Mrudula County

Nagireddy Vasu & Others · Nalgonda · RERA P01800009739

MRUDULA COUNTY is a plotted development in Nakrekal, Nakrekal Mandal, Nalgonda district, developed by registered promoter Nagireddy Vasu & Others. The tentative layout approval states a site extent of 4 Acer 6.52 Gts; 20150 Sq. Yds and 52 residential plots; buildings and floors are not disclosed. The plotted layout offers plots in size bands from 150–200 sq yd to 400–500 sq yd. Its TG-RERA registration number is P01800009739, and the Form B declaration undertakes completion by 11-Mar-2024.

01What we found

RegisteredTG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Nakrekal, Nakrekal, Nalgonda · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameMRUDULA COUNTY RERA record
Project typePlotted development / tentative residential layout RERA record
Phase or registered portionNo phase designation is disclosed; the registration and layout refer to the project on Survey Nos. 571 and 572. RERA record
TG-RERA registration numberP01800009739 RERA record
Registration validityCertificate states validity from 11/03/2022 to 11/03/2024; the supplied certificate records no extension. This is the registration period, separate from the completion undertaking below.
Registered promoterNagireddy Vasu & Others RERA record
RERA statusThe project data describes it as On-Going Project. Registration status in the supplied certificate is recorded separately above; no later extension certificate is supplied. RERA record

Land and geographic identity

FieldProject record
LocalityNakrekal RERA record
Revenue villageNakarekal Revenue Village (also rendered as Nakrekal in the registration record)
Mandal / district / PINNakrekal / Nalgonda / 508211 RERA record
Project survey numbers571 and 572; no project subdivision numbers are specified in the registration certificate or layout approval. RERA record
Registered site extent4 Acer 6.52 Gts; 20150 Sq. Yds as stated in the tentative layout approval.
RERA-filed total and net area16,847.96 sq.mts total and net area; affected area stated as 0. RERA filing
BoundariesEast: Land; West: Land; North: Land; South: Land. RERA filing

Development identity

FieldProject record
Sanctioning authorityNakrekal Municipality / Municipal Corporation, as named in the tentative layout approval.
Principal approvalTentative Layout Plan J001/LO/3093/2022, approved 11 March, 2022.
Application number005790/LO/DTCP/3093/0002/2021.
Approved built-up areaRERA filing states 9982.52 sqmts; the supplied approval is for a plotted layout and does not provide a building plan or building configuration. RERA filing
Plots52 in the tentative layout approval.
Buildings, floors and parking levelsNot disclosed in the supplied project record. The approval is a layout plan, not a building-floor schedule.
Parking in the approved layout0 area reserved for common parking space in the layout area statement. This does not establish individual plot parking arrangements.

Offering and status

FieldProject record
OfferingPlots in a residential layout; the tentative approval describes detached dwelling houses designed for single-family occupation.
Plot count and sizesApproval states 52 plots. Plot-size bands and drawing-derived measurements are described below under Homes and configurations. Layout record
Booked / available countsNot disclosed in the supplied project evidence. RERA record
Construction / development stageThe record labels the project “On-Going Project”; the supplied completeness figure is 80%, with no independent site inspection or measurement stated. RERA record
Completion dateThe Form B declaration undertakes completion by 11-Mar-2024.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied evidence. The approval is identified as a tentative layout approval.

2. The project story

MRUDULA COUNTY is registered as a plotted development in Nakrekal, Nalgonda district, on land identified as Survey Nos. 571 and 572. Its supplied tentative layout approval shows 52 residential plots, with roads, open space, utility land and social-infrastructure land set out in the approved area statement. The approval describes single-family detached dwelling houses as the permitted residential use and says shops, business premises and industrial units are not allowed except at sites specially reserved for those uses; the supplied area statement records no amenity area. RERA record

The project record labels the development “On-Going Project” and reports 80% completeness. That figure is a supplied project-record value, not an independently verified site measurement. The Form B declaration gives 11-Mar-2024 as the promoter’s completion undertaking. The supplied evidence does not establish which works are complete, whether all layout infrastructure has been delivered, or whether a completion/occupancy certificate has been issued. RERA record

3. Master plan, architecture & building design

The supplied sanctioned drawing is a tentative residential layout plan, not a building design. It identifies a layout extent of 4 Acer 6.52 Gts; 20150 Sq. Yds and allocates area as follows.

