UNNATHI s RHYTHM
UNNATHI INFRA PROJECTS · Suryapet · RERA P01900007312
UNNATHI s RHYTHM is a residential apartment project in Ward No. 34, Suryapet, Suryapet District. The registered promoter is Unnathi Infra Projects. On a site area of 817.52 m², the project has one building with 1 Stilt + 5 upper floors and 20 2BHK apartments, each with a RERA-filed saleable area of 112.73 m². It is registered under TG-RERA number P01900007312, with a proposed completion date of 17-11-2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | UNNATHI s RHYTHM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration concerns the project at Survey No. 251 |
| TG-RERA registration | P01900007312 |
| Registration validity | 5 December 2023 to 17 November 2027; certificate says three years, unless extended by the Authority |
| Registered promoter | Unnathi Infra Projects |
| RERA status | Registered; the certificate records no extension |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Ward No. 34; the building-permit record identifies Krishna Nagar Colony W34 RERA record |
| Revenue village | B.Madharam Revenue Village in the title-report record; the RERA record also gives Ward No. 34. The supplied record does not reconcile these as revenue-village labels Land records |
| Mandal | Suryapet in the project identity fields; the registration certificate states Atmakur(S) RERA record |
| District | Suryapet RERA record |
| PIN | 508213 in the project identity and RERA certificate RERA record |
| Survey number(s) | Survey No. 251; no subdivision is identified for the project parcel Land records |
| Registered site extent | 817.52 m² |
| Total / net land area | Total site area: 817.52 m²; net area: 817.52 m²; road-affected area recorded as 0 m² RERA filing |
| Boundaries | East and west: road width 9; north: open place of Chevugani Pushpamma; south: open place of Gunda Sujatha RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Suryapet Municipality |
| Principal building approval | Building Permit Order 3049/W34/2020/2248, approved 17 November 2021 Approvals record |
| Approved built-up area | 2,123.00 m² is recorded in the project information fields as approved built-up area RERA filing |
| Building count | One building is recorded in the project land details RERA filing |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors; the permit lists five residential upper floors (1,719.75 m²) and one stilt (379.04 m²) |
| Height | 15.00 m |
| Parking levels / provision | Stilt is approved for parking; the permit states that approved stilt and cellar parking must be used exclusively for parking. A separate cellar level or parking-space count is not established in the supplied record |
| Units | The RERA land details record 1 proposed building unit, while the RERA inventory records 20 2BHK apartments. The supplied fields do not explain that unit-count distinction RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK; 20 units, 0 booked and 20 available in the portal data. The booking count has no supplied as-of date and is indicative RERA unit table |
| RERA-filed saleable area | 112.73 m² per 2BHK RERA unit table |
| Construction stage | RERA amenity records show item-specific declared progress, but no overall construction-stage statement or independently verified site progress is supplied RERA amenities |
| Completion timeline | Form-B declaration gives a completion undertaking of 17-11-2027 |
| Registration validity vs. completion | Registration is valid to 17 November 2027; the Form-B completion undertaking is also dated 17-11-2027. These are separate recorded dates |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The building permit requires completion notice and an occupancy certificate before occupation |
2. The project story
UNNATHI s RHYTHM is registered as a residential apartment project in Ward No. 34, Suryapet, on Survey No. 251. The municipality’s building-permit record describes a single residential building at Krishna Nagar Colony W34, comprising one stilt and five residential upper floors. The RERA inventory lists 20 2BHK apartments. RERA record RERA unit table
The promoter’s Form-B declaration undertakes completion by 17 November 2027. The supplied RERA data does not provide a consolidated construction-progress percentage or a site-verified account of completion. Portal amenity percentages are item-specific declarations, not an independent inspection. No occupancy or completion certificate is included in the supplied documents. RERA amenities Document index
3. Master plan, architecture & building design
The municipal building permit identifies one residential building, 1 Stilt + 5 upper floors, with a stated height of 15.00 m. It records five residential upper floors at 1,719.75 m² and a stilt at 379.04 m². These are permit-record figures; the project fields separately record approved built-up area as 2,123.00 m². RERA filing
The permit records a site area of 817.52 m², net area of 817.52 m², and road-affected area of 0 m². It also specifies setbacks of front 3 m, rear 4 m, and 4 m on each side. The permit extract lists a 40.96 m² tot-lot, a transformer space, and a garbage house. No verified drawing-derived detail is supplied here for building footprint, flat arrangement by floor, lifts, stairs, circulation, or residential/common-area distribution.
