Dream Land
DEEPAK · Rangareddy · RERA P02400010633
DREAM LAND is a new residential open plotted layout in Kongarakurdu, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter DEEPAK ADHIKARI. It covers 33486.16 sq.m and has 78 plots, with no towers, blocks or floors disclosed; the drawing-derived plot-size range is 192.31–959.9 sq.m. The project is registered under TG-RERA number P02400010633, and its proposed completion is 24/01/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | DREAM LAND RERA record |
| Project type | New residential open plotted layout RERA record |
| Phase / registered portion | Phase not separately stated; registration is for the project identified under the survey numbers below RERA record |
| TG-RERA registration | P02400010633 RERA record |
| Registration validity | 24 September 2025 to 24 September 2028, unless extended by the Authority RERA record |
| Registered promoter | DEEPAK ADHIKARI |
| RERA status | Registered; captured in the supplied project record on 10 September 2026 Approvals record |
| Legal entity type | Not disclosed in the supplied record Corporate record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Kongarakurdu RERA record |
| Revenue village | Kongarakurdu; the layout document identifies KONGARAKHURD (A) VILLAGE. RERA record |
| Mandal | Maheshwaram RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501510 RERA record |
| Project survey numbers and subdivisions | 284/PART (OLD) and 469/PART (NEW); the filing also records 284/P. RERA record |
| Registered site extent | 33486.16 sq.m RERA filing |
| Total / net layout area | 33486.16 sq.m / 33486.16 sq.m |
| Boundaries in RERA filing | East: ROAD; West: NEIGHBOURS LAND; North: NEIGHBOURS LAND; South: NEIGHBOURS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | HMDA; the draft layout letter is issued through Thukkuguda Municipality Approvals record |
| Principal layout approval / file number | 002466/HMDA/00737/SWDL/SHZ/2025; the filed plan records 24/09/2025 Approvals record |
| Other approval number in the draft layout record | 0659/HMDA/SWDL/2025, dated 11/06/2025 Approvals record |
| Approved built-up area | Not stated as a building area; this is a plotted layout RERA filing |
| Plots | 78 plots, as counted from the layout drawing’s plot schedule Layout record |
| Buildings / floors | Not applicable to the plotted-layout offering; no building or floor configuration is disclosed Layout record |
| Road widths shown in the filed layout material | 30.0m, 9.14m and 12.19m |
| Parking | No common parking area is allocated in the layout area statement; individual plot parking provisions are not specified |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots; the supplied layout schedule identifies 78 plots Layout record |
| Plot-size range | 192.31–959.9 sq.m (software-read from the drawing; verify against the drawing) Layout record |
| Booked / available counts | Not disclosed in the supplied evidence RERA unit table |
| Construction / development stage | The project is registered as a new project. The supplied record does not establish independently verified site progress RERA record Document index |
| Completion dates | Form B declares completion by 24 September 2028; the project header records proposed completion as 24/01/2029. RERA record |
| Occupancy / completion certificate | Not supplied. The record concerns a draft plotted layout and does not establish an occupancy or completion certificate Document index |
Registration validity, the promoter’s declared completion date and certificate status are separate matters: the registration certificate is valid through 24 September 2028 unless extended; the Form B declaration gives that same completion date; and the supplied evidence does not include an occupancy or completion certificate.
2. The project story
DREAM LAND is registered as a plotted development at Kongarakurdu, Maheshwaram Mandal, Ranga Reddy District. Its filed layout material describes a residential open plotted layout over 33486.16 sq.m, with 78 plots shown in the plot schedule, internal roads, park/open space, social-infrastructure land and utility land. RERA record Layout record
The layout record is described as a draft layout. It identifies a mortgage to HMDA over six plots—Plots 1, 2, 4 to 7—covering 4121.60 sq.m. The submitted approval materials describe development works and later release of the final layout; they do not establish that those works are complete or that final-layout release has occurred.
