SRI SAI KARTHIKEYA GROUPS - 2 is a plotted development in Dharmaram, Bardipur Revenue Village, Dichpally Mandal, Nizamabad District. The registered promoter is M/s SRI SAI KARTHIKEYA GROUPS & OTHERS. The RERA-filed site extent is 39201.89 sq. m, and the layout approval describes 101 plots; towers, floors and plot-size configurations are not stated. The project is registered under TG-RERA **P03100007214**, and the promoter’s Form B undertaking gives a proposed completion date of **14th September 2023**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SRI SAI KARTHIKEYA GROUPS - 2 RERA record |
| Project type | Plotted development / layout RERA record RERA filing |
| Phase or registered portion | Registered as this named project; no separate phase description is disclosed RERA record |
| TG-RERA registration | P03100007214 Approvals record |
| Registration validity | The Form C states commencement 07/11/2023 and expiry 14/09/2023, and describes the period as “0 years”; it records no extension. These are the certificate’s stated dates, not a verified current-validity determination. |
| Registered promoter | M/s SRI SAI KARTHIKEYA GROUPS & OTHERS; entity type is recorded as “Others” / “JOINT DEVELOPERS.” RERA record Corporate record RERA filing |
| RERA status | The project evidence labels it New Project and includes a Form C registration certificate. RERA record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Dharmaram / Bardipur Revenue Village; the layout approval describes the site as Dharmaram (B), Bardipur Shivar. RERA record RERA filing |
| Mandal / district / PIN | Dichpally / Nizamabad / 503230 RERA record |
| Project survey numbers as registered | 711, 713, 714, 715, 716, 720, 722, 723, 724, 725, 730 & 738 RERA record Land records |
| Subdivisions identified in cadastral records | 713/B/2/2 and 738/6/2 are among the retrieved cadastral survey records; the project filing lists the parent survey numbers without specifying project-held subdivisions. Cadastral map |
| Registered site extent | 39201.89 sq. m; the RERA land record lists this as both total and net area, with affected area 0. RERA filing Land records |
| Boundaries | North: Road; South: Road; East: Others Land; West: Others Land. RERA filing Land records |
| Layout approval’s stated area | Ac. 9-27.5 Gts; the approval document also prints Ac 9.687; 46885.08 Sq. Yds as layout area. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the layout approval was communicated with reference to Nizamabad Urban Development Authority (NUDA). Approvals record |
| Principal layout reference | Draft - TLP No. 27/2019/NUDA; file reference DTCP-HT1/0TH/114/2019-HYD Sec-DTCP; proceedings Lr.Roc.No. 3840/2019/H; approval date recorded as 14/09/2019. Approvals record |
| Approved development form | Layout for 101 plots. |
| Approved built-up area | Not disclosed in the supplied layout evidence. The RERA fields list 25,576.53 sq. m as “Approved Built up Area,” but the evidence does not establish a building program or explain how that figure applies to this plotted layout. RERA filing |
| Buildings / floors / parking levels | No towers or apartment-floor configuration is evidenced. This is a plotted layout; building count, floor configuration and parking levels are not disclosed. |
| Layout land-use figures in approval | Plotted area: Ac. 6.3201; 30589.28 Sq. Yds; roads: Ac. 2.30; 11132.00 Sq. Yds; open-space park: Ac. 0.727; 3518.68 Sq. Yds; social infrastructure: Ac. 0.243; 1176.12 Sq. Yds; utility: Ac. 0.0969; 468.996 Sq. Yds. |
Offering and status
| Item | Project record |
|---|---|
| Offering | 101 plots are stated in the layout approval. Plot size range, plot-wise inventory and individual plot dimensions are not supplied here. |
| Booked / available | The promoter’s RERA replies state that 87 plots had been sold and GPAs executed; the underlying plot schedule and current inventory are not included in the supplied extracts. This is a promoter submission, not an independent inventory verification. |
| Construction / development stage | No independently verified site-progress evidence is supplied. The RERA amenity record marks several layout infrastructure items as available at 100%; that is a filed status, not an independent site inspection. RERA amenities |
| Completion undertaking | Form B records the promoter’s undertaking to complete by 14th September 2023. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. The project is a plotted layout; the supplied record does not establish final layout release or completion certification. Document index |
2. The project story
This is a RERA-registered plotted development in Bardipur Revenue Village, described in the approval record as Dharmaram (B), Dichpally Mandal, Nizamabad District. Its registered land description covers survey numbers 711, 713, 714, 715, 716, 720, 722, 723, 724, 725, 730 and 738, with a RERA-filed site extent of 39,201.89 sq. m. RERA record Land records
The layout approval describes 101 plots, internal roads and designated park, social-infrastructure and utility areas. It also identifies land to be mortgaged to NUDA and land for NUDA master-plan facilities; the approval states that plots other than the mortgaged plots may be sold. These are approval-record descriptions and conditions, not evidence that the reserved land has been handed over or that all works are complete.
