Thirumala Ashok Arcade
THIRUMALA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001118
THIRUMALA ASHOK ARCADE is a residential apartment project in PEERZADIGUDA, Medipally mandal, Medchal-Malkajgiri district, developed by the registered promoter THIRUMALA CONSTRUCTIONS. The project has a land area of 2409.71 sq.m. and one building configured as Stilt+5 floors, with 55 apartments: 30 2BHK units of 81.05 sq.m. each and 25 3BHK units of 100.18 sq.m. each. Its TG-RERA registration number is P02200001118, and the project filing states proposed completion as 01/01/2025.
More from Thirumala Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | THIRUMALA ASHOK ARCADE |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | One registered project; phase-specific details are not separately disclosed. The sanction describes one residential building. |
| TG-RERA registration | P02200001118 |
| Registration validity | Certificate states valid from 08/08/2019 to 01/01/2025; no extension is recorded in the supplied registration evidence. Registration validity is not the same as project completion or occupancy status. |
| Registered promoter | THIRUMALA CONSTRUCTIONS; the RERA Form B names the promoter as “Thirumala Construction.” |
| RERA status | The supplied record identifies it as a registered project. The certificate’s stated validity has ended; current registration status beyond the supplied record is not independently verified. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | PEERZADIGUDA RERA filing |
| Revenue village | Medipally RERA filing |
| Mandal | Medipally in the project filing; the registration certificate separately lists Uppal. RERA filing |
| District / PIN | Medchal-Malkajgiri / 500039 RERA filing |
| Project survey number(s) | Survey No. 10; no project subdivision is disclosed in the supplied RERA identity. RERA filing |
| Registered site extent | 2409.71 sq.m. (stated as net area in the project filing and HMDA permission). RERA filing |
| Total / net land area | Total area 2409.71 sq.m.; net area 2409.71 sq.m.; affected area recorded as 0 sq.m. in the project filing. RERA filing |
| Boundaries | North: 30 WIDE ROAD; South: LAND OF SRI MAHESHWAR; East: LAND OF SRI PAKA NARASIMHA AND BROTHERS; West: LAND OF SRI S MUTHAIAH AND BROTHERS 25 WIDE ROAD. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | HMDA building permission; delegated to Peerzadiguda Municipality. Approvals record |
| Principal building permission | BA.NO: 13/2018-19; approval date appears as 02 [2019 in the supplied extraction. Approvals record |
| Related HMDA technical approval | 0012484/GHT/R1/U6/HMDA/07062018, dated 30.10.2018. Approvals record |
| Approved built-up area | The project filing records 6867.51 sq.m. as approved built-up area. The HMDA permission extraction separately states Residential area 5603.1 Sqm.; the supplied material does not define these two labels as equivalent. RERA filing |
| Building count and floors | One building; sanctioned configuration Stilt+5 floors. The permission extraction gives a height of 14.95 m. RERA filing |
| Parking levels | A stilt level is sanctioned, but the supplied material does not state a parking count or identify the number of dedicated parking levels. |
| Unit count | RERA filing lists 55 apartments: 30 2BHK and 25 3BHK. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations and saleable areas | 2BHK: 30 units, 81.05 sq.m. each; 3BHK: 25 units, 100.18 sq.m. each. RERA unit table RERA filing |
| Booked / available | Portal-derived counts show 0 booked and 55 available (30 2BHK; 25 3BHK). The record does not provide an as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified or RERA-filed construction-progress figure is supplied. Document index |
| Completion dates | Project filing states proposed completion 01/01/2025. The Form B extraction records an undertaking as “01st january, 2095”; the completion undertaking is therefore not consistently captured in the supplied material. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; whether one has since been issued is not established. Document index |
2. The project story
THIRUMALA ASHOK ARCADE is registered as a residential apartment project on Survey No. 10 in Medipally village, at the Peerzadiguda locality in Medchal-Malkajgiri district. The project filing describes a site of 2409.71 sq.m. and a single residential building; the HMDA permission describes the building as Stilt+5 floors. RERA filing RERA filing
The RERA filing lists 55 apartments—30 two-bedroom and 25 three-bedroom homes. Its portal-derived inventory currently shows all 55 as available and none as booked, but the record has no booking-count date. No supplied evidence establishes the actual construction stage, completion of common facilities, or occupancy certification. The proposed completion date recorded in the project information is 01/01/2025; the Form B completion undertaking is transcribed differently in the supplied extraction. RERA unit table RERA filing
3. Master plan, architecture & building design
The filed and sanctioned development is a single residential building on a stated net site area of 2409.71 sq.m. The HMDA permission describes Stilt+5 floors, a height of 14.95 m, a residential area of 5603.1 Sqm., 4 rainwater-harvesting structures and 50 trees. The project filing records 6867.51 sq.m. as approved built-up area. These area labels are reported as stated; the supplied material does not establish that they measure the same thing. RERA filing
