Sri City Phase 2
GRIHASIDHI DEVELOPERS LLP · Siddipet · RERA P01300005703
SRI CITY PHASE 2 is a plotted development in Ensanpalle Gramapanchayat, SIDDIPET (URBAN) mandal, Siddipet district. The registered promoter is GRIHASIDHI DEVELOPERS LLP. The registered site area is 30417.13 sq.mts; the supplied record does not disclose a building count, floor configuration or RERA unit count, while the approved layout drawing extraction reports 94 plots. The offering is residential plots, and the TG-RERA registration is P01300005703, with proposed completion by 18-11-2024.
More from Grihasidhi Developers LLP · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SRI CITY PHASE 2. RERA record |
| Project type | Plotted development / plotted layout. RERA record RERA filing |
| Phase / registered portion | The registration is for SRI CITY PHASE 2; the supplied record does not describe the wider project’s other phases or define their boundaries. |
| TG-RERA registration | P01300005703; certificate issued 09/03/2023, valid from 09/03/2023 to 18/11/2024. The certificate records no extension. Registration validity is separate from the promoter’s completion undertaking. |
| RERA status | The certificate records the project’s registration for the stated validity period; the supplied material does not establish its current registration status. |
| Registered promoter | GRIHASIDHI DEVELOPERS LLP, an LLP. RERA record Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Ensanpalle Gramapanchayat; village spelling in the registration certificate: ENSANPALLY. The layout approval describes the site as at ensanpalle Revenue Village. RERA record RERA filing |
| Revenue village(s) | ENSANPALLY / Ensanpalle Revenue Village. RERA record |
| Mandal / district / PIN | SIDDIPET (URBAN) / Siddipet / 502103. RERA record RERA filing |
| Survey numbers filed for the project | 184, 203, 204, 205, 206, 207, 208, 209, 210, 214, 215, 216, 217, 218, 219, 222, 223, 224, 225, 226, 227, 228 and 229. No subdivisions are specified in the project identity record. RERA filing |
| Registered site area | Total and net area: 30417.13 sq.mts; area reported as affected by road widening/FTL of tanks/nala widening: 0 sq.mts. RERA filing |
| Boundaries filed | East: 30 Ft Road; North: 30 Ft Road; West: Plots of others; South: Land Of others. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Urban Development Authority; the approval document states delegation to Ensanpalle Grampanchayat. The RERA record identifies the authority as DTCP. Approvals record |
| Principal approval | Tentative Layout Plan approval 206203/LP/GP/206948/0004/2022, dated 18-11-2022. Approvals record |
| Approved built-up area | 17021.51 sqmts is recorded as “Approved Built up Area” in the project fields. The supplied evidence does not clarify how this field applies to the plotted layout. RERA filing |
| Buildings / floors | Building count and sanctioned floor configuration are not disclosed in the supplied project record. RERA filing |
| RERA-declared plots / units | No RERA unit-count or plot-inventory schedule is supplied. The approved layout drawing extraction reports 94 plots, read from its plot schedule; that count is software-read from the drawing, not a stated RERA inventory count. Layout record |
| Mortgage area | 2973.45 sq.mts is listed in the project fields. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Residential plots; the RERA project category is plot. RERA record RERA filing |
| RERA-filed plot size range / inventory | Not available in the supplied RERA unit data. The drawing-derived layout schedule gives plot sizes from 131.08 sq.m to 487.03 sq.m; see “Homes, configurations & floor plans.” Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. |
| Proposed completion | The Form B declaration undertakes completion by 18-11-2024. |
| Construction / development stage | No independently verified site-progress update is supplied. The layout approval requires infrastructure and amenity works and a completion certificate before approval of the final layout. |
| OC / completion certificate | No occupancy certificate or completion certificate is supplied. The layout approval is a Tentative Layout Plan approval, not a completion or occupancy certificate. |
The project story
SRI CITY PHASE 2 is registered as a plotted development in Ensanpalle village, Siddipet (Urban) mandal, Siddipet district. Its RERA-filed land schedule names 23 survey numbers, and its filed site area is 30417.13 sq.mts. The layout approval is expressly for a Tentative Layout Plan. RERA record RERA filing
The development is intended for residential plots. The tentative approval describes internal development and amenity works, including roads, drains, water supply, sewerage disposal, street lighting, greenery and rainwater-harvesting pits. The promoter’s Form B declaration gives 18-11-2024 as the completion undertaking; however, the supplied material contains no site-progress evidence establishing how much work was completed by that date or since.
