SHESHADRI NIVAS is a plotted development in HASANPARTHY locality, Pegadapally Revenue Village, Hasanparthy Mandal, Warangal Urban District. The registered promoter is SHUBHADA DEVELOPERS. The approved tentative layout comprises 89 plots on a registered site extent of 28,579.95 sq.mts; drawing-derived plot sizes range from 127.77 sq.m to 425.5 sq.m. It is registered under TG-RERA number P00300009035, and the promoter’s Form B declaration states a completion deadline of 25/10/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SHESHADRI NIVAS RERA record |
| Project type | Plotted development RERA record |
| Phase / registered portion | A plotted layout in the registered survey numbers; no separate phase name or phase-wise scope is disclosed. RERA record |
| TG-RERA registration | P00300009035, granted under section 5; certificate records validity from 25/10/2023 through 25/10/2025. No extension is recorded in the supplied certificate. Registration validity is separate from the stated project completion deadline. RERA record |
| Registered promoter | SHUBHADA DEVELOPERS (also styled “M/S SHUBHADA DEVELOPERS” in project documents). RERA record Corporate record |
| RERA project status in supplied record | “New Project.” The RERA registration certificate records the stated validity period above. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | HASANPARTHY locality; Pegadapally / PEGADAPALLY Revenue Village. RERA record RERA filing |
| Mandal / district / PIN | Hasanparthy Mandal; Warangal Urban / Warangal (Urban) District; 506371. RERA record |
| Project survey numbers and subdivisions | 410/D4/3 and 410/D/4/2. RERA record Land records |
| Registered site extent | RERA land details state 28,579.95 sq.mts total and net area. The tentative-layout approval states 7 Acer 2.49 Gts 34182 Sq. Yds as the layout extent. RERA filing |
| Boundaries filed with RERA | East: PROPOSED ROAD; West: AGRICULTURAL LAND OF RAJARAM; North: AGRICULTURAL LAND OF OTHERS; South: AGRICULTURAL LAND OF N MOGILI AND LINGAIAH. RERA filing Land records |
| Road-widening / FTL / nala-widening area in RERA land details | 0 sq.mts recorded as affected area. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | GWMC Municipality/Municipal Corporation. The RERA record separately names DTCP as the Authority Name. Approvals record RERA filing |
| Principal layout approval | Tentative Layout Plan approval 0231/LO/3006/2023, dated 25 October, 2023. Application number 004223/LO/DTCP/3006/0164/2023. Approvals record |
| Approved layout scale and plots | Approval records a plotted layout of 89 No’s and identifies the development as a tentative layout. |
| Land-use schedule in the drawing extraction | Plotted Area: 18002.39 sq.m; Road Area: 6967.28 sq.m; Organized open space/park Area: 2603.78 sq.m; Utility Area: 289.59 sq.m; Social Infrastructure Area: 716.75 sq.m; Amenity Area: 0.00 sq.m. These are drawing-derived figures. Layout record |
| Buildings / floors / approved built-up area | Not disclosed as a building scheme in the supplied project record. RERA fields list approved built-up area 18002.66 sqmts; the approved plan is for a plotted layout, not a set of apartment floors. RERA filing |
| Parking | The supplied project record does not establish a count or arrangement of purchaser parking spaces. Document index |
Offering and status
| Field | Project record |
|---|---|
| Unit type and count | Plots; 89 plots in the approved tentative-layout record. Layout record |
| Plot-size range | Drawing-derived plot schedule: 127.77–425.5 sq.m (software-measured from the layout drawing; the source notes the schedule should be verified against the drawing). Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. Document index |
| Construction / development progress | RERA header records 70% completeness; this is a filed progress figure, not an independently verified site inspection. RERA record |
| Completion deadline | Promoter’s Form B declaration states 25/10/2025. The RERA certificate’s registration validity is a separate date range. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout; no phase- or plot-specific certificate status is established here. Document index |
2. The project story
SHESHADRI NIVAS is registered as a plotted development in Pegadapally Revenue Village, Hasanparthy Mandal, Warangal Urban District, on survey numbers 410/D4/3 and 410/D/4/2. The filed tentative-layout approval describes 89 plots, with internal roads, reserved park/open-space, utility and social-infrastructure land. RERA record Land records
The RERA header records 70% completeness, while the promoter’s Form B declaration gives 25/10/2025 as the completion deadline. The supplied material does not identify which individual layout works are complete, provide an independently verified progress inspection, or include a completion/occupancy certificate. Accordingly, the percentage is reported as a RERA-filed progress figure rather than a verified description of on-site condition. RERA record
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme. The approved tentative-layout drawing is recorded for 89 plots. The drawing-derived area schedule allocates land to plots, roads, park/open space, utilities and social infrastructure; it records no separate amenity area. Layout record
| Layout component | Area in drawing extraction | Share shown in source |
|---|---|---|
| Plotted Area | 18002.39 sq.m | 62.99% |
| Road Area | 6967.28 sq.m | 24.38% |
| Organized open space/park Area | 2603.78 sq.m | 9.11% |
| Utility Area | 289.59 sq.m | 1.01% |
| Social Infrastructure Area | 716.75 sq.m | 2.51% |
| Amenity Area | 0.00 sq.m | 0.00% |
The layout drawing’s plot schedule was read by software; the supplied record states that plot count and sizes should be verified against the drawing. It records 89 plots with sizes from 127.77 sq.m to 425.5 sq.m. The TG-RERA fields separately state approved built-up area of 18002.66 sqmts; this is reported as filed and is not treated here as plot saleable area or as a building-floor area. Layout record RERA filing
The tentative approval records a mortgage area of 0 Acer 28.95 Gts 3503 Sq. Yds, identified as 16.19 % of plotted area and comprising Plot Nos. 75, 64, 76, 63, 62, 74, 65, 73, 66, 72, 67, 71, 68, 70 and 69. The approval describes these plots as mortgaged to the Municipality/Municipal Corporation in connection with layout development conditions.
