Bhoolaxmi Nagar
NAKKA · Wanaparthy · RERA P01500009166
BHOOLAXMI NAGAR is a plotted development / tentative residential layout in Rajanagaram, Wanaparthy Mandal, Wanaparthy District. The registered promoter is Nakka Nagalaxmi. The RERA land record states an area of 5056.65 sq. m, and the tentative layout approval records 18 plots; buildings, floors and plot configurations are not stated in the RERA record. Its TG-RERA registration number is P01500009166, and the promoter’s Form B undertaking states a proposed completion date of 25th JULY, 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | BHOOLAXMI NAGAR RERA record |
| Project type | Plotted development / tentative residential layout RERA record |
| Phase or registered portion | Phase not separately identified; registration concerns the plotted project at the stated survey numbers RERA record |
| TG-RERA registration | P01500009166 |
| Registration validity | Valid from 25/07/2023 to 25/07/2025; the certificate records a two-year term. Extension is not recorded in the supplied evidence. Registration validity is distinct from the completion undertaking and from any completion/occupancy certificate. |
| RERA record status | The project is identified as “New Project”; the supplied certificate records registration, not an occupancy or completion certificate. RERA record |
| Registered promoter | Nakka Nagalaxmi (also identified in the layout approval as Smt NAKKA JANAKAMMA ALIAS NAGALAXMI). Legal entity type and corporate identifiers are not established in the supplied record. Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Rajanagaram RERA record |
| Revenue village | Rajanagaram Revenue Village |
| Mandal / district / PIN | Wanaparthy Mandal; Wanaparthy District; 509381 RERA record |
| Project survey numbers and subdivisions | 90/A3, 91/C, 90/A1/2, 91/B/1/2, 91/C/1/1 |
| Registered site extent | 5056.65 sq. m in the RERA land record RERA filing |
| Layout extent stated in approval | 1 Acer 9.98 Gts 6048 Sq. Yds |
| Net area / area affected | RERA land details state 4866.78 sq. m net area and 189.87 sq. m affected in road widening/FTL of tanks/nala widening. RERA filing |
| Boundaries | North: ROAD; South, East and West: OTHERS LAND RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Wanapartrhy Municipality/Municipal Corporation; the approval record identifies DTCP as the RERA authority. Approvals record |
| Principal approval | Tentative layout plan 0013/LO/3067/2023, approved 25 July, 2023 Approvals record |
| Application number | 003570/LO/DTCP/3067/0015/2023 Approvals record |
| Approved built-up area | 3227.45 sq. m recorded in the RERA land details; the supplied material does not clarify the measurement basis. RERA filing |
| Layout scale | 18 plots in the tentative layout approval |
| Buildings / floors / parking levels | Not disclosed in the supplied project record; this is a plotted layout, not a multi-storey building schedule. RERA record |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots in a residential layout; the approval records 18 plots. Individual plot inventory and prices are not established by the supplied RERA material. RERA record |
| Plot-size range | The layout drawing’s software-read schedule reports 79.46–375.99 sq. m (smallest to largest); these are drawing-derived measurements, not quoted RERA unit-area disclosures. Layout record |
| Booked / available counts | Not established in the supplied evidence. Document index |
| Construction / development stage | RERA-filed amenity data reports internal roads and footpaths at 40%; the other listed progress percentages are 0%. These are reported figures, not independent site verification. RERA amenities |
| Completion deadline | Promoter’s Form B undertaking states 25th JULY, 2025. |
| Completion / occupancy certificate | No completion or occupancy certificate is included in the supplied evidence. The tentative layout approval is not an occupancy or completion certificate. Document index |
2. The project story
BHOOLAXMI NAGAR is a proposed residential plotted layout in Rajanagaram Revenue Village, Wanaparthy Mandal and District. Its registered land identity covers survey numbers 90/A3, 91/C, 90/A1/2, 91/B/1/2 and 91/C/1/1. The tentative layout approval records 18 plots and provides for roads, park/open space, social infrastructure and utility land. RERA record
The promoter’s Form B undertaking gives 25th JULY, 2025 as the project completion date. The supplied RERA progress data reports internal roads and footpaths at 40%, while listed water, sewerage, park, street lighting and electrical-station items have 0% reported progress. These are project-record progress entries and are not independent confirmation of on-site completion. No completion or occupancy certificate is present in the supplied documents. RERA amenities Document index
3. Master plan, architecture & building design
The principal design evidence is a tentative layout plan, not a building-floor plan. It records an 18-plot residential layout and the following land-use figures: Plotted Area 66.32%, Road Area 20.48%, Open space (Park) 9.37%, Social Infrastructure 2.84%, and Utilities 1%. The approval also records a Mortgage Area of 17.72%, described as Plot Nos. 10, 9 and 8.
