Pharma Green City

SAI RAM INFRA DEVELOPERS · Rangareddy · RERA P02400006250

PHARMA GREEN CITY is a plotted development in Nandiwanaparthy, Yacharam Mandal, Ranga Reddy District, developed by registered promoter SAI RAM INFRA DEVELOPERS. The TG-RERA filing records a site extent of 68,598.26 sq m and a layout of 188 plots; plot configurations and sizes are not stated. The project is registered under TG-RERA number P02400006250, with a proposed completion date of 08/10/2022.

01What we found

Period endedTG-RERA registration ran to 8 Oct 2022 - check its extension on TG-RERA
25documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project namePHARMA GREEN CITY RERA record
Project typePlotted development / plotted layout RERA record
Phase or registered portionNot separately identified in the supplied registration record RERA record
TG-RERA registration numberP02400006250 RERA record
Registration status and validityForm C records registration from 07/07/2023 to 08/10/2022 and states a validity period of 0 years; this is the certificate’s stated validity information. It does not establish a later extension.
Registered promoterSAI RAM INFRA DEVELOPERS RERA record
Project status in RERA filingNew Project RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageNandiwanaparthy; the layout document refers to Nandiwanaparthy Gram Panchayat. RERA record
MandalYacharam RERA record
DistrictRanga Reddy (the layout document spells it “Rangareddy”) RERA record
PIN501509 RERA record
Project survey numbers912, 913, 914P, 915 and 916 in the TG-RERA registration certificate; the layout approval writes survey 914 as 914/P.
Registered site extentThe RERA filing records 68,598.26 sq m total area and 68,598.26 sq m net area, with 0 sq m affected by road widening/FTL/nala widening. RERA filing
Layout document’s stated areaAc. 16.951 cents; 82042.84 Sq. Yds.
Boundaries stated in RERA filingEast: 60 FEET ROAD; West, North and South: OTHERS LAND. RERA filing

Development identity

FieldProject record
Sanctioning authority named in the project filingDirector of Town and Country Planning (DTCP); the filed layout document describes delegation to Nandiwanaparthy Gram Panchayat. Approvals record
Principal layout referenceDraft TLP.No.215/2020/H, approved 08-10-2020; the document also lists application no. 837 and file no. Lr.Roc.No.3689/837/2020/e-Panchayat. Approvals record
Layout scale stated in the filed approval188 plots
Land-use split stated in the filed layout documentPlotted area: 60.70 %, Ac. 10.288 Cents; 49793.92 Sq. Yds.; road area: 29.30 %, Ac. 4.968 Cents; 24045.12 Sq. Yds.; open space: 10.00 %, Ac. 1.695 Cents; 8203.80 Sq. Yds.; mortgage area: 15.52 %, Ac. 1.597 Cents; 7729.48 Sq. Yds.
Approved built-up area / buildings / floorsNot applicable to the plotted-layout description or not disclosed in the supplied project records. RERA filing
Parking provisionNo RERA-filed parking count or parking-level information is supplied.

Offering and status

FieldProject record
Unit typePlots RERA record
Plot counts and sizesThe filed layout document states 188 plots. RERA unit-wise size bands, booked counts and available counts are not supplied.
Proposed completion date08/10/2022, as declared in Form B.
Construction/development stageThe supplied RERA data records overall completeness as 80%, but does not identify the measurement date, whether this is promoter-declared, or the status of individual layout works. RERA record
Completion certificate / occupancy certificateNo project completion or occupancy certificate is present in the supplied documents; the project is a plotted layout. The absence of a certificate in this pack does not establish whether one has since been issued. Document index
Registration validityThe certificate’s stated registration dates are shown above; registration validity is distinct from the declared completion date and from any completion/occupancy certification.

2. The project story

  • PHARMA GREEN CITY is presented in the TG-RERA record as a plotted development in Nandiwanaparthy, Yacharam Mandal, Ranga Reddy District. Its registered land identity covers Survey Nos. 912, 913, 914P, 915 and 916; the filed layout document uses 914/P for the same survey reference. RERA record
  • The filed layout approval describes a 188-plot scheme, with land allocated among plotted area, roads and open space, and with a stated mortgage area. It also lists layout-development works such as road formation, drainage, water supply and street lighting. These are approval-document provisions and descriptions, not confirmation that the works have been completed.
  • Form B records the promoter’s undertaking to complete the project by 8th October, 2022. The supplied project record reports 80% completeness, but does not provide a dated, independently verified site assessment or a work-by-work completion schedule. No completion or occupancy certificate is included in the supplied evidence. RERA record Document index

3. Master plan, architecture & building design

This is a plotted layout rather than a building or apartment scheme. The filed draft layout document states 188 plots and identifies the following land-use allocation: 60.70 % plotted area (Ac. 10.288 Cents; 49793.92 Sq. Yds.), 29.30 % road area (Ac. 4.968 Cents; 24045.12 Sq. Yds.), and 10.00 % open space (Ac. 1.695 Cents; 8203.80 Sq. Yds.). It separately records a 15.52 % mortgage area of Ac. 1.597 Cents or 7729.48 Sq. Yards.

The approval document names avenue plantation, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply among the specified layout works. It also requires road formation and drainage works under Gram Panchayat supervision. The supplied material does not provide plot-by-plot dimensions, a verified drawing-based plot-size schedule, or evidence of completed works.

