Sv Residency
SRI RAJESHWARI CONSTRUCTIONS · Mahabubabad · RERA P00700005456
SV RESIDENCY is a residential apartment project in Old Town, Mahabubabad mandal, Mahabubabad district, developed by registered promoter Sri Rajeshwari Constructions. It is on 743.22 m² of land and comprises one building, Building A, with 1 Stilt + 5 upper floors and 20 2BHK apartments. The project is registered with TG-RERA under P00700005456, and its proposed completion date is 07 June, 2025.
More from Sri Rajeshwari Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SV RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | One registered project; phase name or separate phase number not disclosed RERA record |
| TG-RERA registration | P00700005456 |
| Registration validity | 07/12/2022 to 07/06/2025; certificate says registration is for 2 years unless extended by the Authority. An extension is not recorded in the supplied certificate. |
| Registered promoter | Sri Rajeshwari Constructions RERA record |
| RERA status in supplied record | Registered; the certificate’s stated validity ended on 07/06/2025. The supplied materials do not establish a later extension or current status. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Old Town RERA record RERA filing |
| Revenue village | RERA registration identifies the land as Old Town; the title-search report and filed title instruments also use Mahabubabad Town and Old Abadi, Mahabubabad Revenue Village. RERA record |
| Mandal / district / PIN | Mahabubabad / Mahabubabad / 506101 RERA record |
| Survey numbers and subdivisions | 88/1/A, 88/2, 89/1/A and 89/2 RERA record |
| Registered site extent | 743.22 m² |
| Total / net area and road-affected area | Sanction records total site area 743.22 m², net area 743.22 m², and road-affected area 0 m². |
| Boundaries in RERA project details | East and west: 33 FEET WIDE ROAD; north and south: OTHERS PLOT. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Mahabubabad Municipality/Municipal Corporation; the RERA project details identify DTCP as authority. Approvals record |
| Principal building approval | 0004/BP/3003/2022, approved 07 June, 2022; file no. 001499/BP/DTCP/3003/0004/2022. |
| Approved built-up area | 1,911.60 m² residential; the sanction separately records 393.88 m² of stilt area. |
| Building count and configuration | One building, Building A; sanctioned as 1 Stilt + 5 upper floors, height 14.25 m. |
| Parking level | One stilt floor, 393.88 m², identified in the sanction for parking. No number of parking spaces is supplied. |
| Unit count | RERA filing records 20 apartments, all shown as booked in the portal data supplied; the building sanction’s unit count is not separately stated in the extracted sanction parameters. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 2BHK apartments RERA unit details RERA unit table |
| RERA saleable area | 109.16 m² RERA unit details |
| Booked / available | 20 booked / 0 available, as read from the TG-RERA portal; the portal extract has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress information is supplied. TG-RERA progress fields list several infrastructure items at 100% and others at 0%; these are portal-declared figures, not independent verification. RERA amenities |
| Completion date | Promoter’s Form B undertaking and the sanction both specify completion before/by 07 June, 2025. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The sanction says an occupancy certificate is compulsory before occupation. |
2. The project story
SV RESIDENCY is registered as a residential apartment project on land identified in the RERA record by survey numbers 88/1/A, 88/2, 89/1/A and 89/2, in Old Town, Mahabubabad. The recorded site area is 743.22 m². RERA record
The building approval is for one residential block, Building A, with one stilt level and five upper floors. The RERA unit schedule records twenty 2BHK apartments. The supplied portal extract shows all twenty as booked, but provides no date for that count. RERA unit table
The promoter declared a completion date of 07 June, 2025. The available material does not establish the project’s present physical construction stage or show an occupancy/completion certificate. Portal progress entries are reported disclosures and should not be read as independent site inspection results. RERA amenities
3. Master plan, architecture & building design
The supplied building sanction describes one residential building on 743.22 m² of site area, with 1,911.60 m² of residential built-up area and a separate 393.88 m² stilt floor. It sanctions 1 Stilt + 5 upper floors, with a recorded building height of 14.25 m. These are sanction figures; no separate FSI-counted area, gross built-up area or carpet-area schedule is provided.
The sanction identifies residential use and records zero commercial and zero “others” area in its extracted land-use schedule. It also notes a fifth-floor area of 191.16 m² as “floor handed over”; the supplied extract does not explain this entry further.
