Sign in

Sri Srinivasa Anandha Nilayam

ASWINI · Wanaparthy · RERA P01500007084

SRI SRINIVASA ANANDHA NILAYAM is a plotted development at Nagavaram Revenue Village, Wanaparthy Mandal, Wanaparthy District. The registered promoter is Aswini Byaram. The tentative residential layout covers 4 Acer 8.73 Gts 20417 Sq. Yds and comprises 67 plots; no tower or floor configuration is stated. Plots are offered in size bands from 100–150 sq yd to 500–1000 sq yd. The project is registered with TG-RERA under P01500007084, and the promoter-declared completion date is 01.08.2025.

01What we found

Period endedTG-RERA registration ran to 1 Aug 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Nagavaram, Wanaparthy, Wanaparthy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRI SRINIVASA ANANDHA NILAYAM RERA record
Project typePlotted development / tentative residential layout RERA record
Phase / registered portionThe registration record identifies this project and its layout; a separate phase name or phase number is not disclosed. RERA record
TG-RERA registrationP01500007084 RERA record
Registration validity16/10/2023–01/08/2025; the supplied certificate says registration is not extended. This is the registration period, not a statement that the layout has completion certification.
Registered promoterAswini Byaram on the TG-RERA certificate; the filed layout names Smt BYARAM ASWINI as applicant. The legal entity type is not disclosed. Corporate record
RERA statusThe supplied certificate records the registration dates above. A current active registration status is not established by the supplied evidence.

Land and geographic identity

FieldRecord
Locality / site descriptionSY NO 118/P & 130/P; the filed layout describes the land as 118/PARTS and 130/PARTS. RERA record
Revenue villageNagavaram Revenue Village (also printed as “Nagavaram” in the registration record). RERA record
Mandal / district / PINWanaparthy Mandal, Wanaparthy District, 509103. RERA record
Project survey numbers / subdivisions118/P and 130/P; the layout approval describes 118/PARTS and 130/PARTS.
Registered land extentRERA land details record 17,071.21 sq.m total and net area, with 0 area affected by road widening/FTL/nala widening. RERA filing
Layout-drawing area statementThe tentative layout approval states a Layout Extent / Area of 4 Acer 8.73 Gts 20417 Sq. Yds.
Boundaries recorded in RERA land detailsEast: OTHERS LAND; West: OTHERS LAND and EXISTING 18 ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

FieldRecord
Approving authorityWANAPARTRHY Municipality/Municipal Corporation; the RERA record lists DTCP as the authority name. RERA record Approvals record
Principal layout approval0015/LO/3067/2023, approval date 01/08/2023 in the RERA project information. The filed approval is for a tentative layout plan. RERA record RERA filing
Application number003470/LO/DTCP/3067/0014/2023.
Approved built-up areaRERA fields state 9605.43 sq.m as “Approved Built up Area”; the supplied layout approval is for plots and does not specify building floor configuration. RERA filing
Layout / plots67 plots in the tentative layout approval.
Tower/block count and floor configurationNot applicable to the plotted layout as recorded; no building/tower count or sanctioned floor configuration is supplied.
ParkingNo parking-space count or parking-level provision is disclosed in the supplied project evidence. RERA amenities

Offering and status

FieldRecord
OfferingPlots in a 67-plot tentative residential layout. Plot-by-plot sizes and size bands are summarised under Homes, configurations & floor plans. Layout record
Booked / available countsNot disclosed in the supplied evidence. RERA record RERA amenities
Development stageThe RERA amenity record shows 0% progress for the listed infrastructure and facilities; this is a filed progress figure, not an independent site inspection. RERA amenities
Promoter-declared completion date01.08.2025 in the filed Form B declaration.
Registration deadline01/08/2025, as stated on the TG-RERA certificate; registration validity and the declared completion date are distinct records with the same end date.
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. For a plotted layout, the supplied approval describes a tentative layout and conditions for development and later release of a final layout. Document index

2. The project story

SRI SRINIVASA ANANDHA NILAYAM is registered with TG-RERA as a plotted development at Nagavaram Revenue Village, Wanaparthy Mandal and District, on survey numbers 118/P and 130/P. The project is laid out as a residential subdivision of land rather than an apartment or tower development. The tentative layout approval records 67 plots and provides for residential dwelling houses; it states that shops, business premises and industrial units are not permitted except on sites specifically reserved for such proposals in the draft layout. RERA record

The approval describes a tentative layout, with roads, open space, social infrastructure, utility land and plots. It requires the applicant to carry out the infrastructure and amenities works and sets conditions for eventual release of the mortgaged plots and final layout. The supplied RERA progress fields report 0% against the listed infrastructure and amenities; no independent inspection or site-progress evidence is provided, so the recorded percentage should not be treated as independently verified construction status. RERA amenities

The promoter’s Form B declaration undertakes completion by 01.08.2025. The TG-RERA certificate records registration through 01/08/2025 and says the registration was not extended in the supplied record. No occupancy or completion certificate is supplied.