The permission sets out setbacks of Front 3.00 m, Rear 10.26 m, Side +I 3.00 m and Side - II 5.00 m, and requires a rainwater-harvesting percolation pit and a greenery strip around the site. The supplied drawing data reports two drawing records, but neither contains measured floor-plan geometry or a usable apartment layout for describing room arrangements, flats per floor, lifts, stairs, circulation or building footprint. No FSI-counted area, carpet area from approved drawings, or phase-wise building organization is established by the available evidence. Floor plans
4. Homes, configurations & floor plans
RERA-filed inventory comprises 55 apartments in two configurations. Saleable areas below are the figures in the RERA record; they are not carpet-area measurements. The supplied floor-plan review has no measured apartment drawings, so no software-measured carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 30 | 0 | 30 | 81.05 sq.m. | Not available | Not supplied |
| 3BHK | 25 | 0 | 25 | 100.18 sq.m. | Not available | Not supplied |
The available apartment drawings were not measured for carpet area. Accordingly, there is no drawing-based measurement to compare with the RERA-filed saleable area, and no room sizes, balcony or utility dimensions, or typical floor arrangement can be confirmed from the supplied drawings. Floor plans RERA unit details
5. Parking & vehicle circulation
The sanction describes a stilt level, but the supplied approval extraction and RERA filing do not establish the number of sanctioned parking spaces, their type or location, or any resident, visitor or accessible-space allocation. Parking allotment terms for an individual apartment are also not supplied. A stilt floor alone does not establish a parking count or an exclusive parking right. RERA filing
The HMDA permission refers to surrender of the road-affected portion to Peerzadiguda Municipality and requires a service road wherever required; the supplied records do not provide a detailed internal driveway, ramp, entry/exit, or pedestrian-circulation plan.
6. Amenities, recreation & open spaces
The project RERA amenities record lists 14 items. It marks water supply, sewerage, green strip/tot lot/park, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES”; the listed progress percentage is 0 for each recorded item. These entries report what is in the RERA amenities record; they do not establish completion or independent verification. The HMDA permission separately requires a rainwater-harvesting structure and a greenery strip. RERA amenities
| Description / size | Size and facilities not specified |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0; completion not independently verified |
| Description / size | Area and specific recreational facilities not specified |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0; completion not independently verified |
| Description / size | Size not specified |
|---|---|
| Evidence source | RERA amenities record RERA amenities; HMDA permission requires a strip of greenery on the site periphery |
| Declared progress / verified status | RERA record says “YES” and progress 0; not independently verified |
| Description / size | Use, facilities and size not specified |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0; completion not independently verified |
Other listed RERA amenities and services are addressed under utilities, building services and safety below. No supplied record states that any amenity is complete or independently inspected. RERA amenities
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage (including chamber, lines, septic tank and STP), rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; each relevant listed amenity has progress recorded as 0. It does not specify water sources, storage or treatment capacity, STP capacity or reuse arrangements, storm-water design, electrical supply or backup capacity. The HMDA permission requires a rainwater-harvesting percolation pit and records 4 rainwater-harvesting structures. RERA amenities
| Service / safety area | Evidence in supplied records |
|---|---|
| Water | RERA amenities record says water supply is “YES”; source and capacity are not specified. RERA amenities |
| Sewerage and drainage | Sewerage/STP is listed “YES”; treatment and disposal of sewage and sullage and storm-water drains are also listed, but are not marked complete in the supplied record. Capacities and reuse details are not supplied. RERA amenities |
| Electrical | Electrical meter room/sub-station/receiving station is listed “YES”; supply arrangements and backup capacity are not specified. RERA amenities |
| Lifts / vertical transportation | Not established by the RERA amenities record or supplied drawings. A vendor listing mentions a lift and service/goods lift, but no capacity or project-filed confirmation is supplied. Promoter website |
| Fire and life safety | Fire protection and fire-safety requirements are listed in the RERA amenities record, with progress 0. The supplied evidence does not establish completion, system specifications or statutory clearance. RERA amenities |
| Waste and security | Solid-waste management and disposal is listed with progress 0. CCTV, intercom and security appear only in vendor-provided amenities and are not independently verified in the project records. RERA amenities Promoter website |
| Accessibility | Ramps and accessible circulation are not described in the supplied material. Document index |
The HMDA permission states that an occupancy certificate is compulsory before occupation and that public water-supply and electricity connections will be provided only on production of an occupancy certificate. These are stated approval conditions, not evidence that an occupancy certificate has been issued.
