Siri Township
Gurram · Nalgonda · RERA P01800009977
SIRI TOWNSHIP is a residential plotted development in Devarakonda, Kondamallepally Mandal, Nalgonda District, developed by registered promoter GURRAM VISHWANATHAM. The registered site extent is 18,630.58 sq. m, and the tentative layout comprises 71 residential plots; software-read plot sizes range from 74.95 sq. m (89.6 sq. yd) to 220.73 sq. m (264.0 sq. yd). It is registered with TG-RERA as P01800009977, with registration validity from 26/07/2025 to 26/07/2027; the layout approval requires infrastructure and amenities to be completed by 26 July, 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SIRI TOWNSHIP RERA record |
| Project type | Plotted development / residential plotted layout RERA record Approvals record |
| Phase or registered portion | Not separately identified in the supplied registration record RERA record |
| TG-RERA registration number | P01800009977 RERA record |
| Registration validity | 26/07/2025–26/07/2027; registration validity is not the same as the project completion deadline |
| Registered promoter | GURRAM VISHWANATHAM; the supplied certificate identifies the promoter as an individual |
| RERA status | Registered; the certificate states a two-year validity period, unless extended by the Authority |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / street | Devarakonda RERA record |
| Revenue village | Deverkonda (also described in the approval documents as Devarakonda Revenue Village / DEVARKONDA) RERA record |
| Mandal | Kondamallepally RERA record |
| District / PIN | Nalgonda / 508248 RERA record |
| Project survey numbers | 746A and 747/A/1 Land records |
| Registered site extent | The registration record lists 18,630.58 sq. m; the filed layout drawing separately states Total Layout Area 18630.04 sq.mt, Net Layout Area 18579.09 sq.mt, and Total net layout 18578.35 sq.mt RERA filing |
| Boundaries | North: Land; South: Land; East: Land; West: land RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | The project approval record identifies DTCP; the tentative layout approval document identifies Devarakonda Municipality/Municipal Corporation Approvals record |
| Principal layout approval | 0006/LO/3044/2025, dated 26 July, 2025; described in the approval document as an approval for a Tentative Layout Plan Approvals record |
| Approved plotted layout | 71 plots Layout record |
| Approved built-up area | The filed layout drawing states total proposed built-up area 0.00, excluding and including parking |
| Buildings / floors | Not applicable as a stated building scheme for this plotted layout; no tower or floor configuration is supplied |
| Parking | No common parking area is recorded in the filed layout land-use table; individual plot parking provision or allocation is not specified |
| RERA-declared unit count | A plot allotment form is filed, but no completed unit inventory or booked/available plot counts are supplied |
Offering and status
| Field | Record |
|---|---|
| Offered product | Residential plots; the filed plot allotment form leaves allottee, plot number and price blank |
| Plot count and sizes | The drawing-based schedule states 71 plots; software-read plot sizes range from 74.95 sq. m (89.6 sq. yd) to 220.73 sq. m (264.0 sq. yd), with a median of 139.35 sq. m (166.7 sq. yd). These drawing-derived figures should be checked against the approved drawing Layout record |
| Booked / available counts | Not disclosed in the supplied evidence Document index |
| Construction / development stage | Registration and layout approval are documented; no independently verified site-progress record is supplied. The approval requires infrastructure and amenities to be completed within two years of 26 July 2025 |
| Completion dates | The registration certificate is valid through 26/07/2027. The approval condition gives an infrastructure/amenities completion period ending 26 July, 2027; the promoter’s Form B completion text is OCR-garbled and not reliably readable |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout, and no building-wise OC scope is supplied Document index |
2. The project story
SIRI TOWNSHIP is registered with TG-RERA as a residential plotted development on Survey Nos. 746A and 747/A/1 in Deverkonda/Devarakonda, Kondamallepally Mandal, Nalgonda District. The filed tentative layout approval is for 71 plots and allocates land to plots, roads, open space, social infrastructure and utilities. The approval describes the layout as tentative and assigns development responsibility to the applicant; it does not establish that the infrastructure has since been built or that the plots are ready for occupation RERA record.
The approved layout conditions set a two-year period from 26 July, 2025 to complete infrastructure and amenities, and provide for a possible one-year extension on specific request and payment of the stated fee. No site inspection or independently verified construction-progress evidence is supplied here, so physical completion cannot be established from this record. The registration certificate runs to 26/07/2027; that is the certificate’s validity period, not evidence that a completion or occupancy certificate has been issued.
