Green Trails is an open plotted residential layout in Kongarakalan, Ibrahimpatnam Mandal, Ranga Reddy District, developed by registered promoter Homeland Developers. The RERA filing records a total area of 328559.063 sq m, and the HMDA approval states 120 residential plots; a tower or floor configuration is not stated. The project is registered under TG-RERA number P02400005139, issued 29/09/2022, with proposed and revised completion dated 24/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | Green Trails RERA record |
| Project type | Plotted development / open residential layout RERA record RERA filing |
| Phase or registered portion | A phase name is not disclosed. TG-RERA certificate identifies the registered project; the approved layout covers the survey numbers listed below. |
| TG-RERA registration | P02400005139, issued 29/09/2022; stated validity 29/09/2022–24/11/2025. |
| Registered promoter | Homeland Developers, identified as a partnership in the RERA filing. RERA filing Corporate record |
| RERA project status | On-going project in the supplied RERA filing. RERA filing |
| Registration validity, completion and occupancy | Registration validity ended on 24/11/2025 as stated in the certificate. The filed proposed and revised completion date is also 24/11/2025. No occupancy or completion certificate is identified in the supplied project record. These are separate matters; the registration certificate’s end date is not evidence of an occupancy certificate. RERA record RERA filing Document index |
Land and geographic identity
| Field | Project record |
|---|---|
| Revenue village | Kongarakalan (also written “Kongara Kalan” in approval documents). RERA record |
| Locality | Kongarakalan. RERA record |
| Mandal | Ibrahimpatnam. RERA record |
| District | Ranga Reddy. RERA record |
| PIN | 501510. RERA record |
| Survey numbers in registration certificate | 363-365, 368-373, 377-382, 386-389. |
| Survey numbers in HMDA layout approval | 363, 364, 365, 368, 369, 370, 371, 372, 373, 377, 378, 379, 380, 381, 382, 386, 387, 388, 389. |
| Total/site area | RERA filing: 328559.063 sq m. HMDA drawing: 328559.06 sq m. RERA filing |
| Net area | RERA filing: 309910.71 sq m; HMDA drawing: 309910.72 sq m. RERA filing |
| Road-widening/master-plan affected area | 18648.35 sq m. RERA filing |
| RERA-filed boundaries | North: Neighbors Land; South: Neighbors Land; East: Neighbors Land; West: Road. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Principal planning authority and approval | HMDA draft layout permit 000074/LO/Plg/HMDA/2022, dated 02-05-2022. Approvals record |
| Municipality proceedings | Adibatla Municipality proceedings TPS/Adibatla/6087/2022, approval number 6087/2022, dated 24.05.2022. Approvals record |
| Development form | Open plotted residential layout. |
| Plot count | HMDA approval text states 120 number of plots. |
| Approved built-up area / building configuration | Not applicable as a building scheme in the supplied layout approval; no approved built-up area, tower count or floor configuration is stated for this plotted layout. |
| Roads and layout circulation | The approval identifies internal roads including 12M, 15M and 9M roads; approval records also refer to master-plan roads of 30 Mts and 36 Mts and road widths of 18 mts and above. |
| Mortgage plots | The approval documents identify plots reserved/mortgaged to HMDA; details are set out under “Master plan, architecture & building design.” |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Residential plots. The RERA filing does not provide a plot-by-plot inventory or saleable-size schedule in the supplied data. RERA record RERA filing |
| Plot counts / booked and available | The approval states 120 plots. Booked and available counts are not supplied. |
| Construction stage | RERA filing labels the project “On-Going Project” and records 80% completeness; this is a declared project figure, not an independent site inspection. RERA filing RERA record |
| Proposed/revised completion | 24/11/2025 in the RERA project fields. RERA filing RERA record |
| Occupancy/completion certificate | No such certificate is identified in the supplied project materials. Document index |
2. The project story
- Green Trails is registered as a residential plotted layout at Kongarakalan, Ibrahimpatnam Mandal, Ranga Reddy District. Its land identity is tied to the survey-number groups shown on the TG-RERA certificate and the HMDA layout approval. The approval describes an open layout with 120 plots and internal roads, parks/open space, amenity and social-infrastructure areas; it is not a tower or apartment development. RERA record
- The RERA filing records the project as on-going and reports 80% completeness. That is the promoter’s filed progress figure, rather than an independently verified construction inspection. The project’s filed completion date is 24/11/2025; the registration certificate separately states validity through that date. No occupancy or completion certificate is identified in the supplied evidence. RERA record RERA filing Document index
- The approvals identify development obligations including road formation, drainage, water supply, electricity, street lighting, plantation and park development. They also state that construction in plots is not to be permitted until HMDA issues the final layout. The supplied records do not establish which individual works have since been completed or whether a final layout plan has been issued.
