Sri Sri Sudharma
SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED · Rangareddy · RERA P02400003773
SRI SRI SUDHARMA is a plotted development at Kongarakalan ORRGC Village, Ibrahimpatnam Mandal, Ranga Reddy District. It is being developed by SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED on Survey Nos. 24 and 25P, with a registered total area of 48,112.49 sq. m. The records do not state a total number of saleable plots or plot configurations; they identify mortgage plots 23 to 29 and 31 to 36 (total 13 number of plots). The project is registered under TG-RERA **P02400003773**, with proposed completion **21/10/2024**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
13 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI SRI SUDHARMA RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase or registered portion | No separate phase name is disclosed; the registration identifies the plotted project on Survey Nos. 24 and 25P. RERA record |
| TG-RERA registration | P02400003773; certificate Form C, granted under section 5. |
| Registration validity | Certificate states valid from 20/12/2021 to 21/10/2024; extension is not recorded in the supplied certificate. This is the registration period, not a statement about completion or occupancy certification. |
| Registered promoter | SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED RERA record |
| RERA status in supplied record | Registration certificate supplied; no extension certificate is supplied. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Kongarakalan ORRGC Village RERA record RERA filing |
| Revenue village | Kongarakalan RERA record |
| Mandal / district / PIN | Ibrahimpatnam / Ranga Reddy / 501510 RERA record |
| Project survey numbers | Survey Nos. 24 and 25P RERA record Land records |
| Registered site extent | The RERA filing states total area 48,112.49 sq. m, affected area 4,098.95 sq. m and net area 44,013.54 sq. m. The HMDA draft-layout extraction records total site area 48,112.49, road-affected area 2,249.07 and net site area 44,013.55 sq. m. RERA filing |
| Boundaries in RERA filing | North: neighbours’ land; south: road and neighbours’ land; east: neighbours’ land; west: road and nala. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning / processing authorities | HMDA technical layout approval, followed by Adibatla Municipality proceedings for release of the draft layout. Approvals record |
| Principal approval | HMDA draft-layout permit 000345/LO/Plg/HMDA/2021, dated 21 October, 2021; Adibatla Municipality proceedings Proc No. TPS/ Adibatla/2636 / 2021, dated 15.11.2021. Approvals record |
| Approved built-up area | 26,638.37 sq. m is listed in the RERA filing. No building or apartment configuration is supplied for this plotted development. RERA filing |
| Layout land-use areas recorded in the draft-layout extraction | Plotted area 26,638.37; layout-road area 11,411.4 (a separate sanctioned-parameters entry states 11,366.02 sq. m, 24.78%); open space 1,120.69 in one extraction and 4,842.81 sq. m in other layout entries; park 4,842.81 sq. m; social infrastructure 1,147.31 sq. m, 2.50%; amenities area 0. |
| Plot count | The HMDA draft-layout extraction identifies plot numbers 23 to 29, 31 to 36 (total 13 number of plots) as mortgage plots; a total count of saleable plots is not established by the supplied data. |
| Buildings / floors | Not disclosed in the supplied project records; the approval evidence concerns a plotted layout, not a building schedule. |
Offering and status
| Item | Record |
|---|---|
| Purchasable product | Plots; plot count, plot-size schedule and booked/available inventory are not established in the supplied records. RERA filing |
| Construction stage | No independently verified or RERA-filed current construction-progress percentage is supplied. The layout approval sets infrastructure-development conditions; this is not evidence that those works are complete. |
| Completion dates | RERA filing gives proposed completion 21/10/2024. The Form B declaration states completion by 210/2024 (as recorded in the supplied extraction). No revised completion date is supplied. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. For a plotted layout, the supplied approval records a draft-layout process and conditions for final layout release; it does not establish an OC. |
2. The project story
SRI SRI SUDHARMA is registered as a plotted-development project at Kongarakalan ORRGC Village, Ibrahimpatnam Mandal, Ranga Reddy District. The registered land is identified as Survey Nos. 24 and 25P. The record describes a layout rather than apartment blocks or villas: it identifies plotted land, roads, open-space/park land and social-infrastructure land, and lists infrastructure works associated with development of the layout. RERA record Land records
The supplied approval documents record HMDA’s technical approval of a draft layout and Adibatla Municipality proceedings releasing that draft layout subject to conditions. They require infrastructure work and specified transfers to the local body and state that buildings are not to be constructed on plots until final layout issuance. The supplied documents do not establish final layout release, completion of the development works, current on-site progress, or occupancy certification.