The promoter undertook in Form B to complete the project by 14 September 2023. The supplied record does not establish current physical progress through an independent inspection, and the RERA-filed amenity status should not be read as independently verified completion. The supplied documents do not identify an occupancy or completion certificate. RERA amenities Document index
3. Master plan, architecture & building design
The development is evidenced as a plotted layout rather than a multi-storey building project. The DTCP/NUDA approval describes 101 plots on the stated survey numbers and an approval layout area of Ac 9.687; 46885.08 Sq. Yds. The project’s RERA land record separately states a total/net site area of 39201.89 sq. m. RERA filing
The approval’s stated land-use components are:
| Layout component | Figure in approval |
|---|---|
| Plotted area | 65.24%; Ac. 6.3201; 30589.28 Sq. Yds |
| Road area | 23.75%; Ac. 2.30; 11132.00 Sq. Yds |
| Open space (park) | 7.50%; Ac. 0.727; 3518.68 Sq. Yds |
| Social infrastructure | 2.50%; Ac. 0.243; 1176.12 Sq. Yds |
| Utility | 1.00%; Ac. 0.0969; 468.996 Sq. Yds |
| Mortgage area, Plot Nos. 96–100 | 15.33%; Ac. 0.969; 4689.95 Sq. Yds |
| NUDA master-plan facilities, Plot Nos. 5–11 | 5.11%; Ac 0.323; 1563.32 Sq. Yds |
The approval specifies roads of 18 mts and above. It lists storm-water drains, underground drainage lines, a common septic tank / STP, internal water-supply pipelines, an overhead tank, transformer, avenue plantation, park development and rainwater-harvesting pits as layout development works or facilities. The supplied evidence does not include readable plot-by-plot drawings or sufficient drawing data to describe plot dimensions, internal road geometry or the final layout arrangement.
4. Homes, configurations & floor plans
The RERA evidence describes a plotted offering of 101 plots, not apartment configurations. Plot-size bands, individual plot areas, booked and available plot counts, and plot-wise saleable areas are not provided in the supplied structured data. The promoter’s replies state that 87 plots had been sold and GPAs executed, but the underlying schedule is not supplied, so this is not a current verified inventory.
The three drawing records are scans pending measurement; no software-measured floor-plan or plot measurements are available. Floor plans
5. Parking & vehicle circulation
No plot-wise or project-wide parking count, visitor or accessible parking provision, parking allocation arrangement, or dedicated parking area is disclosed in the supplied evidence. The approval specifies layout roads of 18 mts and above, but the supplied extract does not detail vehicle entrances, turning arrangements, driveway design or pedestrian separation.
6. Amenities, recreation & open spaces
The layout approval identifies park/open space and planned infrastructure; the RERA amenity record marks several items as available. The status shown below is the filed record and has not been independently verified in the supplied evidence.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 7.50%; Ac. 0.727; 3518.68 Sq. Yds | RERA amenities | Approval designates the area; RERA amenity record marks Green Strip/TOT LOT/Park 100%. Independent completion status not established. |
| Social infrastructure area | 2.50%; Ac. 0.243; 1176.12 Sq. Yds | Designated in approval; delivered facility or building is not established. | |
| Community buildings | No size or facility detail supplied | RERA amenities | RERA amenity record shows 0%. |
| Avenue plantation | No quantity or area supplied | Listed in layout approval; progress not separately established. | |
| Park development | No further specification supplied | Listed in layout approval; RERA park status is as above. |
7. Utilities, building services & safety
The layout approval lists the following proposed or required site infrastructure. The RERA amenity statuses are filed declarations and do not establish independent inspection or statutory clearance.