8. Location, access & connectivity
The registered project location is Medipally village, Medipally mandal, Medchal-Malkajgiri district, at the Peerzadiguda locality; the project PIN recorded in the registration evidence is 500039. The project filing identifies 30-foot and 25-foot roads on the north and west boundaries respectively. RERA filing RERA filing
The supplied location record gives a nearest sampled Outer Ring Road interchange distance of approximately 8.8 km. No public-transport routes or other independently measured landmark distances are supplied. The registration certificate lists mandal Uppal, while the project filing identifies Medipally mandal; the registered locality, village, district, survey number and PIN are presented above as recorded in the project identity evidence. Location record RERA filing
9. Developer & development status
The registered promoter is THIRUMALA CONSTRUCTIONS, identified in the project information as a partnership. The corporate identifier supplied is GSTIN 36AANFT1193Q1ZC. The project filing names SUBBARAO THOTA as authorized signatory and srinivasulu thota and MALLEBOINA NARASIMHA as partners. The registered office is recorded as Pragathi Nagar, Kakatiya Nagar Colony, Peerzadiguda, Medipally, Medchal-Malkajgiri, 500039. RERA filing Corporate record Parties record
No construction-progress percentage or independent site inspection is supplied. The RERA portal-derived inventory count is 55 available units and 0 booked, without an as-of date. The project filing’s proposed completion date is 01/01/2025; the Form B extraction separately transcribes the promoter’s completion undertaking as “01st january, 2095.” No extension is recorded in the supplied certificate, and no occupancy or completion certificate is supplied. RERA unit table RERA filing
10. Approvals, official records & documents
| Identifier / date | P02200001118, issued 08/08/2019 |
|---|---|
| What the supplied evidence establishes | Form C certificate for THIRUMALA ASHOK ARCADE; states validity through 01/01/2025. |
| Identifier / date | BA.NO: 13/2018-19; approval date extracted as 02 [2019 |
|---|---|
| What the supplied evidence establishes | Building permission for residential construction on Survey No. 10, Medipally; sanctions Stilt+5 floors and lists conditions, including rainwater harvesting, greenery and obtaining an occupancy certificate before occupation. |
| Identifier / date | 0012484/GHT/R1/U6/HMDA/07062018, dated 30.10.2018 |
|---|---|
| What the supplied evidence establishes | Number and date referenced in the HMDA permission. |
| Identifier / date | 30% July,2019 as transcribed |
|---|---|
| What the supplied evidence establishes | Promoter-authorised declaration concerning title documents, project funds, audit, approvals and completion undertaking. |
| Identifier / date | Not included in supplied documents Document index |
|---|---|
| What the supplied evidence establishes | Issuance and current status are not established by this evidence. |
| Identifier / date | Layout-plan record is listed, but no extracted layout content is supplied; floor-plan review reports no measured apartment drawings. Document index Floor plans |
|---|---|
| What the supplied evidence establishes | Building footprint, floor-by-floor apartment arrangement and detailed circulation cannot be described from the available extracted material. |
The supplied HMDA permission includes conditions on commencement notice, construction in accordance with the sanctioned plan, completion notice and occupancy certification. This overview reports those records and their stated scope; it does not independently verify present construction, compliance or certificate status.