4. Homes, configurations & floor plans
The RERA inventory lists 20 2BHK homes, all shown as available and none booked in the supplied portal data; the portal record has no as-of date, so counts are indicative. RERA-filed saleable area is 112.73 m² per unit. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 112.73 m² | 69.9–73.4 m²; median 71.6 m² | 36% |
Carpet-area figures are software measurements from the approved floor-plan drawings, not RERA-filed areas; the measurements are flagged as needing review. The drawing data includes kitchen, wash area, bedrooms, toilets, foyers, living/dining space and a balcony for the illustrated 2BHK. The measured balcony area is excluded from carpet area. Saleable area is a separate RERA-filed figure and may include the home’s share of common areas; it should not be treated as carpet area. Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit identifies the stilt as a parking level and requires any approved cellar and stilt areas to be used exclusively for vehicle parking, without partitions or conversion to other uses. The supplied material does not establish a parking-space count, visitor or accessible parking, a separate cellar configuration, ramps, EV charging, or unit-specific parking allocation. A drawn or sanctioned parking provision does not by itself establish an exclusive allotment to a particular buyer.
6. Amenities, recreation & open spaces
The RERA portal contains amenity entries with declared percentages. Those percentages are not independent verification of completion. The permit separately records a 40.96 m² tot-lot and a requirement to maintain greenery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | Tot-lot: 40.96 m² in the building-permit record | Permit-listed; RERA “Green Strip/TOT LOT/Park” progress recorded as 0%; completion not independently verified RERA amenities | |
| Community buildings | No facility detail supplied | RERA amenity record | 0%; not independently verified RERA amenities |
| Aggregate recreational open space | No area supplied | RERA amenity record | 0%; not independently verified RERA amenities |
No specific clubhouse or indoor recreation facilities, sports facilities, or convenience/community facilities are identified in the supplied evidence.
7. Utilities, building services & safety
RERA’s amenity record includes the following project-service entries and declared progress. No independent completion verification or service capacity is supplied. RERA amenities
| Service | Record |
|---|---|
| Water | “Water Supply” marked YES; declared progress 55%. The source, storage capacity and treatment arrangements are not stated. |
| Sewerage and drainage | “Sewerage (Chamber, Lines, Septic Tank, STP)” marked YES; 65%. “Storm Water Drains” marked YES; 60%. The specific disposal and treatment arrangements are not established. |
| Rainwater | “Water Conservation, Rain water Harvesting” marked YES; 50%. The permit requires a rainwater-harvesting percolation pit. |
| Electrical | “Electrical Meter Room, Sub-Station, Receiving Station” marked YES; 60%. The permit also requires transformer space. No supply or backup capacity is provided. |
| Fire and life safety | RERA amenity record shows 0% for fire protection and fire-safety requirements. The permit assigns responsibility for fire-safety requirements and installations to the owner, builder/developer and technical professionals; it does not establish completed installation or statutory clearance. RERA amenities |
| Waste | The permit requires a garbage house within the premises. The RERA amenity record shows 0% for solid-waste management and disposal. RERA amenities |
| Lifts and accessibility | The supplied material does not specify lift count or capacity, or an accessible route/ramp arrangement. The permit refers to lifts and services being executed under qualified technical supervision. |
8. Location, access & connectivity
The project is recorded at Ward No. 34, Suryapet, District Suryapet, PIN 508213; the building-permit record identifies Krishna Nagar Colony W34. Survey No. 251 is bounded east and west by roads recorded as width 9; no road unit is specified in the supplied boundary fields. The official revenue-village and mandal labels are not consistently resolved in the supplied records: the title report names B.Madharam Revenue Village, the project identity fields state Suryapet mandal, and the RERA certificate states Atmakur(S). RERA record
A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 105.8 km. No other measured access distances, public-transport details, or nearby landmarks are provided. Location record
9. Developer & development status
The registered promoter is Unnathi Infra Projects, identified in the project record as a proprietorship. The RERA record names Thangella Renuka Reddy as an authorized signatory. The supplied promoter address is B, Athmakur S, B Madhram, Krishna Nagar Colony, Ward 34, Suryapet, District Suryapet, PIN 508213; the registration certificate gives a promoter-office address in Athmakur(S), Suryapet, PIN 508212. Corporate record Parties record
