Sri Gokul City
VANGETI · Rangareddy · RERA P02400009896
SRI GOKUL CITY is a residential plotted development in Govindapally Thanda, Kadthal Mandal, Ranga Reddy District, developed by registered promoter VANGETI LAXMI. The layout covers 8.375 Acs; 40535.00 Sq. Yds and comprises 96 plots; plot configurations are not stated. It is registered with TG-RERA under P02400009896, with a proposed completion date of 11th March 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SRI GOKUL CITY RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration describes the project on Survey Nos. 114/P and 115/P RERA record |
| TG-RERA registration | P02400009896 RERA record |
| Registration validity | 11/03/2025–11/03/2027; this is the registration period, not the stated completion deadline RERA record |
| Registered promoter | VANGETI LAXMI, named in the Form C certificate; the project header uses “VANGETI” RERA record |
| RERA status | The record identifies this as a new project registered with TG-RERA. A later certificate or extension is not supplied. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Govindapally Thanda Gram Panchayat / Govindaipally Thanda RERA record |
| Revenue village(s) | The project header and Gram Panchayat intimation identify Govindapally Thanda; the DTCP draft-layout documents identify Karkalpahad Village. The evidence supplied records both names. RERA record |
| Mandal | Kadthal RERA record |
| District | Ranga Reddy RERA record |
| PIN | 500059 in the project header and RERA filing summary RERA record |
| Survey numbers / subdivisions | 114/P and 115/P RERA record |
| Layout extent | Draft-layout record: 8.375 Acs; 40535.00 Sq. Yds |
| Land areas stated in project record | Total area 33892.42 sq. m, affected area 2881.35 sq. m, and net area 31011.07 sq. m in the RERA filing summary RERA filing |
| Boundaries | East: 33 Feet Wide Road; West: 9 Meters Buffer Zone; North and South: Neighbours Land RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning, Government of Telangana; the draft layout is directed to Govindaipally Gram Panchayat for the subsequent layout process |
| Principal layout approval | Draft - TLP.No. 28/2025/H, dated 11-03-2025 |
| Layout type / number of plots | Draft technical layout for 96 plots |
| Approved built-up area | 18053 sq. m is recorded in the RERA filing summary; the supplied layout material does not specify a building floor configuration RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied project record; the approval material concerns a plotted layout, not a multi-storey building schedule. |
| Unit count | 96 plots in the draft-layout document. A separate RERA inventory count is not supplied here. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; plot sizes and plot-by-plot inventory are not supplied in the available data. |
| Booked / available | Not disclosed in the supplied evidence. |
| Construction / development stage | The registration record labels the project “New Project.” The amenity table reports varying percentages for some layout works; these are reported progress figures, not independent site verification. RERA record RERA amenities |
| Completion date | Promoter’s Form B declaration undertakes completion by 11th March 2027. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. This is a plotted layout, and the supplied document is a draft layout approval with conditions for development and final layout release. |
2. The project story
SRI GOKUL CITY is presented in the TG-RERA record as a residential plotted layout covering Survey Nos. 114/P and 115/P, in the project area identified as Govindapally Thanda / Govindaipally Thanda, Kadthal Mandal, Ranga Reddy District. The DTCP filing describes a 96-plot draft technical layout. RERA record
The draft layout allocates land to plots, roads, open space, canal and buffer areas, and identifies plots to be mortgaged to the Gram Panchayat as security for development obligations. Its conditions call for layout infrastructure—including road formation and drainage, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply—and state that the layout owner/developer is responsible for carrying out the works. These are approval conditions and proposed works; the supplied material does not establish that they are all complete.
The promoter’s Form B declares a completion deadline of 11th March 2027. The supplied evidence does not include an independently verified construction inspection or a completion certificate.
3. Master plan, architecture & building design
The supplied design evidence concerns a plotted layout, rather than apartment-building plans. The DTCP draft technical layout records 96 plots in Survey Nos. 114/P and 115/P, with a total layout area of 8.375 Acs; 40535.00 Sq. Yds. Its area schedule states a net layout area of 07.663 Acs; 37088.92 Sq. Yds, including 0.766 Acs; 3708.89 Sq. Yds reserved for park/open space, 02.4357 Acs; 11788.78 Sq. Yds of roads, and 04.461 Acs; 21591.24 Sq. Yds of plotted area. It also lists canal area of 0.125 Acs; 605.00 Sq. Yds, buffer area of 0.587 Acs; 2841.08 Sq. Yds, and mortgage area of 0.685 Acs; 3315.52 Sq. Yds on plotted land.
The draft-layout conditions require the open-space and road areas to be gifted to the Gram Panchayat before final layout release, and identify Plots 25 to 31 and 61 to 65 as mortgage plots not for sale while mortgaged. The document also requires the layout owner/developer to provide internal roads, drains, storm-water channels, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are layout conditions; the supplied evidence does not provide a detailed finished-works plan or verified completion status.
