Sri Sai Raja Rajeswari Enclave
Sri Sai Vardhaman Constructions · Rangareddy · RERA P02400010271
SRI SAI RAJA RAJESWARI ENCLAVE is a residential apartment project in Bandlaguda Jagir, Gandipet Mandal, Ranga Reddy District, developed by registered promoter Sri Sai Vardhaman Constructions. The registered site area is 445.67 sq. m, with one residential building comprising 1 Stilt + 5 upper floors and 10 3BHK homes, each with a filed saleable area of 78.04 sq. m. The project is registered with TG-RERA as P02400010271, and its proposed completion date is 30/04/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SRI SAI RAJA RAJESWARI ENCLAVE RERA record |
| Project type / phase | Residential apartment project; phase or separately named registered portion not disclosed. RERA record RERA filing |
| TG-RERA registration | P02400010271; registration period 22/05/2024–31/12/2026. This is the registration-validity period, not the construction deadline. RERA record Approvals record |
| Registered promoter | Sri Sai Vardhaman Constructions. RERA record Corporate record |
| Project status in filing | “New Project.” The filing’s proposed completion date is 30/04/2027; the Form B declaration states a completion undertaking of 31st December 2026. RERA filing RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Bandlaguda Jagir; the project documents also identify Bandlaguda Jagir Village. The registration certificate records Bandlaguda. RERA record RERA filing |
| Mandal / district / PIN | Gandipet Mandal, Ranga Reddy District, 500086. RERA record RERA filing |
| Survey and site identifiers | Survey No. 73; Plot Nos. 203 and 204. No project subdivision is specified in the supplied project filing or approval extracts. RERA filing |
| Registered site extent | 445.67 sq. m (the registration land details give 445.67 sq. m total and net area; affected area is 0). RERA filing |
| Boundaries | East: Plot No. 205; West: Plot No. 202; North: Plot Nos. 209 and 210; South: 40 feet wide road. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority / principal approval | HMDA; Building Permit No. 000180/BP/HMDA/0041/SKP/2024, approved 22 May 2024. Approvals record |
| Approved built-up area | 1,238.40 sq. m is recorded as proposed built-up area excluding parking / net BUA. The permit extract also records total built-up area 1,496.58 sq. m and parking area 247.70 sq. m; these are separately stated figures, not interchangeable area measures. |
| Buildings / floors | One residential building; sanctioned as 1 Stilt + 5 upper floors. The plan extract records NO OF FLOORS: 6, building height 14.95 MT., and Total Ht. 21.07mt. RERA filing |
| Parking provision | Stilt is designated for parking in the plan conditions; extracted parking area is 247.70 sq. m in the permit record. A parking-space count or unit-wise allocation is not supplied. |
| Unit count | 10 units in the RERA filing; the approval-plan extract also records 10 units. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Configuration / RERA saleable area | 3BHK, 78.04 sq. m saleable area per filed configuration. RERA unit table RERA unit details |
| Bookings / availability | 5 booked; 5 available, as last read from the TG-RERA portal; no as-of date is recorded, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | The project filing calls it a “New Project”; the supplied records do not establish a current construction-progress percentage or independently verified site progress. RERA filing RERA amenities |
| Completion dates | TG-RERA project information states proposed completion 30/04/2027; the Form B declaration says 31st December 2026. RERA record RERA filing |
| Occupancy certificate | A GHMC Occupancy Certificate is supplied for the residential building on Plot Nos. 203 and 204, Survey No. 73; it records completion date 30/07/2026 and is dated 11/09/2026. Its stated scope is this building. |
2. The project story
Sri Sai Raja Rajeswari Enclave is a single-building residential apartment project registered with TG-RERA as P02400010271. The registered land description identifies Survey No. 73, Plot Nos. 203 and 204, in Bandlaguda Jagir, Gandipet Mandal, Ranga Reddy District. The registered site extent is 445.67 sq. m, with the stated plot boundaries recorded in Land and geographic identity above. RERA record RERA filing
The filed offering is 10 three-bedroom homes, with 5 shown as booked and 5 available in the portal-derived unit record; that count is indicative because the extract has no as-of date. The supplied building permit describes a residential building with one stilt level and five upper floors. The supplied GHMC certificate records an occupancy certificate for this building, with a completion date of 30/07/2026. The documents do not provide a current construction-progress percentage. RERA unit table RERA unit details
3. Master plan, architecture & building design
The supplied HMDA building-permit extract is for a new residential building on Plot Nos. 203 and 204, Survey No. 73, Bandlaguda Jagir Village. It specifies 1 Stilt + 5 upper floors, NO OF FLOORS: 6, and 1,238.40 sq. m as total proposed built-up area excluding parking. It separately records 1,496.58 sq. m total BUA, 247.70 sq. m parking area, and 445.67 sq. m plot area.