The certificate records registration validity through 18/11/2024, while the Form B gives the same date as the promoter’s completion undertaking. These are separate records of registration validity and declared project completion, and neither establishes that a completion certificate was issued.
Master plan, architecture & building design
This is a plotted layout rather than a building-led development. The approved-layout drawing extraction identifies 94 plots across two layout sheets; the plot schedule and areas are software-read from the drawing, and should be checked against the stamped plan. Layout record
The drawing’s area statement allocates the 30417.13 sq.m net layout area as follows:
| Layout use | Area | Share of net layout area | Basis |
|---|---|---|---|
| Plots | 17021.51 sq.m | 55.96% | Software-read from approved layout drawing |
| Roads | 9277.17 sq.m | 30.50% | Software-read from approved layout drawing |
| Parks / open space | 2857.32 sq.m | 9.39% | Software-read from approved layout drawing |
| Utilities | 383.60 sq.m | 1.26% | Software-read from approved layout drawing |
| Social infrastructure | 877.53 sq.m | 2.88% | Software-read from approved layout drawing |
| Amenities | 0.00 sq.m | 0.00% | Software-read from approved layout drawing |
Layout record
The RERA record separately lists an approved built-up area of 17021.51 sqmts; it does not identify that figure as FSI-counted area, gross built-up area, or building floor area. The drawing’s 17021.51 sq.m plotted-area figure is a different, drawing-derived land-use entry. The supplied material does not provide building footprints, floor configurations, tower heights, or building-level architectural plans. RERA filing Layout record
The project fields report a 2973.45 sq.mts mortgage area. The layout drawing extraction identifies the same area as plots mortgaged to the approving authority pending completion of layout works; this is an approval-related reservation, not a statement that the plots are available for sale. RERA filing Layout record
Homes, configurations & floor plans
The project is a plotted layout. No RERA-filed unit schedule with plot-by-plot areas, booked status or availability is included in the supplied materials. The stamped layout drawing’s plot schedule was software-read and identifies 94 plots; the extraction states that the sum of plot areas matches the drawing’s plotted-area statement. These are drawing-derived, not RERA-filed inventory counts. Layout record
| Plot-size band | Plots | Basis |
|---|---|---|
| 150–200 sq.yd (125–167 sq.m) | 67 | Software-read from layout drawing |
| 200–250 sq.yd (167–209 sq.m) | 10 | Software-read from layout drawing |
| 250–300 sq.yd (209–251 sq.m) | 8 | Software-read from layout drawing |
| 300–400 sq.yd (251–334 sq.m) | 7 | Software-read from layout drawing |
| 400–500 sq.yd (334–418 sq.m) | 1 | Software-read from layout drawing |
| 500–1000 sq.yd (418–836 sq.m) | 1 | Software-read from layout drawing |
Layout record
The drawing-derived plot-area range is 131.08 sq.m to 487.03 sq.m, with a median of 157.94 sq.m. Common sizes shown in the drawing extraction include 157.94 sq.m (40 plots), 171.87 sq.m (6), 157.74 sq.m (6), 157.92 sq.m (5) and 158.73 sq.m (3). These figures are software-measured/read from the approved-layout drawing, not RERA-filed saleable areas. Layout record
Carpet-area measurements, room layouts and apartment floor plans do not apply to the plot offering. The supplied floor-plan data records two layout sheets and no flats; no plot-specific drawing comparison is provided. Floor plans
Parking & vehicle circulation
The layout drawing-derived area statement allocates 9277.17 sq.m to roads, or 30.50% of the net layout area. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site. Layout record
No parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or EV-charging provision is disclosed in the supplied project records. The layout approval refers to street and site access but does not establish exclusive parking rights for any plot.
