Parwathi Parameshwara Homes Open Layout
PARWATHI PARAMESHWARA HOMES · Peddapalli · RERA P02900011358
PARWATHI PARAMESHWARA HOMES OPEN LAYOUT is a plotted development / open layout in Peddakalvala and Rangampalli (revenue village), Peddapalli Municipality, Peddapalli Mandal, Peddapalli District. The registered promoter is PARWATHI PARAMESHWARA HOMES. The RERA project record states a total area of 12,269.84 sq m, and the tentative-layout approval records 40 plots; the project offers plots rather than homes in buildings. It is registered under TG-RERA number P02900011358, with a proposed completion date of 05/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | PARWATHI PARAMESHWARA HOMES OPEN LAYOUT RERA record |
| Project type | Plotted development / open layout RERA record |
| Phase / registered portion | The registration is for the open-layout project; no separate phase name is disclosed. RERA record |
| TG-RERA registration | P02900011358 RERA record |
| Registration validity | 06/11/2023 to 05/11/2026, subject to any extension by the Authority |
| Registered promoter | PARWATHI PARAMESHWARA HOMES RERA record |
| RERA status | Registration certificate records a grant under section 5. Certificate issue date: 26/10/2026. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Peddakalvala and Rangampalli (revenue village), Peddapalli Municipality RERA record Land records |
| Revenue villages | Peddakalvala and Rangampalli; the filed layout approval identifies Rangampalli Revenue Village. RERA record |
| Mandal / district / PIN | Peddapalli / Peddapalli / 505172 RERA record |
| Survey numbers and subdivisions | 108/a, 108/b and 230/1 RERA record |
| Registered site extent | The RERA project record states total area 12,269.84 sq m, of which 70.43 sq m is affected by road widening/FTL and net area is 12,199.41 sq m. RERA filing |
| Layout approval extent and land-use schedule | The tentative-layout approval states 3 Acer 1.28 Gts 14675 Sq. Yds. Its schedule allocates 65.62% to plots, 20.23% to roads, 9.05% to open-space park, 4.05% to social infrastructure and 1.04% to utilities. |
| Boundaries | East: 100-0 wide road and existing houses; West: agricultural land of Sy. Nos. 110, 107 and 100; North: open plots of Yamsani Venu and Eagam K; South: agricultural land of Sy. No. 109. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Peddapally Municipality/Municipal Corporation |
| Principal layout approval | Tentative Layout Plan No. 0023/LO/3014/2023, dated 06/11/2023; application No. 004774/LO/DTCP/3014/0026/2023 Approvals record |
| Approved built-up area | 8005.74 sq m is shown in the RERA-filed built-up area details; a building-specific configuration is not provided. RERA filing |
| Plot count | 40 plots in the tentative-layout approval and drawing schedule. Layout record |
| Buildings / floors | No building count or sanctioned floor configuration is disclosed in the supplied project record; the approval is for a plotted layout. |
| Mortgage area | RERA-filed area details state 2552.80 sq m; the layout approval identifies a municipal mortgage over Plot Nos. 18, 19, 20 and 21. RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots in an open layout; the filed layout drawing lists 40 plots. Layout record |
| RERA-filed plot sizes / inventory | Plot sizes and plot-wise booked/available counts are not supplied as RERA unit data in the evidence provided. |
| Drawing-derived plot sizes | Software-measured from the layout drawing: smallest 117.98 sq m (141.1 sq yd), median 154.7 sq m (185.0 sq yd), largest 404.62 sq m (483.9 sq yd). These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record |
| Construction / development stage | No independently verified site-progress assessment is supplied. The municipality’s 22-06-2026 notice requires infrastructure and amenities to be completed by 05.11.2026. |
| Completion deadline | The RERA Form B declaration states 05/11/2026; the municipality’s notice also gives 05.11.2026 for completion of infrastructure and amenities. |
| Registration expiry | 05/11/2026, as stated on the TG-RERA certificate; this is the registration validity date, not evidence of project completion. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is evidenced in the supplied documents. |
2. The project story
This is a plotted open-layout project, not an apartment or multi-storey building development. The RERA registration covers PARWATHI PARAMESHWARA HOMES OPEN LAYOUT at Peddakalvala and Rangampalli in Peddapalli Municipality, over survey numbers 108/a, 108/b and 230/1. The tentative layout approval describes 40 plots and reserves land for roads, a park/open space, social infrastructure and utilities. RERA record
The project record does not establish that the layout’s infrastructure is complete. A municipal notice dated 22-06-2026 extends the time for completing infrastructure and amenities to 05.11.2026; it is a deadline, not a verified progress report. No occupancy or completion certificate is present in the supplied evidence.