3. Master plan, architecture & building design
The extracted layout information identifies 26,638.37 as plotted area, 11,411.4 sq. m as layout-road area, 4,842.81 sq. m as park area and 1,147.31 sq. m as social-infrastructure area. The approval extraction also records 1,120.69 as open space and separately 4,842.81 sq. m as open space/utility area. These are the areas as stated in the supplied extraction; a single reconciled land-use schedule is not supplied here.
The RERA filing lists approved built-up area of 26,638.37 sq. m, but no building plans, floor configuration, building count, plot-size schedule, or plot-by-plot layout drawing is available in the supplied evidence for describing individual plot arrangements. The approval material lists road widths of 45 Mts, 18 mts and 60 feet in the HMDA draft-layout extraction; the municipal proceedings separately refer to roads 18 mts and above. RERA filing
The layout record lists storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits, solid-waste/bio-compost facilities and cycling tracks as proposed infrastructure or facilities. The material does not establish that these works have been completed.
4. Homes, configurations & floor plans
This is a plotted development, not an apartment configuration in the supplied records. No RERA unit-type schedule, total saleable-plot inventory, plot-size range, booked/available counts, or plot-wise saleable-area schedule is supplied. The HMDA draft-layout extraction identifies mortgage plots 23 to 29, 31 to 36 (total 13 number of plots); that entry does not establish the total number of plots offered for sale.
Two drawing files are reported, but both are scans pending measurement; no software-measured area or plot configuration is available. Floor plans
5. Parking & vehicle circulation
The supplied records do not state parking counts, visitor or accessible parking, parking allocation arrangements, or a plot-wise parking provision. The layout approval describes roads and internal accessibility, but does not provide enough information to assess vehicle circulation, entrances, ramps, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The RERA amenity data marks internal roads and footpaths, water supply, sewerage, green strip/tot lot/park, street lighting, rainwater harvesting, an electrical meter room/substation/receiving station and recreational open space as available in the project disclosure; the listed progress percentage is 0 for each item. RERA amenities
| Description / size | Layout-road area stated as 11,411.4 sq. m in one extraction; sanctioned-parameters entry states 11,366.02 sq. m (24.78%). |
|---|---|
| Evidence source | RERA-filed amenity data; HMDA/municipal layout records |
| Declared progress / verified status | Amenity progress listed as 0; completion not independently verified. |
| Description / size | 4,842.81 sq. m recorded as park and also as open-space/utility area in the approval extraction; another extraction lists open space 1,120.69. |
|---|---|
| Evidence source | HMDA/municipal layout records |
| Declared progress / verified status | Layout provision recorded; development and handover not verified. |
| Description / size | 1,147.31 sq. m (2.50%). |
|---|---|
| Evidence source | HMDA/municipal layout records |
| Declared progress / verified status | Provision recorded; use/facility detail and completion not established. |
| Description / size | Listed among layout works. |
|---|---|
| Evidence source | HMDA draft-layout extraction |
| Declared progress / verified status | Proposed/listed; completion not verified. |
| Description / size | Listed among layout works. |
|---|---|
| Evidence source | HMDA draft-layout extraction |
| Declared progress / verified status | Proposed/listed; completion not verified. |
| Description / size | No facility description or size supplied; RERA amenity field is listed with progress 0. RERA amenities |
|---|---|
| Evidence source | RERA amenity data |
| Declared progress / verified status | Completion not verified. |
The approval documents also list infrastructure works, but do not establish completion.
7. Utilities, building services & safety
The approval extractions list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and solid-waste/bio-compost facilities. These are listed as layout works; the supplied records do not provide capacities, operating details or evidence of completion.
The RERA amenity data lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection/fire-safety requirements, and an electrical meter room/substation/receiving station; progress is 0 in the supplied amenity entries. No project-specific fire-system design, safety clearance, waste-management capacity, accessibility specification or security system is supplied. RERA amenities
8. Location, access & connectivity
The registered location is Kongarakalan ORRGC Village, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501510. The project records give boundaries as neighbours’ land to the north and east, road and neighbours’ land to the south, and road and nala to the west. RERA record RERA filing RERA filing
A sampled location record places the nearest sampled Outer Ring Road interchange approximately 3.3 km away. The available data does not identify the interchange or provide other measured travel distances or travel times. Location record
9. Developer & development status
The registered legal promoter is SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED, a company, with GSTIN 36AALCS2721G2ZD. The RERA filing gives the promoter’s address as SRI SRIHOMES, Revenue Board Colony, Kongarakalan ORRGC Village, Ibrahimpatnam, Ranga Reddy District, PIN 501510. RERA record Corporate record Parties record
The registration certificate records the promoter’s office as Village: Mandal: Saroornagar, District: Ranga Reddy, PIN 500060. The supplied evidence does not include a project-specific official contact number or email.