1. Project at a glance
Project identity
Registered project name: THIRUMALA ASHOK ARCADE
Project type: Residential apartment project
Phase / registered portion: One registered project; phase-specific details are not separately disclosed. The sanction describes one residential building.
TG-RERA registration: P02200001118
Registration validity: Certificate states valid from 08/08/2019 to 01/01/2025; no extension is recorded in the supplied registration evidence. Registration validity is not the same as project completion or occupancy status.
Registered promoter: THIRUMALA CONSTRUCTIONS; the RERA Form B names the promoter as “Thirumala Construction.”
RERA status: The supplied record identifies it as a registered project. The certificate’s stated validity has ended; current registration status beyond the supplied record is not independently verified.
Land and geographic identity
Locality: PEERZADIGUDA
Revenue village: Medipally
Mandal: Medipally in the project filing; the registration certificate separately lists Uppal.
District / PIN: Medchal-Malkajgiri / 500039
Project survey number(s): Survey No. 10; no project subdivision is disclosed in the supplied RERA identity.
Registered site extent: 2409.71 sq.m. (stated as net area in the project filing and HMDA permission).
Total / net land area: Total area 2409.71 sq.m.; net area 2409.71 sq.m.; affected area recorded as 0 sq.m. in the project filing.
Boundaries: North: 30 WIDE ROAD; South: LAND OF SRI MAHESHWAR; East: LAND OF SRI PAKA NARASIMHA AND BROTHERS; West: LAND OF SRI S MUTHAIAH AND BROTHERS 25 WIDE ROAD.
Development identity
Sanctioning authority: HMDA building permission; delegated to Peerzadiguda Municipality.
Principal building permission: BA.NO: 13/2018-19; approval date appears as 02 [2019 in the supplied extraction.
Related HMDA technical approval: 0012484/GHT/R1/U6/HMDA/07062018, dated 30.10.2018.
Approved built-up area: The project filing records 6867.51 sq.m. as approved built-up area. The HMDA permission extraction separately states Residential area 5603.1 Sqm.; the supplied material does not define these two labels as equivalent.
Building count and floors: One building; sanctioned configuration Stilt+5 floors. The permission extraction gives a height of 14.95 m.
Parking levels: A stilt level is sanctioned, but the supplied material does not state a parking count or identify the number of dedicated parking levels.
Unit count: RERA filing lists 55 apartments: 30 2BHK and 25 3BHK.
Offering and status
RERA-filed configurations and saleable areas: 2BHK: 30 units, 81.05 sq.m. each; 3BHK: 25 units, 100.18 sq.m. each.
Booked / available: Portal-derived counts show 0 booked and 55 available (30 2BHK; 25 3BHK). The record does not provide an as-of date, so these counts are indicative.
Construction stage: No independently verified or RERA-filed construction-progress figure is supplied.
Completion dates: Project filing states proposed completion 01/01/2025. The Form B extraction records an undertaking as “01st january, 2095”; the completion undertaking is therefore not consistently captured in the supplied material.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; whether one has since been issued is not established.
2. The project story
THIRUMALA ASHOK ARCADE is registered as a residential apartment project on Survey No. 10 in Medipally village, at the Peerzadiguda locality in Medchal-Malkajgiri district. The project filing describes a site of 2409.71 sq.m. and a single residential building; the HMDA permission describes the building as Stilt+5 floors.
The RERA filing lists 55 apartments—30 two-bedroom and 25 three-bedroom homes. Its portal-derived inventory currently shows all 55 as available and none as booked, but the record has no booking-count date. No supplied evidence establishes the actual construction stage, completion of common facilities, or occupancy certification. The proposed completion date recorded in the project information is 01/01/2025; the Form B completion undertaking is transcribed differently in the supplied extraction.