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey residential building scheme in the supplied approval. The tentative layout approval describes 67 plots on survey numbers 118/PARTS and 130/PARTS in Nagavaram Revenue Village. Its land-use statement is:

Layout componentArea stated on approvalShare stated on approval
Plotted area2 Acer 14.94 Gts 11488 Sq. Yds56.27%
Road area1 Acer 11.48 Gts 6230 Sq. Yds30.51%
Open space (park)0 Acer 15.5 Gts 1876 Sq. Yds9.19%
Social infrastructure0 Acer 4.96 Gts 600 Sq. Yds2.94%
Utilities0 Acer 1.85 Gts 224 Sq. Yds1.1%
Layout extent / area4 Acer 8.73 Gts 20417 Sq. Yds—
Mortgage area of plotted area0 Acer 15.13 Gts 1831 Sq. Yds15.8%

The RERA-filed layout extraction identifies Plot Nos. 27, 26, 25, 24, 28, 50, 51, 52, 48, 49 and 47 as mortgaged to the approving Municipality/Municipal Corporation under mortgage deeds 9756/2023 and 9757/2023, dated 21 July, 2023. The approval says the applicant must complete development works and obtain release of the mortgaged land and release of the final layout before layout permissions are released.

The approval calls for road formation with black top, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, assured water supply, electrical lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-specified works, not evidence that they have been completed.

4. Homes, configurations & floor plans

The offering is plots, not apartments. The layout drawing extraction reports 67 plots, with sizes read from the drawing’s plot schedule by software; the extraction notes that the plot count and sizes should be verified against the drawing. Layout record

Plot size bandNumber of plots
100–150 sq yd41
150–200 sq yd14
200–250 sq yd8
250–300 sq yd1
300–400 sq yd2
500–1000 sq yd1

Software-measured plot areas range from 104.79 sq.m (125.3 sq yd) to 436.03 sq.m (521.5 sq yd); the reported median is 125.31 sq.m (149.9 sq yd). These are drawing-derived measurements, not RERA-filed unit areas. The drawing extraction reports that the sum of plot areas matches the plotted area in the drawing’s area statement. Layout record

The supplied floor-plan review records 2 drawing sheets, with no flats; no apartment configuration, RERA saleable area, carpet area, or loading figure is applicable or supplied for this plotted development. Floor plans

5. Parking & vehicle circulation

The supplied evidence does not state a parking-space count, parking allocation to individual plots, visitor or accessible parking, or dedicated two-wheeler or EV provision. The layout approval records a road area of 1 Acer 11.48 Gts 6230 Sq. Yds and requires roads to remain open for access to neighbouring sites; it does not establish a parking arrangement or exclusive ownership of any parking space. RERA amenities

6. Amenities, recreation & open spaces

The tentative layout approval reserves land for a park, social infrastructure and utilities, and specifies infrastructure works. The amenity figures shown as 0% are TG-RERA-recorded progress percentages; they do not independently verify on-site completion. RERA amenities

Park / open space
Description / size0 Acer 15.5 Gts 1876 Sq. Yds; 9.19% of the approved layout area
Evidence sourceTentative layout approval; RERA amenity record RERA amenities
Declared progress / verified statusListed as available “YES” in the amenity record, with 0% progress; completion not independently verified
Social infrastructure site
Description / size0 Acer 4.96 Gts 600 Sq. Yds; 2.94%
Evidence sourceTentative layout approval
Declared progress / verified statusReserved in the approval; progress/completion not established
Internal roads and footpaths
Description / sizeRoad area 1 Acer 11.48 Gts 6230 Sq. Yds; approval specifies road formation with black top
Evidence sourceTentative layout approval; RERA amenity record RERA amenities
Declared progress / verified statusListed as available “YES” with 0% progress; completion not independently verified
Avenue plantation
Description / sizeApproval specifies avenue plantation
Evidence sourceTentative layout approval
Declared progress / verified statusCompletion not established
Community buildings
Description / sizeNo size or facility detail supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; completion not established

The supplied material does not identify a clubhouse or specific indoor or sports facilities. The amenity record includes other site services; these are summarised under Utilities, building services & safety. RERA amenities

7. Utilities, building services & safety

The tentative layout approval specifies the following proposed or required infrastructure works. The evidence does not establish their capacities or independent completion status.

