Golden City
SOUTHER HOMES INFRA DEVELOPERS · Rangareddy · RERA P02400008201
GOLDEN CITY is a plotted development in Mangalpalli, Ibrahimpatnam Mandal, Ranga Reddy District, developed by the registered promoter SOUTHER HOMES INFRA DEVELOPERS. The project has a registered site extent of 42085.6 sq. m and a net layout area of 34964.62 sq. m; it is a residential plots offering, and the supplied record does not state a verified plot count or plot-size schedule. TG-RERA registration number P02400008201 gives a proposed completion date of 22/06/2024 and a revised proposed completion date of 06/06/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GOLDEN CITY RERA record |
| Project type | Plotted development / open layout RERA record RERA filing |
| Phase or registered portion | Not separately identified as a phase in the supplied record; registration is for the project described in the certificate |
| TG-RERA registration | P02400008201 RERA record Approvals record |
| Registration validity | 07/05/2024 to 06/06/2024, unless extended by the Authority; the supplied evidence does not establish an extension Approvals record |
| Registered promoter | SOUTHER HOMES INFRA DEVELOPERS RERA record Corporate record |
| RERA status | Project record describes the project as “On-Going Project”; registration validity dates are stated separately above RERA filing Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Mangalpalli (also rendered Mangalpalle in project records) RERA record RERA filing |
| Mandal | Ibrahimpatnam RERA record RERA filing |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 501506 RERA record RERA filing |
| Project survey numbers | Sy. Nos. 298/AA and 298/A2 RERA record Land records |
| Registered site extent | 42085.6 sq. m RERA filing |
| Net layout area | 34964.62 sq. m Layout record |
| Boundary descriptions in RERA project information | East: NALA AND YBR INFRA LAYOUT; West: LAND OF GURRAM SEKHAR REDDY AND OTHERS; North: LAND OF B PRABHAKAR REDDY AND OTHERS; South: LAND OF D PANDU AND OTHERS RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority shown in the project plan record | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 000100/LO/Plg/HMDA/2019, dated 03 May, 2019, for an open-plot layout at Sy. Nos. 298/AA and 298/A2 Approvals record |
| Later local-body proceedings | Adibatla Municipality proceedings dated 22-06-2021, referring to LP No. 000100/LO/Plg/HMDA/2019 Approvals record |
| Approved built-up area | Not disclosed in the supplied project data; this is a plotted layout, not a building-count schedule RERA filing |
| Plots | The supplied RERA plan drawing is software-read and does not provide a verified complete plot schedule or plot count Layout record |
| Buildings / floors / parking levels | Not applicable to the documented plotted-layout offering; no building-floor or parking-level schedule is supplied RERA record Layout record |
Offering and status
| Field | Record |
|---|---|
| Offering | Residential plots; unit-wise RERA counts, plot-size schedule and booked/available inventory are not supplied RERA record RERA unit table |
| Construction / development stage | Project status is recorded as “On-Going Project”; a RERA filing reports 80% completeness, without independent site verification RERA filing RERA record |
| Completion date in project information | Proposed: 22/06/2024; revised proposed: 06/06/2024 RERA filing RERA record |
| Promoter completion undertaking | Form B dated 27 September 2023 states completion by 22-06-2024 |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied evidence. The project is a plotted layout; the supplied records concern layout release and development conditions rather than building-wise occupancy Document index Approvals record |
2. The project story
GOLDEN CITY is registered as a plotted residential development in Mangalpalli, Ibrahimpatnam Mandal, Ranga Reddy District. The registered land identity is Sy. Nos. 298/AA and 298/A2, with a stated site extent of 42085.6 sq. m and net layout area of 34964.62 sq. m. RERA record Land records Layout record
The RERA-filed layout drawing identifies residential plots, internal roads, park/open-space and social-infrastructure land. It also labels a buffer zone and shows water-supply and other site-service features. This is a plotted offering, not an apartment or tower development. The supplied material does not establish a complete plot inventory, plot-by-plot sizes, bookings or availability. Layout record RERA unit table
The project record says “On-Going Project” and gives 80% completeness. That is a filing status, not an independently verified site inspection. The stated completion dates have passed, but the supplied records do not establish the project’s current on-site condition or whether an extension, final completion record or other subsequent status update was issued. RERA filing RERA record Approvals record
3. Master plan, architecture & building design
The approved layout record gives a total site area of 42085.6 sq. m and net area of 34964.62 sq. m. Its listed land uses include 21537.06 sq. m of plotted area, 8871.48 sq. m of road area, 3682.57 sq. m of organized open space/park/utility area, and 874.84 sq. m of social infrastructure area; the drawing also identifies 7120.98 sq. m as buffer zone. These are layout-drawing figures, not building-area or apartment-area figures. Layout record
The plan is for a residential open layout and records road widths of 9.00 and 9.14M. The HMDA draft-layout letter also refers to roads “18 mts and above” and the local-body proceedings record a requirement to maintain a “12 Mirs wide road to the site”; these are approval-document statements, not a verified on-site road-width survey.
