Siri Nivas Residency
SRI SAI CONSTRUCTIONS AND DEVELOPERS · Yadadri Bhuvanagiri · RERA P02000008033
SIRI NIVAS RESIDENCY is a residential apartment project in RAM NAGAR, Bhongir mandal, Yadadri Bhuvanagiri district. It is being developed by the registered promoter SRI SAI CONSTRUCTIONS AND DEVELOPERS on a registered site extent of 628.67 sq. m, with one residential building, Building A, comprising 1 stilt floor plus 5 upper floors. The RERA unit record lists 15 homes: 10 2BHK units of 101.27 m² each and 5 3BHK units of 143.35 m² each. The project is registered under TG-RERA P02000008033, and the promoter’s declared completion date is 19/12/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SIRI NIVAS RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No phase number is disclosed. The record covers one residential building, Building A. |
| TG-RERA registration | P02000008033 RERA record |
| Registration validity | 8 April 2024 to 19 December 2026, subject to any extension by the Authority RERA record |
| Registered promoter | SRI SAI CONSTRUCTIONS AND DEVELOPERS RERA record Corporate record |
| RERA status | Registered; the supplied record labels the project “New Project.” RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | RAM NAGAR; the filed registration certificate identifies Bhongir. RERA record RERA filing |
| Revenue village | Bhongir is named in the registration certificate and commencement certificate. The building-plan extraction describes the site as “Near Ram Nagar, Bhongir Town.” The supplied records do not provide a separately verified revenue-village identifier beyond these descriptions. |
| Mandal / district / PIN | Bhongir / Yadadri Bhuvanagiri / 508116 RERA record |
| Survey number(s) and plot numbers | Survey No. 240; Plot Nos. 38, 38/1, 39, 39/1, 40 and 40/1 RERA filing |
| Registered site extent | 628.67 sq. m; total area and net area are each recorded as 628.67 sq. m. RERA filing |
| Road-affected area | 0 sq. m in the project land record. RERA filing |
| Boundary descriptions | East: neighbours’ land in Sy. No. 241; West: 30 wide road; North: Plot No. 41; South: Plot No. 37 RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Bhongir Municipality/Municipal Corporation Approvals record |
| Principal building approval | 0006/BP/3043/2023, approved 19 December 2023 Approvals record |
| File number | 012595/BP/DTCP/3043/0007/2023 Approvals record |
| Building arrangement | One residential building, Building A, on the recorded site |
| Sanctioned floors | 1 stilt floor plus 5 upper floors; the plan extraction also records 6 floors. |
| Heights | The commencement-certificate extraction records height 15 m and identifies the residential upper-floor area; the plan extraction separately records total height 21.20 mt and 15.00 mt excluding the stilt floor. |
| Approved built-up area | 1,556.45 m² excluding parking; 1,867.75 m² including parking; parking area 311.30 m² in the building-plan extraction. |
| Units | 15 units in the RERA unit record: 10 2BHK and 5 3BHK. The supplied approval extraction does not give a matching unit total. RERA unit table RERA unit details |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations and saleable areas | 2BHK: 10 units, 101.27 m² each; 3BHK: 5 units, 143.35 m² each RERA unit table RERA unit details |
| Booked / available | The portal data shows 0 booked and 10 available 2BHK units, and 0 booked and 5 available 3BHK units. The record has no as-of date, so these figures are indicative. RERA unit table RERA unit details |
| Construction stage | No project-specific construction progress percentage or independently verified site-stage report is supplied. The available RERA amenity-progress entries show 0% for listed items. RERA amenities |
| Promoter-declared completion date | 19/12/2026 in Form B |
| Registration expiry | 19 December 2026, as recorded on the registration certificate; this is the registration validity date, not evidence of completion. |
| Occupancy / completion certificate | The supplied commencement certificate records completion certification as false; no occupancy or completion certificate is supplied. The approval requires an occupancy certificate before occupation. |
The project story
SIRI NIVAS RESIDENCY is registered as a residential apartment development on a 628.67 m² site in Survey No. 240, at RAM NAGAR, Bhongir, Yadadri Bhuvanagiri. The plan and commencement records describe one building, Building A, with a stilt and five upper floors. RERA record RERA filing
The RERA unit record lists 15 homes: ten 2BHK and five 3BHK. It shows none booked and all 15 available in the portal data supplied; that record has no capture date, so the inventory should be checked again before a purchase decision. The project’s registration remains valid through 19 December 2026, while the promoter’s Form B separately undertakes completion by that date. Neither date establishes that construction is complete. RERA unit table RERA unit details
The supplied material does not establish the current physical construction stage through an independent site inspection or progress certificate. The commencement certificate says completion certification is false, and no occupancy certificate is included.