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence is the layout drawing and land-use schedule, not apartment floor plans. The HMDA drawing records a total site area of 328559.06 sq m, net area of 309910.72 sq m, and road-widening area of 18648.35 sq m. The RERA filing states total area 328559.063 sq m and net area 309910.71 sq m. RERA filing
| Layout component | Area recorded | Basis / status |
|---|---|---|
| Total site / plot area | 328559.06 sq m | HMDA drawing. |
| Net area | 309910.72 sq m | HMDA drawing. |
| Road widening | 18648.35 sq m | HMDA drawing. |
| Plotted area | 185575.42 sq m | HMDA drawing. |
| Layout roads | 84738.25 sq m | HMDA/municipality approval record. |
| Parks / open space | 28566.50 sq m | HMDA/municipality approval record. |
| Social infrastructure | 7856.65 sq m | HMDA/municipality approval record. |
| Amenity area | 3166.90 sq m | HMDA drawing. |
- The HMDA technical approval describes a residential open layout and lists road widths including 12M, 15M and 9M internal roads; it also identifies master-plan road widths of 30 Mts and 36 Mts. The drawings include a club house, tot-lot, sump and OHT, transformer yard, sewage lifting station, normal amenity and social-infrastructure area. These are features identified in the approval/drawing record, not confirmation that they are completed.
- Mortgage reservations are recorded in favour of HMDA: document 5540/2022 covers 37214.54 sq m, described as plots 82–135, 173–188 and 250–265; document 5539/2022 covers 14156.60 sq m, described as plots 418–423, 426–431, 433–440, 442–449 and 451–460. The municipality proceedings state totals of 56 mortgage plots and 38 additional mortgage plots.
- The approval documents also record a registered gift deed 5538/2022 for roads, open space and social-infrastructure areas to the local body. The Adibatla Municipality proceedings specify that internal roads, open space and social-infrastructure areas are to be handed over by registered gift deed before release of the final layout plan by HMDA.
4. Homes, configurations & floor plans
Green Trails is a plotted development. The HMDA approval states 120 plots, but the supplied TG-RERA data does not provide a plot-by-plot count by size, booked/available inventory, or a RERA-filed saleable-area schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Residential plots | 120 (approval-stated) | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
- The approved layout drawing’s text extraction identifies plot numbers 1 to 9, but the software-derived plot count is expressly incomplete and the plot sizes were not measured. Treat those drawing-text readings as unverified rather than as a complete plot inventory. Layout record
- The floor-plan dataset contains no measured plans: four drawings are recorded, with two scans pending and two having no flats. Apartment-style carpet-area measurements therefore are not available or applicable to the supplied plot offering. Floor plans
5. Parking & vehicle circulation
The supplied project data does not establish a sanctioned parking-space count, parking allocation by plot, visitor or accessible parking, or EV charging provision. The approval’s layout roads provide for vehicle circulation, including 12M, 15M and 9M internal roads; the documents also require roads to be opened for access to neighbouring sites. No specific ramp, parking-level or pedestrian-separation design is documented.