3. Master plan, architecture & building design
The filed layout drawing describes an open-plot layout, not a multi-storey building scheme. It identifies 71 individual sub-plots and states proposed built-up area as 0.00, both excluding and including parking. No building footprint, floor configuration, tower height, flat-per-floor arrangement, lift or stair design is evidenced.
The layout drawing’s land-use table records 10,413.30 sq. m (56.05%) as plotted area, 5,814.13 sq. m (31.29%) as roads, 1,694.97 sq. m (9.12%) as organized open space/park, 469.99 sq. m (2.53%) as social infrastructure and 185.96 sq. m (1.00%) as utility area. It records no amenity area, common parking area, buffer-zone area or green-belt area in that table. The separate tentative approval document also lists open space, social infrastructure, utilities, roads and plotted area, and requires specified reserved areas to be handed over to the Municipality by registered gift deed before release of the tentative layout.
The drawing identifies internal and existing/proposed road widths including 9.14 mt. Wide InternalRoad, 18.28 mt. Wide InternalRoad, 9.14 MT WIDE EXISTING, 9.14 MT WIDE PROPOSED ROAD, and 6.7 MT WIDE EXISTING ROAD, as well as other widths printed on the drawing. The drawing also includes FTL and buffer annotations; this overview does not determine their parcel-level effect.
4. Homes, configurations & floor plans
This is a plotted layout. The filed plot schedule states 71 plots; it does not supply a completed RERA inventory of booked and available plots, or plot-specific saleable-area entries.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 71 plots stated on the layout drawing | Not disclosed | Not disclosed | Not supplied by plot | Not applicable | Not supplied |
Software reading of the layout schedule gives plot areas from 74.95 sq. m (89.6 sq. yd) to 220.73 sq. m (264.0 sq. yd), with a median of 139.35 sq. m (166.7 sq. yd). The schedule has 71 plots with sizes read; these are software-measured from the drawing and should be verified against it. The floor-plan record contains no residential floor plans or measured carpet areas Layout record Floor plans.
5. Parking & vehicle circulation
The filed layout land-use table records 0.00 common parking area. The supplied evidence does not establish a sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, plot-specific parking allocations, or a parking allotment arrangement. The drawing identifies internal roads and their widths, but no evidence describes parking bays, driveways, ramps or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
The RERA-filed amenity record marks the following facilities as available in the filing, with 0% progress recorded for each. That percentage does not establish construction completion; no independent verification of delivery is supplied RERA amenities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads; the drawing includes multiple stated road widths | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Water supply | No source, capacity or storage details in this amenity entry | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Sewerage facilities | Filing names chambers, lines, septic tank and STP | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Storm-water drains | No size or capacity stated | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Green strip / tot lot / park | Layout drawing records 1,694.97 sq. m organized open space/park | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Street lighting | No fixture count or specification stated | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Community buildings | No description or size supplied | RERA amenities | No “available” value or progress confirmation supplied |
| Sewage and sullage treatment/disposal | No treatment capacity or reuse details supplied | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Solid-waste management and disposal | No capacity or operating details supplied | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Water conservation / rainwater harvesting | No pit count or capacity supplied | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Energy management | No system description supplied | RERA amenities | No “available” value or progress confirmation supplied |
| Fire protection and fire safety | No equipment or design details supplied | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Electrical meter room, sub-station, receiving station | No capacity or equipment specification supplied | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
| Recreational open space | Aggregate area recorded in the layout drawing as 1,694.97 sq. m | RERA amenities | RERA-filed as available; 0% progress; completion not independently verified |
The tentative approval conditions also refer to a water reservoir, septic tank/Sewerage Treatment Plant, electric transformer and solid-waste management within the utilities provision, and require an overhead tank or sump, septic tank as applicable, and harvesting pits. These are approval conditions, not evidence of completed facilities.
7. Utilities, building services & safety
The layout approval conditions call for an overhead tank or sump, a septic tank as applicable, and sufficient harvesting pits. The filed amenity list also names water supply, sewerage chambers/lines, septic tank and STP, storm-water drains, solid-waste management, rainwater harvesting and an electrical meter room/sub-station/receiving station. The evidence does not provide capacities, detailed designs, completion status, water source, treatment or reuse arrangements, backup power, security systems, accessibility features, or fire-safety system specifications RERA amenities.