3. Master plan, architecture & building design
The filed tentative layout approval is for 40 plots. Its land-use schedule assigns 65.62% to plotted area, 20.23% to roads, 9.05% to park/open space, 4.05% to social infrastructure and 1.04% to utilities.
The RERA land-details record lists a total site area of 12,269.84 sq m, road-widening/FTL-affected area of 70.43 sq m, and net area of 12,199.41 sq m. The approval separately states its layout extent as 3 Acer 1.28 Gts 14675 Sq. Yds. RERA filing
The layout drawing’s software-measured plot schedule reports plot areas from 117.98 sq m to 404.62 sq m, with a median of 154.7 sq m. These are drawing-derived measurements; they are not RERA-filed saleable-area figures. Layout record
No building arrangement, floors, lifts, apartment layouts, or building-specific built-up configuration is evidenced. This is consistent with the project being registered as a plotted layout rather than a building project. The RERA-filed area details list approved built-up area of 8005.74 sq m, but the supplied evidence does not explain its building or use configuration. RERA record RERA filing
4. Homes, configurations & floor plans
This project offers plots rather than homes in buildings. The tentative layout approval and drawing schedule record 40 plots. No RERA unit-type table, plot-wise saleable-area schedule, or booked/available inventory counts are provided in the evidence supplied. Layout record
| Plot information | Value | Measurement/source note |
|---|---|---|
| Plot count | 40 | Stated in the tentative-layout approval and drawing schedule Layout record |
| Smallest plot | 117.98 sq m / 141.1 sq yd | Software-measured from the approved layout drawing Layout record |
| Median plot | 154.7 sq m / 185.0 sq yd | Software-measured from the approved layout drawing Layout record |
| Largest plot | 404.62 sq m / 483.9 sq yd | Software-measured from the approved layout drawing Layout record |
A plotted area is not an apartment carpet-area figure. The supplied drawing analysis identifies the plot schedule as drawing-derived; it does not provide RERA-filed plot-wise saleable areas, booking status or allotment details. Layout record
5. Parking & vehicle circulation
The supplied record does not establish a parking-space count, visitor or accessible parking provision, or parking-allocation arrangements. The layout approval identifies internal roads and states that roads are to remain open for access to neighbouring sites; it does not describe parking bays or a parking system.
6. Amenities, recreation & open spaces
The layout approval requires the applicant to provide infrastructure and amenities, and identifies open space, utilities and roads in the land-use schedule. The amenity checklist records several facilities as available, but the supplied evidence does not independently verify completion. RERA amenities
| Description / size | Approval schedule: 0 Acer 10.91 Gts 1320 Sq. Yds, 9.05%; layout drawing measurement: 1,103.87 sq m |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Included in the approval and checklist; completion not independently verified |
| Description / size | 0 Acer 4.89 Gts 592 Sq. Yds, 4.05% |
|---|---|
| Declared progress / verified status | Land reservation in approval; facility details and completion status not supplied |
| Description / size | Listed as available in the RERA amenity checklist |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Checklist status; not independently verified complete |
| Description / size | Required as layout infrastructure; road area is 0 Acer 24.4 Gts 2952 Sq. Yds, 20.23% in the approval schedule |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed in checklist; completion not independently verified |
| Description / size | No area or facility detail supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Checklist records 0%; not evidenced as provided |
| Description / size | Approval conditions refer to solid-waste management infrastructure |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Amenity checklist records 0%; completion not established |
7. Utilities, building services & safety
The tentative layout approval lists infrastructure works and requires their development; the amenity checklist separately records certain utilities as available. Neither source, by itself, independently verifies installation or operation. RERA amenities
| Evidence in the project record | Water supply is marked available in the amenity checklist. Approval conditions require an overhead tank/sump and sufficient harvesting pits. RERA amenities |
