Venkatadri
HIMALAYA CONSTRUCTIONS · Sangareddy · RERA P01100006820
VENKATADRI is a residential apartment project in OSMAN NAGAR VILLAGE UNDER TELLAPUR MUNICIPALITY, RC PURAM, Sangareddy. The registered promoter is HIMALAYA CONSTRUCTIONS, a partnership. The project occupies 668.85 sq. m and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK apartments, each with a filed saleable area of 101.72 sq. m. Its TG-RERA registration number is P01100006820, and the promoter’s Form-B declaration undertakes completion by 08/02/2026.
More from Himalaya Constructions · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | VENKATADRI RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No phase name is disclosed; the registration and building approval identify the project land as Sy. No. 23/A. RERA record |
| TG-RERA registration | P01100006820 RERA record |
| Registration validity | 30/08/2023 to 08/02/2026, unless extended by the Authority. The record says “extended: false”; this is registration validity, not an occupancy certificate or a statement that the building is complete. |
| Registered promoter | HIMALAYA CONSTRUCTIONS, a partnership. RERA record RERA filing |
| RERA status | The project is recorded as New Project. The registration certificate was granted under section 5. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site description | OSMAN NAGAR VILLAGE UNDER TELLAPUR MUNICIPALITY; the registration certificate gives OSMANNAGAR, RC PURAM. RERA record RERA filing |
| Revenue village | OSMANNAGAR (also written as Osman Nagar Village in the filed title and approval material). RERA filing |
| Mandal / district / PIN | RC PURAM, Sangareddy, 502300. RERA record RERA filing |
| Project survey number(s) | 23/A. RERA record Land records |
| Site extent | 668.85 sq. m in the RERA land record and building-permit parameters; the title report describes 668.85 sq. meters. Land records |
| Total / net area | Total area 668.85 sq. m; net area 668.85 sq. m; recorded road-affected area 0 sq. m. RERA filing |
| Boundaries (RERA-filed) | East: NEIGHBOURS LAND; west: ROAD WIDTH 30; north and south: PART OF OPEN LAND OF THE VENDERS. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Tellapur Municipality/Municipal Corporation. The project record also lists HMDA as the RERA authority. RERA record Approvals record |
| Principal building approval | 0038/BP/3120/2023, approved 08 February, 2023; file no. 012092/BP/DTCP/3120/0034/2022. Approvals record |
| Approved built-up area | 2022.85 sq. m in the project record. The permit extraction separately lists 1,662.85 m2 for residential upper floors and 333.42 m2 for the stilt; these are the permit’s stated components, not a separately verified recalculation. RERA filing |
| Building count | One building is recorded in the RERA project information; the permit identifies Building - PP (WW). RERA filing |
| Sanctioned floors / height | 1 Stilt + 5 upper floors; sanctioned height 14.99 m. Basement and podium levels are not disclosed in the supplied record. |
| Parking levels and provision | The permit says the approved stilt is to be used exclusively for parking; a separate parking count is not available in the supplied evidence. |
| Approved versus RERA-declared homes | The RERA record states 1 total building unit and 1 proposed building unit as per agreement; its unit schedule records 20 2BHK apartments. The building-permit extraction does not provide an apartment count. RERA filing RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 101.72 sq. m per filed 2BHK configuration. RERA unit table RERA unit details |
| Booked / available | Portal-derived counts show 0 booked and 20 available; the portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | A current construction-progress percentage or independently verified site-stage report is not supplied. The RERA amenities schedule records 0% for its listed items; this is not a complete assessment of building construction. RERA amenities |
| Completion date | The promoter’s Form-B declaration undertakes completion by 08/02/2026. The supplied record does not provide a revised completion date. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied project documents. Document index |
2. The project story
VENKATADRI is registered as a residential apartment project on 668.85 sq. m in survey 23/A, Osmannagar, RC Puram, Sangareddy. Its building permit identifies one residential building, Building - PP (WW), with one stilt and five upper floors. The RERA unit schedule describes 20 two-bedroom apartments. RERA record Land records RERA unit table
The permit was approved on 08 February, 2023. The promoter’s Form-B affidavit states a completion undertaking of 08/02/2026; that undertaking is distinct from the registration’s stated validity through 08/02/2026. The supplied material does not establish the project’s current physical construction stage or confirm completion, and no occupancy or completion certificate is included.