No building footprint, building count, floor configuration, tower height, apartment arrangement or building parking layout is evidenced. A project plan record lists a transformer yard, sump, overhead water tank, Mission Bhagiratha pipeline, harvesting pits, garbage point and bio-compost point among layout features.
4. Homes, configurations & floor plans
This is a plotted project, and the supplied RERA data does not include a complete plot-count schedule, plot-wise dimensions, booked/available counts or RERA-filed plot-area range. The layout drawing was read by software; its plot schedule is incomplete and no plot sizes were extracted for verification. RERA record Layout record RERA unit table
The promoter-site/vendor data lists plot saleable figures of 1350 Sq. Ft. and 3888 Sq. Ft.; these are vendor-supplied figures, not a complete RERA-filed inventory schedule. The supplied promotional flyer also describes open plots of 167-400 sg.yd; it is not used here as a RERA-filed plot schedule. Promoter website
The floor-plan review indicates five drawings in total: one layout sheet, four scans pending measurement, and no measured floor-plan areas. Apartment carpet-area and loading comparisons are therefore not applicable on the available evidence. Floor plans
5. Parking & vehicle circulation
No RERA-filed parking count, visitor or accessible parking provision, parking allocation arrangement, or dedicated parking layout is supplied. The approved layout includes internal roads; a project plan record also identifies road widths, but the evidence does not establish current as-built circulation or plot-specific parking rights. Layout record
6. Amenities, recreation & open spaces
| Facility | Organized open space / park / utility area |
|---|---|
| Description / size | 3682.57 sq. m |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Shown in the plan; completion is not independently verified |
| Facility | Social infrastructure area |
|---|---|
| Description / size | 874.84 sq. m |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Area shown; a specific delivered community facility is not identified |
| Facility | Buffer zone |
|---|---|
| Description / size | 7120.98 sq. m |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Shown in the plan; site condition not independently verified |
| Facility | Cycling track |
|---|---|
| Description / size | No size supplied |
| Evidence source | HMDA draft-layout conditions |
| Declared progress / verified status | Required by the cited plan conditions; completion not independently verified |
| Facility | Avenue plantation / trees |
|---|---|
| Description / size | No size supplied |
| Evidence source | RERA-filed layout record; HMDA draft-layout conditions |
| Declared progress / verified status | Identified in plans/conditions; completion not independently verified |
| Facility | Social-infrastructure land |
|---|---|
| Description / size | No specific facility or capacity supplied |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Land-use area identified; facility delivery not established |
The project amenity register marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, sewage treatment/disposal, rainwater harvesting and an electrical meter/sub-station/receiving-station item as “YES” at 100%. These are recorded project disclosures; they do not by themselves establish independent verification of completed facilities. The same register records community buildings, solid-waste management, energy management, fire protection and aggregate recreational open space at 0%. RERA amenities
The promoter-site/vendor material advertises additional facilities, but those claims are not treated as confirmed RERA-provided or delivered amenities in this Overview. Promoter website
7. Utilities, building services & safety
The RERA-filed layout material identifies a SUMP, Overhead Water Tank (O.H.T), Mission Bhagiratha Pipe Line, Transformer Yard, Harvesting Pits 4X4X6 RHP, garbage point, bio-compost point and panel boxes. These are plan labels; capacities and present operating status are not supplied.