Amenities, recreation & open spaces
The approval and project records refer to layout infrastructure and open-space provision. The approval describes the works as required or to be undertaken; the RERA amenities listing marks several items available but reports 0% progress. The supplied evidence does not verify that any facility has been completed or independently inspected.
| Description / size | 2857.32 sq.m in the drawing-derived area statement |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Drawing-derived allocation; completion not verified |
| Description / size | Size not stated in amenities record |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed available; 0% progress; completion not verified |
| Description / size | Social infrastructure: 877.53 sq.m in the drawing-derived area statement; community-building size not stated |
|---|---|
| Evidence source | Layout record RERA amenities |
| Declared progress / verified status | Area is drawing-derived; delivery status not established |
| Description / size | Aggregate open-space facility listed; no separate size in amenities record |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed available; 0% progress; completion not verified |
The tentative approval also calls for greenery, rainwater-harvesting pits, fencing of open spaces, and transfer of developed open-space, social-infrastructure, utility and road areas to the local body by registered gift deed before release of the final layout. The approval’s extracted area figures for those handover conditions are illegible in the supplied document extraction.
Utilities, building services & safety
The tentative layout approval lists infrastructure works to be carried out under the Executive Authority’s supervision. It names levelling and formation of roads, drains and nala channelisation, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. It also calls for an overhead tank or sump, septic tank as applicable, and sufficient harvesting pits. These are approval conditions and required works; the supplied record does not establish completion or capacities.
| Evidence in the record | Protected water supply, water reservoir, overhead tank and sump are referenced. |
|---|---|
| Status / limitation | Required or proposed in the approval; source, storage capacity and completion are not established. |
| Evidence in the record | Drains, nala channelisation, sewerage disposal and septic tank/STP are referenced; RERA amenities also lists sewerage and treatment/disposal of sewage and sullage water. |
|---|---|
| Status / limitation | Listed or required; treatment capacity, operating status and completion are not supplied. RERA amenities |
| Evidence in the record | Rainwater-harvesting pits and storm-water drains are referenced in the approval and RERA amenities list. |
|---|---|
| Status / limitation | Required/listed; quantity and completion are not established. RERA amenities |
| Evidence in the record | Electricity facilities, street lighting and an electrical meter room/sub-station/receiving station are listed. |
|---|---|
| Status / limitation | Listed/required; capacity and completion are not disclosed. RERA amenities |
| Evidence in the record | Solid-waste management and disposal appears in the RERA amenities list and approval’s utilities description. |
|---|---|
| Status / limitation | Listed; system details and completion are not established. RERA amenities |
| Evidence in the record | Fire-protection/safety appears in the amenities list. |
|---|---|
| Status / limitation | No project-specific fire-system design, clearance, accessible circulation or ramp details are supplied. RERA amenities |
Location, access & connectivity
The official project identity places the site in Ensanpalle Gramapanchayat, ENSANPALLY village, SIDDIPET (URBAN) mandal, Siddipet district, Telangana 502103. The cadastral parcel centroid is recorded at 18.090070751125182, 78.8256975457334; it is a parcel-centroid location, not a surveyed site entrance. RERA record RERA filing Cadastral map
The filed site boundaries identify 30 Ft Road to the east and north, with plots of others to the west and land of others to the south. The layout approval requires roads to be opened for access to neighbouring sites. The nearest sampled Outer Ring Road interchange is recorded at approximately 62.9 km. No public-transport routes or verified travel times are supplied. RERA filing Location record