The RERA filing gives proposed completion as 21/10/2024. The registration certificate states validity through 21/10/2024; no registration-extension document or verified current construction-progress record is supplied. These dates refer to separate matters: registration validity and the project’s proposed completion date. RERA filing
10. Approvals, official records & documents
| Evidence supplied | Form C, registration P02400003773, issued 20/12/2021, for SRI SRI SUDHARMA. |
|---|---|
| Scope / note | Project registration; certificate states validity through 21/10/2024. |
| Evidence supplied | Draft layout letter, Permit 000345/LO/Plg/HMDA/2021, dated 21 October, 2021. |
|---|---|
| Scope / note | Draft open-plot layout for Survey Nos. 24 and 25P. |
| Evidence supplied | Proc No. TPS/ Adibatla/2636 / 2021, dated 15.11.2021. |
|---|---|
| Scope / note | Proceedings concerning release of the draft layout, subject to stated conditions. |
| Evidence supplied | 16727/2021, dated 11/10/2021. |
|---|---|
| Scope / note | Mortgage in favour of HMDA; listed plots are 23 to 29 and 31 to 36, extent 4,349.37 Sq.Mt. |
| Evidence supplied | 16728/2021, dated 11/10/2021. |
|---|---|
| Scope / note | Road-affected area stated as 2,249.06 Sq mtrs for the proposed 45 Mts master-plan road. |
| Evidence supplied | Verified at Hyderabad on 20/10/2021. |
|---|---|
| Scope / note | Promoter declaration, including project completion and fund-management undertakings. |
| Evidence supplied | Not supplied. Document index |
|---|---|
| Scope / note | The supplied layout materials describe a draft-layout process; no final layout release or occupancy/completion certificate is established here. |
1. Project at a glance
Project identity
Registered project name: SRI SRI SUDHARMA
Project type: Plotted development / open-plot layout
Phase or registered portion: No separate phase name is disclosed; the registration identifies the plotted project on Survey Nos. 24 and 25P.
TG-RERA registration: P02400003773; certificate Form C, granted under section 5.
Registration validity: Certificate states valid from 20/12/2021 to 21/10/2024; extension is not recorded in the supplied certificate. This is the registration period, not a statement about completion or occupancy certification.
Registered promoter: SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED
RERA status in supplied record: Registration certificate supplied; no extension certificate is supplied.
Land and geographic identity
Locality: Kongarakalan ORRGC Village
Revenue village: Kongarakalan
Mandal / district / PIN: Ibrahimpatnam / Ranga Reddy / 501510
Project survey numbers: Survey Nos. 24 and 25P
Registered site extent: The RERA filing states total area 48,112.49 sq. m, affected area 4,098.95 sq. m and net area 44,013.54 sq. m. The HMDA draft-layout extraction records total site area 48,112.49, road-affected area 2,249.07 and net site area 44,013.55 sq. m.
Boundaries in RERA filing: North: neighbours’ land; south: road and neighbours’ land; east: neighbours’ land; west: road and nala.
Development identity
Sanctioning / processing authorities: HMDA technical layout approval, followed by Adibatla Municipality proceedings for release of the draft layout.
Principal approval: HMDA draft-layout permit 000345/LO/Plg/HMDA/2021, dated 21 October, 2021; Adibatla Municipality proceedings Proc No. TPS/ Adibatla/2636 / 2021, dated 15.11.2021.
Approved built-up area: 26,638.37 sq. m is listed in the RERA filing. No building or apartment configuration is supplied for this plotted development.
Layout land-use areas recorded in the draft-layout extraction: Plotted area 26,638.37; layout-road area 11,411.4 (a separate sanctioned-parameters entry states 11,366.02 sq. m, 24.78%); open space 1,120.69 in one extraction and 4,842.81 sq. m in other layout entries; park 4,842.81 sq. m; social infrastructure 1,147.31 sq. m, 2.50%; amenities area 0.
