SMR BARCELONA is a residential plotted development in Raipally, Athmakur (M), Yadadri Bhuvanagiri. The registered promoter is KOTHAPALLI VIDYA SAGAR SIMON. The RERA record states a total land area of 7729.49 sqmts, and the layout approval states 23 plots; the project is a plotted development, with no building or floor configuration stated. Its TG-RERA registration number is P02000008279, and its proposed completion date is 21/08/2025.

01What we found

Period endedTG-RERA registration ran to 21 Aug 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSMR BARCELONA RERA record
Project typePlotted development / residential plotted layout RERA record RERA filing
Phase or registered portionNot identified as a numbered phase. The registered land is stated as Survey Nos. 125/P and 126/P; the layout document refers to 126/P Part and 125 & 126 PARTS. RERA record
TG-RERA registration numberP02000008279 RERA record Approvals record
Registration validity24 May 2024 to 21 August 2025; the certificate says it may be extended by the Authority under the Act and rules. This is the registration period, distinct from the project completion date. RERA record Approvals record
Registered promoterKOTHAPALLI VIDYA SAGAR SIMON (also rendered in the registration certificate as Kothapalli Vidya Sagar Simon). Corporate record
RERA status in supplied recordThe registration certificate records the project as registered. No extension or current registration-status order is supplied here. Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageRaipally; the layout document also uses Raipally G.P and Raipalle. RERA record RERA filing
MandalAthmakur (M) / Athmakur Mandal RERA record RERA filing
DistrictYadadri Bhuvanagiri; the layout document renders this as Yadadri-Bhuvanagiri District. RERA record RERA filing
PIN508111 RERA record RERA filing
Survey numbers as recorded125/P and 126/P RERA record Approvals record
Survey references in layout approval125/P; 126/P Part; 125 & 126 PARTS
Registered land areaRERA record: Total Area 7729.49 sqmts, Area affected in Road widening/FTL of Tanks/Nala Widening 2553.56 sqmts, and Net Area 5175.93 sqmts. RERA filing
Layout area stated in approval documentAc. 1.91 Cents; 9244.40 Sq. Yds.
Boundaries in RERA recordEast: CART WAY; West: OTHERS LAND; North: OTHERS LAND; South: ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityDistrict Town & Country Planning Officer (DTCP); the document says the draft technical layout pattern was delegated to Raipally G.P. Approvals record
Principal approvalDTLP No. 23/2023/DTCPO/YDRB, approved 21-08-2023. The file number shown is Lr.Roc.No.14731/2158/2023/DTCPO/YDRB. Approvals record
Approval-document descriptionThe supplied approval extraction describes a Draft Technical Layout Pattern for a residential plotted layout, with a requirement for later release of a final layout.
Approved built-up area in RERA record5175.93 sqmts is recorded as “Approved Built up Area”; no building-specific breakdown is supplied. RERA filing
Plot count in layout document23 plots
Building/tower count and floor configurationNot applicable to the described plotted layout; no buildings, floors or parking levels are documented in the supplied project record.
Mortgage area recordedRERA form: 760.80 sqmts. The layout approval describes mortgage plots 01 to 04, extent Ac. 0.188 cents; 909.92 Sq. Yards. RERA filing

Offering and status

ItemProject record
Unit typeResidential plots RERA filing
RERA-filed plot count / sizesThe approval extraction states 23 plots. Plot-size schedule or plot-wise dimensions are not supplied in the RERA materials provided here.
Booked / available countsNot disclosed in the supplied material.
Construction stageNo independently verified site-progress report or project construction-stage evidence is supplied. The approval document permits development works subject to its conditions; it does not establish that those works are complete.
Completion datePromoter’s Form B declaration gives a completion undertaking, but the extracted date is OCR-garbled; the RERA header records the proposed completion date as 21/08/2025. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the record provided does not identify any phase or building-specific OC scope. Document index

2. The project story

SMR BARCELONA is registered as a residential plotted development in Raipally, Athmakur (M), Yadadri Bhuvanagiri district. Its registered land identity is Survey Nos. 125/P and 126/P; the layout approval further refers to 126/P Part and 125 & 126 PARTS. RERA record