The local-body proceedings list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, overhead tank, electrical supply lines, streetlights, transformer, rainwater-harvesting pits, independent sewerage disposal, protected water supply, sumps and solid-waste/bio-compost facilities among development works. The supplied evidence does not establish their current construction or operating condition.
The project amenity register marks water supply, sewerage, storm-water drainage, street lighting, sewage/sullage treatment and disposal, rainwater harvesting and an electrical meter/sub-station/receiving-station item as 100%; it records energy management and fire-protection/fire-safety requirements at 0%. No lift, building fire-system, emergency-access, accessibility or capacity specifications are supplied for this plotted layout. RERA amenities
8. Location, access & connectivity
The official project location is Mangalpalli, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501506, on Sy. Nos. 298/AA and 298/A2. The supplied cadastral centroid is 17.20359854272768, 78.58492762410049. RERA record Land records Cadastral map
The nearest sampled Outer Ring Road interchange is listed at approximately 5.5 km. The supplied data does not identify a measured route, travel time or public-transport service. Location record
9. Developer & development status
The registered promoter is SOUTHER HOMES INFRA DEVELOPERS, recorded as a partnership. Its GSTIN is 36ACZFS9477L1ZO. The RERA certificate lists the project location and promoter; the certificate’s promoter-address line gives “Village: Mandal: District: Hyderabad, Pin: 500028,” while the project filing lists an address at FLAT NO 201,10-3-273, MIZRA BLOCK, Humayun Nagar, with locality and address fields also referencing Ibrahimpatnam, Mangalpalli and Adibatla Village. Corporate record RERA filing
The project filing names NIDAMANURU SUDHAKAR as authorized signatory and lists Nidamanuru Sudhakar and Nidamanuru Sunitha as partners. Form B dated 27 September 2023, made by N. Sudhakar as authorized signatory, declares a completion date of 22-06-2024 and includes project-fund, audit and pending-approval undertakings. Parties record
The project record reports 80% completeness and labels the project “On-Going Project.” No independent site-progress verification, completed-project confirmation, extension order or occupancy/completion certificate is supplied. RERA record RERA filing Approvals record
10. Approvals, official records & documents
| Identifier / date | P02400008201; validity 07/05/2024–06/06/2024 |
|---|---|
| What it evidences | Form C certificate for GOLDEN CITY and registered promoter Souther Homes Infra Developers. |
| Identifier / date | 000100/LO/Plg/HMDA/2019; 03 May, 2019 |
|---|---|
| What it evidences | Draft open-plot layout approval for Sy. Nos. 298/AA and 298/A2, with layout-area details, mortgage references and development conditions. |
| Identifier / date | 047767/LT/SMD/FLT/U6/HMDA/02082021 |
|---|---|
| What it evidences | RERA-filed layout drawing listing land use, road widths and layout features. |
| Identifier / date | LP.No. 000100/LO/Plg/HMDA/2019; 22-06-2021 |
|---|---|
| What it evidences | Local-body proceedings referring to the HMDA layout plan and listing development conditions and infrastructure works. |
| Identifier / date | 27 September 2023 |
|---|---|
| What it evidences | N. Sudhakar, authorized by SOUTHERN HOMES INFRA DEVELOPERS, declares title basis, no encumbrances and completion by 22-06-2024, with stated promoter obligations. |
| Identifier / date | One layout sheet in supplied drawing records |
|---|---|
| What it evidences | Used for the stated land-use and layout features; plot schedule is incomplete and plot sizes were not extracted. Layout record |
The available project evidence does not identify an occupancy or completion certificate. The HMDA DPMS approved-layout lookup is recorded as unavailable through the public channel in the supplied data; that limitation is not evidence of refusal or absence of an authority record. Document index HMDA