3. Master plan, architecture & building design
The filed site area is 668.85 sq. m, with net area also 668.85 sq. m and road-affected area recorded as 0 sq. m. The project record gives approved built-up area as 2022.85 sq. m. The building-permit extraction identifies 1 Stilt + 5 upper floors, a height of 14.99 m, residential upper-floor area of 1,662.85 m2, and stilt area of 333.42 m2. The permit describes one building; the supplied material does not provide a verified footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, or circulation drawings. RERA filing RERA filing
The floor-plan document is identified as 340968, but the supplied extraction does not establish building-wide architectural details such as common-area distribution, landscaping layout, or open-space dimensions. The permit lists a tot-lot as NA and includes conditions for a periphery greenery strip and a fenced tot-lot to be maintained as greenery. Document index
The unit-plan software measurement is distinct from the RERA-filed saleable area: the drawing-derived 2BHK carpet-area measurements are presented in section 4 as software-measured figures, not as RERA disclosures. Floor plans RERA unit details
4. Homes, configurations & floor plans
The TG-RERA schedule records 20 2BHK apartments, with 0 booked and 20 available in the portal-derived counts. The booking record has no stated as-of date. The filed saleable area is 101.72 sq. m. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 101.72 sq. m | 49.4–69.6 sq. m; median 53.4 sq. m (software-measured) | 47% (software-derived) |
Software measured six 2BHK designs from the approved floor-plan drawing file 340968. The supplied room example includes living, kitchen, bedroom, master bedroom, wash and toilet spaces, plus a 0.90 M. WIDE BALC; the extraction’s room-by-room geometry is a drawing measurement, not a RERA area disclosure. The software record marks five of the six designs as needing review. Floor plans RERA unit details
Carpet area is the software-measured internal area from drawing geometry. It is not the same as the filed saleable area, which may include a share of common areas; the supplied record does not provide a separately verified breakdown of carpet, balcony, utility, or common-area loading. The measured values should be checked against the drawing. Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit specifies one stilt and requires approved stilt parking to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. It does not state the number of parking spaces, whether spaces are for residents or visitors, accessible or two-wheeler spaces, or any unit-wise allocation. The RERA record marks the listed 2BHK configuration as mortgaged, but the supplied evidence does not establish parking allocation or exclusive parking rights for any apartment. RERA unit details RERA unit table
No basement, podium, mechanical parking, ramp arrangement, internal driveway, pedestrian separation, or EV-charging provision is documented in the supplied evidence. RERA amenities
6. Amenities, recreation & open spaces
The RERA amenities schedule lists facilities or infrastructure items and records 0% progress for each listed item. “Available: YES” is shown for water supply, sewerage, storm-water drains, rainwater harvesting, and electrical meter room/sub-station/receiving station; this is a filed availability indicator, not independent confirmation of installation or operation. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit lists tot-lot size as NA; requires a fenced tot-lot maintained as greenery and a periphery greenery strip. | RERA amenities | RERA schedule: 0%. No independent completion verification supplied. |
| Community buildings | Listed without a size or description. | RERA amenities | RERA schedule: 0%. |
| Aggregate recreational open space | Listed without an area. | RERA amenities | RERA schedule: 0%. |
The supplied RERA amenities schedule does not list a clubhouse or sports facilities with project-specific details. No facility size, capacity, or completed-status verification is supplied for the items above. RERA amenities Document index
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities schedule marks Water Supply: YES. The permit requires public-amenity water connections to be provided only on production of an occupancy certificate. |
|---|---|
| Status / limitation | Filing indicator only; source, storage, treatment and delivered status are not established. RERA amenities |
| Evidence in the project record | RERA schedule marks Sewerage (Chamber, Lines, Septic Tank, STP): YES and lists storm-water drains. It separately lists treatment and disposal of sewage and sullage water. |
|---|---|
| Status / limitation | Schedule shows 0% progress for the listed items; no capacity, reuse arrangement, or independent verification is supplied. RERA amenities |
| Evidence in the project record | The schedule marks water conservation/rainwater harvesting YES. The building permit requires a rainwater-harvesting percolation pit and specifies 6 RWHPs. |
|---|---|
| Status / limitation | Required / listed provision; completion is not independently confirmed. RERA amenities |
