Jakpat City

MUSHARAF · Nagarkurnool · RERA P01600010669

JAKPAT CITY is a plotted development in Kalwakurthy, Kalwakurthy Mandal, Nagarkurnool District, developed by the registered promoter MUSHARAF. The project has a total site area of 12,036.63 sq.m and a net layout area of 11,587.55 sq.m, with 46 plots; no tower or floor configuration is disclosed. It is a residential open-plot layout, with drawing-read plot sizes from 125.42 sq.m (150.0 sq.yd) to 200.67 sq.m (240.0 sq.yd). TG-RERA registration number P01600010669 is valid through 09/02/2028, and the promoter-declared completion date is 09-Feb-2028.

01What we found

RegisteredTG-RERA - valid till 9 Feb 2028
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kalwakurthy, Kalwakurthy, Nagarkurnool · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameJAKPAT CITY RERA record
Project type / statusPlotted Development; New Project RERA record RERA filing
Registered portion / phaseNot disclosed as a separate phase; the registration is for the plotted project RERA record
TG-RERA registrationP01600010669 RERA record
Registration validity09/02/2026–09/02/2028; certificate states a two-year period and no extension RERA record
Registered promoterMUSHARAF; the Form B names PARVIZ MUSHARAF, and the certificate names MUSHARAF PARVIZ RERA record
RERA statusNew project registered under section 5; registration certificate issued RERA record

Land and geographic identity

ItemRecord
LocalityKalwakurthy / Kalwakurthy Proper; the layout plan also identifies Kalwakurthy Shivar RERA record RERA filing
Revenue villageKalwakurthy; the layout document describes the site as Kalwakurthy Proper RERA record RERA filing
Mandal / district / PINKalwakurthy Mandal / Nagarkurnool District / 509324 RERA record RERA filing
Project survey identifiersSY NOS 707/U/2 (RERA registration); 707/PART (layout plan); the tentative layout approval also records 707/ఒ/2 RERA record
Total site area12,036.63 sq.m RERA filing
Road-widening / affected area449.08 sq.m RERA filing
Net layout area11,587.55 sq.m RERA filing
Boundaries recorded in RERA filingEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: ROAD RERA filing

Development identity

ItemRecord
Sanctioning authority / approvalLayout approval records DTCP and District Collector approval dated 09/02/2026; the tentative layout approval is issued by Kalwakurthy Municipality Approvals record
Principal approval identifiersApproval number 0005/KALW/SWDL/2026; file/application number 008699/KALW/00006/SWDL/2025 Approvals record
Approved built-up area6,694.31 sq.m is recorded in the RERA land/build-up fields; no building configuration is supplied for this plotted layout RERA filing
Plots46 numbered layout plots Layout record
Buildings / floors / parking levelsNot applicable as a disclosed residential building scheme; no tower, floor, basement, stilt or parking-level configuration is supplied Layout record
Sanctioned versus RERA-declared plot countLayout document records 46 plots; the supplied evidence does not provide a separate RERA inventory count Layout record

Offering and status

ItemRecord
OfferingPlots in a residential open-plot layout RERA filing
Plot count / sizes46 plots; software-read drawing schedule reports sizes from 125.42 sq.m (150.0 sq.yd) to 200.67 sq.m (240.0 sq.yd). Drawing-derived size readings should be checked against the plan Layout record
Booked / availableNot disclosed in the supplied evidence
Construction / development stageNo independently verified site progress is supplied. The tentative layout approval requires the owner/developer to complete infrastructure and amenities within two years of approval
Completion undertakingPromoter-declared completion date: 09-Feb-2028
Registration expiry09/02/2028; this is the registration-validity end date, not evidence that works are complete
Completion / occupancy certificateNo completion certificate or occupancy certificate is recorded in the supplied project evidence

2. The project story

JAKPAT CITY is registered as a plotted residential development in Kalwakurthy, Nagarkurnool District. The filed layout identifies 46 plots arranged with internal roads, open space, social-infrastructure land and utility land. This is a plot offering, not a disclosed apartment or multi-tower project. RERA record RERA filing Layout record

The recorded site area is 12,036.63 sq.m, including 449.08 sq.m identified as road-affected area; the net layout area is 11,587.55 sq.m. The layout approval documents identify infrastructure and amenity works to be completed by the owner/developer, but the supplied evidence does not establish that those works are complete or independently verify on-site progress. RERA filing

The promoter’s Form B declares completion by 09-Feb-2028. The registration certificate is valid through 09/02/2028. Neither date establishes completion, handover or an occupancy/completion certificate; none is shown in the supplied evidence.