The permit extract identifies a lift, stair, lift machine room, transformer, rainwater harvesting, septic tank, sump and overhead water tank. It also records a 2.50 M. WIDE PASSAGE, and road widths of 12.00 MT WIDE EXISTING, 12.00 MT WIDE PROPOSED ROAD, and 2.50 M. WIDE PASSAGE. These are details in the supplied plan extraction; the record does not provide a full architectural description of apartment layouts, façade, floor-by-floor unit arrangement, or common-area dimensions.
The supplied GHMC certificate describes the same building as one stilt floor and five upper floors. It records sanctioned built-up area of 1238.4 Sq. Metres and completion built-up area of 1271.403 Sq. Metres, with Total Deviated Builtup Area for Block: 33.0. The certificate is an official building-specific occupancy record; see the evidence index below.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 5 | 5 | 78.04 sq. m | Not established from supplied drawing measurements | Not supplied |
The 3BHK counts and saleable area are TG-RERA filing data. Booked and available counts are indicative because the portal record has no as-of date. The supplied floor-plan extraction reports two drawings reviewed, but zero flat designs measured for the 3BHK configuration; no software-measured carpet area or room dimensions are therefore available here. RERA unit table RERA unit details Floor plans
RERA saleable area and carpet area are different measures: the supplied drawing methodology notes that carpet area is measured from drawing geometry, while RERA saleable area also includes the home’s proportionate share of common areas. No carpet area, balcony/utility measurements, loading figure, or room-by-room plan measurements are established in the supplied data. Floor plans
5. Parking & vehicle circulation
The building permit identifies a stilt floor for parking and records a parking area of 247.70 sq. m. The GHMC occupancy-certificate extract records parking area of 247.68 Sq. mts sanctioned and 247.68 Sq. mts as per completion plan. The records supplied do not state the number of parking bays, visitor or accessible spaces, parking allocation by apartment, or whether any parking is separately assigned to a buyer.
The approval-plan extract includes existing and proposed 12.00-metre-wide roads and a 2.50-metre-wide passage. No ramp, separate pedestrian route, or vehicle entry/exit arrangement is detailed in the supplied extracts. The permit conditions refer to electric-vehicle charging infrastructure, but the supplied records do not verify installed charging equipment.
6. Amenities, recreation & open spaces
| Description / size | Lift, lift machine room and stair are listed; capacities and count beyond the listed provision are not supplied. |
|---|---|
| Declared progress / verified status | Listed in the plan extraction; completion status not established here. |
| Description / size | Sump, overhead water tank and rainwater harvesting are listed. |
|---|---|
| Declared progress / verified status | Listed in plan extraction. The GHMC certificate records 1 rainwater harvesting pit sanctioned and 1 as per completion plan. |
| Description / size | Listed in the approval-plan extraction. |
|---|---|
| Declared progress / verified status | Listed in plan extraction; no independent operating-status record supplied. |
| Description / size | TG-RERA amenities data lists this facility as available: YES. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | The same amenities record reports 0% progress; completion is not established. |
| Description / size | Listed in TG-RERA amenities data. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%. |
| Description / size | TG-RERA amenities data lists water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety, electrical meter room/sub-station/receiving station, and aggregate recreational open space. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | The record shows 0% for these items; for water supply, sewerage, rainwater harvesting and electrical meter room/sub-station/receiving station, availability is listed as YES. The data does not establish independent completion. |
No clubhouse, indoor recreation, sports facility, or facility dimensions/capacities are established by the supplied TG-RERA amenity record. Vendor-listed facilities are not relied on here as proof of sanctioned or delivered project amenities.