| Evidence in the project record | The RERA schedule marks electrical meter room/sub-station/receiving station YES; the permit requires space for a transformer. |
|---|---|
| Status / limitation | No capacity, connection, or completion evidence supplied. RERA amenities |
| Evidence in the project record | The permit refers to lifts among building services to be executed under qualified technical supervision. |
|---|---|
| Status / limitation | Lift count, type, capacity and installed status are not supplied. |
| Evidence in the project record | The RERA schedule lists fire protection and fire-safety requirements. The permit places responsibility for required fire-fighting installations on the owner, builder/developer, architect and site engineer. |
|---|---|
| Status / limitation | No system details, clearance, capacity, or completion verification supplied. RERA amenities |
| Evidence in the project record | The RERA schedule lists solid-waste management and disposal. The permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | Design details and completion status are not supplied; schedule records 0% for these items. RERA amenities |
| Evidence in the project record | Energy management appears in the RERA schedule; the supplied project records do not specify a system. |
|---|---|
| Status / limitation | Backup power, CCTV, access control, ramps and accessible circulation are not established by the supplied project-specific evidence. RERA amenities |
8. Location, access & connectivity
The registered location is OSMAN NAGAR VILLAGE UNDER TELLAPUR MUNICIPALITY, revenue village OSMANNAGAR, RC PURAM, Sangareddy, PIN 502300. The building approval identifies the site as survey 23/A and describes an 18M road width condition; the RERA-filed western boundary is stated as ROAD WIDTH 30. RERA record RERA filing RERA filing
The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 5.5 km. This is a location-data distance, not a travel-time estimate. The supplied evidence does not establish public-transport routes or verified travel times to nearby services. Location record
9. Developer & development status
The registered promoter is HIMALAYA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAIFH3683CIZF. The listed partners include AMBATI SIRISHA; AMBATI VENKATA NARASA REDDY is identified as authorized signatory. The registration certificate gives the promoter office as Village: Mandal: District: Hyderabad, Pin: 500089; the project record lists an address at CYBERSPACE APARTMENTS, PUPPALAGUDA, with locality and district fields also recorded for the project area. RERA filing Corporate record Parties record
The promoter’s Form-B affidavit declares that the project land is free from encumbrances and undertakes completion by 08/02/2026. The supplied evidence does not include a current independently verified construction-progress assessment or an occupancy certificate. Document index
10. Approvals, official records & documents
| Identifier / date | P01100006820; issued 30/08/2023 |
|---|---|
| What the supplied record establishes | Form C registration for VENKATADRI, valid through 08/02/2026 unless extended. |
| Identifier / date | 0038/BP/3120/2023; 08 February, 2023 |
|---|---|
| What the supplied record establishes | Tellapur Municipality/Municipal Corporation approval for one residential building on survey 23/A, with 1 Stilt + 5 upper floors. |
| Identifier / date | 012092/BP/DTCP/3120/0034/2022 |
|---|---|
| What the supplied record establishes | File number stated in the building approval. |
| Identifier / date | Document 347749 |
|---|---|
| What the supplied record establishes | Filed approval document includes sanctioned configuration and conditions; the supplied material does not separately establish a construction commencement notice having been submitted. |
| Identifier / date | Document 341124; verified July 2023 |
|---|---|
| What the supplied record establishes | Form-B affidavit by the promoter’s authorized signatory, including the promoter’s title, encumbrance and completion declarations. |
| Identifier / date | Document 347718, dated 15-07-2023 |
|---|---|
| What the supplied record establishes | Advocate’s report concerning Sy. No. 23/A, stated extent 668.85 sq. meters, and the filed title instruments. |
| Identifier / date | Documents 340963–340966 |
|---|---|
| What the supplied record establishes | Development Agreement-cum-GPA, sale deeds and municipal mortgage deed included in the filed title material. |
| Identifier / date | Document 340968 |
|---|---|
| What the supplied record establishes | Identified as the floor-plan source used for software measurements; the supplied extraction does not provide a complete drawing-based building design description. |
| Identifier / date | Not included in supplied documents |
|---|---|
| What the supplied record establishes | No certificate establishing occupancy or completion is available in this evidence set. Document index |
1. Project at a glance
Project identity
Registered name: VENKATADRI
Project type: Residential apartment project
Phase / registered portion: No phase name is disclosed; the registration and building approval identify the project land as Sy. No. 23/A.