| Evidence in the project record | Internal water-supply pipelines and overhead tank in the layout approval; “Water Supply” marked 100% in the RERA amenity record. RERA amenities |
|---|---|
| Declared progress / limitation | No source, storage capacity, treatment system or independent completion verification supplied. |
| Evidence in the project record | Underground drainage lines and common septic tank / STP are listed in the approval; sewerage is marked 100% in the RERA amenity record. Storm-water drains are also listed and marked 100%. RERA amenities |
|---|---|
| Declared progress / limitation | No capacity, reuse scheme, discharge details or independent verification supplied. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the approval; water conservation/rainwater harvesting is marked 100% in the RERA amenity record. RERA amenities |
|---|---|
| Declared progress / limitation | No number, capacity or independent verification supplied. |
| Evidence in the project record | Transformer is listed in the approval; electrical meter room/sub-station/receiving station is marked 100% in the RERA amenity record. RERA amenities |
|---|---|
| Declared progress / limitation | No capacity, backup-power provision or independent completion evidence supplied. |
| Evidence in the project record | Marked 100% in the RERA amenity record. RERA amenities |
|---|---|
| Declared progress / limitation | No independent verification supplied. |
| Evidence in the project record | The RERA amenity record shows solid-waste management and disposal at 0%. RERA amenities |
|---|---|
| Declared progress / limitation | No further system details supplied. |
| Evidence in the project record | The RERA amenity record shows fire protection and fire-safety requirements at 0%. RERA amenities |
|---|---|
| Declared progress / limitation | No project-specific fire-system description or clearance supplied. |
| Evidence in the project record | Approval specifies roads of 18 mts and above. |
|---|---|
| Declared progress / limitation | No accessibility features, ramps or pedestrian-circulation details supplied. |
8. Location, access & connectivity
The registered location is Dharmaram locality, Bardipur Revenue Village, Dichpally Mandal, Nizamabad District, Telangana, PIN 503230. The layout approval describes the site as Dharmaram (B), Dichpally Mandal. RERA record
The RERA land record states roads on the north and south boundaries, with other land to the east and west. The supplied location data gives an approximate sampled distance of 116.8 km to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport details, approach-road names or local landmark information are supplied. Land records Location record
9. Developer & development status
The registered promoter is M/s SRI SAI KARTHIKEYA GROUPS & OTHERS, recorded as an “Others” organization and described in the RERA fields as “JOINT DEVELOPERS.” The corporate record supplies GSTIN 36ADOFS1148Q1ZB; no more specific legal-entity type is established in the supplied data. The registered office/address field is 1-11/6, Dharmaram, Dharmaram, Dharmaram, DICHPALLY, Nizamabad, 503230. Corporate record RERA filing RERA filing
The promoter’s authorized representative, SURA RAMU, signed the Form-B declaration dated 01/08/2023, which undertakes completion by 14th September 2023. The supplied evidence does not include independently verified construction progress or a current plot inventory.
10. Approvals, official records & documents
| Reference / scope | P03100007214, project SRI SAI KARTHIKEYA GROUPS - 2 |
|---|---|
| Evidence note | Form C records the registered project, promoter, location and survey numbers. The certificate states commencement 07/11/2023 and expiry 14/09/2023. |
| Reference / scope | Draft - TLP No. 27/2019/NUDA; DTCP file DTCP-HT1/0TH/114/2019-HYD Sec-DTCP; proceedings Lr.Roc.No. 3840/2019/H; dated 14/09/2019 |
|---|---|
| Evidence note | DTCP approval communication describes 101 plots and conditions for development, mortgage and transfer of reserved areas. |
| Reference / scope | TLP NO. 27/2019/NUDA; ROC No. 3840/2019/H; renewal notation 8550, dated 14-09-2023 |
|---|---|
| Evidence note | Supplied extract does not set out the extent, detailed layout conditions or effect of the notation. |
| Reference / scope | Dated 01/08/2023 |
|---|---|
| Evidence note | Promoter declaration concerning title, encumbrances, project obligations and completion undertaking. |
| Reference / scope | RERA document listed as layout plan |
|---|---|
| Evidence note | The listed layout-plan file is not extracted; three drawing scans remain pending measurement. Document index Floor plans |
| Reference / scope | Not identified in supplied project documents |
|---|---|
| Evidence note | No project-specific certificate is included in the evidence provided. Document index |
1. Project at a glance
Project identity
Registered project name: SRI SAI KARTHIKEYA GROUPS - 2
Project type: Plotted development / layout
Phase or registered portion: Registered as this named project; no separate phase description is disclosed
TG-RERA registration: P03100007214
Registration validity: The Form C states commencement 07/11/2023 and expiry 14/09/2023, and describes the period as “0 years”; it records no extension. These are the certificate’s stated dates, not a verified current-validity determination.