7. Utilities, building services & safety
The plan extract lists a transformer, sump, overhead water tank, septic tank and rainwater harvesting. The TG-RERA amenities record lists water supply and sewerage as available, and records rainwater harvesting as available; the same record gives 0% progress for these listed amenities. The supplied GHMC certificate records one rainwater-harvesting pit in both the sanctioned and completion plan. Water source, storage capacity, treatment, sewage-treatment capacity, reuse arrangements and storm-water design details are not supplied. RERA amenities
The building permit lists a transformer and requires provision for EV charging infrastructure in its conditions. It also contains building-safety conditions, including fire-safety and structural-stability requirements, and identifies a lift and stair in the plan extraction. These references describe recorded plan requirements or listed features; the supplied materials do not independently verify installed electrical, fire-safety, lift, accessibility, security, or waste-management systems.
8. Location, access & connectivity
The registered location is Survey No. 73, Plot Nos. 203 and 204, Bandlaguda Jagir, Gandipet Mandal, Ranga Reddy District, PIN 500086. The permit extraction identifies a 12.00-metre-wide existing road, a 12.00-metre-wide proposed road and a 2.50-metre-wide passage. The stated southern boundary is a 40-feet-wide road. RERA record RERA filing
The supplied location record gives Financial District (Nanakramguda): 8.8 km. No other independently sourced public-transport details or measured distances are supplied. Location record
9. Developer & development status
The registered promoter is Sri Sai Vardhaman Constructions, recorded as a partnership; the supplied corporate identifier is GSTIN 36AFIFS6512A1Z8. The registration certificate gives the promoter address as Village Adityanagar, Mandal Kukatpally, District Medchal-Malkajgiri, PIN 500085. The project address is separately recorded in Bandlaguda Jagir, Gandipet, Ranga Reddy District. Corporate record RERA filing
The Form B declaration, made by authorised signatory Bala Subrahmanya Vishwanadham, states that D Santhosh Kumar has legal title to 100% of the project land and records the promoter’s completion undertaking as 31st December 2026. The TG-RERA project information separately states a proposed completion date of 30/04/2027. The supplied records do not state a verified construction-progress percentage. RERA filing
10. Approvals, official records & documents
| Identifier / date | P02400010271; 22/05/2024–31/12/2026 |
|---|---|
| Scope and evidence | Form C registration certificate for SRI SAI RAJA RAJESWARI ENCLAVE, promoter Sri Sai Vardhaman Constructions. |
| Identifier / date | 000180/BP/HMDA/0041/SKP/2024; approved 22 May 2024 |
|---|---|
| Scope and evidence | Residential building on Plot Nos. 203 and 204, Survey No. 73; one stilt and five upper floors. |
| Identifier / date | Same principal approval number |
|---|---|
| Scope and evidence | Extracted plan details include site area, built-up areas, floor configuration and listed utilities. |
| Identifier / date | 6056/2024; 04 May 2024 |
|---|---|
| Scope and evidence | The supplied mortgage record describes an HMDA mortgage of built-up area connected with the building permission. |
| Identifier / date | 023381/GHMC/08463/SWOC/RJN2/2026; dated 11/09/2026 |
|---|---|
| Scope and evidence | GHMC certificate for the residential building on Plot Nos. 203 and 204, Survey No. 73; completion date recorded as 30/07/2026. |
| Identifier / date | Declaration dated as extracted “lith oct 2025” |
|---|---|
| Scope and evidence | Promoter declaration covering title, encumbrance/litigation disclosure, project-account undertakings and completion undertaking. |
The supplied evidence does not include a separate approved-layout document beyond the building-plan extraction. A TG-RERA-filed allotment-letter form and agreement-for-sale template are also available, but they contain unfilled buyer/unit or transaction particulars and do not evidence a specific buyer’s allotment.