The RERA land details state a total site area of 5056.65 sq. m, net area of 4866.78 sq. m, and 189.87 sq. m affected in road widening/FTL of tanks/nala widening. The layout approval separately states its layout extent as 1 Acer 9.98 Gts 6048 Sq. Yds. RERA filing
The layout drawing’s own area statement is software-read as 4866.77 sq. m for its land-use base, including 3227.45 sq. m plots, 996.63 sq. m roads, 455.85 sq. m parks/open space, 48.71 sq. m utilities and 138.13 sq. m social infrastructure. These are drawing-derived readings, not independently surveyed measurements. Layout record
No building count, floor configuration, footprint, building height, or apartment arrangement is established. The approval conditions describe infrastructure works for the layout, including roads, drainage, water supply and park development; they do not constitute evidence that those works are complete.
4. Homes, configurations & floor plans
This is a plotted development. The tentative layout approval records 18 plots; the supplied materials do not provide a confirmed booked/available inventory or plot-by-plot RERA saleable areas. Document index
The drawing-derived plot schedule identifies 18 plots with sizes from 79.46 sq. m to 375.99 sq. m (median 167.59 sq. m). The schedule’s size bands are software-read from the drawing and should be treated as drawing measurements, not as RERA-filed saleable areas. Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 18 in tentative layout approval | Not established | Not established | Not disclosed | Not applicable | Not disclosed |
Two layout sheets are recorded; no apartment floor plans or measured apartment areas are supplied. Floor plans
5. Parking & vehicle circulation
The supplied approval and project data do not establish a parking-space count, visitor or accessible parking provision, or a parking allocation for individual plots. The layout approval records 20.48% road area and requires roads to remain open for access to neighbouring sites; it does not establish a separate parking arrangement. Layout record
The approval describes roads to be formed with black top and requires corners at street junctions to be splayed as shown in the tentative plan. These are approval requirements; completion is not independently verified in the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | 455.85 sq. m in the drawing-derived area statement; approval states 0 Acer 4.51 Gts 545 Sq. Yds and 9.37%. Layout record |
|---|---|
| Evidence source | Tentative layout approval and layout drawing Layout record |
| Declared progress / verified status | RERA amenity record reports 0% for “Green Strip/TOT LOT/Park”; not independently verified complete. RERA amenities |
| Description / size | 138.13 sq. m in the drawing-derived area statement; approval states 0 Acer 1.37 Gts 165 Sq. Yds and 2.84%. Layout record |
|---|---|
| Evidence source | Tentative layout approval and layout drawing Layout record |
| Declared progress / verified status | No completed facility or progress beyond the RERA-reported 0% community-building entry is established. RERA amenities |
| Description / size | Approval calls for road formation with black top; no footpath size is supplied. |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | RERA amenity record reports 40% for internal roads and footpaths; not independently verified. RERA amenities |
| Description / size | 48.71 sq. m in the drawing-derived area statement; approval states 0 Acer 0.48 Gts 58 Sq. Yds and 1%. Layout record |
|---|---|
| Evidence source | Tentative layout approval and layout drawing Layout record |
| Declared progress / verified status | RERA progress entries for water supply and sewerage are 0%; not independently verified complete. RERA amenities |
No clubhouse or indoor recreation facility is established in the supplied evidence. The tentative approval requires the applicant to develop infrastructure and amenities and to hand over open-space, utility and road areas to the Municipality by registered gift deed before release of the final layout.
7. Utilities, building services & safety
The tentative layout approval describes required development works as including internal water-supply pipelines and an overhead tank, an assured water-supply source, underground drainage and a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-described works, not confirmation of installation or operational capacity.