No plot-by-plot drawing, individual plot dimensions, building plans, floor configuration, building footprint, or apartment-area schedule is supplied. The project summary’s 18053 sq. m is labelled approved built-up area; no further area breakdown is provided. RERA filing
4. Homes, configurations & floor plans
This is recorded as a plotted layout. The draft-layout document identifies 96 plots, but the supplied project data does not include RERA inventory by plot number, plot-size bands, booked/available counts, or plot saleable-area figures.
The two supplied drawing records are marked as scans pending; none has been software-measured. Accordingly, no measured carpet or plot dimensions can be reported. Floor plans
5. Parking & vehicle circulation
The supplied project documents do not provide a parking count, designated visitor or accessible parking, parking layout, or parking-allocation terms. The draft layout identifies roads and requires them to be opened for access to neighbouring sites, but does not establish specific vehicle-entry arrangements or pedestrian separation.
6. Amenities, recreation & open spaces
The following facilities are identified in the TG-RERA amenity record. Percentages are the reported progress values in that record, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Layout roads and footpaths; no dimensions supplied | RERA amenities | 15% reported; not independently verified |
| Green strip / park | Draft layout reserves 0.766 Acs; 3708.89 Sq. Yds for open space (park) | RERA amenities | 0% reported; not independently verified |
| Community buildings | No building or size specified | RERA amenities | 0% reported |
| Solid-waste management and disposal | Facility type listed; details not supplied | RERA amenities | 0% reported |
| Street lighting | Listed as a layout facility | RERA amenities | 0% reported; not independently verified |
The approval conditions also call for greenery and avenue planting, fencing of open spaces, and rainwater-harvesting pits. These are required layout works; the supplied evidence does not confirm delivery.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station. Its reported progress values are 40% for water supply, 30% for sewerage, and 25% for storm-water drains; the other listed items show 0% where a percentage is provided. These are filed progress figures, not independent verification of completed services or their capacity. RERA amenities
The draft-layout conditions call for a protected water-supply system, sewerage-disposal system, drains and storm-water channelization, street lighting, electricity facilities and rainwater-harvesting pits. They also require the layout owner/developer to shift the electrical line along the road before the layout proceeds to final layout. No service capacities, water source, treatment plant specification, backup-power provision, fire-system details, CCTV/access-control specification, or accessibility plan is supplied.
8. Location, access & connectivity
The project is identified in the RERA record at Govindapally Thanda / Govindaipally Thanda, Kadthal Mandal, Ranga Reddy District, in Survey Nos. 114/P and 115/P. The filed site boundaries identify a 33 Feet Wide Road to the east and a 9 Meters Buffer Zone to the west. RERA record RERA filing
No verified public-transport or landmark distance is supplied in the project record. The available geocode is identified as a cadastral parcel centroid, not as a verified entrance point or travel-distance measurement. Location record
9. Developer & development status
The TG-RERA certificate names VANGETI LAXMI as promoter. The project header uses VANGETI; the supplied evidence does not state the promoter’s legal-entity type. The certificate lists the promoter address as House No.:61/A, 61/AA, Village: Mandal: Saroornagar, District: Ranga Reddy, Pin: 500005 State of Telangana. An official project contact or website is not supplied. RERA record Corporate record
In Form B, the promoter declares that the project is to be completed by 11th March 2027, and makes declarations concerning the project account, audit, pending approvals and allottee treatment. This is the promoter’s declaration, not independent confirmation of project completion or compliance.
10. Approvals, official records & documents
| What the supplied document establishes | Form C certificate for SRI GOKUL CITY, registration P02400009896, with validity from 11/03/2025 to 11/03/2027; names VANGETI LAXMI as promoter |
|---|
| What the supplied document establishes | Draft layout TLP.No. 28/2025/H, dated 11-03-2025, for a 96-plot layout in Survey Nos. 114/P and 115/P; records layout areas and development conditions |
|---|
| What the supplied document establishes | Layout-plan filing records approval reference T.L.P.NO. 28 / 2025 / H N, file C.No.:20061/756/2025/H, and identifies the project as a residential-plot layout |
|---|
| What the supplied document establishes | Intimation regarding permitted layout development under the DTCP draft layout, identifying Survey Nos. 114/P and 115/P and referring to Mortgage Deed No. 4771/2025 |
|---|
| What the supplied document establishes | Promoter’s affidavit-cum-declaration, including the stated completion undertaking of 11th March 2027 |
|---|
| What the supplied document establishes | Not supplied in the evidence reviewed |
|---|---|
| Source | Document index |
1. Project at a glance
Project identity
Registered name: SRI GOKUL CITY
Project type: Plotted development / residential layout
Phase / registered portion: Phase not separately identified; the registration describes the project on Survey Nos. 114/P and 115/P
TG-RERA registration: P02400009896
Registration validity: 11/03/2025–11/03/2027; this is the registration period, not the stated completion deadline
Registered promoter: VANGETI LAXMI, named in the Form C certificate; the project header uses “VANGETI”
RERA status: The record identifies this as a new project registered with TG-RERA. A later certificate or extension is not supplied.
