Chaitanya Icon
SRI CHAITANYARAM BUILDERS · Medchal-Malkajgiri · RERA P02200004352
CHAITANYA ICON is a residential apartment project in Hyder Nagar, Kukatpally Mandal, Medchal-Malkajgiri District, developed by registered promoter SRI CHAITANYARAM BUILDERS, a partnership. The project has a registered site extent of 334.34 sq. m and one building with 1 Stilt + 5 upper floors. Its RERA unit schedule records 10 2BHK apartments, each with a saleable area of 111.48 sq. m. It is registered under TG-RERA number P02200004352, with proposed completion dated 31/01/2025.
More from Sri Chaitanyaram Builders · 16 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | CHAITANYA ICON RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration is for the project identified on the certificate; no separate phase name is disclosed. |
| TG-RERA registration | P02200004352 RERA record |
| Registration validity | Certificate states validity from 04/04/2022 to 31/01/2025; no extension is recorded in the supplied registration data. This is the registration period, not a statement of current construction or occupancy status. RERA record |
| Registered promoter | SRI CHAITANYARAM BUILDERS, a partnership RERA filing Corporate record |
| RERA status | The project is recorded as a “New Project”; the supplied registration certificate is for the period above. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Hyder Nagar RERA record |
| Revenue village | Hyder Nagar / Hydernagar Village, as recorded in the project and approval documents RERA record |
| Mandal | Kukatpally RERA record RERA filing |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500072 RERA record |
| Project survey identity | Survey Nos. 148 to 155 in M.C.K. Block No. 2 RERA record RERA filing |
| Plot identity | Plot Nos. 145 and 146 (Eastern Part) RERA filing |
| Registered site extent | 334.34 sq. m RERA filing |
| Net / total area in building-permit record | Plot area 334.34 sq. m; road-affected area 0.0 sq. m; nala-affected area 0.0 sq. m; net plot area 334.34 sq. m |
| Boundaries | East: Plot No. 144; West: Western Part of Plot No. 146; North: Plot Nos. 119 and 120; South: 30 Feet Wide Road RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 0046/GHMC/KPL/2022-BP, approved 31 January 2022 Approvals record |
| Related file number | 000069/GHMC/0039/KPL2/2022-BP |
| Approved built-up area | 948.90 sq. m residential upper floors; the permit separately records 189.90 sq. m stilt parking area. RERA filing |
| Buildings / blocks | One building is recorded in the RERA land details; the GHMC permit describes one proposed residential building. RERA filing |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors |
| Building height | 14.99 (as stated in the permit; the supplied extraction does not specify a unit) |
| Parking | Stilt parking is recorded; the permit lists total parking area as 189.78 (unit not specified in the extracted parameter) and separately records a stilt parking area of 189.90 sq. m. A parking-space count is not established by the supplied records. |
| Unit count | 1 building unit is recorded in the RERA land details. The unit schedule records 10 proposed 2BHK apartments; the approved unit count is not separately extracted from the GHMC plan. RERA filing RERA unit table RERA unit details |
Offering and status
| Field | Record |
|---|---|
| Configuration | 2BHK apartments RERA unit table RERA unit details |
| RERA-filed saleable area | 111.48 sq. m per unit RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as shown in the supplied TG-RERA unit record; that record has no stated as-of date, so figures are indicative. RERA unit table RERA unit details |
| Construction stage | No construction-progress percentage or independently verified site-stage record is supplied. The RERA filing records a proposed completion date; it does not establish actual completion. RERA record |
| Completion date | Promoter-declared completion undertaking: 1 January 2025 in Form B; project header records proposed completion 31/01/2025. RERA record |
| Occupancy certificate (OC) | No OC is included in the supplied project documents; the GHMC permit requires an OC before occupation. The supplied evidence does not establish whether an OC has since been issued. |
2. The project story
CHAITANYA ICON is registered as a residential apartment project in Hyder Nagar, on the registered land identified as Survey Nos. 148 to 155 in M.C.K. Block No. 2, associated with Plot Nos. 145 and 146 (Eastern Part). The registered site extent is 334.34 sq. m. RERA record RERA filing
The GHMC permit describes a single residential building with a stilt and five upper floors. The RERA unit schedule records ten 2BHK apartments, each with a filed saleable area of 111.48 sq. m. These are the sanctioned building description and RERA-filed offering details respectively; the materials supplied do not provide a verified construction-progress assessment or establish that the building is complete. RERA unit table RERA unit details
The permit requires an occupancy certificate before occupation. No occupancy certificate is present in the supplied documents, so the current OC position remains unverified.