1. Project at a glance
Project identity
Registered project name: GOLDEN CITY
Project type: Plotted development / open layout
Phase or registered portion: Not separately identified as a phase in the supplied record; registration is for the project described in the certificate
TG-RERA registration: P02400008201
Registration validity: 07/05/2024 to 06/06/2024, unless extended by the Authority; the supplied evidence does not establish an extension
Registered promoter: SOUTHER HOMES INFRA DEVELOPERS
RERA status: Project record describes the project as “On-Going Project”; registration validity dates are stated separately above
Land and geographic identity
Locality / revenue village: Mangalpalli (also rendered Mangalpalle in project records)
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501506
Project survey numbers: Sy. Nos. 298/AA and 298/A2
Registered site extent: 42085.6 sq. m
Net layout area: 34964.62 sq. m
Boundary descriptions in RERA project information: East: NALA AND YBR INFRA LAYOUT; West: LAND OF GURRAM SEKHAR REDDY AND OTHERS; North: LAND OF B PRABHAKAR REDDY AND OTHERS; South: LAND OF D PANDU AND OTHERS
Development identity
Sanctioning authority shown in the project plan record: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000100/LO/Plg/HMDA/2019, dated 03 May, 2019, for an open-plot layout at Sy. Nos. 298/AA and 298/A2
Later local-body proceedings: Adibatla Municipality proceedings dated 22-06-2021, referring to LP No. 000100/LO/Plg/HMDA/2019
Approved built-up area: Not disclosed in the supplied project data; this is a plotted layout, not a building-count schedule
Plots: The supplied RERA plan drawing is software-read and does not provide a verified complete plot schedule or plot count
Buildings / floors / parking levels: Not applicable to the documented plotted-layout offering; no building-floor or parking-level schedule is supplied
Offering and status
Offering: Residential plots; unit-wise RERA counts, plot-size schedule and booked/available inventory are not supplied
Construction / development stage: Project status is recorded as “On-Going Project”; a RERA filing reports 80% completeness, without independent site verification
Completion date in project information: Proposed: 22/06/2024; revised proposed: 06/06/2024
Promoter completion undertaking: Form B dated 27 September 2023 states completion by 22-06-2024
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied evidence. The project is a plotted layout; the supplied records concern layout release and development conditions rather than building-wise occupancy
2. The project story
GOLDEN CITY is registered as a plotted residential development in Mangalpalli, Ibrahimpatnam Mandal, Ranga Reddy District. The registered land identity is Sy. Nos. 298/AA and 298/A2, with a stated site extent of 42085.6 sq. m and net layout area of 34964.62 sq. m.
The RERA-filed layout drawing identifies residential plots, internal roads, park/open-space and social-infrastructure land. It also labels a buffer zone and shows water-supply and other site-service features. This is a plotted offering, not an apartment or tower development. The supplied material does not establish a complete plot inventory, plot-by-plot sizes, bookings or availability.
The project record says “On-Going Project” and gives 80% completeness. That is a filing status, not an independently verified site inspection. The stated completion dates have passed, but the supplied records do not establish the project’s current on-site condition or whether an extension, final completion record or other subsequent status update was issued.
3. Master plan, architecture & building design
The approved layout record gives a total site area of 42085.6 sq. m and net area of 34964.62 sq. m. Its listed land uses include 21537.06 sq. m of plotted area, 8871.48 sq. m of road area, 3682.57 sq. m of organized open space/park/utility area, and 874.84 sq. m of social infrastructure area; the drawing also identifies 7120.98 sq. m as buffer zone. These are layout-drawing figures, not building-area or apartment-area figures.