Plot count: The HMDA draft-layout extraction identifies plot numbers 23 to 29, 31 to 36 (total 13 number of plots) as mortgage plots; a total count of saleable plots is not established by the supplied data.
Buildings / floors: Not disclosed in the supplied project records; the approval evidence concerns a plotted layout, not a building schedule.
Offering and status
Purchasable product: Plots; plot count, plot-size schedule and booked/available inventory are not established in the supplied records.
Construction stage: No independently verified or RERA-filed current construction-progress percentage is supplied. The layout approval sets infrastructure-development conditions; this is not evidence that those works are complete.
Completion dates: RERA filing gives proposed completion 21/10/2024. The Form B declaration states completion by 210/2024 (as recorded in the supplied extraction). No revised completion date is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. For a plotted layout, the supplied approval records a draft-layout process and conditions for final layout release; it does not establish an OC.
2. The project story
SRI SRI SUDHARMA is registered as a plotted-development project at Kongarakalan ORRGC Village, Ibrahimpatnam Mandal, Ranga Reddy District. The registered land is identified as Survey Nos. 24 and 25P. The record describes a layout rather than apartment blocks or villas: it identifies plotted land, roads, open-space/park land and social-infrastructure land, and lists infrastructure works associated with development of the layout.
The supplied approval documents record HMDA’s technical approval of a draft layout and Adibatla Municipality proceedings releasing that draft layout subject to conditions. They require infrastructure work and specified transfers to the local body and state that buildings are not to be constructed on plots until final layout issuance. The supplied documents do not establish final layout release, completion of the development works, current on-site progress, or occupancy certification.
3. Master plan, architecture & building design
The extracted layout information identifies 26,638.37 as plotted area, 11,411.4 sq. m as layout-road area, 4,842.81 sq. m as park area and 1,147.31 sq. m as social-infrastructure area. The approval extraction also records 1,120.69 as open space and separately 4,842.81 sq. m as open space/utility area. These are the areas as stated in the supplied extraction; a single reconciled land-use schedule is not supplied here.
The RERA filing lists approved built-up area of 26,638.37 sq. m, but no building plans, floor configuration, building count, plot-size schedule, or plot-by-plot layout drawing is available in the supplied evidence for describing individual plot arrangements. The approval material lists road widths of 45 Mts, 18 mts and 60 feet in the HMDA draft-layout extraction; the municipal proceedings separately refer to roads 18 mts and above.
The layout record lists storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits, solid-waste/bio-compost facilities and cycling tracks as proposed infrastructure or facilities. The material does not establish that these works have been completed.
4. Homes, configurations & floor plans
This is a plotted development, not an apartment configuration in the supplied records. No RERA unit-type schedule, total saleable-plot inventory, plot-size range, booked/available counts, or plot-wise saleable-area schedule is supplied. The HMDA draft-layout extraction identifies mortgage plots 23 to 29, 31 to 36 (total 13 number of plots); that entry does not establish the total number of plots offered for sale.
Two drawing files are reported, but both are scans pending measurement; no software-measured area or plot configuration is available.
5. Parking & vehicle circulation
The supplied records do not state parking counts, visitor or accessible parking, parking allocation arrangements, or a plot-wise parking provision. The layout approval describes roads and internal accessibility, but does not provide enough information to assess vehicle circulation, entrances, ramps, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The RERA amenity data marks internal roads and footpaths, water supply, sewerage, green strip/tot lot/park, street lighting, rainwater harvesting, an electrical meter room/substation/receiving station and recreational open space as available in the project disclosure; the listed progress percentage is 0 for each item.
| Description / size | Layout-road area stated as 11,411.4 sq. m in one extraction; sanctioned-parameters entry states 11,366.02 sq. m (24.78%). |
|---|---|
| Evidence source | RERA-filed amenity data; HMDA/municipal layout records |
| Declared progress / verified status | Amenity progress listed as 0; completion not independently verified. |
| Description / size | 4,842.81 sq. m recorded as park and also as open-space/utility area in the approval extraction; another extraction lists open space 1,120.69. |
|---|---|
| Evidence source | HMDA/municipal layout records |
| Declared progress / verified status | Layout provision recorded; development and handover not verified. |
| Description / size | 1,147.31 sq. m (2.50%). |
|---|---|
| Evidence source | HMDA/municipal layout records |
| Declared progress / verified status | Provision recorded; use/facility detail and completion not established. |
| Description / size | Listed among layout works. |
|---|---|
| Evidence source | HMDA draft-layout extraction |
| Declared progress / verified status | Proposed/listed; completion not verified. |
| Description / size | Listed among layout works. |
|---|---|
| Evidence source | HMDA draft-layout extraction |
| Declared progress / verified status | Proposed/listed; completion not verified. |
| Description / size | No facility description or size supplied; RERA amenity field is listed with progress 0. |
|---|---|
| Evidence source | RERA amenity data |
| Declared progress / verified status | Completion not verified. |
The approval documents also list infrastructure works, but do not establish completion.