The promoter’s Form-B declaration undertakes completion by 17-11-2027. The project inventory shows 20 2BHK units, with bookings and availability as recorded in the portal but without a supplied as-of date. No overall site-verified construction progress or occupancy certificate is supplied. RERA unit table Document index
10. Approvals, official records & documents
| Record | Evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C registers UNNATHI s RHYTHM, registration P01900007312, issued 5 December 2023; validity ends 17 November 2027 unless extended. |
| Building permit | Suryapet Municipality Building Permit Order 3049/W34/2020/2248, dated 17 November 2021, for a residential building at Krishna Nagar Colony W34, Survey No. 251. |
| Building permit conditions relevant to completion | Requires a completion notice and occupancy certificate before occupation; the permit also states that public utility connections are provided on production of an occupancy certificate. |
| Form-B declaration | Promoter declaration by authorized signatory Renuka Reddy Thangella; includes title and encumbrance statements and completion undertaking. The verification date is left unfilled in the supplied OCR. |
| Title-report documents | Title investigation report, dated 21 September 2023, concerning Survey No. 251, B.Madharam Revenue Village; supporting title-report files are also listed in the project evidence. Document index |
| Layout/building-plan file | A layout-plan document is listed, but its extraction is unavailable. The building-permit order is the supplied extracted sanction record. Document index |
| Occupancy/completion certificate | Not supplied in the reviewed project documents. Document index |
1. Project at a glance
Project identity
Registered project name: UNNATHI s RHYTHM
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration concerns the project at Survey No. 251
TG-RERA registration: P01900007312
Registration validity: 5 December 2023 to 17 November 2027; certificate says three years, unless extended by the Authority
Registered promoter: Unnathi Infra Projects
RERA status: Registered; the certificate records no extension
Land and geographic identity
Locality: Ward No. 34; the building-permit record identifies Krishna Nagar Colony W34
Revenue village: B.Madharam Revenue Village in the title-report record; the RERA record also gives Ward No. 34. The supplied record does not reconcile these as revenue-village labels
Mandal: Suryapet in the project identity fields; the registration certificate states Atmakur(S)
District: Suryapet
PIN: 508213 in the project identity and RERA certificate
Survey number(s): Survey No. 251; no subdivision is identified for the project parcel
Registered site extent: 817.52 m²
Total / net land area: Total site area: 817.52 m²; net area: 817.52 m²; road-affected area recorded as 0 m²
Boundaries: East and west: road width 9; north: open place of Chevugani Pushpamma; south: open place of Gunda Sujatha
Development identity
Sanctioning authority: Suryapet Municipality
Principal building approval: Building Permit Order 3049/W34/2020/2248, approved 17 November 2021
Approved built-up area: 2,123.00 m² is recorded in the project information fields as approved built-up area
Building count: One building is recorded in the project land details
Sanctioned floor configuration: 1 Stilt + 5 upper floors; the permit lists five residential upper floors (1,719.75 m²) and one stilt (379.04 m²)
Height: 15.00 m
Parking levels / provision: Stilt is approved for parking; the permit states that approved stilt and cellar parking must be used exclusively for parking. A separate cellar level or parking-space count is not established in the supplied record
Units: The RERA land details record 1 proposed building unit, while the RERA inventory records 20 2BHK apartments. The supplied fields do not explain that unit-count distinction
Offering and status
RERA-filed configuration: 2BHK; 20 units, 0 booked and 20 available in the portal data. The booking count has no supplied as-of date and is indicative
RERA-filed saleable area: 112.73 m² per 2BHK
Construction stage: RERA amenity records show item-specific declared progress, but no overall construction-stage statement or independently verified site progress is supplied
Completion timeline: Form-B declaration gives a completion undertaking of 17-11-2027
Registration validity vs. completion: Registration is valid to 17 November 2027; the Form-B completion undertaking is also dated 17-11-2027. These are separate recorded dates
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The building permit requires completion notice and an occupancy certificate before occupation
2. The project story
UNNATHI s RHYTHM is registered as a residential apartment project in Ward No. 34, Suryapet, on Survey No. 251. The municipality’s building-permit record describes a single residential building at Krishna Nagar Colony W34, comprising one stilt and five residential upper floors. The RERA inventory lists 20 2BHK apartments.