The approval also identifies utility land for items such as a water reservoir, septic tank/STP, electric transformer and solid-waste management. No capacities, detailed system designs, fire-system specifications, backup-power arrangements, CCTV/security provisions, or accessibility details are established in the supplied material. RERA amenities
RERA amenity data reports 0% progress for water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, and the electrical meter room/sub-station/receiving station. These figures are filed progress entries, not independent verification. RERA amenities
8. Location, access & connectivity
The registered location is Rajanagaram, Rajanagaram Revenue Village, Wanaparthy Mandal, Wanaparthy District, Telangana, PIN 509381. The parcel centroid supplied for the project is 16.376479870182873, 78.0379443305877. RERA record Location record Cadastral map
The land record describes the north boundary as ROAD and the other three boundaries as OTHERS LAND. The tentative approval requires layout roads to remain open for access to neighbouring sites. The nearest sampled Outer Ring Road interchange is listed at approximately 103.7 km; no further route, travel-time or public-transport details are supplied. RERA filing Location record
9. Developer & development status
The promoter is identified in the project identity section above. The tentative layout approval additionally records parentage as NAKKA RAMULU. The supplied evidence does not establish a registered office, official contact details or website. Corporate record
The promoter’s Form B affidavit, dated 26th DAY OF NOV, 2024, undertakes completion by 25th JULY, 2025. The RERA certificate was valid through 25/07/2025 and the supplied record does not show an extension. The project’s amenity progress record reports internal roads and footpaths at 40%; this is a promoter/RERA-recorded progress figure, not an independent site inspection. No completion or occupancy certificate is supplied. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P01500009166; issued 21/12/2024; valid 25/07/2023–25/07/2025 |
|---|---|
| Scope and evidence | Form C identifies BHOOLAXMI NAGAR, promoter Nakka Nagalaxmi and the stated survey numbers. |
| Identifier / date | 0013/LO/3067/2023; 25 July, 2023 |
|---|---|
| Scope and evidence | Issued by Wanapartrhy Municipality/Municipal Corporation; records an 18-plot tentative residential layout. |
| Identifier / date | 003570/LO/DTCP/3067/0015/2023 |
|---|---|
| Scope and evidence | Recorded on the tentative layout approval. |
| Identifier / date | 26th DAY OF NOV, 2024 |
|---|---|
| Scope and evidence | Promoter declaration including the completion undertaking and project obligations. |
| Identifier / date | Two layout sheets; drawing-derived plot schedule and area statement |
|---|---|
| Scope and evidence | Plot count and sizes are software-read from the drawing; not an independent survey. Layout record |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | No completion or occupancy certificate is established by the reviewed documents. Document index |
| Identifier / date | Parcel centroid 16.376479870182873, 78.0379443305877 |
|---|---|
| Scope and evidence | Cadastral parcel-centroid coordinate. Cadastral map Location record |
1. Project at a glance
Project identity
Registered project name: BHOOLAXMI NAGAR
Project type: Plotted development / tentative residential layout
Phase or registered portion: Phase not separately identified; registration concerns the plotted project at the stated survey numbers
TG-RERA registration: P01500009166
Registration validity: Valid from 25/07/2023 to 25/07/2025; the certificate records a two-year term. Extension is not recorded in the supplied evidence. Registration validity is distinct from the completion undertaking and from any completion/occupancy certificate.
RERA record status: The project is identified as “New Project”; the supplied certificate records registration, not an occupancy or completion certificate.
Registered promoter: Nakka Nagalaxmi (also identified in the layout approval as Smt NAKKA JANAKAMMA ALIAS NAGALAXMI). Legal entity type and corporate identifiers are not established in the supplied record.
Land and geographic identity
Locality: Rajanagaram
Revenue village: Rajanagaram Revenue Village
Mandal / district / PIN: Wanaparthy Mandal; Wanaparthy District; 509381
Project survey numbers and subdivisions: 90/A3, 91/C, 90/A1/2, 91/B/1/2, 91/C/1/1
Registered site extent: 5056.65 sq. m in the RERA land record
Layout extent stated in approval: 1 Acer 9.98 Gts 6048 Sq. Yds
Net area / area affected: RERA land details state 4866.78 sq. m net area and 189.87 sq. m affected in road widening/FTL of tanks/nala widening.
Boundaries: North: ROAD; South, East and West: OTHERS LAND
Development identity
Sanctioning authority: Wanapartrhy Municipality/Municipal Corporation; the approval record identifies DTCP as the RERA authority.
Principal approval: Tentative layout plan 0013/LO/3067/2023, approved 25 July, 2023
Application number: 003570/LO/DTCP/3067/0015/2023
Approved built-up area: 3227.45 sq. m recorded in the RERA land details; the supplied material does not clarify the measurement basis.
