Sign in

Brundavan Township

BRUNDAVAN TOWNSHIP · Hanamkonda · RERA P00300002580

BRUNDAVAN TOWNSHIP is a plotted development in Oglapur Village, Damera Mandal, Warangal Urban district. The registered promoter developing it is Brundavan Township, identified as a partnership. The layout has a registered site extent of 82,856.87 sq.m and a net plotted area of 46,605.69 sq.m; the supplied records do not state a complete plot count or plot-size configurations. It is registered with TG-RERA as P00300002580, and the promoter’s Form B declares completion by 22/04/2022.

01What we found

Period endedTG-RERA registration ran to 22 Apr 2022 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameBRUNDAVAN TOWNSHIP RERA record
Project typePlotted development / open-plot layout RERA record
Phase / registered portionThe registration record identifies the project as a plotted development; no separate phase name is disclosed. RERA record
TG-RERA registrationP00300002580 RERA record
Registration validity23/02/2021 to 22/04/2022; the certificate states “1 years.” No extension is recorded in the supplied certificate. This is registration validity, not a current completion or occupancy certificate. RERA record
Registered promoterBrundavan Township; the project filing identifies the promoter organization as a partnership. RERA record Corporate record
RERA status in supplied recordRegistration certificate issued under section 5. No current registration-status record is supplied.

Land and geographic identity

FieldRecord
Locality / revenue villageDamera district-level identity; the layout and sanction documents describe the site as Oglapur Village. RERA record Land records
MandalDamera, as stated in the layout-sanction material.
DistrictWarangal Urban in the project header and RERA certificate; the layout-sanction documents use Warangal (Rural) / Warangal Rural. RERA record
PIN506342 RERA record
Project survey numbers and subdivisions74/1/B/1, 74/1/B/2, 74/4, 75/1B/1, 76/1/1, 76/1/2, 76/2, 77/2 RERA record
Registered site extentThe registration filing states 82,856.87 sq.m as total/net area. The layout documents separately state 82,856.87 sq.m as the area “as per the documents” and 77,014.93 sq.m as the layout area “as per the ground.” RERA filing
Layout area allocationsProposed roads: 19,003.81 sq.m; road-affected area: 2,869.79 sq.m; open space: 7,870.86 sq.m; garbage area and septic tank: 515.94 sq.m; water tank area: 148.84 sq.m; net plotted area: 46,605.69 sq.m; mortgage area: 6,918.61 sq.m; commercial area: 1,277.39 sq.m.
Boundaries in RERA land filingEast: VACANT LAND; west: 15M WIDE ACCESS ROAD; north: VACANT LAND; south: VACANT LAND. RERA filing

Development identity

FieldRecord
Sanctioning authorityKakatiya Urban Development Authority (KUDA). Approvals record
Principal layout approvalD.P.No.13/2019, proceedings dated 22-04-2019; application number 000064/LT/U6/KUDA/07022019. Approvals record
Approved built-up areaNo building or approved built-up-area figure is supplied for this plotted layout; the filed 46,605.69 sq.m is identified as net plotted area, not built-up area. RERA filing
Buildings / floorsNo tower or block count, building floor configuration, or parking-level configuration is disclosed. The layout conditions describe individual detached, single-family dwelling houses on plots.
Plots and land-use allocationThe sanction proceedings identify plots numbered 172 to 203, describe 32 plots as mortgage plots, and identify commercial plots 3 to 6 (four plots). The supplied extracts do not state a complete total plot count or plot-size schedule.
Commencement / building approvalThe supplied records establish a KUDA layout sanction, not a building commencement certificate or individual building approvals.

Offering and status

FieldRecord
OfferingPlots in a sanctioned open-plot layout; the layout also identifies a commercial area comprising plots 3 to 6.
Plot sizes / saleable areasNot disclosed in the supplied project records. Document index
Booked / available plotsNot disclosed. Document index
Construction stageNo independently verified site-progress record is supplied. The records describe a proposed layout and conditions for its release and development.
Completion dateThe promoter’s RERA Form B declares completion by 22/04/2022.
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. The project is a plotted layout; no phase- or plot-specific occupancy status is provided. Document index

2. The project story

BRUNDAVAN TOWNSHIP is registered with TG-RERA as a plotted-development project covering the survey numbers listed above in the Damera / Oglapur location. The KUDA proceedings describe an open-plot layout with internal roads, open space, a water-tank area, a garbage-area/septic-tank allocation and a designated commercial area. The approval conditions describe the intended residential plots as sites for detached, single-family dwelling houses; commercial activity is confined to specifically reserved sites. RERA record

The RERA-filed and sanction records do not provide plot-by-plot sizes, booking or availability counts, or a verified construction-progress update. The promoter’s Form B declared a completion date of 22/04/2022; that declaration is not evidence of completed infrastructure or of an occupancy/completion certificate. Document index

3. Master plan, architecture & building design

This is a plotted layout, not a multi-tower or apartment building project in the supplied approval records. The KUDA proceedings identify the layout as D.P.No.13/2019 and state a ground layout extent of 77,014.93 sq.m; the same proceedings record 82,856.87 sq.m as the total open-plots layout area “as per the documents.” The RERA land filing gives 82,856.87 sq.m as total and net area. RERA filing

The sanctioned layout material records 46,605.69 sq.m net plotted area, 7,870.86 sq.m open space, 19,003.81 sq.m proposed roads, 2,869.79 sq.m road-affected area, 515.94 sq.m for a garbage area and septic tank, 148.84 sq.m for a water-tank area, 1,277.39 sq.m commercial area and 6,918.61 sq.m mortgage area. These are layout-area allocations, not building floor areas.