|---|---|
| Status limitation | No water source, storage capacity or completed-work verification is supplied. |
| Evidence in the project record | Sewerage (chambers, lines, septic tank/STP), storm-water drains and treatment/disposal of sewage and sullage are marked available in the checklist; the approval lists septic tank/STP, storm-water drains and underground drainage lines. RERA amenities |
|---|---|
| Status limitation | No system capacity or independent completion verification is supplied. |
| Evidence in the project record | Electrical meter room/substation/receiving station is marked available; approval lists an electric transformer and street lights. RERA amenities |
|---|---|
| Status limitation | No capacity or independent completion verification is supplied. |
| Evidence in the project record | Water conservation/rainwater harvesting is marked available; approval requires harvesting pits. RERA amenities |
|---|---|
| Status limitation | No capacity or independent completion verification is supplied. |
| Evidence in the project record | The approval lists solid-waste management; the amenity checklist records solid-waste management and disposal at 0%. RERA amenities |
|---|---|
| Status limitation | Completion is not established. |
| Evidence in the project record | The amenity checklist records fire-protection and fire-safety requirements at 0%. RERA amenities |
|---|---|
| Status limitation | No project-specific fire system or clearance is evidenced. |
| Evidence in the project record | No project-specific details supplied. |
|---|---|
| Status limitation | Not established by the supplied evidence. |
8. Location, access & connectivity
The registered location is Peddakalvala and Rangampalli (revenue village), Peddapalli Municipality, Peddapalli Mandal, Peddapalli District, Telangana, PIN 505172, across survey numbers 108/a, 108/b and 230/1. The filed layout approval places the land in Rangampalli Revenue Village; the RERA project identity also names Peddakalvala. RERA record
The recorded eastern boundary is a 100-0 wide road and existing houses. The location data identifies the Peddapalli-to-Karimnagar 100-0 wide road and gives the nearest sampled Outer Ring Road interchange as approximately 37.9 km away. That distance is a supplied location-data estimate; no travel time or public-transport information is provided. RERA filing Promoter website Location record
9. Developer & development status
The registered promoter is PARWATHI PARAMESHWARA HOMES, recorded as a partnership, with GSTIN 36ABCFP0245P1Z0. The supplied project record gives an office address at Sharma Nagar, Peddapalli; the TG-RERA certificate separately prints the promoter office as Village: 44th ward, Mandal: Karimnagar urban, District: Karimnagar, PIN 505001. Corporate record RERA filing
A Form B affidavit by authorized signatory AVUNURI SAI SATHWIK declares a project completion period ending 05/11/2026 and undertakes to maintain project funds and obtain pending approvals. These are promoter declarations, not independent confirmation of progress or completion.
The municipality’s notice states that infrastructure and amenities are to be completed by 05.11.2026. No verified construction-progress percentage, site inspection, or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| What it establishes | Registration P02900011358 for PARWATHI PARAMESHWARA HOMES OPEN LAYOUT; valid 06/11/2023–05/11/2026 |
|---|
| What it establishes | Peddapally Municipality/Municipal Corporation approval for Tentative Layout Plan No. 0023/LO/3014/2023, covering survey numbers 108/a, 108/b and 230/1; records 40 plots and land-use reservations |
|---|
| What it establishes | Notice No. G1/ 913/2026, dated 22-06-2026; states completion of infrastructure and amenities by 05.11.2026 and records payment of Rs. 87,176/- |
|---|
| What it establishes | Promoter declaration for the proposed “OPEN LAYOUT,” including completion undertaking of 05/11/2026 |
|---|
| What it establishes | Drawing used for software-measured plot count, plot sizes and land-use areas; these measurements are not RERA-filed saleable areas |
|---|---|
| Evidence | Layout record |
| What it establishes | Tentative approval identifies mortgage deed 6441/2023 over Plot Nos. 18, 19, 20 and 21 in favour of the Municipality/Municipal Corporation, stated as security for layout development conditions |
|---|
No occupancy or completion certificate is present in the supplied project evidence.