4. Homes, configurations & floor plans
The offering shown in the RERA-filed layout is plots, not apartments. The layout schedule records 89 plots. The drawing extraction reports the following size bands; areas are software-measured from the approved layout drawing, not RERA-filed unit saleable areas. Layout record
| Plot-size band | Number of plots |
|---|---|
| 150–200 sq.yd (125–167 sq.m) | 5 |
| 200–250 sq.yd (167–209 sq.m) | 65 |
| 250–300 sq.yd (209–251 sq.m) | 8 |
| 300–400 sq.yd (251–334 sq.m) | 3 |
| 400–500 sq.yd (334–418 sq.m) | 7 |
| 500–1000 sq.yd (418–836 sq.m) | 1 |
The drawing-derived sizes range from 127.77 sq.m to 425.5 sq.m; the source notes that the schedule should be checked against the drawing. No booked/available plot counts, plot-specific price, or plot-level saleable-area schedule is provided in the supplied evidence. The RERA-filed allotment letter and agreement-for-sale documents are templates with transaction-specific fields blank, so they do not establish a particular buyer’s plot or terms. Layout record
5. Parking & vehicle circulation
The tentative-layout approval provides for a road network and requires roads to remain open for accessibility to neighbouring sites. It also records a mortgaged group of plots pending completion of layout conditions. The supplied evidence does not state the number of purchaser or visitor parking spaces, identify marked parking bays, or establish any exclusive parking allocation to a plot.
6. Amenities, recreation & open spaces
The approved tentative-layout conditions describe infrastructure and amenities to be carried out by the applicant. The supplied RERA amenity register marks selected items “YES” and shows 0% progress; that figure is a filed status, not independent verification of delivery. RERA amenities
| Description / size | 2603.78 sq.m in the drawing-derived area statement; approval records 0 Acer 25.74 Gts (9.11%). |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Reserved in the layout; completion not independently verified. |
| Description / size | 716.75 sq.m in the drawing-derived area statement; approval records 0 Acer 7.08 Gts 857 Sq. Yds. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Site reserved; use or facility construction is not specified. |
| Description / size | No size or facility detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No availability or completion status recorded. |
| Description / size | Layout-wide circulation; no construction-completion detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity register marks “YES,” with 0% progress; not independently verified complete. |
| Description / size | Required in the tentative-layout development conditions. |
|---|---|
| Declared progress / verified status | Required work; completion not independently verified. |
7. Utilities, building services & safety
The tentative-layout approval lists the following infrastructure works for the layout: storm-water drains; underground drainage lines and a common septic tank / STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines, street lights and a transformer; solid-waste management; and rainwater-harvesting pits. It also refers to a water reservoir and septic tank/STP among the reserved utility uses. These are approval-condition descriptions of works to be provided, not evidence that the facilities have been completed or are operating.