Layout scale: 18 plots in the tentative layout approval
Buildings / floors / parking levels: Not disclosed in the supplied project record; this is a plotted layout, not a multi-storey building schedule.
Offering and status
Offering: Plots in a residential layout; the approval records 18 plots. Individual plot inventory and prices are not established by the supplied RERA material.
Plot-size range: The layout drawing’s software-read schedule reports 79.46–375.99 sq. m (smallest to largest); these are drawing-derived measurements, not quoted RERA unit-area disclosures.
Booked / available counts: Not established in the supplied evidence.
Construction / development stage: RERA-filed amenity data reports internal roads and footpaths at 40%; the other listed progress percentages are 0%. These are reported figures, not independent site verification.
Completion deadline: Promoter’s Form B undertaking states 25th JULY, 2025.
Completion / occupancy certificate: No completion or occupancy certificate is included in the supplied evidence. The tentative layout approval is not an occupancy or completion certificate.
2. The project story
BHOOLAXMI NAGAR is a proposed residential plotted layout in Rajanagaram Revenue Village, Wanaparthy Mandal and District. Its registered land identity covers survey numbers 90/A3, 91/C, 90/A1/2, 91/B/1/2 and 91/C/1/1. The tentative layout approval records 18 plots and provides for roads, park/open space, social infrastructure and utility land.
The promoter’s Form B undertaking gives 25th JULY, 2025 as the project completion date. The supplied RERA progress data reports internal roads and footpaths at 40%, while listed water, sewerage, park, street lighting and electrical-station items have 0% reported progress. These are project-record progress entries and are not independent confirmation of on-site completion. No completion or occupancy certificate is present in the supplied documents.
3. Master plan, architecture & building design
The principal design evidence is a tentative layout plan, not a building-floor plan. It records an 18-plot residential layout and the following land-use figures: Plotted Area 66.32%, Road Area 20.48%, Open space (Park) 9.37%, Social Infrastructure 2.84%, and Utilities 1%. The approval also records a Mortgage Area of 17.72%, described as Plot Nos. 10, 9 and 8.
The RERA land details state a total site area of 5056.65 sq. m, net area of 4866.78 sq. m, and 189.87 sq. m affected in road widening/FTL of tanks/nala widening. The layout approval separately states its layout extent as 1 Acer 9.98 Gts 6048 Sq. Yds.
The layout drawing’s own area statement is software-read as 4866.77 sq. m for its land-use base, including 3227.45 sq. m plots, 996.63 sq. m roads, 455.85 sq. m parks/open space, 48.71 sq. m utilities and 138.13 sq. m social infrastructure. These are drawing-derived readings, not independently surveyed measurements.
No building count, floor configuration, footprint, building height, or apartment arrangement is established. The approval conditions describe infrastructure works for the layout, including roads, drainage, water supply and park development; they do not constitute evidence that those works are complete.
4. Homes, configurations & floor plans
This is a plotted development. The tentative layout approval records 18 plots; the supplied materials do not provide a confirmed booked/available inventory or plot-by-plot RERA saleable areas.
The drawing-derived plot schedule identifies 18 plots with sizes from 79.46 sq. m to 375.99 sq. m (median 167.59 sq. m). The schedule’s size bands are software-read from the drawing and should be treated as drawing measurements, not as RERA-filed saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 18 in tentative layout approval | Not established | Not established | Not disclosed | Not applicable | Not disclosed |
Two layout sheets are recorded; no apartment floor plans or measured apartment areas are supplied.
5. Parking & vehicle circulation
The supplied approval and project data do not establish a parking-space count, visitor or accessible parking provision, or a parking allocation for individual plots. The layout approval records 20.48% road area and requires roads to remain open for access to neighbouring sites; it does not establish a separate parking arrangement.