Developer & development status
The registered legal promoter is GRIHASIDHI DEVELOPERS LLP, an LLP, with GSTIN 36AAVFG6113B1ZI. The project record gives the promoter address as Venkateswar Nagar, Venkateswar Nagar colony West Venkatapuram Post, ENSANPALLY, Ensanpalle Gramapanchayat, SIDDIPET (URBAN), Siddipet, 502103. The registration certificate separately lists the promoter office as Village: Trimulgiri Village, Mandal: Secunderabad-Cantonment, District: Hyderabad, Pin: 500015. Corporate record RERA filing
The project record lists three landowners: Ellendula Ramesh, Ellendula Santosh and Pabbishetty Sneha. The filed Form B is a promoter declaration and gives a completion undertaking of 18-11-2024; no construction-progress update or completion certificate is supplied to verify delivery. Parties record
Approvals, official records & documents
| What it establishes | Registration certificate for SRI CITY PHASE 2, issued 09/03/2023, valid through 18/11/2024; includes a separate-account condition. |
|---|---|
| Scope / limitation | Certificate states no extension; the supplied record does not establish current registration status. |
| What it establishes | Tentative layout approval for the filed survey schedule, subject to development and other conditions. |
|---|---|
| Scope / limitation | It is not proof of title and is not a final-layout, completion or occupancy certificate. |
| What it establishes | Promoter declaration, signed by Santosh Ellandula as an authorised signatory, stating the land is free from encumbrances and undertaking completion by 18-11-2024. |
|---|---|
| Scope / limitation | A promoter declaration; it does not independently verify title, encumbrance status or completion. |
| What it establishes | Advocate M. Goverdhan Reddy’s report concerning land at Ensanpalle and the recorded title chain. |
|---|---|
| Scope / limitation | Full title-chain review is addressed in the Land & Title section. |
| What it establishes | Registered development arrangement between the named landowners and GRIHASIDHI DEVELOPERS LLP. |
|---|---|
| Scope / limitation | It does not itself convey title, as described in the supplied extraction. |
| What it establishes | Two layout sheets; the plot schedule and area allocations were software-read from the drawing. Layout record |
|---|---|
| Scope / limitation | Drawing-derived counts and measurements should be checked against the stamped drawing. |
| What it establishes | None supplied. Document index |
|---|---|
| Scope / limitation | The available layout approval is tentative; completion/occupancy status is not established. |
Project at a glance
Project identity
Registered name: SRI CITY PHASE 2.
Project type: Plotted development / plotted layout.
Phase / registered portion: The registration is for SRI CITY PHASE 2; the supplied record does not describe the wider project’s other phases or define their boundaries.
TG-RERA registration: P01300005703; certificate issued 09/03/2023, valid from 09/03/2023 to 18/11/2024. The certificate records no extension. Registration validity is separate from the promoter’s completion undertaking.
RERA status: The certificate records the project’s registration for the stated validity period; the supplied material does not establish its current registration status.
Registered promoter: GRIHASIDHI DEVELOPERS LLP, an LLP.
Land and geographic identity
Locality: Ensanpalle Gramapanchayat; village spelling in the registration certificate: ENSANPALLY. The layout approval describes the site as at ensanpalle Revenue Village.
Revenue village(s): ENSANPALLY / Ensanpalle Revenue Village.
Mandal / district / PIN: SIDDIPET (URBAN) / Siddipet / 502103.
Survey numbers filed for the project: 184, 203, 204, 205, 206, 207, 208, 209, 210, 214, 215, 216, 217, 218, 219, 222, 223, 224, 225, 226, 227, 228 and 229. No subdivisions are specified in the project identity record.
Registered site area: Total and net area: 30417.13 sq.mts; area reported as affected by road widening/FTL of tanks/nala widening: 0 sq.mts.
Boundaries filed: East: 30 Ft Road; North: 30 Ft Road; West: Plots of others; South: Land Of others.
Development identity
Sanctioning authority: Urban Development Authority; the approval document states delegation to Ensanpalle Grampanchayat. The RERA record identifies the authority as DTCP.
Principal approval: Tentative Layout Plan approval 206203/LP/GP/206948/0004/2022, dated 18-11-2022.