3. Master plan, architecture & building design
The project’s GHMC building-permit record covers a plot area and net plot area of 334.34 sq. m, with 0.0 sq. m recorded as road-affected and 0.0 sq. m as nala-affected. The permit describes one proposed residential building, comprising 1 Stilt + 5 upper floors. It records 948.90 sq. m for residential upper floors and separately identifies 189.90 sq. m as stilt parking area. These figures are permit-recorded areas; the supplied material does not identify them as carpet area or FSI-counted area.
The permit also states a building height of 14.99 without a unit in the supplied extraction. Detailed floor plans sufficient to confirm floor-by-floor layouts, flat positions, lifts, stairs, circulation, or building footprint are not available in the supplied records. The site is bounded by Plot No. 144 to the east, the Western Part of Plot No. 146 to the west, Plot Nos. 119 and 120 to the north, and a 30 Feet Wide Road to the south. RERA filing
The building permit lists a tot-lot as “NA” in the extracted amenities/utilities field, while its conditions refer to a tot-lot to be fenced and maintained as greenery. The supplied material does not establish its final design, area, or delivered status.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 111.48 sq. m | Not available | Not supplied |
Unit counts, booking figures and saleable area are from the RERA unit record; its booking data has no stated as-of date. No carpet-area measurements are available: the supplied floor-plan record contains two drawings, neither with flats available for measurement. RERA unit table RERA unit details Floor plans
The 111.48 sq. m figure is the RERA-filed saleable area, not a measured carpet-area figure. The supplied records do not provide room dimensions, balcony or utility areas, or common-area loading for the apartments. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit records a stilt parking area of 189.90 sq. m and a “Total Parking Area” of 189.78 (the extracted parameter does not state its unit). The permit requires the stilt area approved for parking to be used exclusively for vehicle parking and not converted or misused. The available evidence does not establish the number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, or the detailed arrangement of ramps, driveways and vehicle entrances. A parking area shown or recorded in a permit does not, by itself, establish exclusive ownership or allocation to a particular unit. RERA unit table
6. Amenities, recreation & open spaces
The RERA amenity record lists fourteen categories. The entries marked “YES” are water supply, green strip/tot-lot/park, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station; the listed entries show 0% progress. The GHMC permit separately specifies certain site provisions and conditions. No supplied record verifies any facility as complete. RERA amenities
| Description / size | Listed in the RERA amenities record; no size or description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | RERA record marks green strip/tot-lot/park “YES”; GHMC permit lists “Tot-lot NA” in the extracted amenities field and also requires a tot-lot to be fenced and maintained as greenery. No area is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0%; delivered status not verified. |
| Description / size | Listed in the RERA amenities record; no area supplied. Permit also requires peripheral greenery/tree planting. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0%; completion not verified. |
| Description / size | Listed in the RERA amenities record; no specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not verified. |
| Description / size | Listed in the RERA amenities record; no specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not verified. |
| Description / size | Listed in the RERA amenities record; GHMC permit requires a garbage house within the premises. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0%; completion not verified. |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, sewage and sullage treatment/disposal, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. Except for the entries marked “YES” in the amenity record, the list does not provide detailed system specifications or capacities; all listed amenity progress values are 0%. RERA amenities
The GHMC permit specifies 6 rainwater-harvesting pits, space for a transformer, and a garbage house. Its conditions require a rainwater-harvesting structure, require water and electricity connections to be provided only on production of an OC, and require sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. These are permit provisions and conditions, not evidence of completion.
The permit also requires an occupancy Fire NOC from the Director (EV&DM) before issue of an OC and places responsibility for structural safety and means of escape/fire-fighting installations on the owner, builder, architect and site engineer. The supplied material does not establish whether the Fire NOC or OC has been obtained, or provide lift capacities, water-storage capacity, STP capacity, backup-power capacity, CCTV/security arrangements, or accessibility features.