6. Amenities, recreation & open spaces
The approval and RERA amenity schedule identify the following facilities and infrastructure. “Available: YES” is the RERA schedule entry; the supplied data does not establish independent completion or site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Club house | Identified on the approved layout drawing; no size or capacity supplied. | Drawing-listed; completion not established. | |
| Tot-lot | Identified on the approved layout drawing. | Drawing-listed; completion not established. | |
| Park / green strip / tot-lot / park | Park area 28566.50 sq m; RERA amenity schedule lists “Green Strip/TOT LOT/Park.” | RERA amenities | RERA schedule entry; no independent completion verification. |
| Open space | 28566.50 sq m; approval records 9.22%. | Approval-recorded area; handover/development status not established here. | |
| Social infrastructure | 7856.65 sq m; approval records 2.54%. | Approval-recorded area; specific facility or completion status not established. | |
| Amenity area | 3166.90 sq m in the HMDA drawing. | Drawing-recorded area; facility-by-facility delivery not established. | |
| Community buildings | Listed in the RERA amenity schedule. | RERA amenities | Schedule entry; no independent completion verification. |
| Internal roads and footpaths | RERA schedule lists internal roads and footpaths; the layout approval identifies internal-road widths. | RERA amenities | RERA schedule reports 15%; not independently verified. |
| Avenue plantation | Required in the municipality proceedings. | Approval condition; completion not established. |
7. Utilities, building services & safety
| Evidence in project record | Approval proceedings require internal water-supply pipelines, an overhead tank and an assured water-supply source; the layout drawing identifies a sump and OHT. |
|---|---|
| Status limitation | Proposed/required in approval documents; source capacity and completed provision are not established. |
| Evidence in project record | Approval proceedings require underground drainage lines and a common septic tank/STP; the drawing identifies a sewage lifting station. Storm-water drainage is also specified. |
|---|---|
| Status limitation | Approval-recorded infrastructure; capacity, commissioning and operating status are not supplied. |
| Evidence in project record | Rainwater-harvesting pits are listed in municipality proceedings; RERA amenity schedule lists water conservation/rainwater harvesting. |
|---|---|
| Status limitation | Listed/required; installation and performance are not independently verified. RERA amenities |
| Evidence in project record | Approval proceedings list electrical supply lines, a transformer and streetlights; the drawing identifies a transformer yard. LED street lighting is specified in the draft-layout letter. |
|---|---|
| Status limitation | Approval-recorded provision; completion and capacity are not supplied. |
| Evidence in project record | RERA amenity schedule lists solid-waste management and disposal. |
|---|---|
| Status limitation | Schedule entry; equipment, operating arrangements and completion are not documented. RERA amenities |
| Evidence in project record | RERA amenity schedule lists fire-protection and fire-safety requirements. |
|---|---|
| Status limitation | No project-specific system details, clearance or completion evidence is supplied. RERA amenities |
| Evidence in project record | Not identified in the project approval material. |
|---|---|
| Status limitation | No project-specific security-system details are supplied. |
| Evidence in project record | The approval documents require roads to be opened for access to neighbouring sites. |
|---|---|
| Status limitation | No accessible-route or accessible-plot design details are supplied. |
8. Location, access & connectivity
- The registered location is Kongarakalan Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The project’s RERA certificate records the same village, mandal, district and PIN. RERA record
- The supplied location data identifies the Outer Ring Road’s nearest sampled interchange at approximately 4.5 km. This is a supplied location-data measurement, not a promoter travel-time claim. The approval documents require internal roads to be opened for access to neighbouring sites and identify internal-road widths, but the supplied record does not describe public-transport services or additional measured distances to landmarks. Location record
9. Developer & development status
- The TG-RERA registered promoter is Homeland Developers, recorded as a partnership. The RERA filing gives GSTIN 36AALFH3840G1ZD; the corporate identifier is shown only as xxxxxx840G in the supplied identity fields. RERA filing Corporate record RERA record