Approved built-up area: 17021.51 sqmts is recorded as “Approved Built up Area” in the project fields. The supplied evidence does not clarify how this field applies to the plotted layout.
Buildings / floors: Building count and sanctioned floor configuration are not disclosed in the supplied project record.
RERA-declared plots / units: No RERA unit-count or plot-inventory schedule is supplied. The approved layout drawing extraction reports 94 plots, read from its plot schedule; that count is software-read from the drawing, not a stated RERA inventory count.
Mortgage area: 2973.45 sq.mts is listed in the project fields.
Offering and status
Unit type: Residential plots; the RERA project category is plot.
RERA-filed plot size range / inventory: Not available in the supplied RERA unit data. The drawing-derived layout schedule gives plot sizes from 131.08 sq.m to 487.03 sq.m; see “Homes, configurations & floor plans.”
Booked / available counts: Not disclosed in the supplied evidence.
Proposed completion: The Form B declaration undertakes completion by 18-11-2024.
Construction / development stage: No independently verified site-progress update is supplied. The layout approval requires infrastructure and amenity works and a completion certificate before approval of the final layout.
OC / completion certificate: No occupancy certificate or completion certificate is supplied. The layout approval is a Tentative Layout Plan approval, not a completion or occupancy certificate.
The project story
SRI CITY PHASE 2 is registered as a plotted development in Ensanpalle village, Siddipet (Urban) mandal, Siddipet district. Its RERA-filed land schedule names 23 survey numbers, and its filed site area is 30417.13 sq.mts. The layout approval is expressly for a Tentative Layout Plan.
The development is intended for residential plots. The tentative approval describes internal development and amenity works, including roads, drains, water supply, sewerage disposal, street lighting, greenery and rainwater-harvesting pits. The promoter’s Form B declaration gives 18-11-2024 as the completion undertaking; however, the supplied material contains no site-progress evidence establishing how much work was completed by that date or since.
The certificate records registration validity through 18/11/2024, while the Form B gives the same date as the promoter’s completion undertaking. These are separate records of registration validity and declared project completion, and neither establishes that a completion certificate was issued.
Master plan, architecture & building design
This is a plotted layout rather than a building-led development. The approved-layout drawing extraction identifies 94 plots across two layout sheets; the plot schedule and areas are software-read from the drawing, and should be checked against the stamped plan.
The drawing’s area statement allocates the 30417.13 sq.m net layout area as follows:
| Layout use | Area | Share of net layout area | Basis |
|---|---|---|---|
| Plots | 17021.51 sq.m | 55.96% | Software-read from approved layout drawing |
| Roads | 9277.17 sq.m | 30.50% | Software-read from approved layout drawing |
| Parks / open space | 2857.32 sq.m | 9.39% | Software-read from approved layout drawing |
| Utilities | 383.60 sq.m | 1.26% | Software-read from approved layout drawing |
| Social infrastructure | 877.53 sq.m | 2.88% | Software-read from approved layout drawing |
| Amenities | 0.00 sq.m | 0.00% | Software-read from approved layout drawing |
The RERA record separately lists an approved built-up area of 17021.51 sqmts; it does not identify that figure as FSI-counted area, gross built-up area, or building floor area. The drawing’s 17021.51 sq.m plotted-area figure is a different, drawing-derived land-use entry. The supplied material does not provide building footprints, floor configurations, tower heights, or building-level architectural plans.
The project fields report a 2973.45 sq.mts mortgage area. The layout drawing extraction identifies the same area as plots mortgaged to the approving authority pending completion of layout works; this is an approval-related reservation, not a statement that the plots are available for sale.