The approval document is titled “Commencement Certificates for each building in each phase” in the RERA filing, but the extracted approval is a building-construction approval for Building A. No separate phase organization, building footprint drawing, floor-by-floor apartment arrangement, lift or stair count, internal road plan, landscape area schedule or common-area allocation is supplied in the extracted records. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 20 | 0 | 109.16 m² | 66.7–99.4 m²; median 78.6 m² | 28% |
RERA records the 2BHK count and saleable area. The carpet-area range and median are software measurements from the floor-plan drawing, not RERA-filed carpet-area disclosures; the measurement record says four measurements need review. The drawing set supplied is one measured drawing, with twenty flat designs measured. RERA unit details Floor plans
The measured example plan labels living/dining, kitchen, two bedrooms, two toilets and a separate living area. Its recorded room dimensions are: living/dining 3.0 × 7.48 m; kitchen 2.68 × 3.0 m; toilets 1.25 × 3.0 m each; one bedroom 3.0 × 3.0 m; the other bedroom 4.05 × 4.37 m; and living 3.0 × 3.0 m. These are drawing-based software measurements, not verified as-built dimensions. RERA unit details
Carpet area describes the measured home area; the RERA saleable area is a separate filed figure and includes the home’s share of common areas according to the supplied measurement caveat. No separate balcony, utility or loading schedule is provided. The booking counts have no as-of date in the supplied portal data. Floor plans RERA unit table
5. Parking & vehicle circulation
The sanction identifies the stilt as a parking floor and requires it to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted sanction records 393.88 m² of stilt area, but does not provide a sanctioned parking-space count, visitor or accessible-space allocation, or unit-wise parking allocation.
The approval conditions require one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. No ramp, driveway, pedestrian-separation, mechanical-parking or EV-charging details are provided in the supplied records. A drawn or sanctioned parking area does not by itself establish exclusive parking ownership for an apartment.
6. Amenities, recreation & open spaces
| Description / size | Listed as available |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 100% portal-declared; not independently verified |
| Description / size | Sewerage lines/chambers, septic tank or STP are grouped in the filing entry; the specific system is not identified |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 100% portal-declared; not independently verified |
| Description / size | No dimensions supplied |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 100% portal-declared; not independently verified |
| Description / size | Specific treatment arrangement and capacity not supplied |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 100% portal-declared; not independently verified |
| Description / size | Sanction requires a rainwater-harvesting structure; extracted approval parameters list 5 RWHPs |
|---|---|
| Declared progress / verified status | Portal record: 100%; completion not independently verified |
| Description / size | Details not supplied |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 100% portal-declared; not independently verified |
| Description / size | Sanction requires transformer space; portal lists electrical meter room, sub-station or receiving station |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal record: 100% for the electrical-room item; not independently verified |
| Description / size | Sanction schedule records Tot-lot as NA; sanction conditions also refer to tot-lot and peripheral greenery. No area or completion evidence is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal record: 0% for green strip/tot-lot/park; not independently verified |
| Description / size | No description or size supplied |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 0% portal-declared |
| Description / size | No specifications supplied |
|---|---|
| Evidence source | TG-RERA progress record RERA amenities |
| Declared progress / verified status | 0% portal-declared |
The sanction also requires a garbage house within the premises, tree planting along the periphery and in front of the premises, and maintenance of a peripheral greenery strip. These are approval conditions; the supplied evidence does not verify delivery.
7. Utilities, building services & safety
The sanction requires a rainwater-harvesting structure and identifies 5 RWHPs in its extracted parameters. It specifies a separate underground static water tank of 25,000 L and a separate residential terrace tank of 25,000 L. These are approval requirements; the supplied material does not verify installation or operation.
For fire and life safety, the approval conditions specify hose reels and down-corners; water-type fire extinguishers at the stated floor-area and minimum-per-floor rates; at least two 5 kg DCP extinguishers at generator and transformer areas; a manually operated alarm system; and fire-resistant swing doors for collapsible lifts. The sanction also requires emergency lighting in corridors, common passages and staircases, and a joint open space with neighbouring premises for fire-vehicle maneuverability. No fire-clearance certificate or completed-system verification is supplied.
The approval requires a generator as an alternate electricity source, transformer protection by fire-resistant construction, and electrical wiring/installations certified by electrical engineers. It also requires qualified technical personnel to supervise sanitation, plumbing, fire safety, lifts and electrical installations. Lift quantity, capacity and service-lift provision are not stated.
The sanction conditions require a garbage house and specify construction-stage dust and debris controls. The supplied records do not establish CCTV, access-control arrangements, waste segregation, accessibility ramps or other accessibility features.