3. Master plan, architecture & building design
The filed and sanctioned development is a single residential building on a stated net site area of 2409.71 sq.m. The HMDA permission describes Stilt+5 floors, a height of 14.95 m, a residential area of 5603.1 Sqm., 4 rainwater-harvesting structures and 50 trees. The project filing records 6867.51 sq.m. as approved built-up area. These area labels are reported as stated; the supplied material does not establish that they measure the same thing.
The permission sets out setbacks of Front 3.00 m, Rear 10.26 m, Side +I 3.00 m and Side - II 5.00 m, and requires a rainwater-harvesting percolation pit and a greenery strip around the site. The supplied drawing data reports two drawing records, but neither contains measured floor-plan geometry or a usable apartment layout for describing room arrangements, flats per floor, lifts, stairs, circulation or building footprint. No FSI-counted area, carpet area from approved drawings, or phase-wise building organization is established by the available evidence.
4. Homes, configurations & floor plans
RERA-filed inventory comprises 55 apartments in two configurations. Saleable areas below are the figures in the RERA record; they are not carpet-area measurements. The supplied floor-plan review has no measured apartment drawings, so no software-measured carpet area or room dimensions can be reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 30 | 0 | 30 | 81.05 sq.m. | Not available | Not supplied |
| 3BHK | 25 | 0 | 25 | 100.18 sq.m. | Not available | Not supplied |
The available apartment drawings were not measured for carpet area. Accordingly, there is no drawing-based measurement to compare with the RERA-filed saleable area, and no room sizes, balcony or utility dimensions, or typical floor arrangement can be confirmed from the supplied drawings.
5. Parking & vehicle circulation
The sanction describes a stilt level, but the supplied approval extraction and RERA filing do not establish the number of sanctioned parking spaces, their type or location, or any resident, visitor or accessible-space allocation. Parking allotment terms for an individual apartment are also not supplied. A stilt floor alone does not establish a parking count or an exclusive parking right.
The HMDA permission refers to surrender of the road-affected portion to Peerzadiguda Municipality and requires a service road wherever required; the supplied records do not provide a detailed internal driveway, ramp, entry/exit, or pedestrian-circulation plan.
6. Amenities, recreation & open spaces
The project RERA amenities record lists 14 items. It marks water supply, sewerage, green strip/tot lot/park, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES”; the listed progress percentage is 0 for each recorded item. These entries report what is in the RERA amenities record; they do not establish completion or independent verification. The HMDA permission separately requires a rainwater-harvesting structure and a greenery strip.
| Description / size | Size and facilities not specified |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Progress recorded as 0; completion not independently verified |
| Description / size | Area and specific recreational facilities not specified |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Progress recorded as 0; completion not independently verified |
| Description / size | Size not specified |
|---|---|
| Evidence source | RERA amenities record; HMDA permission requires a strip of greenery on the site periphery |
| Declared progress / verified status | RERA record says “YES” and progress 0; not independently verified |
| Description / size | Use, facilities and size not specified |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Progress recorded as 0; completion not independently verified |
Other listed RERA amenities and services are addressed under utilities, building services and safety below. No supplied record states that any amenity is complete or independently inspected.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage (including chamber, lines, septic tank and STP), rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; each relevant listed amenity has progress recorded as 0. It does not specify water sources, storage or treatment capacity, STP capacity or reuse arrangements, storm-water design, electrical supply or backup capacity. The HMDA permission requires a rainwater-harvesting percolation pit and records 4 rainwater-harvesting structures.
Water: RERA amenities record says water supply is “YES”; source and capacity are not specified.
Sewerage and drainage: Sewerage/STP is listed “YES”; treatment and disposal of sewage and sullage and storm-water drains are also listed, but are not marked complete in the supplied record. Capacities and reuse details are not supplied.
Electrical: Electrical meter room/sub-station/receiving station is listed “YES”; supply arrangements and backup capacity are not specified.
Lifts / vertical transportation: Not established by the RERA amenities record or supplied drawings. A vendor listing mentions a lift and service/goods lift, but no capacity or project-filed confirmation is supplied.
Fire and life safety: Fire protection and fire-safety requirements are listed in the RERA amenities record, with progress 0. The supplied evidence does not establish completion, system specifications or statutory clearance.