The approval describes roads to be formed with black top and requires corners at street junctions to be splayed as shown in the tentative plan. These are approval requirements; completion is not independently verified in the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | 455.85 sq. m in the drawing-derived area statement; approval states 0 Acer 4.51 Gts 545 Sq. Yds and 9.37%. |
|---|---|
| Evidence source | Tentative layout approval and layout drawing |
| Declared progress / verified status | RERA amenity record reports 0% for “Green Strip/TOT LOT/Park”; not independently verified complete. |
| Description / size | 138.13 sq. m in the drawing-derived area statement; approval states 0 Acer 1.37 Gts 165 Sq. Yds and 2.84%. |
|---|---|
| Evidence source | Tentative layout approval and layout drawing |
| Declared progress / verified status | No completed facility or progress beyond the RERA-reported 0% community-building entry is established. |
| Description / size | Approval calls for road formation with black top; no footpath size is supplied. |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | RERA amenity record reports 40% for internal roads and footpaths; not independently verified. |
| Description / size | 48.71 sq. m in the drawing-derived area statement; approval states 0 Acer 0.48 Gts 58 Sq. Yds and 1%. |
|---|---|
| Evidence source | Tentative layout approval and layout drawing |
| Declared progress / verified status | RERA progress entries for water supply and sewerage are 0%; not independently verified complete. |
No clubhouse or indoor recreation facility is established in the supplied evidence. The tentative approval requires the applicant to develop infrastructure and amenities and to hand over open-space, utility and road areas to the Municipality by registered gift deed before release of the final layout.
7. Utilities, building services & safety
The tentative layout approval describes required development works as including internal water-supply pipelines and an overhead tank, an assured water-supply source, underground drainage and a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-described works, not confirmation of installation or operational capacity.
The approval also identifies utility land for items such as a water reservoir, septic tank/STP, electric transformer and solid-waste management. No capacities, detailed system designs, fire-system specifications, backup-power arrangements, CCTV/security provisions, or accessibility details are established in the supplied material.
RERA amenity data reports 0% progress for water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, and the electrical meter room/sub-station/receiving station. These figures are filed progress entries, not independent verification.
8. Location, access & connectivity
The registered location is Rajanagaram, Rajanagaram Revenue Village, Wanaparthy Mandal, Wanaparthy District, Telangana, PIN 509381. The parcel centroid supplied for the project is 16.376479870182873, 78.0379443305877.
The land record describes the north boundary as ROAD and the other three boundaries as OTHERS LAND. The tentative approval requires layout roads to remain open for access to neighbouring sites. The nearest sampled Outer Ring Road interchange is listed at approximately 103.7 km; no further route, travel-time or public-transport details are supplied.
9. Developer & development status
The promoter is identified in the project identity section above. The tentative layout approval additionally records parentage as NAKKA RAMULU. The supplied evidence does not establish a registered office, official contact details or website.
The promoter’s Form B affidavit, dated 26th DAY OF NOV, 2024, undertakes completion by 25th JULY, 2025. The RERA certificate was valid through 25/07/2025 and the supplied record does not show an extension. The project’s amenity progress record reports internal roads and footpaths at 40%; this is a promoter/RERA-recorded progress figure, not an independent site inspection. No completion or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P01500009166; issued 21/12/2024; valid 25/07/2023–25/07/2025 |
|---|---|
| Scope and evidence | Form C identifies BHOOLAXMI NAGAR, promoter Nakka Nagalaxmi and the stated survey numbers. |
| Identifier / date | 0013/LO/3067/2023; 25 July, 2023 |
|---|---|
| Scope and evidence | Issued by Wanapartrhy Municipality/Municipal Corporation; records an 18-plot tentative residential layout. |
| Identifier / date | 003570/LO/DTCP/3067/0015/2023 |
|---|---|
| Scope and evidence | Recorded on the tentative layout approval. |
| Identifier / date | 26th DAY OF NOV, 2024 |
|---|---|
| Scope and evidence | Promoter declaration including the completion undertaking and project obligations. |
| Identifier / date | Two layout sheets; drawing-derived plot schedule and area statement |
|---|---|
| Scope and evidence | Plot count and sizes are software-read from the drawing; not an independent survey. |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | No completion or occupancy certificate is established by the reviewed documents. |
| Identifier / date | Parcel centroid 16.376479870182873, 78.0379443305877 |
|---|---|
| Scope and evidence | Cadastral parcel-centroid coordinate. |
Frequently asked questions
Is BHOOLAXMI NAGAR registered with Telangana RERA?
Yes. BHOOLAXMI NAGAR is registered with the Telangana Real Estate Regulatory Authority as P01500009166; the registration status is New Project.
Who is the developer of BHOOLAXMI NAGAR?
The promoter named in the RERA registration is NAKKA.
Where is BHOOLAXMI NAGAR located?
BHOOLAXMI NAGAR is in RAJANAGARAM, Wanaparthy, Telangana (509381).
When will BHOOLAXMI NAGAR be completed?
The promoter's proposed date of completion filed with RERA is 25/07/2025. This is the promoter's declaration, not a guarantee.