- The project materials identify Bobbili Pranav Reddy as the promoter’s managing partner/authorized signatory. The Form B affidavit is attributed to him and records a promoter undertaking to complete the project by 02nd Nov 2025. The RERA project fields separately state proposed and revised completion of 24/11/2025; the project certificate states registration validity to 24/11/2025. These dates and registration validity are distinct record items. RERA filing
- The RERA filing labels Green Trails on-going and records 80% completeness. This is a filed progress figure, not an independent inspection result. The supplied material does not identify a project-specific construction-stage breakdown or an occupancy/completion certificate. RERA record RERA filing Document index
10. Approvals, official records & documents
| Identifier / date | P02400005139; issued 29/09/2022; stated validity to 24/11/2025. |
|---|---|
| What the supplied record establishes | Registration of Green Trails as a project with TG-RERA, subject to the certificate’s conditions. |
| Identifier / date | 000074/LO/Plg/HMDA/2022, dated 02-05-2022; file/application 047782/SMD/LT/U6/HMDA/02082021. |
|---|---|
| What the supplied record establishes | Draft residential open-layout approval covering the listed survey numbers, with conditions and mortgage reservations. |
| Identifier / date | Approval number 6087/2022; proceedings TPS/Adibatla/6087/2022; dated 24.05.2022. |
|---|---|
| What the supplied record establishes | Municipality proceedings releasing an HMDA-sanctioned draft residential layout and recording infrastructure and handover conditions. |
| Identifier / date | Document 241297, page 1. |
|---|---|
| What the supplied record establishes | Drawing-based site-area and land-use schedule, roads and layout features. |
| Identifier / date | Document 241300. |
|---|---|
| What the supplied record establishes | Supplied extraction describes it as a draft drawing and establishes no approval details from the available text. |
| Identifier / date | Document 241650, dated 10th day of June 2022. |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project account and other statutory undertakings, including a completion undertaking. |
| Identifier / date | 5540/2022 and 5539/2022, dated 08-04-2022. |
|---|---|
| What the supplied record establishes | Approval records identify plots reserved/mortgaged to HMDA; see the areas and plot ranges above. |
| Identifier / date | 5538/2022, dated 08-04-2022. |
|---|---|
| What the supplied record establishes | Approval records refer to a registered gift deed for roads, open space, social-infrastructure areas and land affected by proposed master-plan roads. |
| Identifier / date | Not identified in supplied project documents. |
|---|---|
| What the supplied record establishes | The supplied evidence does not establish issuance or scope of an occupancy or completion certificate. Document index |
1. Project at a glance
Project identity
Registered project name: Green Trails
Project type: Plotted development / open residential layout
Phase or registered portion: A phase name is not disclosed. TG-RERA certificate identifies the registered project; the approved layout covers the survey numbers listed below.
TG-RERA registration: P02400005139, issued 29/09/2022; stated validity 29/09/2022–24/11/2025.
Registered promoter: Homeland Developers, identified as a partnership in the RERA filing.
RERA project status: On-going project in the supplied RERA filing.
Registration validity, completion and occupancy: Registration validity ended on 24/11/2025 as stated in the certificate. The filed proposed and revised completion date is also 24/11/2025. No occupancy or completion certificate is identified in the supplied project record. These are separate matters; the registration certificate’s end date is not evidence of an occupancy certificate.
Land and geographic identity
Revenue village: Kongarakalan (also written “Kongara Kalan” in approval documents).
Locality: Kongarakalan.
Mandal: Ibrahimpatnam.
District: Ranga Reddy.
PIN: 501510.
Survey numbers in registration certificate: 363-365, 368-373, 377-382, 386-389.
Survey numbers in HMDA layout approval: 363, 364, 365, 368, 369, 370, 371, 372, 373, 377, 378, 379, 380, 381, 382, 386, 387, 388, 389.
Total/site area: RERA filing: 328559.063 sq m. HMDA drawing: 328559.06 sq m.
Net area: RERA filing: 309910.71 sq m; HMDA drawing: 309910.72 sq m.
Road-widening/master-plan affected area: 18648.35 sq m.
RERA-filed boundaries: North: Neighbors Land; South: Neighbors Land; East: Neighbors Land; West: Road.