The promoter’s Form B declares completion by 24 September 2028. No independently verified construction-progress report or completion/occupancy certificate is included in the supplied material, so completed works and current on-site progress cannot be confirmed here. Document index
3. Master plan, architecture & building design
The layout drawing records a total and net layout area of 33486.16 sq.m and the following land-use split:
| Layout use | Area | Share stated in drawing |
|---|---|---|
| Plotted area | 19731.16 sq.m | 58.92% |
| Road area | 10137.47 sq.m | 30.27% |
| Open space / park | 2525.24 sq.m | 7.54% |
| Social infrastructure | 840.26 sq.m | 2.51% |
| Utility area | 252.00 sq.m | 0.75% |
| Buffer area | 0.00 sq.m | 0% |
| Common parking area | 0.00 sq.m | 0% |
| Green belt area | 0.00 sq.m | 0% |
The drawing-derived plot schedule contains 78 plots. The recorded layout road widths include 30.0m, 9.14m and 12.19m; the drawing describes a 30m-wide main road and internal approach roads. Layout record
The project is a plotted layout, not a disclosed apartment or multi-storey building scheme. Building count, building footprint, floor configuration, tower height and common-building layout are not established in the supplied evidence. The layout drawing’s plot sizes and schedule are software-read from the drawing and should be checked against the original. Layout record
4. Homes, configurations & floor plans
The registered offering is plots, rather than residential apartment configurations. The available drawing-derived summary is:
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 78 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Layout record RERA unit table
The drawing-based size summary ranges from 192.31 sq.m (230.0 sq.yd) to 959.9 sq.m (1148.0 sq.yd), with a median of 200.67 sq.m (240.0 sq.yd). These are software-read plot measurements, not RERA-filed saleable-area figures. The drawing-based bands are: 60 plots in 200–250 sq.yd, 12 in 300–400 sq.yd, three in 500–1000 sq.yd and three in 1000+ sq.yd. Verify these measurements and counts against the approved drawing before relying on a particular plot’s dimensions. Layout record
The supplied floor-plan review contains two layout sheets and no measured apartment floor plans; room dimensions, carpet areas and unit-level orientation are therefore not applicable or established for this plotted offering. Floor plans
5. Parking & vehicle circulation
The layout area statement allocates 0.00 sq.m (0%) to common parking. The supplied documents do not state a sanctioned parking-space count, visitor or accessible parking provision, individual plot parking allocation, parking allotment terms, or EV-charging installation.
The layout drawing records road widths of 30.0m, 9.14m and 12.19m. The filed approval material also describes roads to be opened for access to neighbouring sites. These are layout-road provisions; they do not establish plot-specific access rights or the completed condition of the roads.
6. Amenities, recreation & open spaces
The RERA amenities record marks several infrastructure categories as available, but shows 0% progress for the listed items. That is a filed status entry, not independent confirmation of completion. The draft layout documents also describe intended infrastructure and facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 2525.24 sq.m; 7.54% of layout area | Shown in the layout; completion not verified | |
| Tot-lot / green strip | Required to be fenced and maintained as greenery under the filed conditions | Condition stated; completion not verified | |
| Social infrastructure | 840.26 sq.m; 2.51% of layout area | Land allocation shown; facility type and completion not established | |
| Internal roads and footpaths | Layout roads; recorded widths include 30.0m, 9.14m and 12.19m | RERA amenities | RERA amenity entry shows 0% progress; completion not verified |
| Community buildings | No description or size supplied | RERA amenities | No progress or completion established |
| Convenience facilities | Solid-waste disposal/dumping space and bio-compost unit are listed in the draft-layout material | Proposed/listed; completion not verified |
The vendor listing also names a garden, park and CCTV, among other amenities; these are third-party marketing claims, not evidence of sanctioned or delivered facilities, and are not relied on as project completion status here. Promoter website
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, rainwater harvesting, and an electrical meter room/sub-station/receiving station. It shows 0% progress for the listed entries; the supplied evidence does not establish that these facilities have been completed or independently inspected. RERA amenities
The draft layout documents list the following proposed or required infrastructure:
| Supplied project evidence | Internal water-supply pipelines and an overhead tank (OHT) are listed |
|---|---|
| Status evidenced | Listed in draft-layout material; storage capacity, source and completion are not supplied |
| Supplied project evidence | Underground drainage lines, common septic tank / STP and storm-water drains are listed |
|---|---|
| Status evidenced | Listed; treatment capacity, connection details and completion are not supplied |
| Supplied project evidence | Rainwater-harvesting pits/percolation pit are listed |
|---|---|
| Status evidenced | Required/listed; completion not verified |
| Supplied project evidence | Electrical supply lines, street lights, transformer and transformer yard are listed |
|---|---|
| Status evidenced | Listed; supply capacity and completion are not supplied |
| Supplied project evidence | Solid-waste disposal space and bio-compost unit are listed |
|---|---|
| Status evidenced | Listed; completion not verified |
| Supplied project evidence | Filed conditions refer to qualified technical supervision and safety requirements; no project-specific completed fire system or clearance is supplied |
|---|---|
| Status evidenced | Conditions/document references only; compliance or completion not established |
| Supplied project evidence | No project-specific accessible route or facility details are supplied |
|---|---|
| Status evidenced | Not established |
No project-specific capacities, completed service connections, fire clearance or as-built verification are provided in the supplied evidence. Document index RERA amenities
8. Location, access & connectivity
The registered project location is Kongarakurdu, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501510, with the layout document identifying the revenue village as KONGARAKHURD (A) VILLAGE. The supplied cadastral parcel centroid is 17.41528, 78.35459. RERA record Location record
The filed drawing records east-boundary abutment to a road and internal road widths of 30.0m, 9.14m and 12.19m. It does not provide verified distances to public transport, schools, hospitals or other landmarks. RERA filing The supplied location record identifies Financial District (Nanakramguda) at 1.2 km. Location record
Third-party listing distances to schools, bus stops, a hospital and Electronic Hardware Park are marketing-source claims, not independently verified access measurements. Promoter website
9. Developer & development status
The TG-RERA certificate names DEEPAK ADHIKARI as promoter. The Form B declaration is made by Deepak Adhikari as an authorized signatory and declares project completion by 24 September 2028. The supplied record does not establish the promoter’s legal entity type, corporate identifier, registered office or official contact details. Corporate record
The project header records proposed completion as 24/01/2029, while the promoter’s Form B declaration states 24 September 2028. The project registration certificate is valid through 24 September 2028 unless extended. These are distinct recorded dates; this Overview does not establish an extension or completion. RERA record
The submitted layout material is for a draft layout, and the supplied evidence does not establish final-layout release, completed infrastructure, current physical progress or an occupancy/completion certificate. Document index
10. Approvals, official records & documents
| Record | Evidence in the supplied project file |
|---|---|
| TG-RERA registration | Form C certificate for DREAM LAND, registration P02400010633, naming DEEPAK ADHIKARI; valid 24/09/2025–24/09/2028 unless extended |
| Principal layout file / approval | 002466/HMDA/00737/SWDL/SHZ/2025; the filed layout record gives 24/09/2025 Approvals record |
| Draft layout letter | HMDA technical approval record 0659/HMDA/SWDL/2025, dated 11/06/2025; describes a draft plotted layout and delegated processing through Thukkuguda Municipality |
| Draft layout permission | Thukkuguda Municipality record dated 24/09/2025, with project survey numbers 284/PART (OLD) and 469/PART (NEW) |
| Layout plan | Two layout sheets are recorded; the supplied drawing-derived information includes plot schedule and land-use areas Layout record |
| Promoter declaration | Form B dated 01.10.2025, including the promoter’s completion undertaking |
| Occupancy / completion certificate | Not supplied in the reviewed project documents Document index |
| Building commencement / floor-plan approval | Not established as applicable to this plotted-layout offering; no project building-floor plan is supplied |
The approval documents describe the project as a draft layout and state that development permission is not proof of land title. Their listed conditions include development works and later final-layout release; the supplied file does not establish that final release has occurred.