Master plan, architecture & building design
The filed building-plan extraction describes a single residential RCC building on Plot Nos. 38, 38/1, 39, 39/1, 40 and 40/1 in Survey No. 240. It records a site and net plot area of 628.67 m², proposed built-up area of 1,556.45 m² excluding parking, total built-up area of 1,867.75 m² including parking, and parking area of 311.30 m². These are plan-record figures; no FSI-counted area is separately identified in the supplied material.
The commencement certificate identifies Building A as one stilt plus five upper floors, with 1,556.45 m² of residential upper-floor area and one stilt parking level recorded as 297.58 m². Its extracted height field is 15 m; the building-plan extraction separately records total height 21.20 mt and 15.00 mt excluding the stilt floor. The source records do not explain the different height measures, so they are retained as stated rather than reconciled here.
The plan extraction lists a lift, rainwater harvesting, septic tank and visitor parking. It does not supply a detailed floor-by-floor schedule of homes, number of flats per floor, stair or lift specifications, building footprint, internal circulation plan, or measured landscaped/open-space area. The plan also records a 155.64 (10%) second-floor portion as mortgaged/reserved.
Homes, configurations & floor plans
The table separates the RERA-filed saleable areas from software measurements taken from the approved floor-plan drawing. The drawing measurements are not RERA disclosures, are flagged for review, and should be checked against the drawing and the unit documents. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 101.27 m² | Software-measured range: 56.4–63.5 m²; median 60.8 m² | 40% |
| 3BHK | 5 | 0 | 5 | 143.35 m² | Software-measured range: 88.9–89.1 m²; median 89.0 m² | 38% |
The drawing measurement for the sampled 2BHK shows a living room, kitchen, two bedrooms, puja space, attached toilets and utility spaces. The sampled 3BHK drawing shows a living room, kitchen, guest room, two bedrooms, puja space, attached toilets, balcony and utility. These are drawing-based room labels and measurements, not a guarantee of the final unit’s finish or dimensions. RERA unit details Floor plans
Carpet area refers to usable area within a home as defined under the Act; the software measurements are estimates from drawing geometry. RERA saleable area is a separate filed area and can include the home’s proportionate share of common areas. The supplied record says the filed area may not be carpet area. No separate RERA-filed carpet-area figures or unit-specific common-area allocation are provided. RERA unit details Floor plans
Parking & vehicle circulation
The building-plan extraction records 311.30 m² of parking area, while the commencement-certificate extraction records a stilt parking level of 297.58 m². The plan also lists visitor parking, but neither record supplies a car- or two-wheeler-space count, visitor-space count, accessible-space provision, or unit-wise parking allocation.
The commencement conditions state that approved cellar and stilt areas for parking must be used exclusively for vehicle parking and not partitioned or fitted with rolling shutters. The supplied extracts do not establish a cellar level, the design of ramps or driveways, pedestrian separation, or the allocation of any parking bay to a particular apartment. The plan conditions refer to EV charging infrastructure, but no project-specific installation or completion evidence is supplied.