Development identity
Principal planning authority and approval: HMDA draft layout permit 000074/LO/Plg/HMDA/2022, dated 02-05-2022.
Municipality proceedings: Adibatla Municipality proceedings TPS/Adibatla/6087/2022, approval number 6087/2022, dated 24.05.2022.
Development form: Open plotted residential layout.
Plot count: HMDA approval text states 120 number of plots.
Approved built-up area / building configuration: Not applicable as a building scheme in the supplied layout approval; no approved built-up area, tower count or floor configuration is stated for this plotted layout.
Roads and layout circulation: The approval identifies internal roads including 12M, 15M and 9M roads; approval records also refer to master-plan roads of 30 Mts and 36 Mts and road widths of 18 mts and above.
Mortgage plots: The approval documents identify plots reserved/mortgaged to HMDA; details are set out under “Master plan, architecture & building design.”
Offering and status
Unit type: Residential plots. The RERA filing does not provide a plot-by-plot inventory or saleable-size schedule in the supplied data.
Plot counts / booked and available: The approval states 120 plots. Booked and available counts are not supplied.
Construction stage: RERA filing labels the project “On-Going Project” and records 80% completeness; this is a declared project figure, not an independent site inspection.
Proposed/revised completion: 24/11/2025 in the RERA project fields.
Occupancy/completion certificate: No such certificate is identified in the supplied project materials.
2. The project story
- Green Trails is registered as a residential plotted layout at Kongarakalan, Ibrahimpatnam Mandal, Ranga Reddy District. Its land identity is tied to the survey-number groups shown on the TG-RERA certificate and the HMDA layout approval. The approval describes an open layout with 120 plots and internal roads, parks/open space, amenity and social-infrastructure areas; it is not a tower or apartment development.
- The RERA filing records the project as on-going and reports 80% completeness. That is the promoter’s filed progress figure, rather than an independently verified construction inspection. The project’s filed completion date is 24/11/2025; the registration certificate separately states validity through that date. No occupancy or completion certificate is identified in the supplied evidence.
- The approvals identify development obligations including road formation, drainage, water supply, electricity, street lighting, plantation and park development. They also state that construction in plots is not to be permitted until HMDA issues the final layout. The supplied records do not establish which individual works have since been completed or whether a final layout plan has been issued.
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence is the layout drawing and land-use schedule, not apartment floor plans. The HMDA drawing records a total site area of 328559.06 sq m, net area of 309910.72 sq m, and road-widening area of 18648.35 sq m. The RERA filing states total area 328559.063 sq m and net area 309910.71 sq m.
| Layout component | Area recorded | Basis / status |
|---|---|---|
| Total site / plot area | 328559.06 sq m | HMDA drawing. |
| Net area | 309910.72 sq m | HMDA drawing. |
| Road widening | 18648.35 sq m | HMDA drawing. |
| Plotted area | 185575.42 sq m | HMDA drawing. |
| Layout roads | 84738.25 sq m | HMDA/municipality approval record. |
| Parks / open space | 28566.50 sq m | HMDA/municipality approval record. |
| Social infrastructure | 7856.65 sq m | HMDA/municipality approval record. |
| Amenity area | 3166.90 sq m | HMDA drawing. |
- The HMDA technical approval describes a residential open layout and lists road widths including 12M, 15M and 9M internal roads; it also identifies master-plan road widths of 30 Mts and 36 Mts. The drawings include a club house, tot-lot, sump and OHT, transformer yard, sewage lifting station, normal amenity and social-infrastructure area. These are features identified in the approval/drawing record, not confirmation that they are completed.
- Mortgage reservations are recorded in favour of HMDA: document 5540/2022 covers 37214.54 sq m, described as plots 82–135, 173–188 and 250–265; document 5539/2022 covers 14156.60 sq m, described as plots 418–423, 426–431, 433–440, 442–449 and 451–460. The municipality proceedings state totals of 56 mortgage plots and 38 additional mortgage plots.