1. Project at a glance
Project identity
Registered project name: PARWATHI PARAMESHWARA HOMES OPEN LAYOUT
Project type: Plotted development / open layout
Phase / registered portion: The registration is for the open-layout project; no separate phase name is disclosed.
TG-RERA registration: P02900011358
Registration validity: 06/11/2023 to 05/11/2026, subject to any extension by the Authority
Registered promoter: PARWATHI PARAMESHWARA HOMES
RERA status: Registration certificate records a grant under section 5. Certificate issue date: 26/10/2026.
Land and geographic identity
Locality: Peddakalvala and Rangampalli (revenue village), Peddapalli Municipality
Revenue villages: Peddakalvala and Rangampalli; the filed layout approval identifies Rangampalli Revenue Village.
Mandal / district / PIN: Peddapalli / Peddapalli / 505172
Survey numbers and subdivisions: 108/a, 108/b and 230/1
Registered site extent: The RERA project record states total area 12,269.84 sq m, of which 70.43 sq m is affected by road widening/FTL and net area is 12,199.41 sq m.
Layout approval extent and land-use schedule: The tentative-layout approval states 3 Acer 1.28 Gts 14675 Sq. Yds. Its schedule allocates 65.62% to plots, 20.23% to roads, 9.05% to open-space park, 4.05% to social infrastructure and 1.04% to utilities.
Boundaries: East: 100-0 wide road and existing houses; West: agricultural land of Sy. Nos. 110, 107 and 100; North: open plots of Yamsani Venu and Eagam K; South: agricultural land of Sy. No. 109.
Development identity
Sanctioning authority: Peddapally Municipality/Municipal Corporation
Principal layout approval: Tentative Layout Plan No. 0023/LO/3014/2023, dated 06/11/2023; application No. 004774/LO/DTCP/3014/0026/2023
Approved built-up area: 8005.74 sq m is shown in the RERA-filed built-up area details; a building-specific configuration is not provided.
Plot count: 40 plots in the tentative-layout approval and drawing schedule.
Buildings / floors: No building count or sanctioned floor configuration is disclosed in the supplied project record; the approval is for a plotted layout.
Mortgage area: RERA-filed area details state 2552.80 sq m; the layout approval identifies a municipal mortgage over Plot Nos. 18, 19, 20 and 21.
Offering and status
Offering: Plots in an open layout; the filed layout drawing lists 40 plots.
RERA-filed plot sizes / inventory: Plot sizes and plot-wise booked/available counts are not supplied as RERA unit data in the evidence provided.
Drawing-derived plot sizes: Software-measured from the layout drawing: smallest 117.98 sq m (141.1 sq yd), median 154.7 sq m (185.0 sq yd), largest 404.62 sq m (483.9 sq yd). These are drawing-derived measurements, not RERA-filed saleable-area figures.
Construction / development stage: No independently verified site-progress assessment is supplied. The municipality’s 22-06-2026 notice requires infrastructure and amenities to be completed by 05.11.2026.
Completion deadline: The RERA Form B declaration states 05/11/2026; the municipality’s notice also gives 05.11.2026 for completion of infrastructure and amenities.
Registration expiry: 05/11/2026, as stated on the TG-RERA certificate; this is the registration validity date, not evidence of project completion.
Occupancy / completion certificate: No occupancy certificate or completion certificate is evidenced in the supplied documents.
2. The project story
This is a plotted open-layout project, not an apartment or multi-storey building development. The RERA registration covers PARWATHI PARAMESHWARA HOMES OPEN LAYOUT at Peddakalvala and Rangampalli in Peddapalli Municipality, over survey numbers 108/a, 108/b and 230/1. The tentative layout approval describes 40 plots and reserves land for roads, a park/open space, social infrastructure and utilities.
The project record does not establish that the layout’s infrastructure is complete. A municipal notice dated 22-06-2026 extends the time for completing infrastructure and amenities to 05.11.2026; it is a deadline, not a verified progress report. No occupancy or completion certificate is present in the supplied evidence.
3. Master plan, architecture & building design
The filed tentative layout approval is for 40 plots. Its land-use schedule assigns 65.62% to plotted area, 20.23% to roads, 9.05% to park/open space, 4.05% to social infrastructure and 1.04% to utilities.