Homes, configurations & floor plans
The project is a plotted layout. No RERA-filed unit schedule with plot-by-plot areas, booked status or availability is included in the supplied materials. The stamped layout drawing’s plot schedule was software-read and identifies 94 plots; the extraction states that the sum of plot areas matches the drawing’s plotted-area statement. These are drawing-derived, not RERA-filed inventory counts.
| Plot-size band | Plots | Basis |
|---|---|---|
| 150–200 sq.yd (125–167 sq.m) | 67 | Software-read from layout drawing |
| 200–250 sq.yd (167–209 sq.m) | 10 | Software-read from layout drawing |
| 250–300 sq.yd (209–251 sq.m) | 8 | Software-read from layout drawing |
| 300–400 sq.yd (251–334 sq.m) | 7 | Software-read from layout drawing |
| 400–500 sq.yd (334–418 sq.m) | 1 | Software-read from layout drawing |
| 500–1000 sq.yd (418–836 sq.m) | 1 | Software-read from layout drawing |
The drawing-derived plot-area range is 131.08 sq.m to 487.03 sq.m, with a median of 157.94 sq.m. Common sizes shown in the drawing extraction include 157.94 sq.m (40 plots), 171.87 sq.m (6), 157.74 sq.m (6), 157.92 sq.m (5) and 158.73 sq.m (3). These figures are software-measured/read from the approved-layout drawing, not RERA-filed saleable areas.
Carpet-area measurements, room layouts and apartment floor plans do not apply to the plot offering. The supplied floor-plan data records two layout sheets and no flats; no plot-specific drawing comparison is provided.
Parking & vehicle circulation
The layout drawing-derived area statement allocates 9277.17 sq.m to roads, or 30.50% of the net layout area. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site.
No parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or EV-charging provision is disclosed in the supplied project records. The layout approval refers to street and site access but does not establish exclusive parking rights for any plot.
Amenities, recreation & open spaces
The approval and project records refer to layout infrastructure and open-space provision. The approval describes the works as required or to be undertaken; the RERA amenities listing marks several items available but reports 0% progress. The supplied evidence does not verify that any facility has been completed or independently inspected.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 2857.32 sq.m in the drawing-derived area statement | Drawing-derived allocation; completion not verified | |
| Green strip / tot lot / park | Size not stated in amenities record | Listed available; 0% progress; completion not verified | |
| Community buildings / social infrastructure | Social infrastructure: 877.53 sq.m in the drawing-derived area statement; community-building size not stated | Area is drawing-derived; delivery status not established | |
| Recreational open space | Aggregate open-space facility listed; no separate size in amenities record | Listed available; 0% progress; completion not verified |
The tentative approval also calls for greenery, rainwater-harvesting pits, fencing of open spaces, and transfer of developed open-space, social-infrastructure, utility and road areas to the local body by registered gift deed before release of the final layout. The approval’s extracted area figures for those handover conditions are illegible in the supplied document extraction.
Utilities, building services & safety
The tentative layout approval lists infrastructure works to be carried out under the Executive Authority’s supervision. It names levelling and formation of roads, drains and nala channelisation, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. It also calls for an overhead tank or sump, septic tank as applicable, and sufficient harvesting pits. These are approval conditions and required works; the supplied record does not establish completion or capacities.
| Evidence in the record | Protected water supply, water reservoir, overhead tank and sump are referenced. |
|---|---|
| Status / limitation | Required or proposed in the approval; source, storage capacity and completion are not established. |
| Evidence in the record | Drains, nala channelisation, sewerage disposal and septic tank/STP are referenced; RERA amenities also lists sewerage and treatment/disposal of sewage and sullage water. |
|---|---|
| Status / limitation | Listed or required; treatment capacity, operating status and completion are not supplied. |
| Evidence in the record | Rainwater-harvesting pits and storm-water drains are referenced in the approval and RERA amenities list. |
|---|---|
| Status / limitation | Required/listed; quantity and completion are not established. |
| Evidence in the record | Electricity facilities, street lighting and an electrical meter room/sub-station/receiving station are listed. |
|---|---|
| Status / limitation | Listed/required; capacity and completion are not disclosed. |
| Evidence in the record | Solid-waste management and disposal appears in the RERA amenities list and approval’s utilities description. |
|---|---|
| Status / limitation | Listed; system details and completion are not established. |
| Evidence in the record | Fire-protection/safety appears in the amenities list. |
|---|---|
| Status / limitation | No project-specific fire-system design, clearance, accessible circulation or ramp details are supplied. |
Location, access & connectivity
The official project identity places the site in Ensanpalle Gramapanchayat, ENSANPALLY village, SIDDIPET (URBAN) mandal, Siddipet district, Telangana 502103. The cadastral parcel centroid is recorded at 18.090070751125182, 78.8256975457334; it is a parcel-centroid location, not a surveyed site entrance.
