waste management and disposal |
|---|---|
| Declared progress / verified status | 0% reported |
| Evidence in the project record | Listed in the RERA amenity record |
|---|---|
| Declared progress / verified status | 0% reported; no specification supplied |
| Evidence in the project record | Listed in the RERA amenity record; no system details supplied |
|---|---|
| Declared progress / verified status | 0% reported; no independent compliance evidence supplied |
| Evidence in the project record | No project-specific details supplied |
|---|---|
| Declared progress / verified status | Not established |
8. Location, access & connectivity
The registered location is Boyapally Village, Mahabubnagar Rural, Mahabubnagar district, Telangana, PIN 509002; the RERA address fields also identify Mahabubnagar Municipality. The layout boundaries identify an 18M-wide road to the east and a 10M-wide road to the south.
A location record gives the nearest sampled Outer Ring Road interchange as approximately 80.4 km. This is a supplied geospatial measurement; no route, travel time, public-transport service or additional landmark distances are established.
9. Developer & development status
The TG-RERA certificate names YELKUR SUNITHA as promoter. The RERA project header and registration fields use “YELKUR” as the promoter name. The legal entity type, corporate registration identifiers, registered office and official contact details are not established in the supplied evidence; the certificate records the promoter’s office as House No. 9-34, Village Dharur, Mandal Dharoor, District Jogulamba Gadwal, PIN 509125.
The project record reports 70% completeness and an on-going status. These are recorded project data, not an independently verified construction inspection. The proposed and revised completion date shown in the project record is 30/11/2026; the supplied registration certificate states validity through 10/03/2026 and records no extension. No occupancy or completion certificate is supplied.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration No. P01400010384 |
|---|---|
| What it establishes | Registration certificate states validity from 10/03/2022 through 10/03/2026 |
| Supplied evidence | Tentative layout approval, LP No. 0057/LO/3063/2022, dated 10 March 2022; application No. 003837/LO/DTCP/3063/0051/2021 |
|---|---|
| What it establishes | Tentative approval for 13 plots in Sy. No. 426/2, Boyapally Revenue Village; the document says the approval is not proof of title |
| Supplied evidence | Approved layout drawing extraction, document ID 629038 |
|---|---|
| What it establishes | Drawing-derived plot schedule and land-use figures; layout sheets are extracted, and measurements are software-read |
| Supplied evidence | Promoter affidavit dated 28 November 2025 |
|---|---|
| What it establishes | Promoter-declared title basis, encumbrance position, fund-account obligations and completion undertaking; these are declarations, not independent verification |
| Supplied evidence | Not present in supplied project documents |
|---|---|
| What it establishes | Certificate status is not established by the supplied records |
| Supplied evidence | No building-level approval or commencement schedule is established; the supplied approval concerns a tentative plotted layout |
|---|---|
| What it establishes | Building configuration and building-specific approvals are not established in this overview |
Frequently asked questions
Is HANUMAN NAGAR COLONY registered with Telangana RERA?
Yes. HANUMAN NAGAR COLONY is registered with the Telangana Real Estate Regulatory Authority as P01400010384; the registration status is On-Going Project.
Who is the developer of HANUMAN NAGAR COLONY?
The promoter named in the RERA registration is YELKUR.
Where is HANUMAN NAGAR COLONY located?
HANUMAN NAGAR COLONY is in Mahabubnagar Municipality, Boyapally, Mahabubnagar Rural, Mahabubnagar, Telangana (509002).
When will HANUMAN NAGAR COLONY be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Mahabubnagar Rural