Amenities, recreation & open spaces
The table distinguishes plan-listed provisions from RERA progress entries. The supplied amenity progress is 0% for the listed items; it does not establish that any facility is complete. RERA amenities
| Description / size | Listed as available in the RERA amenity record; no size supplied. |
|---|---|
| Evidence source | RERA amenities; building-permit conditions |
| Declared progress / verified status | 0% recorded; not independently verified complete. |
| Description / size | Listed in the RERA amenity record; no facility or size details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; not independently verified complete. |
| Description / size | Listed in the RERA amenity record; no area supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; not independently verified complete. |
The plan conditions require tree planting along the site periphery and in front of the premises and require the tot lot to be fenced and maintained as greenery before an occupancy certificate is issued. No independent evidence of delivery or maintenance is supplied.
Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, rainwater harvesting, fire protection and safety, and an electrical meter room/sub-station/receiving station as “YES”; it records 0% progress for the listed amenities. These are filed status entries, not independent verification of completed or operational services. The plan extraction lists a septic tank, and the commencement certificate requires a rainwater-harvesting structure, transformer space and an on-site garbage house. RERA amenities
The commencement conditions also require sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision, and require an occupancy certificate before occupation. The supplied project records do not specify water source or storage capacity, an STP or sewage-reuse system, drainage capacity, backup power, lift count or capacity, fire-equipment details, CCTV, waste-segregation arrangements, security systems, or accessible routes and facilities.
The building-plan conditions mention EV charging infrastructure and digital-connectivity infrastructure; the extracts do not provide project-specific equipment details or confirm installation.
Location, access & connectivity
The project’s registered location is RAM NAGAR, Bhongir, Yadadri Bhuvanagiri, PIN 508116, on Survey No. 240 and the listed plots 38, 38/1, 39, 39/1, 40 and 40/1. The filed boundary record describes a 30 wide road to the west. The building-plan extraction also identifies a 9.15MT wide main road and a 100'-0" wide road; it does not identify the project’s precise frontage or the route connecting it to either road. RERA record RERA filing
No project-specific public-transport information or nearby landmark distances are supplied in the reviewed location data. Location record
Developer & development status
The registered promoter is SRI SAI CONSTRUCTIONS AND DEVELOPERS, recorded as a partnership, with GSTIN 36AEPFS2295L1Z8. The supplied registered address is B, KISAN NAGAR, RAM NAGAR, Bhongir, Yadadri Bhuvanagiri, 508116. The registration record names Sri Sai Constructions And Developers as promoter; no official website or project contact details are supplied here. RERA record Corporate record Parties record
The project record identifies PADAM AKHIL as a landowner under an AreaShare arrangement. Form B, signed by authorized signatory PADAM SRIRAMULU, states that K. CHAKRAPANI has legal title to the land, declares it free from encumbrances, and undertakes completion by 19/12/2026. These are statements in the promoter’s filed declaration. Parties record
The RERA registration is valid through 19 December 2026; the Form B completion undertaking gives the same date. The commencement record says completion certification is false, and no occupancy certificate is supplied. No independent progress percentage is available in the supplied project evidence.
Approvals, official records & documents
| Identifier / date | P02000008033; valid 8 April 2024–19 December 2026 |
|---|---|
| What the supplied record establishes | Registration of SIRI NIVAS RESIDENCY under the named promoter, with project location and site identifiers. |
| Identifier / date | 0006/BP/3043/2023; 19 December 2023; file no. 012595/BP/DTCP/3043/0007/2023 |
|---|---|
| What the supplied record establishes | Permission for Building A, a stilt plus five upper floors, on the 628.67 m² site; completion certification is recorded as false. |
| Identifier / date | Document 395728 |
|---|---|
| What the supplied record establishes | Plan description and extracted parameters for the proposed RCC building, including floors, areas, listed amenities and conditions. |
| Identifier / date | Document 395728 |
|---|---|
| What the supplied record establishes | The supplied document is labelled as a layout-plan requirement, but the extraction describes a building plan and building permit; a separate stamped approved layout plan is not established by this extract. |
| Identifier / date | 4 February 2024 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project-account obligations and completion undertaking. |
| Identifier / date | Plot Nos. 38, 38/1, 39, 39/1, 40 and 40/1 in Sy. No. 240 |
|---|---|
| What the supplied record establishes | Provisional plot-regularisation records are included for the listed plots. |
The commencement certificate requires commencement notice before construction, completion notice after construction, and an occupancy certificate before occupation. No occupancy or completion certificate for the building is included in the supplied documents.