Registered promoter: M/s SRI SAI KARTHIKEYA GROUPS & OTHERS; entity type is recorded as “Others” / “JOINT DEVELOPERS.”
RERA status: The project evidence labels it New Project and includes a Form C registration certificate.
Land and geographic identity
Locality / revenue village: Dharmaram / Bardipur Revenue Village; the layout approval describes the site as Dharmaram (B), Bardipur Shivar.
Mandal / district / PIN: Dichpally / Nizamabad / 503230
Project survey numbers as registered: 711, 713, 714, 715, 716, 720, 722, 723, 724, 725, 730 & 738
Subdivisions identified in cadastral records: 713/B/2/2 and 738/6/2 are among the retrieved cadastral survey records; the project filing lists the parent survey numbers without specifying project-held subdivisions.
Registered site extent: 39201.89 sq. m; the RERA land record lists this as both total and net area, with affected area 0.
Boundaries: North: Road; South: Road; East: Others Land; West: Others Land.
Layout approval’s stated area: Ac. 9-27.5 Gts; the approval document also prints Ac 9.687; 46885.08 Sq. Yds as layout area.
Development identity
Sanctioning authority: Director of Town and Country Planning; the layout approval was communicated with reference to Nizamabad Urban Development Authority (NUDA).
Principal layout reference: Draft - TLP No. 27/2019/NUDA; file reference DTCP-HT1/0TH/114/2019-HYD Sec-DTCP; proceedings Lr.Roc.No. 3840/2019/H; approval date recorded as 14/09/2019.
Approved development form: Layout for 101 plots.
Approved built-up area: Not disclosed in the supplied layout evidence. The RERA fields list 25,576.53 sq. m as “Approved Built up Area,” but the evidence does not establish a building program or explain how that figure applies to this plotted layout.
Buildings / floors / parking levels: No towers or apartment-floor configuration is evidenced. This is a plotted layout; building count, floor configuration and parking levels are not disclosed.
Layout land-use figures in approval: Plotted area: Ac. 6.3201; 30589.28 Sq. Yds; roads: Ac. 2.30; 11132.00 Sq. Yds; open-space park: Ac. 0.727; 3518.68 Sq. Yds; social infrastructure: Ac. 0.243; 1176.12 Sq. Yds; utility: Ac. 0.0969; 468.996 Sq. Yds.
Offering and status
Offering: 101 plots are stated in the layout approval. Plot size range, plot-wise inventory and individual plot dimensions are not supplied here.
Booked / available: The promoter’s RERA replies state that 87 plots had been sold and GPAs executed; the underlying plot schedule and current inventory are not included in the supplied extracts. This is a promoter submission, not an independent inventory verification.
Construction / development stage: No independently verified site-progress evidence is supplied. The RERA amenity record marks several layout infrastructure items as available at 100%; that is a filed status, not an independent site inspection.
Completion undertaking: Form B records the promoter’s undertaking to complete by 14th September 2023.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. The project is a plotted layout; the supplied record does not establish final layout release or completion certification.
2. The project story
This is a RERA-registered plotted development in Bardipur Revenue Village, described in the approval record as Dharmaram (B), Dichpally Mandal, Nizamabad District. Its registered land description covers survey numbers 711, 713, 714, 715, 716, 720, 722, 723, 724, 725, 730 and 738, with a RERA-filed site extent of 39,201.89 sq. m.
The layout approval describes 101 plots, internal roads and designated park, social-infrastructure and utility areas. It also identifies land to be mortgaged to NUDA and land for NUDA master-plan facilities; the approval states that plots other than the mortgaged plots may be sold. These are approval-record descriptions and conditions, not evidence that the reserved land has been handed over or that all works are complete.