3. Master plan, architecture & building design

The layout plan records a net layout area of 11,587.55 sq.m within a total site area of 12,036.63 sq.m. Its land-use schedule allocates 6,694.31 sq.m (57.77%) to plots, 3,397.88 sq.m (29.32%) to roads, 1,048.75 sq.m (9.05%) to open space, 330.61 sq.m (2.85%) to social infrastructure and 115.99 sq.m (1.00%) to utilities. These are layout-plan figures, not apartment floor-area or carpet-area measures.

The drawing identifies 46 numbered plots and internal roads. It gives road-width details including a 9.14m Main Internal Approach Road, a 9.14m Wide Sub Road, an existing road width of 10.97m, and proposed road width of 18.29m. The site also records a road-affected portion of 449.08 sq.m. Layout record

No building-by-building layout, floor configuration, apartment distribution, building footprint or residential floor plans are supplied. The RERA filing records 6,694.31 sq.m as approved built-up area, but the available evidence does not explain a building configuration for that figure. RERA filing Floor plans

4. Homes, configurations & floor plans

This project is a plotted layout. The supplied evidence does not include a RERA unit-type inventory, booked/available plot counts, or plot-wise sale status. The layout plan records 46 plots; plot sizes below are drawing-derived software readings, not a RERA-filed unit schedule. Layout record

Plot informationRecord
Number of plots46, as recorded on the layout drawing
Drawing-read size range125.42–200.67 sq.m (150.0–240.0 sq.yd) Layout record
Size bands39 plots: 150–200 sq.yd (125–167 sq.m); 7 plots: 200–250 sq.yd (167–209 sq.m) Layout record
Booked / availableNot disclosed in the supplied evidence
Measured carpet area / loadingNot applicable to the disclosed plot offering; no such figures supplied Floor plans

The drawing-reading record reports the plot schedule as complete, but also cautions that plot counts and sizes were read by software and should be verified against the drawing. The supplied floor-plan record contains two layout sheets and no flat measurements. Layout record Floor plans

5. Parking & vehicle circulation

The layout land-use schedule records 0.00 sq.m for common parking area. The supplied evidence does not state a parking-space count, plot-specific parking allocation, visitor parking, accessible parking, EV charging installation or parking ownership arrangement.

The layout drawing records internal roads, including a 9.14m Main Internal Approach Road and 9.14m Wide Sub Road; it also records an existing road width of 10.97m and a proposed road width of 18.29m. No separate vehicle-entry/exit or pedestrian-circulation plan is supplied.

6. Amenities, recreation & open spaces

The filed layout records open-space, social-infrastructure and utility land. A separate amenities record lists proposed facilities with 0% progress; that record does not establish completion. The tentative-layout approval also specifies infrastructure works and a fenced, green-maintained tot-lot before occupancy certification. Layout record RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space1,048.75 sq.m (9.05%) of net layout areaApproved layout planLayout allocation shown; completion not verified
Social infrastructure330.61 sq.m (2.85%) of net layout areaApproved layout planLand allocation shown; facility delivery not verified
Tot-lot / parkListed as Green Strip/TOT LOT/Park; plan condition requires a fenced tot-lot maintained as greeneryAmenities record RERA amenities; approval conditions0% in amenities record; not independently verified
Community buildingsListed in the amenities record; no size or specific building description suppliedAmenities record RERA amenities0%; not independently verified

No clubhouse or indoor recreation facility is identified in the supplied project evidence.