1. Project at a glance
Project identity
Registered name: DREAM LAND
Project type: New residential open plotted layout
Phase / registered portion: Phase not separately stated; registration is for the project identified under the survey numbers below
TG-RERA registration: P02400010633
Registration validity: 24 September 2025 to 24 September 2028, unless extended by the Authority
Registered promoter: DEEPAK ADHIKARI
RERA status: Registered; captured in the supplied project record on 10 September 2026
Legal entity type: Not disclosed in the supplied record
Land and geographic identity
Locality: Kongarakurdu
Revenue village: Kongarakurdu; the layout document identifies KONGARAKHURD (A) VILLAGE.
Mandal: Maheshwaram
District: Ranga Reddy
PIN: 501510
Project survey numbers and subdivisions: 284/PART (OLD) and 469/PART (NEW); the filing also records 284/P.
Registered site extent: 33486.16 sq.m
Total / net layout area: 33486.16 sq.m / 33486.16 sq.m
Boundaries in RERA filing: East: ROAD; West: NEIGHBOURS LAND; North: NEIGHBOURS LAND; South: NEIGHBOURS LAND
Development identity
Sanctioning authority: HMDA; the draft layout letter is issued through Thukkuguda Municipality
Principal layout approval / file number: 002466/HMDA/00737/SWDL/SHZ/2025; the filed plan records 24/09/2025
Other approval number in the draft layout record: 0659/HMDA/SWDL/2025, dated 11/06/2025
Approved built-up area: Not stated as a building area; this is a plotted layout
Plots: 78 plots, as counted from the layout drawing’s plot schedule
Buildings / floors: Not applicable to the plotted-layout offering; no building or floor configuration is disclosed
Road widths shown in the filed layout material: 30.0m, 9.14m and 12.19m
Parking: No common parking area is allocated in the layout area statement; individual plot parking provisions are not specified
Offering and status
Offering: Plots; the supplied layout schedule identifies 78 plots
Plot-size range: 192.31–959.9 sq.m (software-read from the drawing; verify against the drawing)
Booked / available counts: Not disclosed in the supplied evidence
Construction / development stage: The project is registered as a new project. The supplied record does not establish independently verified site progress
Completion dates: Form B declares completion by 24 September 2028; the project header records proposed completion as 24/01/2029.
Occupancy / completion certificate: Not supplied. The record concerns a draft plotted layout and does not establish an occupancy or completion certificate
Registration validity, the promoter’s declared completion date and certificate status are separate matters: the registration certificate is valid through 24 September 2028 unless extended; the Form B declaration gives that same completion date; and the supplied evidence does not include an occupancy or completion certificate.
2. The project story
DREAM LAND is registered as a plotted development at Kongarakurdu, Maheshwaram Mandal, Ranga Reddy District. Its filed layout material describes a residential open plotted layout over 33486.16 sq.m, with 78 plots shown in the plot schedule, internal roads, park/open space, social-infrastructure land and utility land.
The layout record is described as a draft layout. It identifies a mortgage to HMDA over six plots—Plots 1, 2, 4 to 7—covering 4121.60 sq.m. The submitted approval materials describe development works and later release of the final layout; they do not establish that those works are complete or that final-layout release has occurred.
The promoter’s Form B declares completion by 24 September 2028. No independently verified construction-progress report or completion/occupancy certificate is included in the supplied material, so completed works and current on-site progress cannot be confirmed here.