8. Location, access & connectivity
The registered location is Deverkonda, Kondamallepally Mandal, Nalgonda District, Telangana, PIN 508248, with the project land identified in Survey Nos. 746A and 747/A/1 RERA record. The supplied location record gives a geocode of 16.7137293, 78.975509 and records the nearest sampled Outer Ring Road interchange at approximately 74.0 km Location record.
The approval drawing shows internal-road widths, but the supplied evidence does not establish public-transport services, specific approach-road routes, or distances to local landmarks or amenities.
9. Developer & development status
The TG-RERA certificate names GURRAM VISHWANATHAM as the registered promoter and gives the address as House No.: 19-64/3, Village: Deverkonda, Mandal: Kondamallepally, District: Nalgonda, Pin: 508248, State of Telangana. The supplied evidence identifies the promoter as an individual and provides no company registration number or official website/contact details Corporate record.
The promoter’s filed Form B affidavit declares that the project will be completed by a date that is OCR-garbled and cannot be reliably read. The layout approval separately requires infrastructure and amenities to be completed by 26 July, 2027. The supplied record does not include independently verified on-site progress Document index.
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C certificate for SIRI TOWNSHIP, registration P01800009977; validity 26/07/2025–26/07/2027; promoter named as GURRAM VISHWANATHAM |
| Tentative layout approval | 0006/LO/3044/2025, dated 26 July, 2025, issued by Devarakonda Municipality/Municipal Corporation for a 71-plot layout on Survey Nos. 746A and 747/A/1; includes development and reserved-land conditions |
| Filed layout drawing | Layout-plan record identifies 71 plots, land-use areas, roads, utility and open-space allocations, and the file number G/282/02/KLKY/2021-22 |
| Plot allotment form | Filed plot allotment form, with allottee, plot number and price fields blank |
| Agreement-for-sale form | Filed form for the proposed sale of a plot; key allottee, plot, land particulars, price and dates are largely unfilled |
| Form B promoter declaration | Affidavit dated 05-August-2025 identifying the promoter and containing declarations on title, encumbrances, project funds, approvals and completion; the completion date text is OCR-garbled |
No occupancy/completion certificate is included in the supplied project documents. The overview therefore cannot confirm that any part of the layout has received such certification.
1. Project at a glance
Project identity
Registered project name: SIRI TOWNSHIP
Project type: Plotted development / residential plotted layout
Phase or registered portion: Not separately identified in the supplied registration record
TG-RERA registration number: P01800009977
Registration validity: 26/07/2025–26/07/2027; registration validity is not the same as the project completion deadline
Registered promoter: GURRAM VISHWANATHAM; the supplied certificate identifies the promoter as an individual
RERA status: Registered; the certificate states a two-year validity period, unless extended by the Authority
Land and geographic identity
Locality / street: Devarakonda
Revenue village: Deverkonda (also described in the approval documents as Devarakonda Revenue Village / DEVARKONDA)
Mandal: Kondamallepally
District / PIN: Nalgonda / 508248
Project survey numbers: 746A and 747/A/1
Registered site extent: The registration record lists 18,630.58 sq. m; the filed layout drawing separately states Total Layout Area 18630.04 sq.mt, Net Layout Area 18579.09 sq.mt, and Total net layout 18578.35 sq.mt
Boundaries: North: Land; South: Land; East: Land; West: land
Development identity
Sanctioning authority: The project approval record identifies DTCP; the tentative layout approval document identifies Devarakonda Municipality/Municipal Corporation
Principal layout approval: 0006/LO/3044/2025, dated 26 July, 2025; described in the approval document as an approval for a Tentative Layout Plan
Approved plotted layout: 71 plots
Approved built-up area: The filed layout drawing states total proposed built-up area 0.00, excluding and including parking
Buildings / floors: Not applicable as a stated building scheme for this plotted layout; no tower or floor configuration is supplied
Parking: No common parking area is recorded in the filed layout land-use table; individual plot parking provision or allocation is not specified
RERA-declared unit count: A plot allotment form is filed, but no completed unit inventory or booked/available plot counts are supplied
Offering and status
Offered product: Residential plots; the filed plot allotment form leaves allottee, plot number and price blank
Plot count and sizes: The drawing-based schedule states 71 plots; software-read plot sizes range from 74.95 sq. m (89.6 sq. yd) to 220.73 sq. m (264.0 sq. yd), with a median of 139.35 sq. m (166.7 sq. yd). These drawing-derived figures should be checked against the approved drawing
Booked / available counts: Not disclosed in the supplied evidence
Construction / development stage: Registration and layout approval are documented; no independently verified site-progress record is supplied. The approval requires infrastructure and amenities to be completed within two years of 26 July 2025
Completion dates: The registration certificate is valid through 26/07/2027. The approval condition gives an infrastructure/amenities completion period ending 26 July, 2027; the promoter’s Form B completion text is OCR-garbled and not reliably readable
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout, and no building-wise OC scope is supplied
2. The project story
SIRI TOWNSHIP is registered with TG-RERA as a residential plotted development on Survey Nos. 746A and 747/A/1 in Deverkonda/Devarakonda, Kondamallepally Mandal, Nalgonda District. The filed tentative layout approval is for 71 plots and allocates land to plots, roads, open space, social infrastructure and utilities. The approval describes the layout as tentative and assigns development responsibility to the applicant; it does not establish that the infrastructure has since been built or that the plots are ready for occupation.