TG-RERA registration: P01100006820
Registration validity: 30/08/2023 to 08/02/2026, unless extended by the Authority. The record says “extended: false”; this is registration validity, not an occupancy certificate or a statement that the building is complete.
Registered promoter: HIMALAYA CONSTRUCTIONS, a partnership.
RERA status: The project is recorded as New Project. The registration certificate was granted under section 5.
Land and geographic identity
Locality / site description: OSMAN NAGAR VILLAGE UNDER TELLAPUR MUNICIPALITY; the registration certificate gives OSMANNAGAR, RC PURAM.
Revenue village: OSMANNAGAR (also written as Osman Nagar Village in the filed title and approval material).
Mandal / district / PIN: RC PURAM, Sangareddy, 502300.
Project survey number(s): 23/A.
Site extent: 668.85 sq. m in the RERA land record and building-permit parameters; the title report describes 668.85 sq. meters.
Total / net area: Total area 668.85 sq. m; net area 668.85 sq. m; recorded road-affected area 0 sq. m.
Boundaries (RERA-filed): East: NEIGHBOURS LAND; west: ROAD WIDTH 30; north and south: PART OF OPEN LAND OF THE VENDERS.
Development identity
Sanctioning authority: Tellapur Municipality/Municipal Corporation. The project record also lists HMDA as the RERA authority.
Principal building approval: 0038/BP/3120/2023, approved 08 February, 2023; file no. 012092/BP/DTCP/3120/0034/2022.
Approved built-up area: 2022.85 sq. m in the project record. The permit extraction separately lists 1,662.85 m2 for residential upper floors and 333.42 m2 for the stilt; these are the permit’s stated components, not a separately verified recalculation.
Building count: One building is recorded in the RERA project information; the permit identifies Building - PP (WW).
Sanctioned floors / height: 1 Stilt + 5 upper floors; sanctioned height 14.99 m. Basement and podium levels are not disclosed in the supplied record.
Parking levels and provision: The permit says the approved stilt is to be used exclusively for parking; a separate parking count is not available in the supplied evidence.
Approved versus RERA-declared homes: The RERA record states 1 total building unit and 1 proposed building unit as per agreement; its unit schedule records 20 2BHK apartments. The building-permit extraction does not provide an apartment count.
Offering and status
RERA-filed configuration: 2BHK, 20 units.
RERA-filed saleable area: 101.72 sq. m per filed 2BHK configuration.
Booked / available: Portal-derived counts show 0 booked and 20 available; the portal record has no as-of date, so these counts are indicative.
Construction stage: A current construction-progress percentage or independently verified site-stage report is not supplied. The RERA amenities schedule records 0% for its listed items; this is not a complete assessment of building construction.
Completion date: The promoter’s Form-B declaration undertakes completion by 08/02/2026. The supplied record does not provide a revised completion date.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied project documents.
2. The project story
VENKATADRI is registered as a residential apartment project on 668.85 sq. m in survey 23/A, Osmannagar, RC Puram, Sangareddy. Its building permit identifies one residential building, Building - PP (WW), with one stilt and five upper floors. The RERA unit schedule describes 20 two-bedroom apartments.
The permit was approved on 08 February, 2023. The promoter’s Form-B affidavit states a completion undertaking of 08/02/2026; that undertaking is distinct from the registration’s stated validity through 08/02/2026. The supplied material does not establish the project’s current physical construction stage or confirm completion, and no occupancy or completion certificate is included.
3. Master plan, architecture & building design
The filed site area is 668.85 sq. m, with net area also 668.85 sq. m and road-affected area recorded as 0 sq. m. The project record gives approved built-up area as 2022.85 sq. m. The building-permit extraction identifies 1 Stilt + 5 upper floors, a height of 14.99 m, residential upper-floor area of 1,662.85 m2, and stilt area of 333.42 m2. The permit describes one building; the supplied material does not provide a verified footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, or circulation drawings.