The promoter’s Form-B declaration undertakes completion by 17 November 2027. The supplied RERA data does not provide a consolidated construction-progress percentage or a site-verified account of completion. Portal amenity percentages are item-specific declarations, not an independent inspection. No occupancy or completion certificate is included in the supplied documents.
3. Master plan, architecture & building design
The municipal building permit identifies one residential building, 1 Stilt + 5 upper floors, with a stated height of 15.00 m. It records five residential upper floors at 1,719.75 m² and a stilt at 379.04 m². These are permit-record figures; the project fields separately record approved built-up area as 2,123.00 m².
The permit records a site area of 817.52 m², net area of 817.52 m², and road-affected area of 0 m². It also specifies setbacks of front 3 m, rear 4 m, and 4 m on each side. The permit extract lists a 40.96 m² tot-lot, a transformer space, and a garbage house. No verified drawing-derived detail is supplied here for building footprint, flat arrangement by floor, lifts, stairs, circulation, or residential/common-area distribution.
4. Homes, configurations & floor plans
The RERA inventory lists 20 2BHK homes, all shown as available and none booked in the supplied portal data; the portal record has no as-of date, so counts are indicative. RERA-filed saleable area is 112.73 m² per unit.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 112.73 m² | 69.9–73.4 m²; median 71.6 m² | 36% |
Carpet-area figures are software measurements from the approved floor-plan drawings, not RERA-filed areas; the measurements are flagged as needing review. The drawing data includes kitchen, wash area, bedrooms, toilets, foyers, living/dining space and a balcony for the illustrated 2BHK. The measured balcony area is excluded from carpet area. Saleable area is a separate RERA-filed figure and may include the home’s share of common areas; it should not be treated as carpet area.
5. Parking & vehicle circulation
The building permit identifies the stilt as a parking level and requires any approved cellar and stilt areas to be used exclusively for vehicle parking, without partitions or conversion to other uses. The supplied material does not establish a parking-space count, visitor or accessible parking, a separate cellar configuration, ramps, EV charging, or unit-specific parking allocation. A drawn or sanctioned parking provision does not by itself establish an exclusive allotment to a particular buyer.
6. Amenities, recreation & open spaces
The RERA portal contains amenity entries with declared percentages. Those percentages are not independent verification of completion. The permit separately records a 40.96 m² tot-lot and a requirement to maintain greenery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | Tot-lot: 40.96 m² in the building-permit record | Permit-listed; RERA “Green Strip/TOT LOT/Park” progress recorded as 0%; completion not independently verified | |
| Community buildings | No facility detail supplied | RERA amenity record | 0%; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenity record | 0%; not independently verified |
No specific clubhouse or indoor recreation facilities, sports facilities, or convenience/community facilities are identified in the supplied evidence.
7. Utilities, building services & safety
RERA’s amenity record includes the following project-service entries and declared progress. No independent completion verification or service capacity is supplied.
Water: “Water Supply” marked YES; declared progress 55%. The source, storage capacity and treatment arrangements are not stated.