The approved layout conditions set a two-year period from 26 July, 2025 to complete infrastructure and amenities, and provide for a possible one-year extension on specific request and payment of the stated fee. No site inspection or independently verified construction-progress evidence is supplied here, so physical completion cannot be established from this record. The registration certificate runs to 26/07/2027; that is the certificate’s validity period, not evidence that a completion or occupancy certificate has been issued.
3. Master plan, architecture & building design
The filed layout drawing describes an open-plot layout, not a multi-storey building scheme. It identifies 71 individual sub-plots and states proposed built-up area as 0.00, both excluding and including parking. No building footprint, floor configuration, tower height, flat-per-floor arrangement, lift or stair design is evidenced.
The layout drawing’s land-use table records 10,413.30 sq. m (56.05%) as plotted area, 5,814.13 sq. m (31.29%) as roads, 1,694.97 sq. m (9.12%) as organized open space/park, 469.99 sq. m (2.53%) as social infrastructure and 185.96 sq. m (1.00%) as utility area. It records no amenity area, common parking area, buffer-zone area or green-belt area in that table. The separate tentative approval document also lists open space, social infrastructure, utilities, roads and plotted area, and requires specified reserved areas to be handed over to the Municipality by registered gift deed before release of the tentative layout.
The drawing identifies internal and existing/proposed road widths including 9.14 mt. Wide InternalRoad, 18.28 mt. Wide InternalRoad, 9.14 MT WIDE EXISTING, 9.14 MT WIDE PROPOSED ROAD, and 6.7 MT WIDE EXISTING ROAD, as well as other widths printed on the drawing. The drawing also includes FTL and buffer annotations; this overview does not determine their parcel-level effect.
4. Homes, configurations & floor plans
This is a plotted layout. The filed plot schedule states 71 plots; it does not supply a completed RERA inventory of booked and available plots, or plot-specific saleable-area entries.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 71 plots stated on the layout drawing | Not disclosed | Not disclosed | Not supplied by plot | Not applicable | Not supplied |
Software reading of the layout schedule gives plot areas from 74.95 sq. m (89.6 sq. yd) to 220.73 sq. m (264.0 sq. yd), with a median of 139.35 sq. m (166.7 sq. yd). The schedule has 71 plots with sizes read; these are software-measured from the drawing and should be verified against it. The floor-plan record contains no residential floor plans or measured carpet areas.