Layout useArea and share stated on approval
Plotted area2 Acer 18.67 Gts; 11939 Sq. Yds — 59.25%
Road area1 Acer 6.72 Gts; 5654 Sq. Yds — 28.06%
Open space (park)0 Acer 15.06 Gts; 1823 Sq. Yds — 9.05%
Social infrastructure0 Acer 4.36 Gts; 527 Sq. Yds — 2.62%
Utilities0 Acer 1.71 Gts; 207 Sq. Yds — 1.03%
Common parking space0 Acer 0 Gts; 0 Sq. Yds — 0%
Mortgage area0 Acer 15.4 Gts; 1863 Sq. Yds — 15.55% of plotted area, as printed on the approval

The layout approval says the open space, utilities and roads are to be handed over to the Municipality by registered gift deed before final layout release. It also states that the layout applicant is responsible for development works, including road formation, drains, nala channelization, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval conditions and proposed/required works; the supplied evidence does not confirm their completion.

RERA-filed approved built-up area is 9982.52 sqmts. No building count, building footprint, floor configuration, height, plot-by-plot building plan or phase-wise building organization is provided in the supplied documents. RERA filing

4. Homes, configurations & floor plans

This is a plotted project rather than an apartment offering. The tentative layout approval states 52 plots. The drawing-derived plot schedule contains 52 plots with sizes; these are software-read from the approved layout drawing and should be checked against the drawing itself. Layout record

Plot-size bandPlot count
150–200 sq yd (125–167 sq m)2
200–250 sq yd (167–209 sq m)43
250–300 sq yd (209–251 sq m)2
300–400 sq yd (251–334 sq m)3
400–500 sq yd (334–418 sq m)2

Software-measured plot sizes range from 137.6 sq.m (164.6 sq yd) to 349.38 sq.m (417.9 sq yd), with a median of 179.6 sq.m (214.8 sq yd). The drawing-derived record notes that the sum of plot areas matches the plotted area in the drawing’s own area statement. These measurements are not presented as RERA-filed unit sizes. Layout record

No RERA unit-type schedule, booked/available inventory counts, apartment carpet areas or saleable-area figures are supplied. The floor-plan review records two layout sheets and no measured building floor plans. Floor plans

5. Parking & vehicle circulation

The approved layout area statement allocates 0% to common parking space. It does not provide a count of individual parking bays or establish parking rights attached to any plot.

The approval requires roads to be opened for access to neighbouring sites and states that the layout owner/developer shall not build a compound wall or fencing around the site. Road widths, access-gate arrangements, visitor parking, accessible parking, EV charging and individual plot parking allocations are not specified in the supplied evidence.

6. Amenities, recreation & open spaces

The layout approval lists infrastructure works and land reservations; its conditions identify several facilities or works as required, but the supplied evidence does not independently verify delivery. The RERA amenity record marks the items below as available or records percentages; these are filing data, not an independent site inspection. RERA amenities

Landscape / open space
FacilityPark / open space
Description / size0 Acer 15.06 Gts; 1823 Sq. Yds; 9.05%
Declared progress / verified statusReserved in tentative layout; delivery not independently verified.
Landscape / open space
FacilityGreen strip / tot lot / park
Description / sizeSize not separately stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: YES, 100%; not independently verified.
Sports / recreation
FacilityRecreational open space
Description / sizeAggregate area not separately stated beyond the park allocation
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: YES, 100%; not independently verified.
Convenience / community
FacilitySocial infrastructure
Description / size0 Acer 4.36 Gts; 527 Sq. Yds; 2.62%
Declared progress / verified statusReserved in tentative layout; specific facility and delivery status not disclosed.
Convenience / community
FacilityCommunity buildings
Description / sizeNo area or facility specified
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; no completed facility verified.