1. Project at a glance
Project identity
Registered project name: SRI SAI RAJA RAJESWARI ENCLAVE
Project type / phase: Residential apartment project; phase or separately named registered portion not disclosed.
TG-RERA registration: P02400010271; registration period 22/05/2024–31/12/2026. This is the registration-validity period, not the construction deadline.
Registered promoter: Sri Sai Vardhaman Constructions.
Project status in filing: “New Project.” The filing’s proposed completion date is 30/04/2027; the Form B declaration states a completion undertaking of 31st December 2026.
Land and geographic identity
Locality / revenue village: Bandlaguda Jagir; the project documents also identify Bandlaguda Jagir Village. The registration certificate records Bandlaguda.
Mandal / district / PIN: Gandipet Mandal, Ranga Reddy District, 500086.
Survey and site identifiers: Survey No. 73; Plot Nos. 203 and 204. No project subdivision is specified in the supplied project filing or approval extracts.
Registered site extent: 445.67 sq. m (the registration land details give 445.67 sq. m total and net area; affected area is 0).
Boundaries: East: Plot No. 205; West: Plot No. 202; North: Plot Nos. 209 and 210; South: 40 feet wide road.
Development identity
Sanctioning authority / principal approval: HMDA; Building Permit No. 000180/BP/HMDA/0041/SKP/2024, approved 22 May 2024.
Approved built-up area: 1,238.40 sq. m is recorded as proposed built-up area excluding parking / net BUA. The permit extract also records total built-up area 1,496.58 sq. m and parking area 247.70 sq. m; these are separately stated figures, not interchangeable area measures.
Buildings / floors: One residential building; sanctioned as 1 Stilt + 5 upper floors. The plan extract records NO OF FLOORS: 6, building height 14.95 MT., and Total Ht. 21.07mt.
Parking provision: Stilt is designated for parking in the plan conditions; extracted parking area is 247.70 sq. m in the permit record. A parking-space count or unit-wise allocation is not supplied.
Unit count: 10 units in the RERA filing; the approval-plan extract also records 10 units.
Offering and status
Configuration / RERA saleable area: 3BHK, 78.04 sq. m saleable area per filed configuration.
Bookings / availability: 5 booked; 5 available, as last read from the TG-RERA portal; no as-of date is recorded, so these counts are indicative.
Construction stage: The project filing calls it a “New Project”; the supplied records do not establish a current construction-progress percentage or independently verified site progress.
Completion dates: TG-RERA project information states proposed completion 30/04/2027; the Form B declaration says 31st December 2026.
Occupancy certificate: A GHMC Occupancy Certificate is supplied for the residential building on Plot Nos. 203 and 204, Survey No. 73; it records completion date 30/07/2026 and is dated 11/09/2026. Its stated scope is this building.
2. The project story
Sri Sai Raja Rajeswari Enclave is a single-building residential apartment project registered with TG-RERA as P02400010271. The registered land description identifies Survey No. 73, Plot Nos. 203 and 204, in Bandlaguda Jagir, Gandipet Mandal, Ranga Reddy District. The registered site extent is 445.67 sq. m, with the stated plot boundaries recorded in Land and geographic identity above.
The filed offering is 10 three-bedroom homes, with 5 shown as booked and 5 available in the portal-derived unit record; that count is indicative because the extract has no as-of date. The supplied building permit describes a residential building with one stilt level and five upper floors. The supplied GHMC certificate records an occupancy certificate for this building, with a completion date of 30/07/2026. The documents do not provide a current construction-progress percentage.
3. Master plan, architecture & building design
The supplied HMDA building-permit extract is for a new residential building on Plot Nos. 203 and 204, Survey No. 73, Bandlaguda Jagir Village. It specifies 1 Stilt + 5 upper floors, NO OF FLOORS: 6, and 1,238.40 sq. m as total proposed built-up area excluding parking. It separately records 1,496.58 sq. m total BUA, 247.70 sq. m parking area, and 445.67 sq. m plot area.