The promoter undertook in Form B to complete the project by 14 September 2023. The supplied record does not establish current physical progress through an independent inspection, and the RERA-filed amenity status should not be read as independently verified completion. The supplied documents do not identify an occupancy or completion certificate.
3. Master plan, architecture & building design
The development is evidenced as a plotted layout rather than a multi-storey building project. The DTCP/NUDA approval describes 101 plots on the stated survey numbers and an approval layout area of Ac 9.687; 46885.08 Sq. Yds. The project’s RERA land record separately states a total/net site area of 39201.89 sq. m.
The approval’s stated land-use components are:
Plotted area: 65.24%; Ac. 6.3201; 30589.28 Sq. Yds
Road area: 23.75%; Ac. 2.30; 11132.00 Sq. Yds
Open space (park): 7.50%; Ac. 0.727; 3518.68 Sq. Yds
Social infrastructure: 2.50%; Ac. 0.243; 1176.12 Sq. Yds
Utility: 1.00%; Ac. 0.0969; 468.996 Sq. Yds
Mortgage area, Plot Nos. 96–100: 15.33%; Ac. 0.969; 4689.95 Sq. Yds
NUDA master-plan facilities, Plot Nos. 5–11: 5.11%; Ac 0.323; 1563.32 Sq. Yds
The approval specifies roads of 18 mts and above. It lists storm-water drains, underground drainage lines, a common septic tank / STP, internal water-supply pipelines, an overhead tank, transformer, avenue plantation, park development and rainwater-harvesting pits as layout development works or facilities. The supplied evidence does not include readable plot-by-plot drawings or sufficient drawing data to describe plot dimensions, internal road geometry or the final layout arrangement.
4. Homes, configurations & floor plans
The RERA evidence describes a plotted offering of 101 plots, not apartment configurations. Plot-size bands, individual plot areas, booked and available plot counts, and plot-wise saleable areas are not provided in the supplied structured data. The promoter’s replies state that 87 plots had been sold and GPAs executed, but the underlying schedule is not supplied, so this is not a current verified inventory.
The three drawing records are scans pending measurement; no software-measured floor-plan or plot measurements are available.
5. Parking & vehicle circulation
No plot-wise or project-wide parking count, visitor or accessible parking provision, parking allocation arrangement, or dedicated parking area is disclosed in the supplied evidence. The approval specifies layout roads of 18 mts and above, but the supplied extract does not detail vehicle entrances, turning arrangements, driveway design or pedestrian separation.
6. Amenities, recreation & open spaces
The layout approval identifies park/open space and planned infrastructure; the RERA amenity record marks several items as available. The status shown below is the filed record and has not been independently verified in the supplied evidence.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 7.50%; Ac. 0.727; 3518.68 Sq. Yds | Approval designates the area; RERA amenity record marks Green Strip/TOT LOT/Park 100%. Independent completion status not established. | |
| Social infrastructure area | 2.50%; Ac. 0.243; 1176.12 Sq. Yds | Designated in approval; delivered facility or building is not established. | |
| Community buildings | No size or facility detail supplied | RERA amenity record shows 0%. | |
| Avenue plantation | No quantity or area supplied | Listed in layout approval; progress not separately established. | |
| Park development | No further specification supplied | Listed in layout approval; RERA park status is as above. |
7. Utilities, building services & safety
The layout approval lists the following proposed or required site infrastructure. The RERA amenity statuses are filed declarations and do not establish independent inspection or statutory clearance.