3. Master plan, architecture & building design
The layout drawing records a total and net layout area of 33486.16 sq.m and the following land-use split:
| Layout use | Area | Share stated in drawing |
|---|---|---|
| Plotted area | 19731.16 sq.m | 58.92% |
| Road area | 10137.47 sq.m | 30.27% |
| Open space / park | 2525.24 sq.m | 7.54% |
| Social infrastructure | 840.26 sq.m | 2.51% |
| Utility area | 252.00 sq.m | 0.75% |
| Buffer area | 0.00 sq.m | 0% |
| Common parking area | 0.00 sq.m | 0% |
| Green belt area | 0.00 sq.m | 0% |
The drawing-derived plot schedule contains 78 plots. The recorded layout road widths include 30.0m, 9.14m and 12.19m; the drawing describes a 30m-wide main road and internal approach roads.
The project is a plotted layout, not a disclosed apartment or multi-storey building scheme. Building count, building footprint, floor configuration, tower height and common-building layout are not established in the supplied evidence. The layout drawing’s plot sizes and schedule are software-read from the drawing and should be checked against the original.
4. Homes, configurations & floor plans
The registered offering is plots, rather than residential apartment configurations. The available drawing-derived summary is:
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 78 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The drawing-based size summary ranges from 192.31 sq.m (230.0 sq.yd) to 959.9 sq.m (1148.0 sq.yd), with a median of 200.67 sq.m (240.0 sq.yd). These are software-read plot measurements, not RERA-filed saleable-area figures. The drawing-based bands are: 60 plots in 200–250 sq.yd, 12 in 300–400 sq.yd, three in 500–1000 sq.yd and three in 1000+ sq.yd. Verify these measurements and counts against the approved drawing before relying on a particular plot’s dimensions.
The supplied floor-plan review contains two layout sheets and no measured apartment floor plans; room dimensions, carpet areas and unit-level orientation are therefore not applicable or established for this plotted offering.
5. Parking & vehicle circulation
The layout area statement allocates 0.00 sq.m (0%) to common parking. The supplied documents do not state a sanctioned parking-space count, visitor or accessible parking provision, individual plot parking allocation, parking allotment terms, or EV-charging installation.
The layout drawing records road widths of 30.0m, 9.14m and 12.19m. The filed approval material also describes roads to be opened for access to neighbouring sites. These are layout-road provisions; they do not establish plot-specific access rights or the completed condition of the roads.
6. Amenities, recreation & open spaces
The RERA amenities record marks several infrastructure categories as available, but shows 0% progress for the listed items. That is a filed status entry, not independent confirmation of completion. The draft layout documents also describe intended infrastructure and facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 2525.24 sq.m; 7.54% of layout area | Shown in the layout; completion not verified | |
| Tot-lot / green strip | Required to be fenced and maintained as greenery under the filed conditions | Condition stated; completion not verified | |
| Social infrastructure | 840.26 sq.m; 2.51% of layout area | Land allocation shown; facility type and completion not established | |
| Internal roads and footpaths | Layout roads; recorded widths include 30.0m, 9.14m and 12.19m | RERA amenity entry shows 0% progress; completion not verified | |
| Community buildings | No description or size supplied | No progress or completion established | |
| Convenience facilities | Solid-waste disposal/dumping space and bio-compost unit are listed in the draft-layout material | Proposed/listed; completion not verified |
The vendor listing also names a garden, park and CCTV, among other amenities; these are third-party marketing claims, not evidence of sanctioned or delivered facilities, and are not relied on as project completion status here.
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, rainwater harvesting, and an electrical meter room/sub-station/receiving station. It shows 0% progress for the listed entries; the supplied evidence does not establish that these facilities have been completed or independently inspected.
