Yenganti Linga Goud Project

YENGANTI · Nizamabad · RERA P03100009550

YENGANTI LINGA GOUD PROJECT is a plotted development in Perkit-B, Armoor mandal, Nizamabad district, developed by registered promoter Yenganti Linga Goud. The layout covers 2 Acer 27.85 Gts 13050 Sq. Yds and comprises 41 plots, with drawing-derived plot sizes of 68.77–208.9 sq. m; no buildings or floors are disclosed. The project is registered under TG-RERA **P03100009550**, and its proposed and revised completion date is **30/11/2026**.

01What we found

RegisteredTG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Perkit B, Armoor, Nizamabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameYENGANTI LINGA GOUD PROJECT
Project type and registered portionPlotted development; the registration and layout approval describe one layout. No separate phase or phase-wise scope is disclosed. RERA record
TG-RERA registrationP03100009550
Registration validityCertificate states 17/03/2023 through 16/03/2026; it records no extension. Registration validity is separate from the project’s stated completion dates and does not establish completion or an occupancy certificate.
Registered promoterYenganti Linga Goud (also styled YENGANTI LINGA GOUD in the filing). Legal entity type is not disclosed. Corporate record
RERA project statusOn-Going Project in the project record. RERA record

Land and geographic identity

ItemRecord
Locality / addressPerkit & Kotarmoor; Kotarmoor; PIN 503223. The RERA certificate identifies the locality as Perkit-B, Armoor. RERA record
Revenue village(s)Perkit-B in the project identity; the tentative layout approval describes Perkit&Kotarmoor Revenue Village. RERA record
Mandal / districtArmoor mandal; Nizamabad district. RERA record
Project survey numbersSY NO 64/A,65 (also expressed as 64/A and 65 in the layout approval). RERA record
Registered site extent2 Acer 27.85 Gts 13050 Sq. Yds, as stated in the tentative layout approval.
RERA land areaTotal and net area each recorded as 10911.11 sq. m; area affected in road widening/FTL of tanks/nala widening recorded as 0. RERA filing
BoundariesEast: land of Ameen; west: land of Ettadi Sayanna; north: land of Munpally Linganna; south: carts way. RERA filing

Development identity

ItemRecord
Sanctioning authorityARMOOR Municipality/Municipal Corporation.
Principal approvalTentative layout plan 0025/LO/3069/2023, approved 17 March 2023.
Application number013144/LO/DTCP/3069/0039/2022.
Approved layout scale41 plots; the approval states a layout extent of 2 Acer 27.85 Gts 13050 Sq. Yds.
Approved built-up areaRERA project information records 6320.08 sq. m; the supplied material does not explain its application to this plotted layout. RERA filing
Buildings / floorsNo building count, floor configuration or building-level plan is disclosed; this is a plotted layout. Document index
Layout land-use schedulePlotted Area 1 Acer 22.47 Gts 7559 Sq. Yds (62.19%); Road Area 0 Acer 23.31 Gts 2820 Sq. Yds (23.21%); open space (park) 0 Acer 9.15 Gts 1108 Sq. Yds (9.11%); social infrastructure 0 Acer 4.25 Gts 514 Sq. Yds (4.23%); utilities 0 Acer 1.26 Gts 153 Sq. Yds (1.26%).
Authority-mortgaged layout plotsApproval identifies plots 32, 39, 31, 40, 41, 30, 29 and 28, with stated mortgage area 0 Acer 10.84 Gts 1311 Sq. Yds.