Sewerage and drainage: “Sewerage (Chamber, Lines, Septic Tank, STP)” marked YES; 65%. “Storm Water Drains” marked YES; 60%. The specific disposal and treatment arrangements are not established.
Rainwater: “Water Conservation, Rain water Harvesting” marked YES; 50%. The permit requires a rainwater-harvesting percolation pit.
Electrical: “Electrical Meter Room, Sub-Station, Receiving Station” marked YES; 60%. The permit also requires transformer space. No supply or backup capacity is provided.
Fire and life safety: RERA amenity record shows 0% for fire protection and fire-safety requirements. The permit assigns responsibility for fire-safety requirements and installations to the owner, builder/developer and technical professionals; it does not establish completed installation or statutory clearance.
Waste: The permit requires a garbage house within the premises. The RERA amenity record shows 0% for solid-waste management and disposal.
Lifts and accessibility: The supplied material does not specify lift count or capacity, or an accessible route/ramp arrangement. The permit refers to lifts and services being executed under qualified technical supervision.
8. Location, access & connectivity
The project is recorded at Ward No. 34, Suryapet, District Suryapet, PIN 508213; the building-permit record identifies Krishna Nagar Colony W34. Survey No. 251 is bounded east and west by roads recorded as width 9; no road unit is specified in the supplied boundary fields. The official revenue-village and mandal labels are not consistently resolved in the supplied records: the title report names B.Madharam Revenue Village, the project identity fields state Suryapet mandal, and the RERA certificate states Atmakur(S).
A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 105.8 km. No other measured access distances, public-transport details, or nearby landmarks are provided.
9. Developer & development status
The registered promoter is Unnathi Infra Projects, identified in the project record as a proprietorship. The RERA record names Thangella Renuka Reddy as an authorized signatory. The supplied promoter address is B, Athmakur S, B Madhram, Krishna Nagar Colony, Ward 34, Suryapet, District Suryapet, PIN 508213; the registration certificate gives a promoter-office address in Athmakur(S), Suryapet, PIN 508212.
The promoter’s Form-B declaration undertakes completion by 17-11-2027. The project inventory shows 20 2BHK units, with bookings and availability as recorded in the portal but without a supplied as-of date. No overall site-verified construction progress or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C registers UNNATHI s RHYTHM, registration P01900007312, issued 5 December 2023; validity ends 17 November 2027 unless extended.
Building permit: Suryapet Municipality Building Permit Order 3049/W34/2020/2248, dated 17 November 2021, for a residential building at Krishna Nagar Colony W34, Survey No. 251.
Building permit conditions relevant to completion: Requires a completion notice and occupancy certificate before occupation; the permit also states that public utility connections are provided on production of an occupancy certificate.
Form-B declaration: Promoter declaration by authorized signatory Renuka Reddy Thangella; includes title and encumbrance statements and completion undertaking. The verification date is left unfilled in the supplied OCR.
Title-report documents: Title investigation report, dated 21 September 2023, concerning Survey No. 251, B.Madharam Revenue Village; supporting title-report files are also listed in the project evidence.
Layout/building-plan file: A layout-plan document is listed, but its extraction is unavailable. The building-permit order is the supplied extracted sanction record.
Occupancy/completion certificate: Not supplied in the reviewed project documents.
Frequently asked questions
Is UNNATHI s RHYTHM registered with Telangana RERA?
Yes. UNNATHI s RHYTHM is registered with the Telangana Real Estate Regulatory Authority as P01900007312; the registration status is New Project.
Who is the developer of UNNATHI s RHYTHM?
The promoter named in the RERA registration is UNNATHI INFRA PROJECTS.
Where is UNNATHI s RHYTHM located?
UNNATHI s RHYTHM is in SURYAPET, Ward No. 34, Telangana (508213).
When will UNNATHI s RHYTHM be completed?
The promoter's proposed date of completion filed with RERA is 17/03/2028. This is the promoter's declaration, not a guarantee.
More projects in Suryapet