Waste and security: Solid-waste management and disposal is listed with progress 0. CCTV, intercom and security appear only in vendor-provided amenities and are not independently verified in the project records.
Accessibility: Ramps and accessible circulation are not described in the supplied material.
The HMDA permission states that an occupancy certificate is compulsory before occupation and that public water-supply and electricity connections will be provided only on production of an occupancy certificate. These are stated approval conditions, not evidence that an occupancy certificate has been issued.
8. Location, access & connectivity
The registered project location is Medipally village, Medipally mandal, Medchal-Malkajgiri district, at the Peerzadiguda locality; the project PIN recorded in the registration evidence is 500039. The project filing identifies 30-foot and 25-foot roads on the north and west boundaries respectively.
The supplied location record gives a nearest sampled Outer Ring Road interchange distance of approximately 8.8 km. No public-transport routes or other independently measured landmark distances are supplied. The registration certificate lists mandal Uppal, while the project filing identifies Medipally mandal; the registered locality, village, district, survey number and PIN are presented above as recorded in the project identity evidence.
9. Developer & development status
The registered promoter is THIRUMALA CONSTRUCTIONS, identified in the project information as a partnership. The corporate identifier supplied is GSTIN 36AANFT1193Q1ZC. The project filing names SUBBARAO THOTA as authorized signatory and srinivasulu thota and MALLEBOINA NARASIMHA as partners. The registered office is recorded as Pragathi Nagar, Kakatiya Nagar Colony, Peerzadiguda, Medipally, Medchal-Malkajgiri, 500039.
No construction-progress percentage or independent site inspection is supplied. The RERA portal-derived inventory count is 55 available units and 0 booked, without an as-of date. The project filing’s proposed completion date is 01/01/2025; the Form B extraction separately transcribes the promoter’s completion undertaking as “01st january, 2095.” No extension is recorded in the supplied certificate, and no occupancy or completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200001118, issued 08/08/2019 |
|---|---|
| What the supplied evidence establishes | Form C certificate for THIRUMALA ASHOK ARCADE; states validity through 01/01/2025. |
| Identifier / date | BA.NO: 13/2018-19; approval date extracted as 02 [2019 |
|---|---|
| What the supplied evidence establishes | Building permission for residential construction on Survey No. 10, Medipally; sanctions Stilt+5 floors and lists conditions, including rainwater harvesting, greenery and obtaining an occupancy certificate before occupation. |
| Identifier / date | 0012484/GHT/R1/U6/HMDA/07062018, dated 30.10.2018 |
|---|---|
| What the supplied evidence establishes | Number and date referenced in the HMDA permission. |
| Identifier / date | 30% July,2019 as transcribed |
|---|---|
| What the supplied evidence establishes | Promoter-authorised declaration concerning title documents, project funds, audit, approvals and completion undertaking. |
| Identifier / date | Not included in supplied documents |
|---|---|
| What the supplied evidence establishes | Issuance and current status are not established by this evidence. |
| Identifier / date | Layout-plan record is listed, but no extracted layout content is supplied; floor-plan review reports no measured apartment drawings. |
|---|---|
| What the supplied evidence establishes | Building footprint, floor-by-floor apartment arrangement and detailed circulation cannot be described from the available extracted material. |
The supplied HMDA permission includes conditions on commencement notice, construction in accordance with the sanctioned plan, completion notice and occupancy certification. This overview reports those records and their stated scope; it does not independently verify present construction, compliance or certificate status.
Frequently asked questions
Is THIRUMALA ASHOK ARCADE registered with Telangana RERA?
Yes. THIRUMALA ASHOK ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02200001118; the registration status is New Project.
Who is the developer of THIRUMALA ASHOK ARCADE?
The promoter named in the RERA registration is THIRUMALA CONSTRUCTIONS.
Where is THIRUMALA ASHOK ARCADE located?
THIRUMALA ASHOK ARCADE is in PEERZADIGUDA, Medipally, Medchal-Malkajgiri, Telangana (500039).
When will THIRUMALA ASHOK ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 01/01/2025. This is the promoter's declaration, not a guarantee.
More projects in Medipally