The proceedings identify mortgage plots 172 to 203 and commercial plots 3 to 6. They specify layout streets at least 40 ft. or 12.192 meters wide and set out road-dependent building lines and open-space conditions. The supplied material does not include a complete readable plot schedule or a building design set showing plot dimensions, house footprints, floor configurations or building heights.

4. Homes, configurations & floor plans

The registered offering is plots, not apartment configurations. The supplied records do not state plot-size bands, a complete plot count, booked or available plots, or plot saleable areas. The approval proceedings identify plots numbered 172 to 203 as mortgage plots and plots 3 to 6 as commercial plots.

Two floor-plan drawings are listed, but both are scans pending measurement; no software-measured carpet-area data or room measurements are available. Apartment carpet-area and loading comparisons therefore cannot be made from the supplied evidence. Floor plans

5. Parking & vehicle circulation

The layout approval specifies streets at least 40 ft. or 12.192 meters wide and includes proposed road area of 19,003.81 sq.m. The approval conditions require streets to be formed, with surfacing, drainage, lighting and culverts.

No sanctioned parking-space count, visitor or accessible parking allocation, parking-level arrangement, EV provision, or legally documented plot-level parking allocation is supplied. The layout records a 6,918.61 sq.m mortgage area; this is not a parking provision.

6. Amenities, recreation & open spaces

The following are shown in the filed layout or RERA amenity schedule. A “YES” in the schedule is a filed availability entry, not independent confirmation of construction or delivery; all listed progress percentages are 0 in the supplied schedule. RERA amenities

Landscape / open space
FacilityOpen space
Description / size7,870.86 sq.m; the layout records 10% open space.
Declared progress / verified statusLayout allocation; progress reported as 0% in RERA amenity schedule. No independent completion evidence supplied.
Landscape / open space
FacilityGreen strip / tot lot / park
Description / sizeSize not stated.
Evidence sourceRERA amenities
Declared progress / verified statusListed “YES”; progress 0%. Completion not independently verified.
Convenience / community
FacilityCommunity buildings
Description / sizeSize and quantity not stated.
Evidence sourceRERA amenities
Declared progress / verified statusNo availability entry or progress figure above 0% is supplied; completion not independently verified.
Site infrastructure
FacilityGarbage area and septic tank
Description / size515.94 sq.m allocation in the layout.
Declared progress / verified statusLayout allocation; completion not independently verified.
Site infrastructure
FacilityWater-tank area
Description / size148.84 sq.m allocation in the layout.
Declared progress / verified statusLayout allocation; completion not independently verified.

7. Utilities, building services & safety

The RERA amenity schedule lists internal roads and footpaths, water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, street lighting, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These entries have 0% progress in the supplied schedule; the record does not establish that these facilities are completed or operational. RERA amenities

The layout sanction separately allocates 515.94 sq.m for a garbage area and septic tank and 148.84 sq.m for a water-tank area. Its conditions require rainwater-harvesting pits and effective drainage for storm, sullage and sewage water. No water-source details, storage capacity, treatment capacity, electrical capacity, backup details, waste-system operating information, fire-system specifications or accessibility design are supplied.

8. Location, access & connectivity

The registered project location is Damera, with the layout and sanction records identifying Oglapur Village, Damera Mandal. The RERA filing gives the district as Warangal Urban; the KUDA layout proceedings refer to Warangal Rural / Warangal (Rural). The RERA-filed western boundary is a 15M WIDE ACCESS ROAD. RERA record RERA filing

The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) — 1.2 km as a connectivity point. Location record The evidence does not provide a verified approach-road route, public-transport details or project-specific travel times.

9. Developer & development status

The registered promoter is Brundavan Township, identified in the project filing as a partnership. The RERA project records name Ravi Kumar Thallapally as the promoter’s authorized signatory. The supplied corporate record does not provide a verified corporate identification number or official website/contact details. Corporate record Parties record

The promoter’s Form B, dated 21 December 2020, declares completion by 22/04/2022. The supplied records do not contain a later verified progress report, revised completion date, or completion/occupancy certificate; the declared deadline should not be read as proof that the layout infrastructure was completed. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for BRUNDAVAN TOWNSHIP, registration P00300002580, valid 23/02/2021–22/04/2022.
Principal layout sanctionKUDA proceedings D.P.No.13/2019, dated 22-04-2019, for the plotted layout in the listed survey numbers.
Layout planFiled plan identifies the Oglapur Village layout, land-use allocations and layout conditions.
Promoter declarationForm B affidavit by Ravi Kumar Thallapally, dated 21 December 2020, including the promoter’s completion undertaking.
RERA application correspondencePromoter letter dated 23/12/2020 asks TG-RERA to consider the KUDA layout proceeding in processing the project registration application.
Completion / occupancy certificateNot present in the supplied records. Document index

The approval records describe further layout release and development subject to stated conditions. This overview does not treat the filing of an approval document or a RERA registration certificate as evidence that infrastructure has been completed.

Frequently asked questions

Is BRUNDAVAN TOWNSHIP registered with Telangana RERA?

Yes. BRUNDAVAN TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P00300002580; the registration status is New Project.

Who is the developer of BRUNDAVAN TOWNSHIP?

The promoter named in the RERA registration is BRUNDAVAN TOWNSHIP.

Where is BRUNDAVAN TOWNSHIP located?

BRUNDAVAN TOWNSHIP is in DAMERA, Hanamkonda, Telangana (506342).

When will BRUNDAVAN TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 22/04/2022. This is the promoter's declaration, not a guarantee.

More projects in Hanamkonda