| Evidence in the project record | Internal water-supply pipelines and overhead tank in the layout approval; “Water Supply” marked 100% in the RERA amenity record. |
|---|---|
| Declared progress / limitation | No source, storage capacity, treatment system or independent completion verification supplied. |
| Evidence in the project record | Underground drainage lines and common septic tank / STP are listed in the approval; sewerage is marked 100% in the RERA amenity record. Storm-water drains are also listed and marked 100%. |
|---|---|
| Declared progress / limitation | No capacity, reuse scheme, discharge details or independent verification supplied. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the approval; water conservation/rainwater harvesting is marked 100% in the RERA amenity record. |
|---|---|
| Declared progress / limitation | No number, capacity or independent verification supplied. |
| Evidence in the project record | Transformer is listed in the approval; electrical meter room/sub-station/receiving station is marked 100% in the RERA amenity record. |
|---|---|
| Declared progress / limitation | No capacity, backup-power provision or independent completion evidence supplied. |
| Evidence in the project record | Marked 100% in the RERA amenity record. |
|---|---|
| Declared progress / limitation | No independent verification supplied. |
| Evidence in the project record | The RERA amenity record shows solid-waste management and disposal at 0%. |
|---|---|
| Declared progress / limitation | No further system details supplied. |
| Evidence in the project record | The RERA amenity record shows fire protection and fire-safety requirements at 0%. |
|---|---|
| Declared progress / limitation | No project-specific fire-system description or clearance supplied. |
| Evidence in the project record | Approval specifies roads of 18 mts and above. |
|---|---|
| Declared progress / limitation | No accessibility features, ramps or pedestrian-circulation details supplied. |
8. Location, access & connectivity
The registered location is Dharmaram locality, Bardipur Revenue Village, Dichpally Mandal, Nizamabad District, Telangana, PIN 503230. The layout approval describes the site as Dharmaram (B), Dichpally Mandal.
The RERA land record states roads on the north and south boundaries, with other land to the east and west. The supplied location data gives an approximate sampled distance of 116.8 km to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport details, approach-road names or local landmark information are supplied.
9. Developer & development status
The registered promoter is M/s SRI SAI KARTHIKEYA GROUPS & OTHERS, recorded as an “Others” organization and described in the RERA fields as “JOINT DEVELOPERS.” The corporate record supplies GSTIN 36ADOFS1148Q1ZB; no more specific legal-entity type is established in the supplied data. The registered office/address field is 1-11/6, Dharmaram, Dharmaram, Dharmaram, DICHPALLY, Nizamabad, 503230.
The promoter’s authorized representative, SURA RAMU, signed the Form-B declaration dated 01/08/2023, which undertakes completion by 14th September 2023. The supplied evidence does not include independently verified construction progress or a current plot inventory.
10. Approvals, official records & documents
| Reference / scope | P03100007214, project SRI SAI KARTHIKEYA GROUPS - 2 |
|---|---|
| Evidence note | Form C records the registered project, promoter, location and survey numbers. The certificate states commencement 07/11/2023 and expiry 14/09/2023. |
| Reference / scope | Draft - TLP No. 27/2019/NUDA; DTCP file DTCP-HT1/0TH/114/2019-HYD Sec-DTCP; proceedings Lr.Roc.No. 3840/2019/H; dated 14/09/2019 |
|---|---|
| Evidence note | DTCP approval communication describes 101 plots and conditions for development, mortgage and transfer of reserved areas. |
| Reference / scope | TLP NO. 27/2019/NUDA; ROC No. 3840/2019/H; renewal notation 8550, dated 14-09-2023 |
|---|---|
| Evidence note | Supplied extract does not set out the extent, detailed layout conditions or effect of the notation. |
| Reference / scope | Dated 01/08/2023 |
|---|---|
| Evidence note | Promoter declaration concerning title, encumbrances, project obligations and completion undertaking. |
| Reference / scope | RERA document listed as layout plan |
|---|---|
| Evidence note | The listed layout-plan file is not extracted; three drawing scans remain pending measurement. |
| Reference / scope | Not identified in supplied project documents |
|---|---|
| Evidence note | No project-specific certificate is included in the evidence provided. |
Frequently asked questions
Is SRI SAI KARTHIKEYA GROUPS - 2 registered with Telangana RERA?
Yes. SRI SAI KARTHIKEYA GROUPS - 2 is registered with the Telangana Real Estate Regulatory Authority as P03100007214; the registration status is New Project.
Who is the developer of SRI SAI KARTHIKEYA GROUPS - 2?
The promoter named in the RERA registration is M/s SRI SAI KARTHIKEYA GROUPS & OTHERS.
Where is SRI SAI KARTHIKEYA GROUPS - 2 located?
SRI SAI KARTHIKEYA GROUPS - 2 is in Dharmaram, Bardipur, DICHPALLY, Nizamabad, Telangana (503230).
When will SRI SAI KARTHIKEYA GROUPS - 2 be completed?
The promoter's proposed date of completion filed with RERA is 14/09/2023. This is the promoter's declaration, not a guarantee.