8. Location, access & connectivity
The registered location is Hyder Nagar, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072. The GHMC building-permit record identifies the locality as HYDER NAGAR (Circle 14A) and states that the permission was delegated to Kukatpally Zone. RERA record
The RERA-filed site boundaries identify a 30 Feet Wide Road along the southern side. The supplied location dataset lists distances to nearby points, including JNTU College metro station at 0.6 km, a bus stop at 0.5 km, CMR Shopping Mall at 1.0 km, and Ravindra Bharati School at 0.3 km. These are dataset-listed distances; the supplied material does not specify a measurement method. RERA filing Location record
9. Developer & development status
The registered promoter is SRI CHAITANYARAM BUILDERS, identified in the project filing as a partnership. Its supplied corporate identifier is GSTIN 36ADHFS3993A1ZY. The project record lists the promoter’s address as Plot No. 84, Venkataramana Colony, Gopal Nagar Co-Operative House Building Society Limited, Hyder Nagar, Kukatpally, Medchal-Malkajgiri, 500072. Corporate record RERA filing RERA filing
The registration certificate gives a different office-location description—Village, Mandal and District Ranga Reddy, PIN 500049. This Overview records both supplied registered-document descriptions without resolving them. Corporate record
The promoter’s Form B declares a completion timeframe of 1 January 2025 and states that the land is free from encumbrances. Those are promoter declarations in the RERA-filed affidavit. The project header separately records a proposed completion date of 31/01/2025. No construction progress or post-completion certification is supplied, and no OC is included in the document set. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for CHAITANYA ICON, registration P02200004352, issued 04/04/2022; certificate states validity through 31/01/2025. |
| GHMC building permit | Building Permit Order 0046/GHMC/KPL/2022-BP, dated 31 January 2022, for the residential building described as 1 Stilt + 5 upper floors; related file number 000069/GHMC/0039/KPL2/2022-BP. |
| Approved layout references in permit | LRS/5596/08, dated 3-8-10; and LRS/611/10, dated 31-12-11. These are references extracted from the building-permit record. |
| RERA Form B | Promoter affidavit/declaration identifying CHAITANYA ICON and containing title, encumbrance, completion-timeframe and project-account declarations. |
| Occupancy / completion certification | No OC or completion certificate is included in the supplied documents. The permit requires an OC before occupation. |
| Floor-plan records | Two drawing records are noted; neither has flats available for software measurement. Floor plans |
The supplied evidence does not establish a completed occupancy-certified phase or tower. No project-specific official EC or pollution-board clearance document is supplied in this Overview evidence; the promoter-name environmental search is not a project-specific clearance. Regulatory record
1. Project at a glance
Project identity
Registered project name: CHAITANYA ICON
Project type: Residential apartment project
Phase / registered portion: The registration is for the project identified on the certificate; no separate phase name is disclosed.
TG-RERA registration: P02200004352
Registration validity: Certificate states validity from 04/04/2022 to 31/01/2025; no extension is recorded in the supplied registration data. This is the registration period, not a statement of current construction or occupancy status.
Registered promoter: SRI CHAITANYARAM BUILDERS, a partnership
RERA status: The project is recorded as a “New Project”; the supplied registration certificate is for the period above.
Land and geographic identity
Locality: Hyder Nagar
Revenue village: Hyder Nagar / Hydernagar Village, as recorded in the project and approval documents
Mandal: Kukatpally
District: Medchal-Malkajgiri
PIN: 500072
Project survey identity: Survey Nos. 148 to 155 in M.C.K. Block No. 2
Plot identity: Plot Nos. 145 and 146 (Eastern Part)
Registered site extent: 334.34 sq. m
Net / total area in building-permit record: Plot area 334.34 sq. m; road-affected area 0.0 sq. m; nala-affected area 0.0 sq. m; net plot area 334.34 sq. m
Boundaries: East: Plot No. 144; West: Western Part of Plot No. 146; North: Plot Nos. 119 and 120; South: 30 Feet Wide Road
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 0046/GHMC/KPL/2022-BP, approved 31 January 2022
Related file number: 000069/GHMC/0039/KPL2/2022-BP
Approved built-up area: 948.90 sq. m residential upper floors; the permit separately records 189.90 sq. m stilt parking area.
Buildings / blocks: One building is recorded in the RERA land details; the GHMC permit describes one proposed residential building.
Sanctioned floor configuration: 1 Stilt + 5 upper floors
Building height: 14.99 (as stated in the permit; the supplied extraction does not specify a unit)
Parking: Stilt parking is recorded; the permit lists total parking area as 189.78 (unit not specified in the extracted parameter) and separately records a stilt parking area of 189.90 sq. m. A parking-space count is not established by the supplied records.