No clubhouse or indoor-facility provision is established by the supplied sanctioned layout evidence. A third-party listing names facilities including a clubhouse, swimming pool, gym and indoor games, but those claims are not treated here as RERA-filed or sanctioned project facilities. Promoter website

7. Utilities, building services & safety

The tentative layout approval requires the developer to undertake infrastructure works and refers to water supply, sewerage disposal, drains, street lighting and electricity. It also identifies utility land for items including a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management. These are approval requirements or intended utility uses; the supplied material does not establish installed capacity or completion.

Water
What the supplied record saysApproval conditions require protected water supply and an overhead tank/sump as applicable; utility land is identified.
Status evidencedRequired/planned; capacity and completion not supplied.
Sewerage and drainage
What the supplied record saysApproval refers to septic tank, STP, sewerage disposal, drains and nala channelization.
Status evidencedRequired/planned; no capacity or independent completion evidence.
Storm-water / rainwater
What the supplied record saysApproval requires rainwater-harvesting pits.
Status evidencedRequired/planned; completion not verified.
Electrical
What the supplied record saysUtility land and an electric transformer are identified; street lighting and electricity facilities are listed as development works.
Status evidencedRequired/planned; capacity and completion not supplied.
Solid waste
What the supplied record saysSolid-waste management is listed among the utility uses/works.
Status evidencedRequired/planned; operating arrangements not supplied.
Fire and life safety
What the supplied record saysThe supplied layout approval and project records do not provide a specific fire-safety system or clearance.
Status evidencedNot established by the supplied evidence.
Security, accessibility and lifts
What the supplied record saysNo project-specific details supplied.
Status evidencedNot established by the supplied evidence.

8. Location, access & connectivity

The registered location is Nakrekal, Nakrekal Mandal, Nalgonda District, Telangana, PIN 508211. The project parcel centroid is recorded at 17.156137804778865, 79.41486425421992. RERA record Cadastral map

The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 84.6 km. This is a supplied distance measurement; no travel time or public-transport details are provided. Location record

The approved layout conditions require roads to be opened for neighbouring-site access, but the road widths and named approach roads are not stated in the supplied approval text.

9. Developer & development status

The registered promoter is Nagireddy Vasu & Others. The RERA record identifies the organization type as Others, described as “Joint Individuals”; no company registration number or promoter corporate identifier is supplied. The registration certificate gives the promoter office location as Village/Mandal Nakrekal, District Nalgonda, PIN 508211. RERA record RERA filing

The Form B declaration is signed by Mr Nagireddy Vasu, described as authorized by the promoter, and states a completion undertaking of 11-Mar-2024. The supplied project record reports 80% completeness, without an independent verification date or site-progress certificate. No revised completion date, extension certificate or occupancy/completion certificate is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM C registration certificate for MRUDULA COUNTY, registration P01800009739, issued 17/06/2025, stating validity 11/03/2022–11/03/2024.
Principal layout sanctionTentative Layout Plan J001/LO/3093/2022, approved 11 March, 2022 by Nakrekal Municipality / Municipal Corporation; application 005790/LO/DTCP/3093/0002/2021.
Form B declarationPromoter declaration dated 26-May-2025, including title and encumbrance statements, fund-management commitments and completion undertaking. These are promoter declarations.
Occupancy / completion certificateNot supplied. The available layout approval is tentative.
Building plans / floor plansNo building-floor configuration is established in the supplied documents; the available drawing evidence consists of layout sheets. Floor plans

The approval lists conditions for infrastructure delivery, release of mortgaged plots and final layout release. This overview records the existence and scope of the supplied approval; the detailed approval conditions and their status require review in the approvals section.

Frequently asked questions

Is MRUDULA COUNTY registered with Telangana RERA?

Yes. MRUDULA COUNTY is registered with the Telangana Real Estate Regulatory Authority as P01800009739; the registration status is On-Going Project.

Who is the developer of MRUDULA COUNTY?

The promoter named in the RERA registration is Nagireddy Vasu & Others.

Where is MRUDULA COUNTY located?

MRUDULA COUNTY is in Nakrekal, Nalgonda, Telangana (508211).

When will MRUDULA COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 11/03/2024. This is the promoter's declaration, not a guarantee.