7. Utilities, building services & safety

The tentative-layout approval identifies proposed infrastructure including a water reservoir, overhead tank/sump, internal water-supply pipelines, septic tank/STP, underground drainage lines, storm-water drains, street lights, rainwater-harvesting pits, an electric transformer and solid-waste-management provision. The plan also requires a rainwater-harvesting structure, transformer space and a garbage house. These are approval requirements or listed infrastructure provisions, not evidence that the works have been installed or are operational.

Water
Evidence in the recordWater supply; reservoir, overhead tank/sump and internal water-supply pipelines listed
Status shownProposed/listed; completion and capacity not supplied RERA amenities
Sewerage and drainage
Evidence in the recordSeptic tank/STP, underground drainage lines and storm-water drains listed
Status shownProposed/listed; capacity, commissioning and completion not supplied RERA amenities
Rainwater
Evidence in the recordRainwater-harvesting pits / percolation structure required
Status shownRequired/listed; installation not verified
Electrical and lighting
Evidence in the recordTransformer space and street lighting listed; electrical meter room/sub-station/receiving station appears in the amenities record
Status shownProposed/listed; installation and capacity not supplied RERA amenities
Solid waste
Evidence in the recordSolid-waste-management provision and garbage house listed
Status shownProposed/listed; operation not verified RERA amenities
Fire and life safety
Evidence in the recordFire-safety requirement appears in the amenities record and layout conditions; no project-specific installed system or clearance is supplied
Status shownNot verified RERA amenities
Lifts / accessibility
Evidence in the recordNo project-specific lift or accessible-circulation details supplied
Status shownNot disclosed

8. Location, access & connectivity

The registered location is Kalwakurthy, Kalwakurthy Mandal, Nagarkurnool District, Telangana, PIN 509324. The layout plan describes the site as Kalwakurthy Proper / Kalwakurthy Shivar and records ROAD on the south boundary; the other three boundaries are recorded as OTHERS LAND in the RERA filing. RERA record RERA filing

The location record gives a distance of 63.8 km to the nearest sampled Outer Ring Road interchange. This is a recorded approximate distance; no travel time or public-transport details are supplied. Location record

9. Developer & development status

The project registration identifies the promoter as MUSHARAF. The project Form B is declared by PARVIZ MUSHARAF, while the registration certificate names MUSHARAF PARVIZ. The supplied evidence does not state the promoter’s legal-entity type, corporate identifier, registered office or official contact details. RERA record Corporate record

The promoter declares a completion date of 09-Feb-2028 in Form B. The tentative layout approval requires infrastructure and amenities to be completed within two years of the approval date, 09/02/2026, and provides for possible extension on application. No progress percentage or independently verified construction status is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01600010669; valid 09/02/2026–09/02/2028
What the supplied record establishesRegistration of JAKPAT CITY as a project; certificate includes separate-account and other registration conditions
Layout approval / plan
Identifier / date0005/KALW/SWDL/2026; approved 09/02/2026
What the supplied record establishesLayout plan for 46 plots, with land-use schedule, road details and conditions
Tentative layout-plan approval
Identifier / date0005/KALW/SWDL/2026; Kalwakurthy Municipality; approved 09/02/2026
What the supplied record establishesTentative residential open-plot layout approval and stated infrastructure obligations
File/application number
Identifier / date008699/KALW/00006/SWDL/2025
What the supplied record establishesApproval application identifier
Promoter declaration, Form B
Identifier / dateDated 11-February-2026
What the supplied record establishesPromoter’s title, encumbrance, financial and completion declarations, including the 09-Feb-2028 completion undertaking
Completion / occupancy certificate
Identifier / dateNot supplied
What the supplied record establishesNo completion or occupancy certificate is evidenced in the supplied records

Frequently asked questions

Is JAKPAT CITY registered with Telangana RERA?

Yes. JAKPAT CITY is registered with the Telangana Real Estate Regulatory Authority as P01600010669; the registration status is New Project.

Who is the developer of JAKPAT CITY?

The promoter named in the RERA registration is MUSHARAF.

Where is JAKPAT CITY located?

JAKPAT CITY is in KALWAKURTHY, Nagarkurnool, Telangana (509324).

When will JAKPAT CITY be completed?

The promoter's proposed date of completion filed with RERA is 09/06/2028. This is the promoter's declaration, not a guarantee.