The filed layout material describes a 23-plot arrangement and identifies land for plotted area, roads, open space and a mortgage to the Gram Panchayat. It is a draft layout approval with stated conditions, including subsequent release of a final layout; the supplied record does not establish final-layout release or completed development. No reliable site-progress evidence is available here, so neither completion nor delivery of the layout infrastructure can be confirmed independently. RERA amenities Document index

3. Master plan, architecture & building design

The project is described in the supplied approval as a draft technical layout pattern for residential plots, rather than a building scheme. The approval extraction gives a total layout area of Ac. 1.91 Cents; 9244.40 Sq. Yds., divided as follows: plotted area Ac. 1.088 Cents; 5265.92 Sq. Yds. (56.97%), road area Ac. 0.631 Cents; 3054.04 Sq. Yds. (33.03%), and open space Ac. 0.191 Cents; 924.44 Sq. Yds. (10.00%). It separately records mortgage area Ac. 0.188 Cents; 909.92 Sq. Yds. (17.27%), comprising Plot Nos. 01 to 04.

The RERA filing records 7729.49 sqmts total land area, 2553.56 sqmts affected in road widening/FTL of tanks/nala widening, and 5175.93 sqmts net area; it also records 5175.93 sqmts as “Approved Built up Area.” These are reproduced as filed labels and are not treated here as building floor area. RERA filing RERA filing

The floor-plan materials contain two drawings, both awaiting measurement; there are no measured floor plans or building layouts available for analysis. Floor plans No building footprint, floor configuration, internal plot schedule, or final-layout drawing is available in the supplied evidence. Document index

4. Homes, configurations & floor plans

The registered offering is plots, not apartments. The supplied layout approval states 23 plots, but no plot-wise schedule, dimensions, booked/available inventory, or RERA-filed saleable-area table is provided. The following size range appears only in third-party vendor material and is not a TG-RERA-filed plot-size schedule: 1800 - 2375 sq.ft. Promoter website

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plot23 plots stated in layout approvalNot disclosedNot disclosedNot disclosed plot-wiseNot applicableNot supplied

Carpet-area measurements are not applicable to plots. The supplied floor-plan drawings have not been software-measured. Floor plans

5. Parking & vehicle circulation

No parking-space count, parking allocation, visitor or accessible parking provision, or parking layout is supplied. The layout approval does state that roads are to be opened for access to neighbouring sites and that a compound wall or fencing is not to be constructed around the site; it does not provide a road-width schedule or detailed vehicle-circulation plan.

6. Amenities, recreation & open spaces

The layout approval lists street lighting, electricity facilities, a sewerage-disposal system, protected water supply and rainwater-harvesting pits at 4 per Acre as development works. These are approval-document requirements/provisions, not evidence that the facilities have been completed or independently verified. The RERA amenity record shows 0% progress for each listed item. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open spaceAc. 0.191 Cents; 924.44 Sq. Yds. (10.00%); approval says it is to be handed over to the Gram Panchayat by registered gift deed before release of the final layout.Approval-document provision; handover/completion not established.
Internal roadsAc. 0.631 Cents; 3054.04 Sq. Yds. (33.03%); approval says roads are to be opened for access to neighbouring sites.Approval-document provision; completion not established. RERA amenity progress: 0%. RERA amenities
Street lightingListed as a layout development provision.RERA amenity progress: 0%. RERA amenities
Electricity facilitiesListed as a layout development provision.RERA amenity progress: 0%. RERA amenities
Protected water supplyListed as a layout development provision.RERA amenity progress: 0%. RERA amenities
Sewerage-disposal systemListed as a layout development provision.RERA amenity progress: 0%. RERA amenities
Rainwater-harvesting pits4 per Acre stated in the approval.RERA amenity progress: 0%. RERA amenities

Third-party vendor material advertises a landscaped garden, security cabin, security personnel, 24-hour water supply and a sewage treatment plant, among other amenities. These are vendor claims, not established sanctioned or delivered facilities in the supplied RERA record. Promoter website