Offering and status

ItemRecord
OfferingPlots in a layout; approved drawing-derived schedule identifies 41 plots. Layout record
Plot sizesSoftware-read from the approved layout drawing: 68.77–208.9 sq. m (82.2–249.8 sq. yd); median 167.11 sq. m (199.9 sq. yd). Drawing-derived figures should be checked against the drawing. Layout record
Booked / available plotsNot established by the supplied record. Document index
Declared development progressProject record reports 70% completeness; this is a recorded figure, not independent site verification. RERA record
Completion datesProject header states proposed and revised completion 30/11/2026. The filed Form B declaration states completion by 16th March2026. These are recorded claims; their implications are for the relevant review sections. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. The layout approval is described as tentative. Document index

2. The project story

This is a plotted development in the Perkit-B / Perkit & Kotarmoor area of Armoor mandal, Nizamabad district, associated with survey numbers 64/A and 65. The RERA filing identifies 41 plots, while the tentative layout approval allocates land to plots, roads, a park, social infrastructure and utilities. The approval places responsibility for carrying out the layout’s infrastructure and amenities on the applicant. RERA record

The project record reports 70% completeness, but the supplied material does not identify which layout works have been completed or provide independent site verification. The RERA registration certificate is valid through 16/03/2026 and no extension is recorded there; the project header separately gives 30/11/2026 as the proposed and revised completion date. No occupancy or completion certificate is supplied. RERA record Document index

3. Master plan, architecture & building design

The approved drawing is a tentative layout plan, not a building plan. It provides for 41 plots over the stated layout extent and shows a land-use schedule of 62.19% plotted area, 23.21% roads, 9.11% park/open space, 4.23% social infrastructure and 1.26% utilities. These are figures printed in the approval.

Software reading of the layout drawing identifies 41 plots with sizes from 68.77 sq. m to 208.9 sq. m; the median is 167.11 sq. m. The plot schedule is reported complete in the drawing-derived data, but the figures are software-read and should be verified against the plan. Layout record

The RERA filing records approved built-up area of 6320.08 sq. m, but the supplied material does not specify what this figure represents for the plotted development. No building arrangement, building footprint, floors, parking levels or phase organization is disclosed. RERA filing Document index

4. Homes, configurations & floor plans

This is a plotted layout, not an apartment offering. The supplied layout record identifies 41 plots. The software-read size distribution is:

Plot size bandPlot count
0–100 sq. yd (0–84 sq. m)2
150–200 sq. yd (125–167 sq. m)31
200–250 sq. yd (167–209 sq. m)8

The software-read smallest, median and largest plot sizes are 68.77 sq. m (82.2 sq. yd), 167.11 sq. m (199.9 sq. yd) and 208.9 sq. m (249.8 sq. yd) respectively. These are drawing-derived measurements, not RERA-filed saleable areas. No RERA unit-type schedule, booked/available counts, plot-specific saleable areas, or plot-specific allotment data is supplied. Layout record Document index

Two layout sheets are recorded; no apartment floor plans or measured carpet-area drawings are available. Floor plans

5. Parking & vehicle circulation

The layout approval allocates 23.21% of the stated layout schedule to roads and requires roads to be opened for access to neighbouring sites. It also says the layout owner/developer shall not construct a compound wall or fencing around the site.

No parking-space count, parking allocation, vehicle-entry arrangement, visitor parking or accessible parking details are established in the supplied record. The approval lists internal roads among the infrastructure and amenities, but does not provide their detailed design or dimensions. RERA amenities

6. Amenities, recreation & open spaces

The tentative layout approval identifies public-purpose land and lists infrastructure and amenities to be provided. Separately, the RERA amenities record marks several categories as available at 100%; those percentages are filing data and do not independently verify completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / open space0 Acer 9.15 Gts 1108 Sq. Yds; 9.11% in the approvalReserved in the tentative layout; completed status not independently verified
Social infrastructure site0 Acer 4.25 Gts 514 Sq. Yds; 4.23%Reserved in the tentative layout; facility or completed building not specified
Roads0 Acer 23.31 Gts 2820 Sq. Yds; 23.21%RERA amenities record marks internal roads and footpaths 100%; independently verified completion not supplied RERA amenities
Utilities site0 Acer 1.26 Gts 153 Sq. Yds; 1.26%Reserved in the tentative layout; listed utility works are not independently verified as complete
Green strip / parkSize not separately statedRERA amenitiesRERA amenities record marks 100%; independently verified completion not supplied
Water conservation / rainwater harvestingRainwater harvesting pits are listed in the approval; no count or capacity statedRERA amenities record marks 100%; independently verified completion not supplied
Street lighting / avenue plantationNo quantity or size statedRERA amenitiesStreet lighting marked 100% in RERA amenities data; completed status not independently verified. Avenue plantation is listed in the approval
Community buildingsNo description or size statedRERA amenitiesRERA amenities record shows 0%
Solid waste managementListed as an approval condition; no system details or capacity statedRERA amenitiesRERA amenities record shows 0%; no independent completion evidence