- The approval documents also record a registered gift deed 5538/2022 for roads, open space and social-infrastructure areas to the local body. The Adibatla Municipality proceedings specify that internal roads, open space and social-infrastructure areas are to be handed over by registered gift deed before release of the final layout plan by HMDA.
4. Homes, configurations & floor plans
Green Trails is a plotted development. The HMDA approval states 120 plots, but the supplied TG-RERA data does not provide a plot-by-plot count by size, booked/available inventory, or a RERA-filed saleable-area schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Residential plots | 120 (approval-stated) | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
- The approved layout drawing’s text extraction identifies plot numbers 1 to 9, but the software-derived plot count is expressly incomplete and the plot sizes were not measured. Treat those drawing-text readings as unverified rather than as a complete plot inventory.
- The floor-plan dataset contains no measured plans: four drawings are recorded, with two scans pending and two having no flats. Apartment-style carpet-area measurements therefore are not available or applicable to the supplied plot offering.
5. Parking & vehicle circulation
The supplied project data does not establish a sanctioned parking-space count, parking allocation by plot, visitor or accessible parking, or EV charging provision. The approval’s layout roads provide for vehicle circulation, including 12M, 15M and 9M internal roads; the documents also require roads to be opened for access to neighbouring sites. No specific ramp, parking-level or pedestrian-separation design is documented.
6. Amenities, recreation & open spaces
The approval and RERA amenity schedule identify the following facilities and infrastructure. “Available: YES” is the RERA schedule entry; the supplied data does not establish independent completion or site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Club house | Identified on the approved layout drawing; no size or capacity supplied. | Drawing-listed; completion not established. | |
| Tot-lot | Identified on the approved layout drawing. | Drawing-listed; completion not established. | |
| Park / green strip / tot-lot / park | Park area 28566.50 sq m; RERA amenity schedule lists “Green Strip/TOT LOT/Park.” | RERA schedule entry; no independent completion verification. | |
| Open space | 28566.50 sq m; approval records 9.22%. | Approval-recorded area; handover/development status not established here. | |
| Social infrastructure | 7856.65 sq m; approval records 2.54%. | Approval-recorded area; specific facility or completion status not established. | |
| Amenity area | 3166.90 sq m in the HMDA drawing. | Drawing-recorded area; facility-by-facility delivery not established. | |
| Community buildings | Listed in the RERA amenity schedule. | Schedule entry; no independent completion verification. | |
| Internal roads and footpaths | RERA schedule lists internal roads and footpaths; the layout approval identifies internal-road widths. | RERA schedule reports 15%; not independently verified. | |
| Avenue plantation | Required in the municipality proceedings. | Approval condition; completion not established. |
7. Utilities, building services & safety
| Evidence in project record | Approval proceedings require internal water-supply pipelines, an overhead tank and an assured water-supply source; the layout drawing identifies a sump and OHT. |
|---|---|
| Status limitation | Proposed/required in approval documents; source capacity and completed provision are not established. |
| Evidence in project record | Approval proceedings require underground drainage lines and a common septic tank/STP; the drawing identifies a sewage lifting station. Storm-water drainage is also specified. |
|---|---|
| Status limitation | Approval-recorded infrastructure; capacity, commissioning and operating status are not supplied. |
| Evidence in project record | Rainwater-harvesting pits are listed in municipality proceedings; RERA amenity schedule lists water conservation/rainwater harvesting. |
|---|---|
| Status limitation | Listed/required; installation and performance are not independently verified. |
| Evidence in project record | Approval proceedings list electrical supply lines, a transformer and streetlights; the drawing identifies a transformer yard. LED street lighting is specified in the draft-layout letter. |
|---|---|
| Status limitation | Approval-recorded provision; completion and capacity are not supplied. |
| Evidence in project record | RERA amenity schedule lists solid-waste management and disposal. |
|---|---|
| Status limitation | Schedule entry; equipment, operating arrangements and completion are not documented. |
| Evidence in project record | RERA amenity schedule lists fire-protection and fire-safety requirements. |
|---|---|
| Status limitation | No project-specific system details, clearance or completion evidence is supplied. |
| Evidence in project record | Not identified in the project approval material. |
|---|---|
| Status limitation | No project-specific security-system details are supplied. |
| Evidence in project record | The approval documents require roads to be opened for access to neighbouring sites. |
|---|---|
| Status limitation | No accessible-route or accessible-plot design details are supplied. |
8. Location, access & connectivity
- The registered location is Kongarakalan Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The project’s RERA certificate records the same village, mandal, district and PIN.