Unit count: 1 building unit is recorded in the RERA land details. The unit schedule records 10 proposed 2BHK apartments; the approved unit count is not separately extracted from the GHMC plan.
Offering and status
Configuration: 2BHK apartments
RERA-filed saleable area: 111.48 sq. m per unit
Booked / available: 0 booked / 10 available, as shown in the supplied TG-RERA unit record; that record has no stated as-of date, so figures are indicative.
Construction stage: No construction-progress percentage or independently verified site-stage record is supplied. The RERA filing records a proposed completion date; it does not establish actual completion.
Completion date: Promoter-declared completion undertaking: 1 January 2025 in Form B; project header records proposed completion 31/01/2025.
Occupancy certificate (OC): No OC is included in the supplied project documents; the GHMC permit requires an OC before occupation. The supplied evidence does not establish whether an OC has since been issued.
2. The project story
CHAITANYA ICON is registered as a residential apartment project in Hyder Nagar, on the registered land identified as Survey Nos. 148 to 155 in M.C.K. Block No. 2, associated with Plot Nos. 145 and 146 (Eastern Part). The registered site extent is 334.34 sq. m.
The GHMC permit describes a single residential building with a stilt and five upper floors. The RERA unit schedule records ten 2BHK apartments, each with a filed saleable area of 111.48 sq. m. These are the sanctioned building description and RERA-filed offering details respectively; the materials supplied do not provide a verified construction-progress assessment or establish that the building is complete.
The permit requires an occupancy certificate before occupation. No occupancy certificate is present in the supplied documents, so the current OC position remains unverified.
3. Master plan, architecture & building design
The project’s GHMC building-permit record covers a plot area and net plot area of 334.34 sq. m, with 0.0 sq. m recorded as road-affected and 0.0 sq. m as nala-affected. The permit describes one proposed residential building, comprising 1 Stilt + 5 upper floors. It records 948.90 sq. m for residential upper floors and separately identifies 189.90 sq. m as stilt parking area. These figures are permit-recorded areas; the supplied material does not identify them as carpet area or FSI-counted area.
The permit also states a building height of 14.99 without a unit in the supplied extraction. Detailed floor plans sufficient to confirm floor-by-floor layouts, flat positions, lifts, stairs, circulation, or building footprint are not available in the supplied records. The site is bounded by Plot No. 144 to the east, the Western Part of Plot No. 146 to the west, Plot Nos. 119 and 120 to the north, and a 30 Feet Wide Road to the south.
The building permit lists a tot-lot as “NA” in the extracted amenities/utilities field, while its conditions refer to a tot-lot to be fenced and maintained as greenery. The supplied material does not establish its final design, area, or delivered status.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 111.48 sq. m | Not available | Not supplied |
Unit counts, booking figures and saleable area are from the RERA unit record; its booking data has no stated as-of date. No carpet-area measurements are available: the supplied floor-plan record contains two drawings, neither with flats available for measurement.
The 111.48 sq. m figure is the RERA-filed saleable area, not a measured carpet-area figure. The supplied records do not provide room dimensions, balcony or utility areas, or common-area loading for the apartments.
5. Parking & vehicle circulation
The GHMC permit records a stilt parking area of 189.90 sq. m and a “Total Parking Area” of 189.78 (the extracted parameter does not state its unit). The permit requires the stilt area approved for parking to be used exclusively for vehicle parking and not converted or misused. The available evidence does not establish the number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, or the detailed arrangement of ramps, driveways and vehicle entrances. A parking area shown or recorded in a permit does not, by itself, establish exclusive ownership or allocation to a particular unit.
6. Amenities, recreation & open spaces
The RERA amenity record lists fourteen categories. The entries marked “YES” are water supply, green strip/tot-lot/park, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station; the listed entries show 0% progress. The GHMC permit separately specifies certain site provisions and conditions. No supplied record verifies any facility as complete.
| Description / size | Listed in the RERA amenities record; no size or description supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | RERA record marks green strip/tot-lot/park “YES”; GHMC permit lists “Tot-lot NA” in the extracted amenities field and also requires a tot-lot to be fenced and maintained as greenery. No area is supplied. |
|---|---|
| Declared progress / verified status | RERA progress 0%; delivered status not verified. |
| Description / size | Listed in the RERA amenities record; no area supplied. Permit also requires peripheral greenery/tree planting. |
|---|---|
| Declared progress / verified status | RERA progress 0%; completion not verified. |
| Description / size | Listed in the RERA amenities record; no specification supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not verified. |
| Description / size | Listed in the RERA amenities record; no specification supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not verified. |
| Description / size | Listed in the RERA amenities record; GHMC permit requires a garbage house within the premises. |
|---|---|
| Declared progress / verified status | RERA progress 0%; completion not verified. |
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, sewage and sullage treatment/disposal, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. Except for the entries marked “YES” in the amenity record, the list does not provide detailed system specifications or capacities; all listed amenity progress values are 0%.