Project at a glance
Project identity
Registered project name: SIRI NIVAS RESIDENCY
Project type: Residential apartment project
Phase / registered portion: No phase number is disclosed. The record covers one residential building, Building A.
TG-RERA registration: P02000008033
Registration validity: 8 April 2024 to 19 December 2026, subject to any extension by the Authority
Registered promoter: SRI SAI CONSTRUCTIONS AND DEVELOPERS
RERA status: Registered; the supplied record labels the project “New Project.”
Land and geographic identity
Locality: RAM NAGAR; the filed registration certificate identifies Bhongir.
Revenue village: Bhongir is named in the registration certificate and commencement certificate. The building-plan extraction describes the site as “Near Ram Nagar, Bhongir Town.” The supplied records do not provide a separately verified revenue-village identifier beyond these descriptions.
Mandal / district / PIN: Bhongir / Yadadri Bhuvanagiri / 508116
Survey number(s) and plot numbers: Survey No. 240; Plot Nos. 38, 38/1, 39, 39/1, 40 and 40/1
Registered site extent: 628.67 sq. m; total area and net area are each recorded as 628.67 sq. m.
Road-affected area: 0 sq. m in the project land record.
Boundary descriptions: East: neighbours’ land in Sy. No. 241; West: 30 wide road; North: Plot No. 41; South: Plot No. 37
Development identity
Sanctioning authority: Bhongir Municipality/Municipal Corporation
Principal building approval: 0006/BP/3043/2023, approved 19 December 2023
File number: 012595/BP/DTCP/3043/0007/2023
Building arrangement: One residential building, Building A, on the recorded site
Sanctioned floors: 1 stilt floor plus 5 upper floors; the plan extraction also records 6 floors.
Heights: The commencement-certificate extraction records height 15 m and identifies the residential upper-floor area; the plan extraction separately records total height 21.20 mt and 15.00 mt excluding the stilt floor.
Approved built-up area: 1,556.45 m² excluding parking; 1,867.75 m² including parking; parking area 311.30 m² in the building-plan extraction.
Units: 15 units in the RERA unit record: 10 2BHK and 5 3BHK. The supplied approval extraction does not give a matching unit total.
Offering and status
RERA-filed configurations and saleable areas: 2BHK: 10 units, 101.27 m² each; 3BHK: 5 units, 143.35 m² each
Booked / available: The portal data shows 0 booked and 10 available 2BHK units, and 0 booked and 5 available 3BHK units. The record has no as-of date, so these figures are indicative.
Construction stage: No project-specific construction progress percentage or independently verified site-stage report is supplied. The available RERA amenity-progress entries show 0% for listed items.
Promoter-declared completion date: 19/12/2026 in Form B
Registration expiry: 19 December 2026, as recorded on the registration certificate; this is the registration validity date, not evidence of completion.
Occupancy / completion certificate: The supplied commencement certificate records completion certification as false; no occupancy or completion certificate is supplied. The approval requires an occupancy certificate before occupation.
The project story
SIRI NIVAS RESIDENCY is registered as a residential apartment development on a 628.67 m² site in Survey No. 240, at RAM NAGAR, Bhongir, Yadadri Bhuvanagiri. The plan and commencement records describe one building, Building A, with a stilt and five upper floors.
The RERA unit record lists 15 homes: ten 2BHK and five 3BHK. It shows none booked and all 15 available in the portal data supplied; that record has no capture date, so the inventory should be checked again before a purchase decision. The project’s registration remains valid through 19 December 2026, while the promoter’s Form B separately undertakes completion by that date. Neither date establishes that construction is complete.
The supplied material does not establish the current physical construction stage through an independent site inspection or progress certificate. The commencement certificate says completion certification is false, and no occupancy certificate is included.