The RERA land-details record lists a total site area of 12,269.84 sq m, road-widening/FTL-affected area of 70.43 sq m, and net area of 12,199.41 sq m. The approval separately states its layout extent as 3 Acer 1.28 Gts 14675 Sq. Yds.
The layout drawing’s software-measured plot schedule reports plot areas from 117.98 sq m to 404.62 sq m, with a median of 154.7 sq m. These are drawing-derived measurements; they are not RERA-filed saleable-area figures.
No building arrangement, floors, lifts, apartment layouts, or building-specific built-up configuration is evidenced. This is consistent with the project being registered as a plotted layout rather than a building project. The RERA-filed area details list approved built-up area of 8005.74 sq m, but the supplied evidence does not explain its building or use configuration.
4. Homes, configurations & floor plans
This project offers plots rather than homes in buildings. The tentative layout approval and drawing schedule record 40 plots. No RERA unit-type table, plot-wise saleable-area schedule, or booked/available inventory counts are provided in the evidence supplied.
| Plot information | Value | Measurement/source note |
|---|---|---|
| Plot count | 40 | Stated in the tentative-layout approval and drawing schedule |
| Smallest plot | 117.98 sq m / 141.1 sq yd | Software-measured from the approved layout drawing |
| Median plot | 154.7 sq m / 185.0 sq yd | Software-measured from the approved layout drawing |
| Largest plot | 404.62 sq m / 483.9 sq yd | Software-measured from the approved layout drawing |
A plotted area is not an apartment carpet-area figure. The supplied drawing analysis identifies the plot schedule as drawing-derived; it does not provide RERA-filed plot-wise saleable areas, booking status or allotment details.
5. Parking & vehicle circulation
The supplied record does not establish a parking-space count, visitor or accessible parking provision, or parking-allocation arrangements. The layout approval identifies internal roads and states that roads are to remain open for access to neighbouring sites; it does not describe parking bays or a parking system.
6. Amenities, recreation & open spaces
The layout approval requires the applicant to provide infrastructure and amenities, and identifies open space, utilities and roads in the land-use schedule. The amenity checklist records several facilities as available, but the supplied evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | Approval schedule: 0 Acer 10.91 Gts 1320 Sq. Yds, 9.05%; layout drawing measurement: 1,103.87 sq m | Included in the approval and checklist; completion not independently verified | |
| Social infrastructure land | 0 Acer 4.89 Gts 592 Sq. Yds, 4.05% | Land reservation in approval; facility details and completion status not supplied | |
| Green strip / tot lot / park | Listed as available in the RERA amenity checklist | Checklist status; not independently verified complete | |
| Internal roads and footpaths | Required as layout infrastructure; road area is 0 Acer 24.4 Gts 2952 Sq. Yds, 20.23% in the approval schedule | Listed in checklist; completion not independently verified | |
| Community buildings | No area or facility detail supplied | Checklist records 0%; not evidenced as provided | |
| Solid-waste management and disposal | Approval conditions refer to solid-waste management infrastructure | Amenity checklist records 0%; completion not established |
7. Utilities, building services & safety
The tentative layout approval lists infrastructure works and requires their development; the amenity checklist separately records certain utilities as available. Neither source, by itself, independently verifies installation or operation.