Water
What the supplied record specifiesAssured water-supply source, internal water-supply pipelines, overhead tank and water reservoir
Status evidenceSpecified in the approval; RERA amenity progress is 0% for water supply. Completion and capacity are not established.
Sewerage and drainage
What the supplied record specifiesUnderground drainage lines, common septic tank/STP, storm-water drains and treatment/disposal of sewage and sullage water
Status evidenceSpecified in the approval; the RERA amenity record reports 0% for sewerage, storm-water drains, and sewage/sullage treatment.
Electrical
What the supplied record specifiesElectrical supply lines, transformer and street lights; the RERA amenity record also lists an electrical meter room/sub-station/receiving station
Status evidenceSpecified or listed in the records; no capacity or completed status is established. Amenity progress is 0%.
Solid waste
What the supplied record specifiesSolid-waste management and disposal
Status evidenceListed in the approval and RERA amenity record; progress is 0%.
Water conservation
What the supplied record specifiesRainwater-harvesting pits
Status evidenceSpecified in the approval and listed in the RERA amenity record; progress is 0%.
Fire and life safety
What the supplied record specifiesFire protection and fire-safety requirements appear in the RERA amenity record
Status evidenceProgress is 0%; no detailed system, clearance or completed status is supplied.

The supplied records do not specify backup power, EV charging, lifts, security systems, accessibility features, or service capacities. RERA amenities

8. Location, access & connectivity

The registered location is SY NO 118/P & 130/P, Nagavaram Revenue Village, Wanaparthy Mandal, Wanaparthy District, Telangana, PIN 509103. The RERA land details describe the western boundary as OTHERS LAND and EXISTING 18 ROAD. The layout approval requires roads to remain open for access to neighbouring sites. RERA record RERA filing

The supplied cadastral parcel centroid is 16.3537665263774, 78.0440985680394. The nearest sampled Outer Ring Road interchange is listed at approximately 105.7 km; this is the supplied location-data estimate, not a promoter travel-time claim. No other approach-road, public-transport, landmark or travel-time information is supplied. Cadastral map Location record

9. Developer & development status

The TG-RERA certificate identifies the promoter as Aswini Byaram. The tentative layout approval names Smt BYARAM ASWINI as applicant, and the Form B declaration is signed by Byaram Aswini, who states she is acting for Smt. KOLLI SWAPNA. The supplied evidence does not establish the promoter’s legal entity type, corporate identifiers, registered office, official website or project contact details. Corporate record

The promoter’s Form B declaration gives a completion undertaking of 01.08.2025. The RERA amenity record reports 0% progress for the listed facilities; no independent site inspection is provided. The certificate’s recorded registration period ended 01/08/2025, and the supplied certificate extraction states it was not extended. No completion or occupancy certificate is supplied. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceP01500007084, Form C, issued 16/10/2023, valid through 01/08/2025
Scope / noteProject registration; the supplied extraction states “extended: false.”
Tentative layout approval
Supplied evidenceApproval No. 0015/LO/3067/2023; application No. 003470/LO/DTCP/3067/0014/2023
Scope / noteApproval for tentative residential layout of 67 plots at Nagavaram, survey numbers 118/PARTS and 130/PARTS.
Layout mortgage deeds and receipts
Supplied evidenceMortgage deeds 9756/2023 and 9757/2023, dated 21 July, 2023; receipts TS/9147/2023, TS/9148/2023 and TS/9169/2023
Scope / noteNumbers and dates appear in the filed layout approval.
Form B declaration
Supplied evidenceDated 9 / 8/2023, with completion undertaking to 01.08.2025
Scope / notePromoter-filed declaration concerning the project and its stated obligations.
Completion / occupancy records
Supplied evidenceNo completion certificate or occupancy certificate supplied. Document index
Scope / noteThe supplied layout approval describes a tentative plan and conditions for final layout release.

Frequently asked questions

Is SRI SRINIVASA ANANDHA NILAYAM registered with Telangana RERA?

Yes. SRI SRINIVASA ANANDHA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P01500007084; the registration status is New Project.

Who is the developer of SRI SRINIVASA ANANDHA NILAYAM?

The promoter named in the RERA registration is ASWINI.

Where is SRI SRINIVASA ANANDHA NILAYAM located?

SRI SRINIVASA ANANDHA NILAYAM is in SY NO 118/P & 130/P, Nagavaram, Wanaparthy, Telangana (509103).

When will SRI SRINIVASA ANANDHA NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 01/08/2025. This is the promoter's declaration, not a guarantee.

More projects in Nagavaram