The floor-plan document is identified as 340968, but the supplied extraction does not establish building-wide architectural details such as common-area distribution, landscaping layout, or open-space dimensions. The permit lists a tot-lot as NA and includes conditions for a periphery greenery strip and a fenced tot-lot to be maintained as greenery.
The unit-plan software measurement is distinct from the RERA-filed saleable area: the drawing-derived 2BHK carpet-area measurements are presented in section 4 as software-measured figures, not as RERA disclosures.
4. Homes, configurations & floor plans
The TG-RERA schedule records 20 2BHK apartments, with 0 booked and 20 available in the portal-derived counts. The booking record has no stated as-of date. The filed saleable area is 101.72 sq. m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 101.72 sq. m | 49.4–69.6 sq. m; median 53.4 sq. m (software-measured) | 47% (software-derived) |
Software measured six 2BHK designs from the approved floor-plan drawing file 340968. The supplied room example includes living, kitchen, bedroom, master bedroom, wash and toilet spaces, plus a 0.90 M. WIDE BALC; the extraction’s room-by-room geometry is a drawing measurement, not a RERA area disclosure. The software record marks five of the six designs as needing review.
Carpet area is the software-measured internal area from drawing geometry. It is not the same as the filed saleable area, which may include a share of common areas; the supplied record does not provide a separately verified breakdown of carpet, balcony, utility, or common-area loading. The measured values should be checked against the drawing.
5. Parking & vehicle circulation
The building permit specifies one stilt and requires approved stilt parking to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. It does not state the number of parking spaces, whether spaces are for residents or visitors, accessible or two-wheeler spaces, or any unit-wise allocation. The RERA record marks the listed 2BHK configuration as mortgaged, but the supplied evidence does not establish parking allocation or exclusive parking rights for any apartment.
No basement, podium, mechanical parking, ramp arrangement, internal driveway, pedestrian separation, or EV-charging provision is documented in the supplied evidence.
6. Amenities, recreation & open spaces
The RERA amenities schedule lists facilities or infrastructure items and records 0% progress for each listed item. “Available: YES” is shown for water supply, sewerage, storm-water drains, rainwater harvesting, and electrical meter room/sub-station/receiving station; this is a filed availability indicator, not independent confirmation of installation or operation.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit lists tot-lot size as NA; requires a fenced tot-lot maintained as greenery and a periphery greenery strip. | RERA schedule: 0%. No independent completion verification supplied. | |
| Community buildings | Listed without a size or description. | RERA schedule: 0%. | |
| Aggregate recreational open space | Listed without an area. | RERA schedule: 0%. |
The supplied RERA amenities schedule does not list a clubhouse or sports facilities with project-specific details. No facility size, capacity, or completed-status verification is supplied for the items above.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities schedule marks Water Supply: YES. The permit requires public-amenity water connections to be provided only on production of an occupancy certificate. |
|---|---|
| Status / limitation | Filing indicator only; source, storage, treatment and delivered status are not established. |
| Evidence in the project record | RERA schedule marks Sewerage (Chamber, Lines, Septic Tank, STP): YES and lists storm-water drains. It separately lists treatment and disposal of sewage and sullage water. |
|---|---|
| Status / limitation | Schedule shows 0% progress for the listed items; no capacity, reuse arrangement, or independent verification is supplied. |
| Evidence in the project record | The schedule marks water conservation/rainwater harvesting YES. The building permit requires a rainwater-harvesting percolation pit and specifies 6 RWHPs. |
|---|---|
| Status / limitation | Required / listed provision; completion is not independently confirmed. |
| Evidence in the project record | The RERA schedule marks electrical meter room/sub-station/receiving station YES; the permit requires space for a transformer. |
|---|---|
| Status / limitation | No capacity, connection, or completion evidence supplied. |
| Evidence in the project record | The permit refers to lifts among building services to be executed under qualified technical supervision. |
|---|---|
| Status / limitation | Lift count, type, capacity and installed status are not supplied. |
| Evidence in the project record | The RERA schedule lists fire protection and fire-safety requirements. The permit places responsibility for required fire-fighting installations on the owner, builder/developer, architect and site engineer. |
|---|---|
| Status / limitation | No system details, clearance, capacity, or completion verification supplied. |
| Evidence in the project record | The RERA schedule lists solid-waste management and disposal. The permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | Design details and completion status are not supplied; schedule records 0% for these items. |
| Evidence in the project record | Energy management appears in the RERA schedule; the supplied project records do not specify a system. |
|---|---|
| Status / limitation | Backup power, CCTV, access control, ramps and accessible circulation are not established by the supplied project-specific evidence. |
8. Location, access & connectivity
The registered location is OSMAN NAGAR VILLAGE UNDER TELLAPUR MUNICIPALITY, revenue village OSMANNAGAR, RC PURAM, Sangareddy, PIN 502300. The building approval identifies the site as survey 23/A and describes an 18M road width condition; the RERA-filed western boundary is stated as ROAD WIDTH 30.