The filed site boundaries identify 30 Ft Road to the east and north, with plots of others to the west and land of others to the south. The layout approval requires roads to be opened for access to neighbouring sites. The nearest sampled Outer Ring Road interchange is recorded at approximately 62.9 km. No public-transport routes or verified travel times are supplied.
Developer & development status
The registered legal promoter is GRIHASIDHI DEVELOPERS LLP, an LLP, with GSTIN 36AAVFG6113B1ZI. The project record gives the promoter address as Venkateswar Nagar, Venkateswar Nagar colony West Venkatapuram Post, ENSANPALLY, Ensanpalle Gramapanchayat, SIDDIPET (URBAN), Siddipet, 502103. The registration certificate separately lists the promoter office as Village: Trimulgiri Village, Mandal: Secunderabad-Cantonment, District: Hyderabad, Pin: 500015.
The project record lists three landowners: Ellendula Ramesh, Ellendula Santosh and Pabbishetty Sneha. The filed Form B is a promoter declaration and gives a completion undertaking of 18-11-2024; no construction-progress update or completion certificate is supplied to verify delivery.
Approvals, official records & documents
| What it establishes | Registration certificate for SRI CITY PHASE 2, issued 09/03/2023, valid through 18/11/2024; includes a separate-account condition. |
|---|---|
| Scope / limitation | Certificate states no extension; the supplied record does not establish current registration status. |
| What it establishes | Tentative layout approval for the filed survey schedule, subject to development and other conditions. |
|---|---|
| Scope / limitation | It is not proof of title and is not a final-layout, completion or occupancy certificate. |
| What it establishes | Promoter declaration, signed by Santosh Ellandula as an authorised signatory, stating the land is free from encumbrances and undertaking completion by 18-11-2024. |
|---|---|
| Scope / limitation | A promoter declaration; it does not independently verify title, encumbrance status or completion. |
| What it establishes | Advocate M. Goverdhan Reddy’s report concerning land at Ensanpalle and the recorded title chain. |
|---|---|
| Scope / limitation | Full title-chain review is addressed in the Land & Title section. |
| What it establishes | Registered development arrangement between the named landowners and GRIHASIDHI DEVELOPERS LLP. |
|---|---|
| Scope / limitation | It does not itself convey title, as described in the supplied extraction. |
| What it establishes | Two layout sheets; the plot schedule and area allocations were software-read from the drawing. |
|---|---|
| Scope / limitation | Drawing-derived counts and measurements should be checked against the stamped drawing. |
| What it establishes | None supplied. |
|---|---|
| Scope / limitation | The available layout approval is tentative; completion/occupancy status is not established. |
Other registrations of Sri City
Frequently asked questions
Is SRI CITY PHASE 2 registered with Telangana RERA?
Yes. SRI CITY PHASE 2 is registered with the Telangana Real Estate Regulatory Authority as P01300005703; the registration status is New Project.
Who is the developer of SRI CITY PHASE 2?
The promoter named in the RERA registration is GRIHASIDHI DEVELOPERS LLP.
Where is SRI CITY PHASE 2 located?
SRI CITY PHASE 2 is in Ensanpalle Gramapanchayat, ENSANPALLY, SIDDIPET (URBAN), Siddipet, Telangana (502103).
When will SRI CITY PHASE 2 be completed?
The promoter's proposed date of completion filed with RERA is 18/11/2024. This is the promoter's declaration, not a guarantee.
More projects in Ensanpally