5. Parking & vehicle circulation
The filed layout land-use table records 0.00 common parking area. The supplied evidence does not establish a sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, plot-specific parking allocations, or a parking allotment arrangement. The drawing identifies internal roads and their widths, but no evidence describes parking bays, driveways, ramps or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
The RERA-filed amenity record marks the following facilities as available in the filing, with 0% progress recorded for each. That percentage does not establish construction completion; no independent verification of delivery is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads; the drawing includes multiple stated road widths | RERA-filed as available; 0% progress; completion not independently verified | |
| Water supply | No source, capacity or storage details in this amenity entry | RERA-filed as available; 0% progress; completion not independently verified | |
| Sewerage facilities | Filing names chambers, lines, septic tank and STP | RERA-filed as available; 0% progress; completion not independently verified | |
| Storm-water drains | No size or capacity stated | RERA-filed as available; 0% progress; completion not independently verified | |
| Green strip / tot lot / park | Layout drawing records 1,694.97 sq. m organized open space/park | RERA-filed as available; 0% progress; completion not independently verified | |
| Street lighting | No fixture count or specification stated | RERA-filed as available; 0% progress; completion not independently verified | |
| Community buildings | No description or size supplied | No “available” value or progress confirmation supplied | |
| Sewage and sullage treatment/disposal | No treatment capacity or reuse details supplied | RERA-filed as available; 0% progress; completion not independently verified | |
| Solid-waste management and disposal | No capacity or operating details supplied | RERA-filed as available; 0% progress; completion not independently verified | |
| Water conservation / rainwater harvesting | No pit count or capacity supplied | RERA-filed as available; 0% progress; completion not independently verified | |
| Energy management | No system description supplied | No “available” value or progress confirmation supplied | |
| Fire protection and fire safety | No equipment or design details supplied | RERA-filed as available; 0% progress; completion not independently verified | |
| Electrical meter room, sub-station, receiving station | No capacity or equipment specification supplied | RERA-filed as available; 0% progress; completion not independently verified | |
| Recreational open space | Aggregate area recorded in the layout drawing as 1,694.97 sq. m | RERA-filed as available; 0% progress; completion not independently verified |
The tentative approval conditions also refer to a water reservoir, septic tank/Sewerage Treatment Plant, electric transformer and solid-waste management within the utilities provision, and require an overhead tank or sump, septic tank as applicable, and harvesting pits. These are approval conditions, not evidence of completed facilities.
7. Utilities, building services & safety
The layout approval conditions call for an overhead tank or sump, a septic tank as applicable, and sufficient harvesting pits. The filed amenity list also names water supply, sewerage chambers/lines, septic tank and STP, storm-water drains, solid-waste management, rainwater harvesting and an electrical meter room/sub-station/receiving station. The evidence does not provide capacities, detailed designs, completion status, water source, treatment or reuse arrangements, backup power, security systems, accessibility features, or fire-safety system specifications.
8. Location, access & connectivity
The registered location is Deverkonda, Kondamallepally Mandal, Nalgonda District, Telangana, PIN 508248, with the project land identified in Survey Nos. 746A and 747/A/1. The supplied location record gives a geocode of 16.7137293, 78.975509 and records the nearest sampled Outer Ring Road interchange at approximately 74.0 km.
The approval drawing shows internal-road widths, but the supplied evidence does not establish public-transport services, specific approach-road routes, or distances to local landmarks or amenities.
9. Developer & development status
The TG-RERA certificate names GURRAM VISHWANATHAM as the registered promoter and gives the address as House No.: 19-64/3, Village: Deverkonda, Mandal: Kondamallepally, District: Nalgonda, Pin: 508248, State of Telangana. The supplied evidence identifies the promoter as an individual and provides no company registration number or official website/contact details.
The promoter’s filed Form B affidavit declares that the project will be completed by a date that is OCR-garbled and cannot be reliably read. The layout approval separately requires infrastructure and amenities to be completed by 26 July, 2027. The supplied record does not include independently verified on-site progress.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C certificate for SIRI TOWNSHIP, registration P01800009977; validity 26/07/2025–26/07/2027; promoter named as GURRAM VISHWANATHAM
Tentative layout approval: 0006/LO/3044/2025, dated 26 July, 2025, issued by Devarakonda Municipality/Municipal Corporation for a 71-plot layout on Survey Nos. 746A and 747/A/1; includes development and reserved-land conditions
Filed layout drawing: Layout-plan record identifies 71 plots, land-use areas, roads, utility and open-space allocations, and the file number G/282/02/KLKY/2021-22
Plot allotment form: Filed plot allotment form, with allottee, plot number and price fields blank
Agreement-for-sale form: Filed form for the proposed sale of a plot; key allottee, plot, land particulars, price and dates are largely unfilled
Form B promoter declaration: Affidavit dated 05-August-2025 identifying the promoter and containing declarations on title, encumbrances, project funds, approvals and completion; the completion date text is OCR-garbled
No occupancy/completion certificate is included in the supplied project documents. The overview therefore cannot confirm that any part of the layout has received such certification.
Frequently asked questions
Is SIRI TOWNSHIP registered with Telangana RERA?
Yes. SIRI TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01800009977; the registration status is New Project.
Who is the developer of SIRI TOWNSHIP?
The promoter named in the RERA registration is Gurram.
Where is SIRI TOWNSHIP located?
SIRI TOWNSHIP is in Devarakonda, Deverkonda, Kondamallepally, Nalgonda, Telangana (508248).
When will SIRI TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 26/11/2027. This is the promoter's declaration, not a guarantee.