The permit extract identifies a lift, stair, lift machine room, transformer, rainwater harvesting, septic tank, sump and overhead water tank. It also records a 2.50 M. WIDE PASSAGE, and road widths of 12.00 MT WIDE EXISTING, 12.00 MT WIDE PROPOSED ROAD, and 2.50 M. WIDE PASSAGE. These are details in the supplied plan extraction; the record does not provide a full architectural description of apartment layouts, façade, floor-by-floor unit arrangement, or common-area dimensions.
The supplied GHMC certificate describes the same building as one stilt floor and five upper floors. It records sanctioned built-up area of 1238.4 Sq. Metres and completion built-up area of 1271.403 Sq. Metres, with Total Deviated Builtup Area for Block: 33.0. The certificate is an official building-specific occupancy record; see the evidence index below.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 5 | 5 | 78.04 sq. m | Not established from supplied drawing measurements | Not supplied |
The 3BHK counts and saleable area are TG-RERA filing data. Booked and available counts are indicative because the portal record has no as-of date. The supplied floor-plan extraction reports two drawings reviewed, but zero flat designs measured for the 3BHK configuration; no software-measured carpet area or room dimensions are therefore available here.
RERA saleable area and carpet area are different measures: the supplied drawing methodology notes that carpet area is measured from drawing geometry, while RERA saleable area also includes the home’s proportionate share of common areas. No carpet area, balcony/utility measurements, loading figure, or room-by-room plan measurements are established in the supplied data.
5. Parking & vehicle circulation
The building permit identifies a stilt floor for parking and records a parking area of 247.70 sq. m. The GHMC occupancy-certificate extract records parking area of 247.68 Sq. mts sanctioned and 247.68 Sq. mts as per completion plan. The records supplied do not state the number of parking bays, visitor or accessible spaces, parking allocation by apartment, or whether any parking is separately assigned to a buyer.
The approval-plan extract includes existing and proposed 12.00-metre-wide roads and a 2.50-metre-wide passage. No ramp, separate pedestrian route, or vehicle entry/exit arrangement is detailed in the supplied extracts. The permit conditions refer to electric-vehicle charging infrastructure, but the supplied records do not verify installed charging equipment.
6. Amenities, recreation & open spaces
| Description / size | Lift, lift machine room and stair are listed; capacities and count beyond the listed provision are not supplied. |
|---|---|
| Declared progress / verified status | Listed in the plan extraction; completion status not established here. |
| Description / size | Sump, overhead water tank and rainwater harvesting are listed. |
|---|---|
| Declared progress / verified status | Listed in plan extraction. The GHMC certificate records 1 rainwater harvesting pit sanctioned and 1 as per completion plan. |
| Description / size | Listed in the approval-plan extraction. |
|---|---|
| Declared progress / verified status | Listed in plan extraction; no independent operating-status record supplied. |
| Description / size | TG-RERA amenities data lists this facility as available: YES. |
|---|---|
| Declared progress / verified status | The same amenities record reports 0% progress; completion is not established. |
| Description / size | Listed in TG-RERA amenities data. |
|---|---|
| Declared progress / verified status | Progress recorded as 0%. |
| Description / size | TG-RERA amenities data lists water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety, electrical meter room/sub-station/receiving station, and aggregate recreational open space. |
|---|---|
| Declared progress / verified status | The record shows 0% for these items; for water supply, sewerage, rainwater harvesting and electrical meter room/sub-station/receiving station, availability is listed as YES. The data does not establish independent completion. |
No clubhouse, indoor recreation, sports facility, or facility dimensions/capacities are established by the supplied TG-RERA amenity record. Vendor-listed facilities are not relied on here as proof of sanctioned or delivered project amenities.
7. Utilities, building services & safety
The plan extract lists a transformer, sump, overhead water tank, septic tank and rainwater harvesting. The TG-RERA amenities record lists water supply and sewerage as available, and records rainwater harvesting as available; the same record gives 0% progress for these listed amenities. The supplied GHMC certificate records one rainwater-harvesting pit in both the sanctioned and completion plan. Water source, storage capacity, treatment, sewage-treatment capacity, reuse arrangements and storm-water design details are not supplied.