Land and geographic identity
Locality: Govindapally Thanda Gram Panchayat / Govindaipally Thanda
Revenue village(s): The project header and Gram Panchayat intimation identify Govindapally Thanda; the DTCP draft-layout documents identify Karkalpahad Village. The evidence supplied records both names.
Mandal: Kadthal
District: Ranga Reddy
PIN: 500059 in the project header and RERA filing summary
Survey numbers / subdivisions: 114/P and 115/P
Layout extent: Draft-layout record: 8.375 Acs; 40535.00 Sq. Yds
Land areas stated in project record: Total area 33892.42 sq. m, affected area 2881.35 sq. m, and net area 31011.07 sq. m in the RERA filing summary
Boundaries: East: 33 Feet Wide Road; West: 9 Meters Buffer Zone; North and South: Neighbours Land
Development identity
Sanctioning authority: Director of Town and Country Planning, Government of Telangana; the draft layout is directed to Govindaipally Gram Panchayat for the subsequent layout process
Principal layout approval: Draft - TLP.No. 28/2025/H, dated 11-03-2025
Layout type / number of plots: Draft technical layout for 96 plots
Approved built-up area: 18053 sq. m is recorded in the RERA filing summary; the supplied layout material does not specify a building floor configuration
Buildings / floors / parking levels: Not disclosed in the supplied project record; the approval material concerns a plotted layout, not a multi-storey building schedule.
Unit count: 96 plots in the draft-layout document. A separate RERA inventory count is not supplied here.
Offering and status
Offering: Residential plots; plot sizes and plot-by-plot inventory are not supplied in the available data.
Booked / available: Not disclosed in the supplied evidence.
Construction / development stage: The registration record labels the project “New Project.” The amenity table reports varying percentages for some layout works; these are reported progress figures, not independent site verification.
Completion date: Promoter’s Form B declaration undertakes completion by 11th March 2027.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. This is a plotted layout, and the supplied document is a draft layout approval with conditions for development and final layout release.
2. The project story
SRI GOKUL CITY is presented in the TG-RERA record as a residential plotted layout covering Survey Nos. 114/P and 115/P, in the project area identified as Govindapally Thanda / Govindaipally Thanda, Kadthal Mandal, Ranga Reddy District. The DTCP filing describes a 96-plot draft technical layout.
The draft layout allocates land to plots, roads, open space, canal and buffer areas, and identifies plots to be mortgaged to the Gram Panchayat as security for development obligations. Its conditions call for layout infrastructure—including road formation and drainage, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply—and state that the layout owner/developer is responsible for carrying out the works. These are approval conditions and proposed works; the supplied material does not establish that they are all complete.
The promoter’s Form B declares a completion deadline of 11th March 2027. The supplied evidence does not include an independently verified construction inspection or a completion certificate.
3. Master plan, architecture & building design
The supplied design evidence concerns a plotted layout, rather than apartment-building plans. The DTCP draft technical layout records 96 plots in Survey Nos. 114/P and 115/P, with a total layout area of 8.375 Acs; 40535.00 Sq. Yds. Its area schedule states a net layout area of 07.663 Acs; 37088.92 Sq. Yds, including 0.766 Acs; 3708.89 Sq. Yds reserved for park/open space, 02.4357 Acs; 11788.78 Sq. Yds of roads, and 04.461 Acs; 21591.24 Sq. Yds of plotted area. It also lists canal area of 0.125 Acs; 605.00 Sq. Yds, buffer area of 0.587 Acs; 2841.08 Sq. Yds, and mortgage area of 0.685 Acs; 3315.52 Sq. Yds on plotted land.
The draft-layout conditions require the open-space and road areas to be gifted to the Gram Panchayat before final layout release, and identify Plots 25 to 31 and 61 to 65 as mortgage plots not for sale while mortgaged. The document also requires the layout owner/developer to provide internal roads, drains, storm-water channels, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are layout conditions; the supplied evidence does not provide a detailed finished-works plan or verified completion status.
No plot-by-plot drawing, individual plot dimensions, building plans, floor configuration, building footprint, or apartment-area schedule is supplied. The project summary’s 18053 sq. m is labelled approved built-up area; no further area breakdown is provided.