The plan is for a residential open layout and records road widths of 9.00 and 9.14M. The HMDA draft-layout letter also refers to roads “18 mts and above” and the local-body proceedings record a requirement to maintain a “12 Mirs wide road to the site”; these are approval-document statements, not a verified on-site road-width survey.
No building footprint, building count, floor configuration, tower height, apartment arrangement or building parking layout is evidenced. A project plan record lists a transformer yard, sump, overhead water tank, Mission Bhagiratha pipeline, harvesting pits, garbage point and bio-compost point among layout features.
4. Homes, configurations & floor plans
This is a plotted project, and the supplied RERA data does not include a complete plot-count schedule, plot-wise dimensions, booked/available counts or RERA-filed plot-area range. The layout drawing was read by software; its plot schedule is incomplete and no plot sizes were extracted for verification.
The promoter-site/vendor data lists plot saleable figures of 1350 Sq. Ft. and 3888 Sq. Ft.; these are vendor-supplied figures, not a complete RERA-filed inventory schedule. The supplied promotional flyer also describes open plots of 167-400 sg.yd; it is not used here as a RERA-filed plot schedule.
The floor-plan review indicates five drawings in total: one layout sheet, four scans pending measurement, and no measured floor-plan areas. Apartment carpet-area and loading comparisons are therefore not applicable on the available evidence.
5. Parking & vehicle circulation
No RERA-filed parking count, visitor or accessible parking provision, parking allocation arrangement, or dedicated parking layout is supplied. The approved layout includes internal roads; a project plan record also identifies road widths, but the evidence does not establish current as-built circulation or plot-specific parking rights.
6. Amenities, recreation & open spaces
| Facility | Organized open space / park / utility area |
|---|---|
| Description / size | 3682.57 sq. m |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Shown in the plan; completion is not independently verified |
| Facility | Social infrastructure area |
|---|---|
| Description / size | 874.84 sq. m |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Area shown; a specific delivered community facility is not identified |
| Facility | Buffer zone |
|---|---|
| Description / size | 7120.98 sq. m |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Shown in the plan; site condition not independently verified |
| Facility | Cycling track |
|---|---|
| Description / size | No size supplied |
| Evidence source | HMDA draft-layout conditions |
| Declared progress / verified status | Required by the cited plan conditions; completion not independently verified |
| Facility | Avenue plantation / trees |
|---|---|
| Description / size | No size supplied |
| Evidence source | RERA-filed layout record; HMDA draft-layout conditions |
| Declared progress / verified status | Identified in plans/conditions; completion not independently verified |
| Facility | Social-infrastructure land |
|---|---|
| Description / size | No specific facility or capacity supplied |
| Evidence source | RERA-filed layout drawing |
| Declared progress / verified status | Land-use area identified; facility delivery not established |
The project amenity register marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, sewage treatment/disposal, rainwater harvesting and an electrical meter/sub-station/receiving-station item as “YES” at 100%. These are recorded project disclosures; they do not by themselves establish independent verification of completed facilities. The same register records community buildings, solid-waste management, energy management, fire protection and aggregate recreational open space at 0%.
The promoter-site/vendor material advertises additional facilities, but those claims are not treated as confirmed RERA-provided or delivered amenities in this Overview.
7. Utilities, building services & safety
The RERA-filed layout material identifies a SUMP, Overhead Water Tank (O.H.T), Mission Bhagiratha Pipe Line, Transformer Yard, Harvesting Pits 4X4X6 RHP, garbage point, bio-compost point and panel boxes. These are plan labels; capacities and present operating status are not supplied.
The local-body proceedings list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, overhead tank, electrical supply lines, streetlights, transformer, rainwater-harvesting pits, independent sewerage disposal, protected water supply, sumps and solid-waste/bio-compost facilities among development works. The supplied evidence does not establish their current construction or operating condition.