Master plan, architecture & building design
The filed building-plan extraction describes a single residential RCC building on Plot Nos. 38, 38/1, 39, 39/1, 40 and 40/1 in Survey No. 240. It records a site and net plot area of 628.67 m², proposed built-up area of 1,556.45 m² excluding parking, total built-up area of 1,867.75 m² including parking, and parking area of 311.30 m². These are plan-record figures; no FSI-counted area is separately identified in the supplied material.
The commencement certificate identifies Building A as one stilt plus five upper floors, with 1,556.45 m² of residential upper-floor area and one stilt parking level recorded as 297.58 m². Its extracted height field is 15 m; the building-plan extraction separately records total height 21.20 mt and 15.00 mt excluding the stilt floor. The source records do not explain the different height measures, so they are retained as stated rather than reconciled here.
The plan extraction lists a lift, rainwater harvesting, septic tank and visitor parking. It does not supply a detailed floor-by-floor schedule of homes, number of flats per floor, stair or lift specifications, building footprint, internal circulation plan, or measured landscaped/open-space area. The plan also records a 155.64 (10%) second-floor portion as mortgaged/reserved.
Homes, configurations & floor plans
The table separates the RERA-filed saleable areas from software measurements taken from the approved floor-plan drawing. The drawing measurements are not RERA disclosures, are flagged for review, and should be checked against the drawing and the unit documents.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 101.27 m² | Software-measured range: 56.4–63.5 m²; median 60.8 m² | 40% |
| 3BHK | 5 | 0 | 5 | 143.35 m² | Software-measured range: 88.9–89.1 m²; median 89.0 m² | 38% |
The drawing measurement for the sampled 2BHK shows a living room, kitchen, two bedrooms, puja space, attached toilets and utility spaces. The sampled 3BHK drawing shows a living room, kitchen, guest room, two bedrooms, puja space, attached toilets, balcony and utility. These are drawing-based room labels and measurements, not a guarantee of the final unit’s finish or dimensions.
Carpet area refers to usable area within a home as defined under the Act; the software measurements are estimates from drawing geometry. RERA saleable area is a separate filed area and can include the home’s proportionate share of common areas. The supplied record says the filed area may not be carpet area. No separate RERA-filed carpet-area figures or unit-specific common-area allocation are provided.
Parking & vehicle circulation
The building-plan extraction records 311.30 m² of parking area, while the commencement-certificate extraction records a stilt parking level of 297.58 m². The plan also lists visitor parking, but neither record supplies a car- or two-wheeler-space count, visitor-space count, accessible-space provision, or unit-wise parking allocation.
The commencement conditions state that approved cellar and stilt areas for parking must be used exclusively for vehicle parking and not partitioned or fitted with rolling shutters. The supplied extracts do not establish a cellar level, the design of ramps or driveways, pedestrian separation, or the allocation of any parking bay to a particular apartment. The plan conditions refer to EV charging infrastructure, but no project-specific installation or completion evidence is supplied.
Amenities, recreation & open spaces
The table distinguishes plan-listed provisions from RERA progress entries. The supplied amenity progress is 0% for the listed items; it does not establish that any facility is complete.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Listed as available in the RERA amenity record; no size supplied. | building-permit conditions | 0% recorded; not independently verified complete. |
| Community buildings | Listed in the RERA amenity record; no facility or size details supplied. | 0% recorded; not independently verified complete. | |
| Aggregate recreational open space | Listed in the RERA amenity record; no area supplied. | 0% recorded; not independently verified complete. |
The plan conditions require tree planting along the site periphery and in front of the premises and require the tot lot to be fenced and maintained as greenery before an occupancy certificate is issued. No independent evidence of delivery or maintenance is supplied.
Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, rainwater harvesting, fire protection and safety, and an electrical meter room/sub-station/receiving station as “YES”; it records 0% progress for the listed amenities. These are filed status entries, not independent verification of completed or operational services. The plan extraction lists a septic tank, and the commencement certificate requires a rainwater-harvesting structure, transformer space and an on-site garbage house.