- The supplied location data identifies the Outer Ring Road’s nearest sampled interchange at approximately 4.5 km. This is a supplied location-data measurement, not a promoter travel-time claim. The approval documents require internal roads to be opened for access to neighbouring sites and identify internal-road widths, but the supplied record does not describe public-transport services or additional measured distances to landmarks.
9. Developer & development status
- The TG-RERA registered promoter is Homeland Developers, recorded as a partnership. The RERA filing gives GSTIN 36AALFH3840G1ZD; the corporate identifier is shown only as xxxxxx840G in the supplied identity fields.
- The project materials identify Bobbili Pranav Reddy as the promoter’s managing partner/authorized signatory. The Form B affidavit is attributed to him and records a promoter undertaking to complete the project by 02nd Nov 2025. The RERA project fields separately state proposed and revised completion of 24/11/2025; the project certificate states registration validity to 24/11/2025. These dates and registration validity are distinct record items.
- The RERA filing labels Green Trails on-going and records 80% completeness. This is a filed progress figure, not an independent inspection result. The supplied material does not identify a project-specific construction-stage breakdown or an occupancy/completion certificate.
10. Approvals, official records & documents
| Identifier / date | P02400005139; issued 29/09/2022; stated validity to 24/11/2025. |
|---|---|
| What the supplied record establishes | Registration of Green Trails as a project with TG-RERA, subject to the certificate’s conditions. |
| Identifier / date | 000074/LO/Plg/HMDA/2022, dated 02-05-2022; file/application 047782/SMD/LT/U6/HMDA/02082021. |
|---|---|
| What the supplied record establishes | Draft residential open-layout approval covering the listed survey numbers, with conditions and mortgage reservations. |
| Identifier / date | Approval number 6087/2022; proceedings TPS/Adibatla/6087/2022; dated 24.05.2022. |
|---|---|
| What the supplied record establishes | Municipality proceedings releasing an HMDA-sanctioned draft residential layout and recording infrastructure and handover conditions. |
| Identifier / date | Document 241297, page 1. |
|---|---|
| What the supplied record establishes | Drawing-based site-area and land-use schedule, roads and layout features. |
| Identifier / date | Document 241300. |
|---|---|
| What the supplied record establishes | Supplied extraction describes it as a draft drawing and establishes no approval details from the available text. |
| Identifier / date | Document 241650, dated 10th day of June 2022. |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project account and other statutory undertakings, including a completion undertaking. |
| Identifier / date | 5540/2022 and 5539/2022, dated 08-04-2022. |
|---|---|
| What the supplied record establishes | Approval records identify plots reserved/mortgaged to HMDA; see the areas and plot ranges above. |
| Identifier / date | 5538/2022, dated 08-04-2022. |
|---|---|
| What the supplied record establishes | Approval records refer to a registered gift deed for roads, open space, social-infrastructure areas and land affected by proposed master-plan roads. |
| Identifier / date | Not identified in supplied project documents. |
|---|---|
| What the supplied record establishes | The supplied evidence does not establish issuance or scope of an occupancy or completion certificate. |
Frequently asked questions
Is Green Trails registered with Telangana RERA?
Yes. Green Trails is registered with the Telangana Real Estate Regulatory Authority as P02400005139; the registration status is On-Going Project.
Who is the developer of Green Trails?
The promoter named in the RERA registration is HomeLand Developers.
Where is Green Trails located?
Green Trails is in Kongarakalan, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will Green Trails be completed?
The promoter's proposed date of completion filed with RERA is 24/11/2025. This is the promoter's declaration, not a guarantee.