The GHMC permit specifies 6 rainwater-harvesting pits, space for a transformer, and a garbage house. Its conditions require a rainwater-harvesting structure, require water and electricity connections to be provided only on production of an OC, and require sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. These are permit provisions and conditions, not evidence of completion.
The permit also requires an occupancy Fire NOC from the Director (EV&DM) before issue of an OC and places responsibility for structural safety and means of escape/fire-fighting installations on the owner, builder, architect and site engineer. The supplied material does not establish whether the Fire NOC or OC has been obtained, or provide lift capacities, water-storage capacity, STP capacity, backup-power capacity, CCTV/security arrangements, or accessibility features.
8. Location, access & connectivity
The registered location is Hyder Nagar, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072. The GHMC building-permit record identifies the locality as HYDER NAGAR (Circle 14A) and states that the permission was delegated to Kukatpally Zone.
The RERA-filed site boundaries identify a 30 Feet Wide Road along the southern side. The supplied location dataset lists distances to nearby points, including JNTU College metro station at 0.6 km, a bus stop at 0.5 km, CMR Shopping Mall at 1.0 km, and Ravindra Bharati School at 0.3 km. These are dataset-listed distances; the supplied material does not specify a measurement method.
9. Developer & development status
The registered promoter is SRI CHAITANYARAM BUILDERS, identified in the project filing as a partnership. Its supplied corporate identifier is GSTIN 36ADHFS3993A1ZY. The project record lists the promoter’s address as Plot No. 84, Venkataramana Colony, Gopal Nagar Co-Operative House Building Society Limited, Hyder Nagar, Kukatpally, Medchal-Malkajgiri, 500072.
The registration certificate gives a different office-location description—Village, Mandal and District Ranga Reddy, PIN 500049. This Overview records both supplied registered-document descriptions without resolving them.
The promoter’s Form B declares a completion timeframe of 1 January 2025 and states that the land is free from encumbrances. Those are promoter declarations in the RERA-filed affidavit. The project header separately records a proposed completion date of 31/01/2025. No construction progress or post-completion certification is supplied, and no OC is included in the document set.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for CHAITANYA ICON, registration P02200004352, issued 04/04/2022; certificate states validity through 31/01/2025.
GHMC building permit: Building Permit Order 0046/GHMC/KPL/2022-BP, dated 31 January 2022, for the residential building described as 1 Stilt + 5 upper floors; related file number 000069/GHMC/0039/KPL2/2022-BP.
Approved layout references in permit: LRS/5596/08, dated 3-8-10; and LRS/611/10, dated 31-12-11. These are references extracted from the building-permit record.
RERA Form B: Promoter affidavit/declaration identifying CHAITANYA ICON and containing title, encumbrance, completion-timeframe and project-account declarations.
Occupancy / completion certification: No OC or completion certificate is included in the supplied documents. The permit requires an OC before occupation.
Floor-plan records: Two drawing records are noted; neither has flats available for software measurement.
The supplied evidence does not establish a completed occupancy-certified phase or tower. No project-specific official EC or pollution-board clearance document is supplied in this Overview evidence; the promoter-name environmental search is not a project-specific clearance.
Frequently asked questions
Is CHAITANYA ICON registered with Telangana RERA?
Yes. CHAITANYA ICON is registered with the Telangana Real Estate Regulatory Authority as P02200004352; the registration status is New Project.
Who is the developer of CHAITANYA ICON?
The promoter named in the RERA registration is SRI CHAITANYARAM BUILDERS.
Where is CHAITANYA ICON located?
CHAITANYA ICON is in Hyder Nagar, Kukatpally, Medchal-Malkajgiri, Telangana (500072).
When will CHAITANYA ICON be completed?
The promoter's proposed date of completion filed with RERA is 31/01/2025. This is the promoter's declaration, not a guarantee.
More projects in Hyder Nagar