4. Homes, configurations & floor plans

The RERA-filed development is for plots; apartment configurations, carpet areas and floor plans do not apply. The supplied layout approval states 188 plots, but the evidence pack does not include RERA unit-wise counts, plot-size bands, booked/available inventory, or a plot schedule from which those details can be confirmed. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots188 (layout-document count)Not disclosedNot disclosedNot disclosed unit-by-unitNot applicableNot disclosed

The floor-plan record contains two drawings, but both are scans pending measurement and neither supplies measured unit areas. Carpet-area measurement is therefore unavailable; the record also states that software-measured carpet area, where available, would not be a RERA-filed saleable-area figure. Floor plans

5. Parking & vehicle circulation

No RERA-filed count of car or two-wheeler spaces, visitor or accessible spaces, parking arrangement, or dedicated parking allocation is included in the supplied project documents. RERA amenities

The layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. These are approval conditions; the evidence supplied does not verify the present road-access or circulation condition on site.

6. Amenities, recreation & open spaces

The layout document lists facilities and site works associated with the layout. The RERA amenity record includes infrastructure categories, but its percentage-progress fields are 0 and do not establish completion. The evidence pack does not provide independent verification that any facility has been delivered. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space10.00 %; Ac. 1.695 Cents; 8203.80 Sq. Yds.Filed layout documentApproval-document allocation; completion not verified
Internal roads and footpathsLayout infrastructure; no dimensions suppliedRERA amenity record RERA amenitiesListed as available “YES”; progress 0; completion not independently verified
Green strip / tot lot / parkNo further size or facilities disclosedRERA amenity record RERA amenitiesListed as available “YES”; progress 0; completion not independently verified
Avenue plantationNo quantity or area suppliedFiled layout documentSpecified layout work; completion not verified
Fencing of open spacesNo further detail suppliedFiled layout documentSpecified layout work; completion not verified
Community buildingsNo size or capacity suppliedRERA amenity record RERA amenitiesProgress 0; delivery not verified
Rainwater-harvesting pitsNo quantity or capacity suppliedFiled layout document; RERA amenity record RERA amenitiesSpecified/listed; progress 0 in the amenity record; completion not verified

Promoter-marketed facilities listed by the vendor source include a common garden, park, children’s play area, jogging/strolling track and CCTV. These are vendor claims, not established here as RERA-approved or delivered project facilities. Promoter website

7. Utilities, building services & safety

The filed layout document specifies protected water supply, sewerage disposal, drains and nala channelization, rainwater-harvesting pits, electricity and street lighting as layout works. It does not provide capacities, technical designs, completion records or test results.

The RERA amenity record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety requirements, and an electrical meter room/sub-station/receiving station. The record does not provide equipment specifications or establish that these systems are complete or operational. RERA amenities

The vendor source describes borewell water and fire-fighting equipment, but provides no capacities or project-specific completion evidence; these remain vendor-attributed claims. Promoter website

8. Location, access & connectivity

The registered location is Nandiwanaparthy, Yacharam Mandal, Ranga Reddy District, Telangana, PIN 501509. The RERA filing records the eastern boundary as a 60 FEET ROAD. RERA record RERA filing

The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 22.6 km. The measurement is labelled approximate and is not a travel-time estimate. Location record

The vendor source names Srisailam Highway and Sagar Highway and lists several nearby or proposed destinations, but these are vendor-attributed connectivity statements rather than independently established distances or travel times. Promoter website

9. Developer & development status

The registered promoter is SAI RAM INFRA DEVELOPERS, identified in the RERA filing as a partnership. The project record gives GSTIN 36AEGFS5566K1Z3. The supplied records do not establish a registered office address, official website or project-specific contact details beyond the filing information; the registration certificate lists the promoter office as “Village: Mandal: Saroornagar, District: Ranga Reddy, Pin: 500068.” Corporate record RERA filing

Form B, signed by Depa Malla Reddy as promoter/authorized signatory, declares project completion by 8th October, 2022. The project record’s completeness figure is 80%, with no supplied date or independent inspection basis. The evidence does not establish the current completion status or the issue of a completion certificate. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for PHARMA GREEN CITY, registration P02400006250, granted under section 5; certificate records issue date 07/07/2023.
Layout approvalDirector of Town and Country Planning document titled “Draft Technical Layout Pattern - Approved,” reference Draft TLP.No.215/2020/H, dated 08-10-2020, for the stated survey numbers at Nandiwanaparthy.
Related layout-file referencesApplication no. 837; file no. Lr.Roc.No.3689/837/2020/e-Panchayat; the document also cites reference GP/NWP-103/2021 dated 12-3-2021 and a revised ownership letter dated 12-04-2021.
Promoter declarationForm B affidavit-cum-declaration by Depa Malla Reddy, dated 28th June, 2021, including the promoter’s completion undertaking and other declarations.
Completion / occupancy certificateNot present in the supplied document set. Document index

The approval document contains conditions concerning development works, mortgaged plots, transfer of open-space and road areas, access and later release of the final layout. This Overview identifies the filed record; it does not verify that those conditions or works have been completed.

Frequently asked questions

Is PHARMA GREEN CITY registered with Telangana RERA?

Yes. PHARMA GREEN CITY is registered with the Telangana Real Estate Regulatory Authority as P02400006250; the registration status is New Project.

Who is the developer of PHARMA GREEN CITY?

The promoter named in the RERA registration is SAI RAM INFRA DEVELOPERS.

Where is PHARMA GREEN CITY located?

PHARMA GREEN CITY is in Nandiwanaparthy, Yacharam, Rangareddy, Telangana (501509).

When will PHARMA GREEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 08/10/2022. This is the promoter's declaration, not a guarantee.