7. Utilities, building services & safety

The layout approval lists protected water supply, a sewerage-disposal system, rainwater-harvesting pits (4 per Acre), street lighting and electricity facilities as development works. The supplied documents do not provide water-source or storage capacity, treatment specifications, drainage/storm-water design, electrical-load or substation details, backup capacity, security arrangements, accessibility provisions, or fire-safety design. The RERA amenity progress record reports 0% for water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/substation/receiving station. RERA amenities

8. Location, access & connectivity

The registered project location is Raipally, Athmakur (M), Yadadri Bhuvanagiri, Telangana 508111. The RERA filing identifies the project as lying in Survey Nos. 125/P and 126/P. RERA record

The location record provides an approximate distance of 45.9 km to the nearest sampled Outer Ring Road interchange. This is a sampled-distance record, not a travel-time estimate. Location record The supplied project evidence does not identify other approach roads, public-transport services or measured distances to local landmarks.

9. Developer & development status

The registered promoter is KOTHAPALLI VIDYA SAGAR SIMON. The supplied record does not establish the promoter’s entity type, corporate registration number, registered office, official contact details or official website. The promoter’s address in the RERA record is RAIPALLY, RAIPALLY, Athmakur (M), Yadadri Bhuvanagiri, 508111. Corporate record Parties record The registration certificate identifies the promoter as Kothapalli Vidya Sagar Simon and gives an address referencing SY NO 125/4/1.

The promoter’s Form B declares a completion undertaking, but the extracted date is unreadable; the RERA header states a proposed completion date of 21/08/2025. No verified construction-progress evidence or completion/occupancy certificate is supplied. RERA record The registration certificate requires quarterly updates, but no quarterly update records are included in this overview’s evidence.

10. Approvals, official records & documents

RecordWhat the supplied material establishes
TG-RERA registration certificateForm C certificate for SMR BARCELONA, registration P02000008279, with validity 24/05/2024–21/08/2025 and promoter obligations.
DTCP layout approvalDTLP No. 23/2023/DTCPO/YDRB, dated 21-08-2023; the supplied extraction describes a draft technical layout pattern for 23 plots, subject to conditions and later release of a final layout.
Approval identifiers also shownLr.Roc.No.14731/2158/2023/DTCPO/YDRB; E-Panchayat Unique ID 14731/2158; E.P. references 15577 / 2168 / 2023 / DTCPO / YDRB and 15577 / 2158 / 2023 / DTCPO / YDRB; layout reference 15577 / 2168 of the E-Panchayat and 15577 / 2158.
Village-map extractDocument described as an EXTRACT OF VILLAGE MAP, carrying approval reference T.L.P. No: 23/2023/DTCPO/YDRB.
Promoter declarationForm B affidavit-cum-declaration dated 23-05-2024, naming KOTHAPALLI VIDYA SAGAR SIMON and containing declarations on title, encumbrances, funds, approvals and completion.
Other approval-labelled documentA second commencement-certificate-labelled document has OCR too garbled to establish its heading, approval details, parties or land particulars.
Layout lookup / master-plan recordsThe supplied HMDA layout-status record is unavailable through the public lookup described in the evidence; no HMDA-approved-layout determination is established here. HMDA

The approval extraction states that layout permission is not proof of land title and describes requirements concerning mortgage, development works, roads, open-space handover and release of the final layout.

Frequently asked questions

Is SMR BARCELONA registered with Telangana RERA?

Yes. SMR BARCELONA is registered with the Telangana Real Estate Regulatory Authority as P02000008279; the registration status is New Project.

Who is the developer of SMR BARCELONA?

The promoter named in the RERA registration is KOTHAPALLI.

Where is SMR BARCELONA located?

SMR BARCELONA is in RAIPALLY, Athmakur (M), Yadadri Bhuvanagiri, Telangana (508111).

When will SMR BARCELONA be completed?

The promoter's proposed date of completion filed with RERA is 21/08/2025. This is the promoter's declaration, not a guarantee.