The building permit lists a transformer and requires provision for EV charging infrastructure in its conditions. It also contains building-safety conditions, including fire-safety and structural-stability requirements, and identifies a lift and stair in the plan extraction. These references describe recorded plan requirements or listed features; the supplied materials do not independently verify installed electrical, fire-safety, lift, accessibility, security, or waste-management systems.
8. Location, access & connectivity
The registered location is Survey No. 73, Plot Nos. 203 and 204, Bandlaguda Jagir, Gandipet Mandal, Ranga Reddy District, PIN 500086. The permit extraction identifies a 12.00-metre-wide existing road, a 12.00-metre-wide proposed road and a 2.50-metre-wide passage. The stated southern boundary is a 40-feet-wide road.
The supplied location record gives Financial District (Nanakramguda): 8.8 km. No other independently sourced public-transport details or measured distances are supplied.
9. Developer & development status
The registered promoter is Sri Sai Vardhaman Constructions, recorded as a partnership; the supplied corporate identifier is GSTIN 36AFIFS6512A1Z8. The registration certificate gives the promoter address as Village Adityanagar, Mandal Kukatpally, District Medchal-Malkajgiri, PIN 500085. The project address is separately recorded in Bandlaguda Jagir, Gandipet, Ranga Reddy District.
The Form B declaration, made by authorised signatory Bala Subrahmanya Vishwanadham, states that D Santhosh Kumar has legal title to 100% of the project land and records the promoter’s completion undertaking as 31st December 2026. The TG-RERA project information separately states a proposed completion date of 30/04/2027. The supplied records do not state a verified construction-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P02400010271; 22/05/2024–31/12/2026 |
|---|---|
| Scope and evidence | Form C registration certificate for SRI SAI RAJA RAJESWARI ENCLAVE, promoter Sri Sai Vardhaman Constructions. |
| Identifier / date | 000180/BP/HMDA/0041/SKP/2024; approved 22 May 2024 |
|---|---|
| Scope and evidence | Residential building on Plot Nos. 203 and 204, Survey No. 73; one stilt and five upper floors. |
| Identifier / date | Same principal approval number |
|---|---|
| Scope and evidence | Extracted plan details include site area, built-up areas, floor configuration and listed utilities. |
| Identifier / date | 6056/2024; 04 May 2024 |
|---|---|
| Scope and evidence | The supplied mortgage record describes an HMDA mortgage of built-up area connected with the building permission. |
| Identifier / date | 023381/GHMC/08463/SWOC/RJN2/2026; dated 11/09/2026 |
|---|---|
| Scope and evidence | GHMC certificate for the residential building on Plot Nos. 203 and 204, Survey No. 73; completion date recorded as 30/07/2026. |
| Identifier / date | Declaration dated as extracted “lith oct 2025” |
|---|---|
| Scope and evidence | Promoter declaration covering title, encumbrance/litigation disclosure, project-account undertakings and completion undertaking. |
The supplied evidence does not include a separate approved-layout document beyond the building-plan extraction. A TG-RERA-filed allotment-letter form and agreement-for-sale template are also available, but they contain unfilled buyer/unit or transaction particulars and do not evidence a specific buyer’s allotment.
Frequently asked questions
Is SRI SAI RAJA RAJESWARI ENCLAVE registered with Telangana RERA?
Yes. SRI SAI RAJA RAJESWARI ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02400010271; the registration status is New Project.
Who is the developer of SRI SAI RAJA RAJESWARI ENCLAVE?
The promoter named in the RERA registration is Sri Sai Vardhaman Constructions.
Where is SRI SAI RAJA RAJESWARI ENCLAVE located?
SRI SAI RAJA RAJESWARI ENCLAVE is in Bandlaguda Jagir Village, Bandlaguda, Gandipet, Rangareddy, Telangana (500086).
When will SRI SAI RAJA RAJESWARI ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Bandlaguda