7. Utilities, building services & safety
The approval extractions list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and solid-waste/bio-compost facilities. These are listed as layout works; the supplied records do not provide capacities, operating details or evidence of completion.
The RERA amenity data lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection/fire-safety requirements, and an electrical meter room/substation/receiving station; progress is 0 in the supplied amenity entries. No project-specific fire-system design, safety clearance, waste-management capacity, accessibility specification or security system is supplied.
8. Location, access & connectivity
The registered location is Kongarakalan ORRGC Village, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501510. The project records give boundaries as neighbours’ land to the north and east, road and neighbours’ land to the south, and road and nala to the west.
A sampled location record places the nearest sampled Outer Ring Road interchange approximately 3.3 km away. The available data does not identify the interchange or provide other measured travel distances or travel times.
9. Developer & development status
The registered legal promoter is SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED, a company, with GSTIN 36AALCS2721G2ZD. The RERA filing gives the promoter’s address as SRI SRIHOMES, Revenue Board Colony, Kongarakalan ORRGC Village, Ibrahimpatnam, Ranga Reddy District, PIN 501510.
The registration certificate records the promoter’s office as Village: Mandal: Saroornagar, District: Ranga Reddy, PIN 500060. The supplied evidence does not include a project-specific official contact number or email.
The RERA filing gives proposed completion as 21/10/2024. The registration certificate states validity through 21/10/2024; no registration-extension document or verified current construction-progress record is supplied. These dates refer to separate matters: registration validity and the project’s proposed completion date.
10. Approvals, official records & documents
| Evidence supplied | Form C, registration P02400003773, issued 20/12/2021, for SRI SRI SUDHARMA. |
|---|---|
| Scope / note | Project registration; certificate states validity through 21/10/2024. |
| Evidence supplied | Draft layout letter, Permit 000345/LO/Plg/HMDA/2021, dated 21 October, 2021. |
|---|---|
| Scope / note | Draft open-plot layout for Survey Nos. 24 and 25P. |
| Evidence supplied | Proc No. TPS/ Adibatla/2636 / 2021, dated 15.11.2021. |
|---|---|
| Scope / note | Proceedings concerning release of the draft layout, subject to stated conditions. |
| Evidence supplied | 16727/2021, dated 11/10/2021. |
|---|---|
| Scope / note | Mortgage in favour of HMDA; listed plots are 23 to 29 and 31 to 36, extent 4,349.37 Sq.Mt. |
| Evidence supplied | 16728/2021, dated 11/10/2021. |
|---|---|
| Scope / note | Road-affected area stated as 2,249.06 Sq mtrs for the proposed 45 Mts master-plan road. |
| Evidence supplied | Verified at Hyderabad on 20/10/2021. |
|---|---|
| Scope / note | Promoter declaration, including project completion and fund-management undertakings. |
| Evidence supplied | Not supplied. |
|---|---|
| Scope / note | The supplied layout materials describe a draft-layout process; no final layout release or occupancy/completion certificate is established here. |
Frequently asked questions
Is SRI SRI SUDHARMA registered with Telangana RERA?
Yes. SRI SRI SUDHARMA is registered with the Telangana Real Estate Regulatory Authority as P02400003773; the registration status is New Project.
Who is the developer of SRI SRI SUDHARMA?
The promoter named in the RERA registration is SRI SRI GRUHANIRMAN INDIA PRIVATE LIMITED.
Where is SRI SRI SUDHARMA located?
SRI SRI SUDHARMA is in KONGARAKALAN ORRGC VILLAGE, Kongarakalan, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will SRI SRI SUDHARMA be completed?
The promoter's proposed date of completion filed with RERA is 21/10/2024. This is the promoter's declaration, not a guarantee.