8. Location, access & connectivity
The registered project location is Old Town, Mahabubabad, in Mahabubabad mandal and district, PIN 506101. The RERA land details list 33-foot-wide roads on the east and west boundaries; the building approval also contains conditions referring to an 18 m road and site access, but does not supply a verified route or connectivity-distance schedule for this project. RERA record RERA filing
A supplied location dataset gives the cadastral parcel centroid as 17.41528, 78.35459. The broader connectivity dataset lists Financial District (Nanakramguda) at 1.2 km; the evidence does not establish that this is a relevant project-area connection, so it should not be relied upon as a local access measurement. Location record
9. Developer & development status
The registered promoter is Sri Rajeshwari Constructions, recorded as a partnership. The supplied RERA information names Manohar Singam as authorized signatory and lists Damodhar Reddy Gudipalli, Lalitha Singam, Yakub Reddy Vemu and Malla Reddy Bolla as partners. The GSTIN supplied is 36ADRFS0091H1ZR. RERA record RERA filing Corporate record Parties record
The registration certificate gives the promoter’s office location as Mahabubabad district, PIN 506101; the project filing’s address details give Sri Nagar Colony, Ward 28, Old Town, Mahabubabad, PIN 506101. No official contact number, email or promoter website is supplied in the RERA evidence. RERA filing
The promoter’s Form B declares a completion undertaking of 7th June, 2025. No construction-progress evidence from an independent site inspection and no occupancy/completion certificate are included in the supplied materials.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for SV RESIDENCY, registration no. P00700005456, issued 07/12/2022; stated validity through 07/06/2025. |
| Building approval | Mahabubabad Municipality/Municipal Corporation approval 0004/BP/3003/2022, dated 07 June, 2022; file no. 001499/BP/DTCP/3003/0004/2022. |
| Building / commencement record | RERA-filed approval for Building A, one stilt plus five upper floors. The supplied extract includes detailed approval conditions. |
| Layout plan | A RERA filing entry requests a layout approval or stamped layout plan; the supplied document entry is not extracted, so its contents are not available for review. Document index |
| Title-search report | Advocate’s title-search report dated 29-07-2022 concerning the project plots and survey numbers; it is a filed opinion, not a substitute for the underlying registered instruments. |
| Form B declaration | Promoter declaration includes the 07 June, 2025 completion undertaking and statements on title, encumbrances and project obligations. |
| Occupancy / completion certificate | Not present in the supplied records. The building sanction requires an occupancy certificate before occupation. |
1. Project at a glance
Project identity
Registered project name: SV RESIDENCY
Project type: Residential apartment project
Phase / registered portion: One registered project; phase name or separate phase number not disclosed
TG-RERA registration: P00700005456
Registration validity: 07/12/2022 to 07/06/2025; certificate says registration is for 2 years unless extended by the Authority. An extension is not recorded in the supplied certificate.
Registered promoter: Sri Rajeshwari Constructions
RERA status in supplied record: Registered; the certificate’s stated validity ended on 07/06/2025. The supplied materials do not establish a later extension or current status.
Land and geographic identity
Locality: Old Town
Revenue village: RERA registration identifies the land as Old Town; the title-search report and filed title instruments also use Mahabubabad Town and Old Abadi, Mahabubabad Revenue Village.
Mandal / district / PIN: Mahabubabad / Mahabubabad / 506101
Survey numbers and subdivisions: 88/1/A, 88/2, 89/1/A and 89/2
Registered site extent: 743.22 m²
Total / net area and road-affected area: Sanction records total site area 743.22 m², net area 743.22 m², and road-affected area 0 m².
Boundaries in RERA project details: East and west: 33 FEET WIDE ROAD; north and south: OTHERS PLOT.
Development identity
Sanctioning authority: Mahabubabad Municipality/Municipal Corporation; the RERA project details identify DTCP as authority.
Principal building approval: 0004/BP/3003/2022, approved 07 June, 2022; file no. 001499/BP/DTCP/3003/0004/2022.
Approved built-up area: 1,911.60 m² residential; the sanction separately records 393.88 m² of stilt area.
Building count and configuration: One building, Building A; sanctioned as 1 Stilt + 5 upper floors, height 14.25 m.
Parking level: One stilt floor, 393.88 m², identified in the sanction for parking. No number of parking spaces is supplied.
Unit count: RERA filing records 20 apartments, all shown as booked in the portal data supplied; the building sanction’s unit count is not separately stated in the extracted sanction parameters.
Offering and status
Unit type: 2BHK apartments
RERA saleable area: 109.16 m²
Booked / available: 20 booked / 0 available, as read from the TG-RERA portal; the portal extract has no as-of date, so counts are indicative.