The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 5.5 km. This is a location-data distance, not a travel-time estimate. The supplied evidence does not establish public-transport routes or verified travel times to nearby services.
9. Developer & development status
The registered promoter is HIMALAYA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAIFH3683CIZF. The listed partners include AMBATI SIRISHA; AMBATI VENKATA NARASA REDDY is identified as authorized signatory. The registration certificate gives the promoter office as Village: Mandal: District: Hyderabad, Pin: 500089; the project record lists an address at CYBERSPACE APARTMENTS, PUPPALAGUDA, with locality and district fields also recorded for the project area.
The promoter’s Form-B affidavit declares that the project land is free from encumbrances and undertakes completion by 08/02/2026. The supplied evidence does not include a current independently verified construction-progress assessment or an occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P01100006820; issued 30/08/2023 |
|---|---|
| What the supplied record establishes | Form C registration for VENKATADRI, valid through 08/02/2026 unless extended. |
| Identifier / date | 0038/BP/3120/2023; 08 February, 2023 |
|---|---|
| What the supplied record establishes | Tellapur Municipality/Municipal Corporation approval for one residential building on survey 23/A, with 1 Stilt + 5 upper floors. |
| Identifier / date | 012092/BP/DTCP/3120/0034/2022 |
|---|---|
| What the supplied record establishes | File number stated in the building approval. |
| Identifier / date | Document 347749 |
|---|---|
| What the supplied record establishes | Filed approval document includes sanctioned configuration and conditions; the supplied material does not separately establish a construction commencement notice having been submitted. |
| Identifier / date | Document 341124; verified July 2023 |
|---|---|
| What the supplied record establishes | Form-B affidavit by the promoter’s authorized signatory, including the promoter’s title, encumbrance and completion declarations. |
| Identifier / date | Document 347718, dated 15-07-2023 |
|---|---|
| What the supplied record establishes | Advocate’s report concerning Sy. No. 23/A, stated extent 668.85 sq. meters, and the filed title instruments. |
| Identifier / date | Documents 340963–340966 |
|---|---|
| What the supplied record establishes | Development Agreement-cum-GPA, sale deeds and municipal mortgage deed included in the filed title material. |
| Identifier / date | Document 340968 |
|---|---|
| What the supplied record establishes | Identified as the floor-plan source used for software measurements; the supplied extraction does not provide a complete drawing-based building design description. |
| Identifier / date | Not included in supplied documents |
|---|---|
| What the supplied record establishes | No certificate establishing occupancy or completion is available in this evidence set. |
Frequently asked questions
Is VENKATADRI registered with Telangana RERA?
Yes. VENKATADRI is registered with the Telangana Real Estate Regulatory Authority as P01100006820; the registration status is New Project.
Who is the developer of VENKATADRI?
The promoter named in the RERA registration is HIMALAYA CONSTRUCTIONS.
Where is VENKATADRI located?
VENKATADRI is in OSMAN NAGAR VILLAGE UNDER TELLAPUR MUNICIPALITY, OSMANNAGAR, RC PURAM, Sangareddy, Telangana (502300).
When will VENKATADRI be completed?
The promoter's proposed date of completion filed with RERA is 08/02/2026. This is the promoter's declaration, not a guarantee.
More projects in Osmannagar