The draft layout documents list the following proposed or required infrastructure:
| Supplied project evidence | Internal water-supply pipelines and an overhead tank (OHT) are listed |
|---|---|
| Status evidenced | Listed in draft-layout material; storage capacity, source and completion are not supplied |
| Supplied project evidence | Underground drainage lines, common septic tank / STP and storm-water drains are listed |
|---|---|
| Status evidenced | Listed; treatment capacity, connection details and completion are not supplied |
| Supplied project evidence | Rainwater-harvesting pits/percolation pit are listed |
|---|---|
| Status evidenced | Required/listed; completion not verified |
| Supplied project evidence | Electrical supply lines, street lights, transformer and transformer yard are listed |
|---|---|
| Status evidenced | Listed; supply capacity and completion are not supplied |
| Supplied project evidence | Solid-waste disposal space and bio-compost unit are listed |
|---|---|
| Status evidenced | Listed; completion not verified |
| Supplied project evidence | Filed conditions refer to qualified technical supervision and safety requirements; no project-specific completed fire system or clearance is supplied |
|---|---|
| Status evidenced | Conditions/document references only; compliance or completion not established |
| Supplied project evidence | No project-specific accessible route or facility details are supplied |
|---|---|
| Status evidenced | Not established |
No project-specific capacities, completed service connections, fire clearance or as-built verification are provided in the supplied evidence.
8. Location, access & connectivity
The registered project location is Kongarakurdu, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501510, with the layout document identifying the revenue village as KONGARAKHURD (A) VILLAGE. The supplied cadastral parcel centroid is 17.41528, 78.35459.
The filed drawing records east-boundary abutment to a road and internal road widths of 30.0m, 9.14m and 12.19m. It does not provide verified distances to public transport, schools, hospitals or other landmarks. The supplied location record identifies Financial District (Nanakramguda) at 1.2 km.
Third-party listing distances to schools, bus stops, a hospital and Electronic Hardware Park are marketing-source claims, not independently verified access measurements.
9. Developer & development status
The TG-RERA certificate names DEEPAK ADHIKARI as promoter. The Form B declaration is made by Deepak Adhikari as an authorized signatory and declares project completion by 24 September 2028. The supplied record does not establish the promoter’s legal entity type, corporate identifier, registered office or official contact details.
The project header records proposed completion as 24/01/2029, while the promoter’s Form B declaration states 24 September 2028. The project registration certificate is valid through 24 September 2028 unless extended. These are distinct recorded dates; this Overview does not establish an extension or completion.
The submitted layout material is for a draft layout, and the supplied evidence does not establish final-layout release, completed infrastructure, current physical progress or an occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for DREAM LAND, registration P02400010633, naming DEEPAK ADHIKARI; valid 24/09/2025–24/09/2028 unless extended
Principal layout file / approval: 002466/HMDA/00737/SWDL/SHZ/2025; the filed layout record gives 24/09/2025
Draft layout letter: HMDA technical approval record 0659/HMDA/SWDL/2025, dated 11/06/2025; describes a draft plotted layout and delegated processing through Thukkuguda Municipality
Draft layout permission: Thukkuguda Municipality record dated 24/09/2025, with project survey numbers 284/PART (OLD) and 469/PART (NEW)
Layout plan: Two layout sheets are recorded; the supplied drawing-derived information includes plot schedule and land-use areas
Promoter declaration: Form B dated 01.10.2025, including the promoter’s completion undertaking
Occupancy / completion certificate: Not supplied in the reviewed project documents
Building commencement / floor-plan approval: Not established as applicable to this plotted-layout offering; no project building-floor plan is supplied
The approval documents describe the project as a draft layout and state that development permission is not proof of land title. Their listed conditions include development works and later final-layout release; the supplied file does not establish that final release has occurred.
Frequently asked questions
Is DREAM LAND registered with Telangana RERA?
Yes. DREAM LAND is registered with the Telangana Real Estate Regulatory Authority as P02400010633; the registration status is New Project.
Who is the developer of DREAM LAND?
The promoter named in the RERA registration is DEEPAK.
Where is DREAM LAND located?
DREAM LAND is in KONGARAKURDU, Maheshwaram, Rangareddy, Telangana (501510).
When will DREAM LAND be completed?
The promoter's proposed date of completion filed with RERA is 24/01/2029. This is the promoter's declaration, not a guarantee.