Construction stage: No independently verified site-progress information is supplied. TG-RERA progress fields list several infrastructure items at 100% and others at 0%; these are portal-declared figures, not independent verification.
Completion date: Promoter’s Form B undertaking and the sanction both specify completion before/by 07 June, 2025.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The sanction says an occupancy certificate is compulsory before occupation.
2. The project story
SV RESIDENCY is registered as a residential apartment project on land identified in the RERA record by survey numbers 88/1/A, 88/2, 89/1/A and 89/2, in Old Town, Mahabubabad. The recorded site area is 743.22 m².
The building approval is for one residential block, Building A, with one stilt level and five upper floors. The RERA unit schedule records twenty 2BHK apartments. The supplied portal extract shows all twenty as booked, but provides no date for that count.
The promoter declared a completion date of 07 June, 2025. The available material does not establish the project’s present physical construction stage or show an occupancy/completion certificate. Portal progress entries are reported disclosures and should not be read as independent site inspection results.
3. Master plan, architecture & building design
The supplied building sanction describes one residential building on 743.22 m² of site area, with 1,911.60 m² of residential built-up area and a separate 393.88 m² stilt floor. It sanctions 1 Stilt + 5 upper floors, with a recorded building height of 14.25 m. These are sanction figures; no separate FSI-counted area, gross built-up area or carpet-area schedule is provided.
The sanction identifies residential use and records zero commercial and zero “others” area in its extracted land-use schedule. It also notes a fifth-floor area of 191.16 m² as “floor handed over”; the supplied extract does not explain this entry further.
The approval document is titled “Commencement Certificates for each building in each phase” in the RERA filing, but the extracted approval is a building-construction approval for Building A. No separate phase organization, building footprint drawing, floor-by-floor apartment arrangement, lift or stair count, internal road plan, landscape area schedule or common-area allocation is supplied in the extracted records.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 20 | 0 | 109.16 m² | 66.7–99.4 m²; median 78.6 m² | 28% |
RERA records the 2BHK count and saleable area. The carpet-area range and median are software measurements from the floor-plan drawing, not RERA-filed carpet-area disclosures; the measurement record says four measurements need review. The drawing set supplied is one measured drawing, with twenty flat designs measured.
The measured example plan labels living/dining, kitchen, two bedrooms, two toilets and a separate living area. Its recorded room dimensions are: living/dining 3.0 × 7.48 m; kitchen 2.68 × 3.0 m; toilets 1.25 × 3.0 m each; one bedroom 3.0 × 3.0 m; the other bedroom 4.05 × 4.37 m; and living 3.0 × 3.0 m. These are drawing-based software measurements, not verified as-built dimensions.
Carpet area describes the measured home area; the RERA saleable area is a separate filed figure and includes the home’s share of common areas according to the supplied measurement caveat. No separate balcony, utility or loading schedule is provided. The booking counts have no as-of date in the supplied portal data.
5. Parking & vehicle circulation
The sanction identifies the stilt as a parking floor and requires it to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted sanction records 393.88 m² of stilt area, but does not provide a sanctioned parking-space count, visitor or accessible-space allocation, or unit-wise parking allocation.
The approval conditions require one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. No ramp, driveway, pedestrian-separation, mechanical-parking or EV-charging details are provided in the supplied records. A drawn or sanctioned parking area does not by itself establish exclusive parking ownership for an apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | Listed as available | TG-RERA progress record | 100% portal-declared; not independently verified |
| Sewerage | Sewerage lines/chambers, septic tank or STP are grouped in the filing entry; the specific system is not identified | TG-RERA progress record | 100% portal-declared; not independently verified |
| Storm-water drains | No dimensions supplied | TG-RERA progress record | 100% portal-declared; not independently verified |
| Sewage and sullage treatment/disposal | Specific treatment arrangement and capacity not supplied | TG-RERA progress record | 100% portal-declared; not independently verified |
| Rainwater harvesting / water conservation | Sanction requires a rainwater-harvesting structure; extracted approval parameters list 5 RWHPs | Portal record: 100%; completion not independently verified | |
| Energy management | Details not supplied | TG-RERA progress record | 100% portal-declared; not independently verified |
| Transformer space / electrical room | Sanction requires transformer space; portal lists electrical meter room, sub-station or receiving station | Portal record: 100% for the electrical-room item; not independently verified | |
| Tot-lot / green strip / park | Sanction schedule records Tot-lot as NA; sanction conditions also refer to tot-lot and peripheral greenery. No area or completion evidence is supplied. | Portal record: 0% for green strip/tot-lot/park; not independently verified | |
| Community buildings | No description or size supplied | TG-RERA progress record | 0% portal-declared |
| Street lighting and solid-waste management | No specifications supplied | TG-RERA progress record | 0% portal-declared |
The sanction also requires a garbage house within the premises, tree planting along the periphery and in front of the premises, and maintenance of a peripheral greenery strip. These are approval conditions; the supplied evidence does not verify delivery.
