Sign in

Siri Elite

GRENSTONE INFRA · Rangareddy · RERA P02400005051

SIRI ELITE is a residential gated community of villas in SIRIGIRIPUR NEAR MAHESHWARAM, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter GRENSTONE INFRA. The site area is 26952.35 sq.mts, and the TG-RERA filing records 93 building units configured as 4BHK villas. The project is registered under TG-RERA number P02400005051, with a proposed completion date of 30/11/2026.

📘 Project brochure from the promoter’s website ↗

01What we found

Period endedTG-RERA registration ran to 19 Jun 2026 - check its extension on TG-RERA
29documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSIRI ELITE RERA record
Project typeResidential; the filed and drawing evidence describes a gated community with villas. RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration number: P02400005051. RERA record
TG-RERA registrationP02400005051, issued 13/09/2022; certificate states validity from 13/09/2022 to 19/06/2026. Registration validity is not the same as the project’s completion deadline. RERA record Approvals record
Registered promoterGRENSTONE INFRA. RERA record RERA filing
RERA status in supplied recordRegistered; the certificate lists an end date of 19/06/2026. The pack does not provide an extension order. Approvals record

Land and geographic identity

FieldProject record
LocalitySIRIGIRIPUR NEAR MAHESHWARAM RERA record RERA filing
Revenue villageSirigirpur Revenue Village in the title records; approval and registration materials use Sirigirpur. The RERA land details field itself does not disclose a village. Land records
Mandal / district / PINMaheshwaram / Ranga Reddy / 501359 RERA record RERA filing
Project survey numbers and subdivisions65/B/A3, 65/B/B2, 66/A2, 65/B/A2, 66/A3, 66/B2, 65/B/B3/1, 66/B3/1, 65/B/A1, 66/A1, 65/B/B1, 66/B1 RERA record Land records
Site areaTotal site area 26952.35 sq.mts; area affected by road widening 670.32 sq.mts; net area 26282.03 sq.mts. RERA filing
Boundaries recorded in RERA filingEast: 40 FEET WIDE ROAD; West: PROPOSED 60 FEET WIDE ROAD; North: PART OF SY NO S 65 AND 66; South: LAND BELONGS TO JANGAMMA. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalHyderabad Metropolitan Development Authority (HMDA); approval reference 000105/LO/Plg/HMDA/2022, dated 13 June, 2022. Approvals record
Nature and status of plan evidenceHMDA materials describe technical approval for a draft gated-community layout, forwarded to the local body for final sanction. The supplied record does not establish a final layout release.
RERA-filed approved built-up areaThe RERA filing’s land details list 23455.56 sqmts as “Approved Built up Area.” The supplied HMDA drawing extracts separately show building-specific totals; see the design section. RERA filing
Buildings and homesThe TG-RERA filing records 93 total building units and 93 proposed building units. The approved-drawing extracts identify villa types and a clubhouse, but the extracted sheets do not provide one clear consolidated building schedule for all 93 units. RERA filing RERA unit table
Floors / parking levelsVilla drawings show Ground Floor, First Floor and Second Floor; the clubhouse drawing shows Stilt Floor, First, Second and Third Floors, with Terrace Floor. No basement or parking-level schedule is supplied.
Sanctioned dwelling-unit countThe available HMDA extracts contain sheet-level unit figures, not a consistent project-wide total that can be established from the supplied material.

Offering and status

FieldProject record
RERA-filed configuration4BHK villas; 93 units in the normalized RERA unit record. RERA unit table RERA unit details
RERA saleable area271.89–284.39 sq.m. This is the filed saleable area, not a measured carpet area. RERA unit table RERA unit details
Booked / availableTG-RERA portal data read for the report records 0 booked / 93 available; no as-of date is provided, so these counts are indicative. RERA unit table
Construction stageNo independently verified site-progress measurement or construction-stage report is supplied. The RERA amenity schedule lists multiple works as available, but records 0% progress for those entries; the compound wall is listed at 50%. RERA amenities
Completion timelinePromoter’s Form B declaration undertakes completion by 19.06.2026. The project header also records a proposed completion date of 30/11/2026. The pack does not include a completion-date revision order. RERA filing
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. No tower-wise or phase-wise certificate status is available. Document index

2. The project story

SIRI ELITE is registered as a residential project and is described in its TG-RERA filing and HMDA-drawing records as a gated community of villas at Sirigirpur, Maheshwaram Mandal, Ranga Reddy District. The registered site is identified by 12 survey subdivisions, with a total site area of 26952.35 sq.mts and a net area of 26282.03 sq.mts after the stated 670.32 sq.mts road-widening area. RERA record Land records RERA filing