The commencement conditions also require sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision, and require an occupancy certificate before occupation. The supplied project records do not specify water source or storage capacity, an STP or sewage-reuse system, drainage capacity, backup power, lift count or capacity, fire-equipment details, CCTV, waste-segregation arrangements, security systems, or accessible routes and facilities.
The building-plan conditions mention EV charging infrastructure and digital-connectivity infrastructure; the extracts do not provide project-specific equipment details or confirm installation.
Location, access & connectivity
The project’s registered location is RAM NAGAR, Bhongir, Yadadri Bhuvanagiri, PIN 508116, on Survey No. 240 and the listed plots 38, 38/1, 39, 39/1, 40 and 40/1. The filed boundary record describes a 30 wide road to the west. The building-plan extraction also identifies a 9.15MT wide main road and a 100'-0" wide road; it does not identify the project’s precise frontage or the route connecting it to either road.
No project-specific public-transport information or nearby landmark distances are supplied in the reviewed location data.
Developer & development status
The registered promoter is SRI SAI CONSTRUCTIONS AND DEVELOPERS, recorded as a partnership, with GSTIN 36AEPFS2295L1Z8. The supplied registered address is B, KISAN NAGAR, RAM NAGAR, Bhongir, Yadadri Bhuvanagiri, 508116. The registration record names Sri Sai Constructions And Developers as promoter; no official website or project contact details are supplied here.
The project record identifies PADAM AKHIL as a landowner under an AreaShare arrangement. Form B, signed by authorized signatory PADAM SRIRAMULU, states that K. CHAKRAPANI has legal title to the land, declares it free from encumbrances, and undertakes completion by 19/12/2026. These are statements in the promoter’s filed declaration.
The RERA registration is valid through 19 December 2026; the Form B completion undertaking gives the same date. The commencement record says completion certification is false, and no occupancy certificate is supplied. No independent progress percentage is available in the supplied project evidence.
Approvals, official records & documents
| Identifier / date | P02000008033; valid 8 April 2024–19 December 2026 |
|---|---|
| What the supplied record establishes | Registration of SIRI NIVAS RESIDENCY under the named promoter, with project location and site identifiers. |
| Identifier / date | 0006/BP/3043/2023; 19 December 2023; file no. 012595/BP/DTCP/3043/0007/2023 |
|---|---|
| What the supplied record establishes | Permission for Building A, a stilt plus five upper floors, on the 628.67 m² site; completion certification is recorded as false. |
| Identifier / date | Document 395728 |
|---|---|
| What the supplied record establishes | Plan description and extracted parameters for the proposed RCC building, including floors, areas, listed amenities and conditions. |
| Identifier / date | Document 395728 |
|---|---|
| What the supplied record establishes | The supplied document is labelled as a layout-plan requirement, but the extraction describes a building plan and building permit; a separate stamped approved layout plan is not established by this extract. |
| Identifier / date | 4 February 2024 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project-account obligations and completion undertaking. |
| Identifier / date | Plot Nos. 38, 38/1, 39, 39/1, 40 and 40/1 in Sy. No. 240 |
|---|---|
| What the supplied record establishes | Provisional plot-regularisation records are included for the listed plots. |
The commencement certificate requires commencement notice before construction, completion notice after construction, and an occupancy certificate before occupation. No occupancy or completion certificate for the building is included in the supplied documents.
Frequently asked questions
Is SIRI NIVAS RESIDENCY registered with Telangana RERA?
Yes. SIRI NIVAS RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02000008033; the registration status is New Project.
Who is the developer of SIRI NIVAS RESIDENCY?
The promoter named in the RERA registration is SRI SAI CONSTRUCTIONS AND DEVELOPERS.
Where is SIRI NIVAS RESIDENCY located?
SIRI NIVAS RESIDENCY is in RAM NAGAR, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).
When will SIRI NIVAS RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 19/12/2026. This is the promoter's declaration, not a guarantee.