7. Utilities, building services & safety
The sanction requires a rainwater-harvesting structure and identifies 5 RWHPs in its extracted parameters. It specifies a separate underground static water tank of 25,000 L and a separate residential terrace tank of 25,000 L. These are approval requirements; the supplied material does not verify installation or operation.
For fire and life safety, the approval conditions specify hose reels and down-corners; water-type fire extinguishers at the stated floor-area and minimum-per-floor rates; at least two 5 kg DCP extinguishers at generator and transformer areas; a manually operated alarm system; and fire-resistant swing doors for collapsible lifts. The sanction also requires emergency lighting in corridors, common passages and staircases, and a joint open space with neighbouring premises for fire-vehicle maneuverability. No fire-clearance certificate or completed-system verification is supplied.
The approval requires a generator as an alternate electricity source, transformer protection by fire-resistant construction, and electrical wiring/installations certified by electrical engineers. It also requires qualified technical personnel to supervise sanitation, plumbing, fire safety, lifts and electrical installations. Lift quantity, capacity and service-lift provision are not stated.
The sanction conditions require a garbage house and specify construction-stage dust and debris controls. The supplied records do not establish CCTV, access-control arrangements, waste segregation, accessibility ramps or other accessibility features.
8. Location, access & connectivity
The registered project location is Old Town, Mahabubabad, in Mahabubabad mandal and district, PIN 506101. The RERA land details list 33-foot-wide roads on the east and west boundaries; the building approval also contains conditions referring to an 18 m road and site access, but does not supply a verified route or connectivity-distance schedule for this project.
A supplied location dataset gives the cadastral parcel centroid as 17.41528, 78.35459. The broader connectivity dataset lists Financial District (Nanakramguda) at 1.2 km; the evidence does not establish that this is a relevant project-area connection, so it should not be relied upon as a local access measurement.
9. Developer & development status
The registered promoter is Sri Rajeshwari Constructions, recorded as a partnership. The supplied RERA information names Manohar Singam as authorized signatory and lists Damodhar Reddy Gudipalli, Lalitha Singam, Yakub Reddy Vemu and Malla Reddy Bolla as partners. The GSTIN supplied is 36ADRFS0091H1ZR.
The registration certificate gives the promoter’s office location as Mahabubabad district, PIN 506101; the project filing’s address details give Sri Nagar Colony, Ward 28, Old Town, Mahabubabad, PIN 506101. No official contact number, email or promoter website is supplied in the RERA evidence.
The promoter’s Form B declares a completion undertaking of 7th June, 2025. No construction-progress evidence from an independent site inspection and no occupancy/completion certificate are included in the supplied materials.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for SV RESIDENCY, registration no. P00700005456, issued 07/12/2022; stated validity through 07/06/2025.
Building approval: Mahabubabad Municipality/Municipal Corporation approval 0004/BP/3003/2022, dated 07 June, 2022; file no. 001499/BP/DTCP/3003/0004/2022.
Building / commencement record: RERA-filed approval for Building A, one stilt plus five upper floors. The supplied extract includes detailed approval conditions.
Layout plan: A RERA filing entry requests a layout approval or stamped layout plan; the supplied document entry is not extracted, so its contents are not available for review.
Title-search report: Advocate’s title-search report dated 29-07-2022 concerning the project plots and survey numbers; it is a filed opinion, not a substitute for the underlying registered instruments.
Form B declaration: Promoter declaration includes the 07 June, 2025 completion undertaking and statements on title, encumbrances and project obligations.
Occupancy / completion certificate: Not present in the supplied records. The building sanction requires an occupancy certificate before occupation.
Frequently asked questions
Is SV RESIDENCY registered with Telangana RERA?
Yes. SV RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P00700005456; the registration status is New Project.
Who is the developer of SV RESIDENCY?
The promoter named in the RERA registration is SRI RAJESHWARI CONSTRUCTIONS.
Where is SV RESIDENCY located?
SV RESIDENCY is in Old Town, Mahabubabad, Telangana (506101).
When will SV RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 07/06/2025. This is the promoter's declaration, not a guarantee.
More projects in Mahabubabad