4. Homes, configurations & floor plans
This is recorded as a plotted layout. The draft-layout document identifies 96 plots, but the supplied project data does not include RERA inventory by plot number, plot-size bands, booked/available counts, or plot saleable-area figures.
The two supplied drawing records are marked as scans pending; none has been software-measured. Accordingly, no measured carpet or plot dimensions can be reported.
5. Parking & vehicle circulation
The supplied project documents do not provide a parking count, designated visitor or accessible parking, parking layout, or parking-allocation terms. The draft layout identifies roads and requires them to be opened for access to neighbouring sites, but does not establish specific vehicle-entry arrangements or pedestrian separation.
6. Amenities, recreation & open spaces
The following facilities are identified in the TG-RERA amenity record. Percentages are the reported progress values in that record, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Layout roads and footpaths; no dimensions supplied | 15% reported; not independently verified | |
| Green strip / park | Draft layout reserves 0.766 Acs; 3708.89 Sq. Yds for open space (park) | 0% reported; not independently verified | |
| Community buildings | No building or size specified | 0% reported | |
| Solid-waste management and disposal | Facility type listed; details not supplied | 0% reported | |
| Street lighting | Listed as a layout facility | 0% reported; not independently verified |
The approval conditions also call for greenery and avenue planting, fencing of open spaces, and rainwater-harvesting pits. These are required layout works; the supplied evidence does not confirm delivery.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station. Its reported progress values are 40% for water supply, 30% for sewerage, and 25% for storm-water drains; the other listed items show 0% where a percentage is provided. These are filed progress figures, not independent verification of completed services or their capacity.
The draft-layout conditions call for a protected water-supply system, sewerage-disposal system, drains and storm-water channelization, street lighting, electricity facilities and rainwater-harvesting pits. They also require the layout owner/developer to shift the electrical line along the road before the layout proceeds to final layout. No service capacities, water source, treatment plant specification, backup-power provision, fire-system details, CCTV/access-control specification, or accessibility plan is supplied.
8. Location, access & connectivity
The project is identified in the RERA record at Govindapally Thanda / Govindaipally Thanda, Kadthal Mandal, Ranga Reddy District, in Survey Nos. 114/P and 115/P. The filed site boundaries identify a 33 Feet Wide Road to the east and a 9 Meters Buffer Zone to the west.
No verified public-transport or landmark distance is supplied in the project record. The available geocode is identified as a cadastral parcel centroid, not as a verified entrance point or travel-distance measurement.
9. Developer & development status
The TG-RERA certificate names VANGETI LAXMI as promoter. The project header uses VANGETI; the supplied evidence does not state the promoter’s legal-entity type. The certificate lists the promoter address as House No.:61/A, 61/AA, Village: Mandal: Saroornagar, District: Ranga Reddy, Pin: 500005 State of Telangana. An official project contact or website is not supplied.
In Form B, the promoter declares that the project is to be completed by 11th March 2027, and makes declarations concerning the project account, audit, pending approvals and allottee treatment. This is the promoter’s declaration, not independent confirmation of project completion or compliance.
10. Approvals, official records & documents
| What the supplied document establishes | Form C certificate for SRI GOKUL CITY, registration P02400009896, with validity from 11/03/2025 to 11/03/2027; names VANGETI LAXMI as promoter |
|---|
| What the supplied document establishes | Draft layout TLP.No. 28/2025/H, dated 11-03-2025, for a 96-plot layout in Survey Nos. 114/P and 115/P; records layout areas and development conditions |
|---|
| What the supplied document establishes | Layout-plan filing records approval reference T.L.P.NO. 28 / 2025 / H N, file C.No.:20061/756/2025/H, and identifies the project as a residential-plot layout |
|---|
| What the supplied document establishes | Intimation regarding permitted layout development under the DTCP draft layout, identifying Survey Nos. 114/P and 115/P and referring to Mortgage Deed No. 4771/2025 |
|---|
| What the supplied document establishes | Promoter’s affidavit-cum-declaration, including the stated completion undertaking of 11th March 2027 |
|---|
| What the supplied document establishes | Not supplied in the evidence reviewed |
|---|
Frequently asked questions
Is SRI GOKUL CITY registered with Telangana RERA?
Yes. SRI GOKUL CITY is registered with the Telangana Real Estate Regulatory Authority as P02400009896; the registration status is New Project.
Who is the developer of SRI GOKUL CITY?
The promoter named in the RERA registration is VANGETI.
Where is SRI GOKUL CITY located?
SRI GOKUL CITY is in Govindapally Thanda Gram Panchayat, Kadthal, Rangareddy, Telangana (500059).
When will SRI GOKUL CITY be completed?
The promoter's proposed date of completion filed with RERA is 11/07/2027. This is the promoter's declaration, not a guarantee.