7. Utilities, building services & safety

The tentative layout approval lists a water reservoir, overhead tank / sump, internal water-supply pipelines, a common septic tank / STP, sewerage lines, storm-water drains, rainwater-harvesting pits, an electric transformer, street lights and solid-waste management. It requires public-purpose areas for open space, utilities and roads to be handed over to the Municipality by registered gift deed before release of the tentative layout. The supplied record does not state capacities or independently verify installation or operation.

The RERA amenities record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and the electrical meter room/substation/receiving station categories as 100%; these are recorded amenity percentages, not independent confirmation of delivery. It records 0% for treatment and disposal of sewage and sullage water, solid-waste management, energy management and fire-protection/fire-safety requirements. No detailed fire-safety design, accessibility arrangements, security systems or waste-segregation specifications are provided. RERA amenities

8. Location, access & connectivity

The registered location is in Perkit-B, Armoor mandal, Nizamabad district, Telangana, with PIN 503223. The tentative layout approval describes the site as being in Perkit&Kotarmoor Revenue Village, at Perkit&Kotarmoor. The recorded southern boundary is a carts way. The approved layout also requires roads to be opened for access to neighbouring sites. RERA record RERA filing

The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 130.6 km. No other measured distances, public-transport details or project-specific approach-road descriptions are provided. Location record

9. Developer & development status

The registered promoter is Yenganti Linga Goud. The supplied record does not establish a legal entity type, corporate registration identifier, registered office address, official contact details or project website. The RERA certificate lists the promoter’s office as House No.: 12-22; no further office location is stated there. Corporate record

The project record reports 70% completeness, without independent site verification or a works-by-works progress breakdown. The filed Form B declaration, dated 26-3-2025, states that the promoter will complete the project by 16th March2026. The RERA certificate states registration validity through 16/03/2026 and no extension. The project header records 30/11/2026 as both proposed and revised completion date. No occupancy or completion certificate is included in the available project documents. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP03100009550; valid 17/03/2023–16/03/2026
What it establishesRegistration of YENGANTI LINGA GOUD PROJECT; certificate lists project conditions, including a separate-account requirement.
Tentative layout approval
Identifier / date0025/LO/3069/2023; 17 March 2023
What it establishesApproval by ARMOOR Municipality/Municipal Corporation for a 41-plot layout in survey numbers 64/A and 65. The document expressly describes the approval as tentative and says it is not proof of land title.
Layout application
Identifier / date013144/LO/DTCP/3069/0039/2022
What it establishesApplication number stated in the layout approval.
Mortgage deed cited in layout approval
Identifier / date1655/2023; 13 March 2023
What it establishesApproval identifies plots 32, 39, 31, 40, 41, 30, 29 and 28 as mortgaged to the Municipality.
Form B declaration
Identifier / dateDated 26-3-2025
What it establishesPromoter declaration concerning title, encumbrances, completion and other RERA commitments.
Occupancy / completion certificate
Identifier / dateNot supplied
What it establishesNo such certificate is identified in the reviewed project documents. Document index

Frequently asked questions

Is YENGANTI LINGA GOUD PROJECT registered with Telangana RERA?

Yes. YENGANTI LINGA GOUD PROJECT is registered with the Telangana Real Estate Regulatory Authority as P03100009550; the registration status is On-Going Project.

Who is the developer of YENGANTI LINGA GOUD PROJECT?

The promoter named in the RERA registration is YENGANTI.

Where is YENGANTI LINGA GOUD PROJECT located?

YENGANTI LINGA GOUD PROJECT is in KOTARMOOR, Perkit-B, ARMOOR, Nizamabad, Telangana (503223).

When will YENGANTI LINGA GOUD PROJECT be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Perkit B