The project amenity register marks water supply, sewerage, storm-water drainage, street lighting, sewage/sullage treatment and disposal, rainwater harvesting and an electrical meter/sub-station/receiving-station item as 100%; it records energy management and fire-protection/fire-safety requirements at 0%. No lift, building fire-system, emergency-access, accessibility or capacity specifications are supplied for this plotted layout.
8. Location, access & connectivity
The official project location is Mangalpalli, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501506, on Sy. Nos. 298/AA and 298/A2. The supplied cadastral centroid is 17.20359854272768, 78.58492762410049.
The nearest sampled Outer Ring Road interchange is listed at approximately 5.5 km. The supplied data does not identify a measured route, travel time or public-transport service.
9. Developer & development status
The registered promoter is SOUTHER HOMES INFRA DEVELOPERS, recorded as a partnership. Its GSTIN is 36ACZFS9477L1ZO. The RERA certificate lists the project location and promoter; the certificate’s promoter-address line gives “Village: Mandal: District: Hyderabad, Pin: 500028,” while the project filing lists an address at FLAT NO 201,10-3-273, MIZRA BLOCK, Humayun Nagar, with locality and address fields also referencing Ibrahimpatnam, Mangalpalli and Adibatla Village.
The project filing names NIDAMANURU SUDHAKAR as authorized signatory and lists Nidamanuru Sudhakar and Nidamanuru Sunitha as partners. Form B dated 27 September 2023, made by N. Sudhakar as authorized signatory, declares a completion date of 22-06-2024 and includes project-fund, audit and pending-approval undertakings.
The project record reports 80% completeness and labels the project “On-Going Project.” No independent site-progress verification, completed-project confirmation, extension order or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400008201; validity 07/05/2024–06/06/2024 |
|---|---|
| What it evidences | Form C certificate for GOLDEN CITY and registered promoter Souther Homes Infra Developers. |
| Identifier / date | 000100/LO/Plg/HMDA/2019; 03 May, 2019 |
|---|---|
| What it evidences | Draft open-plot layout approval for Sy. Nos. 298/AA and 298/A2, with layout-area details, mortgage references and development conditions. |
| Identifier / date | 047767/LT/SMD/FLT/U6/HMDA/02082021 |
|---|---|
| What it evidences | RERA-filed layout drawing listing land use, road widths and layout features. |
| Identifier / date | LP.No. 000100/LO/Plg/HMDA/2019; 22-06-2021 |
|---|---|
| What it evidences | Local-body proceedings referring to the HMDA layout plan and listing development conditions and infrastructure works. |
| Identifier / date | 27 September 2023 |
|---|---|
| What it evidences | N. Sudhakar, authorized by SOUTHERN HOMES INFRA DEVELOPERS, declares title basis, no encumbrances and completion by 22-06-2024, with stated promoter obligations. |
| Identifier / date | One layout sheet in supplied drawing records |
|---|---|
| What it evidences | Used for the stated land-use and layout features; plot schedule is incomplete and plot sizes were not extracted. |
The available project evidence does not identify an occupancy or completion certificate. The HMDA DPMS approved-layout lookup is recorded as unavailable through the public channel in the supplied data; that limitation is not evidence of refusal or absence of an authority record.
Frequently asked questions
Is GOLDEN CITY registered with Telangana RERA?
Yes. GOLDEN CITY is registered with the Telangana Real Estate Regulatory Authority as P02400008201; the registration status is On-Going Project.
Who is the developer of GOLDEN CITY?
The promoter named in the RERA registration is SOUTHER HOMES INFRA DEVELOPERS.
Where is GOLDEN CITY located?
GOLDEN CITY is in IBRAHIMPATNAM, Mangalpalli, Rangareddy, Telangana (501506).
When will GOLDEN CITY be completed?
The promoter's proposed date of completion filed with RERA is 22/06/2024. This is the promoter's declaration, not a guarantee.
More projects in Mangalpalli