The RERA filing records 93 building units, all identified in the unit data as four-bedroom villas. The supplied plan extracts show several villa types, individual villa plots and a clubhouse; they do not establish a complete, consolidated drawing schedule for the whole project. RERA unit table RERA unit details

The project’s registration certificate runs to 19/06/2026. Separately, the RERA filing proposes completion by 30/11/2026, while the promoter’s Form B undertaking states 19.06.2026. The evidence pack contains no extension order, completion certificate, occupancy certificate or independently verified construction-progress report. The portal amenity schedule reports 0% progress for listed items other than the compound wall at 50%; these are portal entries, not an independent site inspection. RERA filing RERA amenities

3. Master plan, architecture & building design

The site-area statement in the HMDA-drawing extraction records 26952.35 sq.mts total and 26282.03 sq.mts net, with 670.32 sq.mts identified as road-widening area. The extracted layout plan allocates the net area to 15170.70 sq.mts plotted area, 7393.73 sq.mts roads, 672.94 sq.mts amenity area and 3044.61 sq.mts organized open space/park/utility area. These are drawing-extracted land-use figures, not measurements of completed works.

The HMDA extracts show residential villa plans with Ground, First and Second Floors, and a clubhouse plan with Stilt, First, Second and Third Floors plus Terrace. One clubhouse sheet lists 777.81 Sq.mt. total built-up area and 16.92 mt. total height. RERA’s filed “Approved Built up Area” is 23455.56 sqmts; the drawing extracts also show sheet-level built-up figures, but do not provide a single consolidated, reconciled schedule in the supplied material. RERA filing

The drawing extracts describe a villa-led residential layout with internal roads, amenity land and open-space/park/utility land. They do not provide reliable project-wide information on villa footprints, lift or stair arrangements, number of homes per building, or phase organization. The master-plan zoning sheet available for the area is image-only and has not been interpreted at the project survey level in this Overview. HMDA

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
4BHK villa93093271.89–284.39 sq.mNot suppliedNot supplied

The TG-RERA filing records the villas under three spelling variants—“FOUR BEBROOM VILLA,” “FOUR BEDROOM VILLA” and “FOUR BEDRROM VILLA”—which the normalized unit record groups as 4BHK. The saleable-area range and unit counts above come from the TG-RERA unit record. The portal booking snapshot has no stated as-of date. RERA unit details RERA unit table RERA unit table

The supplied drawing-measurement summary does not provide a usable measured carpet area for the RERA-filed villa configuration. Carpet area is therefore not stated here. Saleable area is not interchangeable with carpet area: it may include the home’s share of common areas. Floor plans RERA unit table

5. Parking & vehicle circulation

The supplied HMDA layout material records roads within the layout and an approval condition referring to 60 feet and above roads; an extracted layout sheet also lists an internal road width of 12.20 mts. RERA land details record a 40-foot road on the east and a proposed 60-foot road on the west. RERA filing

The documents do not establish a project-wide sanctioned count of resident or visitor parking spaces, parking levels, EV facilities, or unit-specific parking allocations. A layout sheet records a mortgage over five villa plots/units—Nos. 41, 53, 54, 67 and 68—with an area stated as 1161.00 sq.mts in the plan record; this is not a parking allocation.

6. Amenities, recreation & open spaces

Clubhouse / indoor

Clubhouse
Description / sizeHMDA drawing identifies a clubhouse building; one extracted sheet lists total built-up area 777.81 Sq.mt.
Evidence sourceHMDA drawing
Declared progress / verified statusDrawing evidence only; no completion verification supplied
Clubhouse facilities
Description / sizeA clubhouse is shown, but specific indoor facilities and capacities are not established in the RERA-filed data supplied for this report.
Evidence sourceHMDA drawing
Declared progress / verified statusNot established

Sports / recreation

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Cycling trackRequired in the HMDA draft-layout conditions.Condition recorded; completion not independently verified
Park / open-space and recreation land3044.61 sq.mts organized open space/park/utility area in the layout drawing extraction.Area is drawing-extracted; delivered condition not verified

Landscape / open space

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Organized open space / park / utility area3044.61 sq.mts in the layout drawing extraction.Drawing allocation; not proof of completed landscaping
Avenue planting / green foliageHMDA conditions refer to planting and surviving saplings before OC.Condition recorded; completion not verified

Convenience / community

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Amenity area672.94 sq.mts in the layout drawing extraction.Drawing allocation; individual facilities and delivered status not established
Community buildingsListed as “YES” in the RERA amenity schedule, with 0% recorded progress.RERA amenitiesRERA schedule entry; not independently verified complete