| Evidence in the project record | Water supply is marked available in the amenity checklist. Approval conditions require an overhead tank/sump and sufficient harvesting pits. |
|---|---|
| Status limitation | No water source, storage capacity or completed-work verification is supplied. |
| Evidence in the project record | Sewerage (chambers, lines, septic tank/STP), storm-water drains and treatment/disposal of sewage and sullage are marked available in the checklist; the approval lists septic tank/STP, storm-water drains and underground drainage lines. |
|---|---|
| Status limitation | No system capacity or independent completion verification is supplied. |
| Evidence in the project record | Electrical meter room/substation/receiving station is marked available; approval lists an electric transformer and street lights. |
|---|---|
| Status limitation | No capacity or independent completion verification is supplied. |
| Evidence in the project record | Water conservation/rainwater harvesting is marked available; approval requires harvesting pits. |
|---|---|
| Status limitation | No capacity or independent completion verification is supplied. |
| Evidence in the project record | The approval lists solid-waste management; the amenity checklist records solid-waste management and disposal at 0%. |
|---|---|
| Status limitation | Completion is not established. |
| Evidence in the project record | The amenity checklist records fire-protection and fire-safety requirements at 0%. |
|---|---|
| Status limitation | No project-specific fire system or clearance is evidenced. |
| Evidence in the project record | No project-specific details supplied. |
|---|---|
| Status limitation | Not established by the supplied evidence. |
8. Location, access & connectivity
The registered location is Peddakalvala and Rangampalli (revenue village), Peddapalli Municipality, Peddapalli Mandal, Peddapalli District, Telangana, PIN 505172, across survey numbers 108/a, 108/b and 230/1. The filed layout approval places the land in Rangampalli Revenue Village; the RERA project identity also names Peddakalvala.
The recorded eastern boundary is a 100-0 wide road and existing houses. The location data identifies the Peddapalli-to-Karimnagar 100-0 wide road and gives the nearest sampled Outer Ring Road interchange as approximately 37.9 km away. That distance is a supplied location-data estimate; no travel time or public-transport information is provided.
9. Developer & development status
The registered promoter is PARWATHI PARAMESHWARA HOMES, recorded as a partnership, with GSTIN 36ABCFP0245P1Z0. The supplied project record gives an office address at Sharma Nagar, Peddapalli; the TG-RERA certificate separately prints the promoter office as Village: 44th ward, Mandal: Karimnagar urban, District: Karimnagar, PIN 505001.
A Form B affidavit by authorized signatory AVUNURI SAI SATHWIK declares a project completion period ending 05/11/2026 and undertakes to maintain project funds and obtain pending approvals. These are promoter declarations, not independent confirmation of progress or completion.
The municipality’s notice states that infrastructure and amenities are to be completed by 05.11.2026. No verified construction-progress percentage, site inspection, or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| What it establishes | Registration P02900011358 for PARWATHI PARAMESHWARA HOMES OPEN LAYOUT; valid 06/11/2023–05/11/2026 |
|---|
| What it establishes | Peddapally Municipality/Municipal Corporation approval for Tentative Layout Plan No. 0023/LO/3014/2023, covering survey numbers 108/a, 108/b and 230/1; records 40 plots and land-use reservations |
|---|
| What it establishes | Notice No. G1/ 913/2026, dated 22-06-2026; states completion of infrastructure and amenities by 05.11.2026 and records payment of Rs. 87,176/- |
|---|
| What it establishes | Promoter declaration for the proposed “OPEN LAYOUT,” including completion undertaking of 05/11/2026 |
|---|
| What it establishes | Drawing used for software-measured plot count, plot sizes and land-use areas; these measurements are not RERA-filed saleable areas |
|---|
| What it establishes | Tentative approval identifies mortgage deed 6441/2023 over Plot Nos. 18, 19, 20 and 21 in favour of the Municipality/Municipal Corporation, stated as security for layout development conditions |
|---|
No occupancy or completion certificate is present in the supplied project evidence.
Frequently asked questions
Is PARWATHI PARAMESHWARA HOMES OPEN LAYOUT registered with Telangana RERA?
Yes. PARWATHI PARAMESHWARA HOMES OPEN LAYOUT is registered with the Telangana Real Estate Regulatory Authority as P02900011358; the registration status is New Project.
Who is the developer of PARWATHI PARAMESHWARA HOMES OPEN LAYOUT?
The promoter named in the RERA registration is PARWATHI PARAMESHWARA HOMES.
Where is PARWATHI PARAMESHWARA HOMES OPEN LAYOUT located?
PARWATHI PARAMESHWARA HOMES OPEN LAYOUT is in PEDDAKALVALA AND RANGAMPALLI (REVENUE VILLAGE),PEDDAPALLI MUNICIPAILTY., Peddapalli, Telangana (505172).
When will PARWATHI PARAMESHWARA HOMES OPEN LAYOUT be completed?
The promoter's proposed date of completion filed with RERA is 05/11/2026. This is the promoter's declaration, not a guarantee.