The RERA amenity schedule also lists internal roads and footpaths, water supply, sewerage/septic tank/STP, storm-water drains, green strip/park, street lighting, sewage and sullage treatment, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station, recreational open space, and compound wall. For the listed entries with progress values, the schedule records 0% except the compound wall at 50%; the entries do not establish independent completion. RERA amenities

7. Utilities, building services & safety

HMDA’s draft-layout conditions and listed services refer to potable/drinking-water supply arrangements, internal water-supply pipelines and an overhead tank; underground ducting for utilities; underground storm-water drainage; a transformer yard, electrical supply lines and LED street lighting; solid-waste disposal space and source segregation; and a common septic tank/STP and bio-compost unit. Rainwater-harvesting pits are also listed. These are approval/drawing disclosures and conditions, not confirmation that the systems have been installed, commissioned or are operating.

The TG-RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage and sullage treatment, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. It gives no capacities or independent commissioning evidence; several entries have no reported progress percentage. RERA amenities

The supplied project records do not establish lift provision, backup-power capacity, CCTV/security arrangements, accessible routes, fire-system specifications, or completion of statutory fire clearances. Document index RERA amenities

8. Location, access & connectivity

The registered location is SIRIGIRIPUR NEAR MAHESHWARAM, Maheshwaram Mandal, Ranga Reddy District, PIN 501359. The approval and title material identifies Sirigirpur village; the RERA land-details field does not separately populate the revenue-village field. RERA record RERA filing Land records

The RERA filing records an existing 40 FEET WIDE ROAD on the east boundary and a PROPOSED 60 FEET WIDE ROAD on the west. HMDA drawing material refers to roads within the layout, including an extracted 12.20 mts internal road. The supplied records do not provide verified public-transport routes or measured distances from the project to nearby landmarks. RERA filing Location record

9. Developer & development status

The registered legal promoter is GRENSTONE INFRA, identified in the project record as a partnership. Its GSTIN is 36AARFG6735F1Z2. The supplied corporate record identifies RAM GOPAL CHALAMALASETTY as an authorized signatory. The registered promoter address shown in the project record is MR PRIME, BP RAJU MARG, MAHESHWARAM TO SIRIGIRIPURAM ROAD, SIRIGIRIPUR NEAR MAHESHWARAM, Maheshwaram, Ranga Reddy, 501359; the supplied website is https://grenstoneinfra.com. Corporate record Parties record RERA filing

The registration certificate and the RERA filing record the project as registered and proposed for residential villa development. The record provides no independently verified construction-progress assessment or occupancy/completion certificate. Form B is the promoter’s declaration, including its completion undertaking; it is not an independent progress certification. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400005051, issued 13/09/2022
What the supplied document establishesForm C registration certificate for SIRI ELITE; stated validity ends 19/06/2026.
HMDA principal approval reference
Identifier / date000105/LO/Plg/HMDA/2022, 13 June, 2022
What the supplied document establishesDraft gated-community layout technical approval materials; the letter records conditions and says approval is not proof of land title.
HMDA application/file reference
Identifier / date051902/SMD/LT/U6/HMDA/24012022
What the supplied document establishesReferenced in the drawing extracts associated with the HMDA technical approval.
Layout and building-plan drawings
Identifier / dateHMDA drawing sheets, including villa types, individual villa plots and clubhouse
What the supplied document establishesProposed residential villa layout and building drawings; the supplied extracts do not establish final layout release or completion.
Promoter Form B declaration
Identifier / dateDated 08th JUNE day of 2022
What the supplied document establishesPromoter-declared title basis, encumbrance statement, project-fund commitments and completion undertaking.
HMDA mortgage deed reference
Identifier / date10035/2022, dated 11/5/2022
What the supplied document establishesRecorded in the HMDA approval material in connection with specified villa plots/units.
Road-widening gift deed reference
Identifier / date10036/2022, dated 11.05.2022
What the supplied document establishesRecorded in HMDA material for the road-widening area.
Environmental NOC reference in HMDA material
Identifier / dateSIA/TG/MIS/259200/2022, dated 05.05.2022
What the supplied document establishesListed as an environmental NOC reference in the HMDA approval extraction.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied document establishesNo project- or phase/tower-scoped OC or completion certificate is available in the evidence provided. Document index

Frequently asked questions

Is SIRI ELITE registered with Telangana RERA?

Yes. SIRI ELITE is registered with the Telangana Real Estate Regulatory Authority as P02400005051; the registration status is New Project.

Who is the developer of SIRI ELITE?

The promoter named in the RERA registration is GRENSTONE INFRA.

Where is SIRI ELITE located?

SIRI ELITE is in SIRIGIRIPUR NEAR MAHESWARAM, Maheshwaram, Rangareddy, Telangana (501359).

When will SIRI ELITE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Maheshwaram