| Evidence in project record | Internal water-supply pipelines, overhead tank and assured water-supply source specified in the tentative-layout conditions. |
|---|---|
| Status evidenced | Required/proposed in approval conditions; source, capacity and completion not independently verified. |
| Evidence in project record | Underground drainage, common septic tank/STP and storm-water drains specified. |
|---|---|
| Status evidenced | Required/proposed in approval conditions; capacity and completion not established. |
| Evidence in project record | Electrical supply lines, transformer and street lights specified; the RERA amenity register marks electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status evidenced | Filed/approval description; capacity and completed status not established. |
| Evidence in project record | Harvesting pits specified; the RERA amenity register marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Status evidenced | Filed/approval description; quantity and completion not established. |
| Evidence in project record | Solid-waste management/disposal specified in the approval conditions and RERA amenity register. |
|---|---|
| Status evidenced | Required/listed; operating arrangements and completion not established. |
| Evidence in project record | RERA amenity register includes fire protection and fire-safety requirements but does not mark availability or provide system details. |
|---|---|
| Status evidenced | No system specification, capacity or completion evidence supplied. |
| Evidence in project record | Not applicable to a building configuration established in the supplied record; no project-specific lift or accessible-circulation details supplied. |
|---|---|
| Status evidenced | Not disclosed. |
8. Location, access & connectivity
The registered project location is Pegadapally Revenue Village, Hasanparthy Mandal, Warangal Urban District, Telangana, PIN 506371. The RERA locality field states HASANPARTHY. The project boundaries filed with RERA identify a proposed road to the east and agricultural land on the other three sides. RERA record RERA filing
The approval requires the roads to remain open for access to neighbouring sites. The location record provides one sampled connectivity reference: Outer Ring Road (nearest sampled interchange, approximate) at 112.9 km. No further project approach-road details, public-transport information, or measured distances to local landmarks are supplied. Location record
9. Developer & development status
The registered promoter is SHUBHADA DEVELOPERS, recorded as a partnership with GSTIN 36AEYFS1694A1ZL. The project record lists its address as SRI NILAYAM, NANDHI HILLS, HASANPARTHY, HASANPARTHY, Hasanparthy, Warangal Urban, 506371. The RERA certificate separately prints a promoter-office field as “Village: Mandal: District: Warangal Urban, Pin: 506001”; the supplied evidence does not provide an official contact number, email address or project website. Corporate record Parties record
The promoter’s Form B declaration states a completion deadline of 25/10/2025. The RERA header reports 70% completeness, without a supplied independent site-verification report or breakdown by infrastructure item. No extension is recorded in the supplied registration certificate, and no completion/occupancy certificate is included. These are distinct records: the stated completion deadline does not itself establish completion, and registration validity is recorded separately in section 1. RERA record
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C for SHESHADRI NIVAS, registration P00300009035, granted under section 5; validity recorded as 25/10/2023–25/10/2025. |
| Tentative layout approval | Approval 0231/LO/3006/2023, dated 25 October, 2023, issued by GWMC Municipality/Municipal Corporation; application 004223/LO/DTCP/3006/0164/2023. The document identifies the survey numbers and 89-plot layout. |
| Layout drawing | Two layout sheets; software-derived plot schedule and land-use figures are available in the supplied layout record. Layout record |
| Promoter declaration | Form B identifies SHUBHADA DEVELOPERS, states a legal-title basis and declares a completion deadline of 25/10/2025; the printed encumbrance statement is incomplete. |
| Layout development conditions | The tentative approval sets out infrastructure works, public-area/utility/road handover requirements and mortgage-related conditions. |
| Occupancy/completion certificate | None supplied. Document index |
| Other plan / portal records | The supplied record does not establish a separate building plan or a publicly retrievable approved-layout portal record for this project. HMDA Document index |
1. Project at a glance
Project identity
Registered project name: SHESHADRI NIVAS
Project type: Plotted development
Phase / registered portion: A plotted layout in the registered survey numbers; no separate phase name or phase-wise scope is disclosed.
TG-RERA registration: P00300009035, granted under section 5; certificate records validity from 25/10/2023 through 25/10/2025. No extension is recorded in the supplied certificate. Registration validity is separate from the stated project completion deadline.
Registered promoter: SHUBHADA DEVELOPERS (also styled “M/S SHUBHADA DEVELOPERS” in project documents).
RERA project status in supplied record: “New Project.” The RERA registration certificate records the stated validity period above.
Land and geographic identity
Locality / revenue village: HASANPARTHY locality; Pegadapally / PEGADAPALLY Revenue Village.
Mandal / district / PIN: Hasanparthy Mandal; Warangal Urban / Warangal (Urban) District; 506371.
Project survey numbers and subdivisions: 410/D4/3 and 410/D/4/2.
Registered site extent: RERA land details state 28,579.95 sq.mts total and net area. The tentative-layout approval states 7 Acer 2.49 Gts 34182 Sq. Yds as the layout extent.
Boundaries filed with RERA: East: PROPOSED ROAD; West: AGRICULTURAL LAND OF RAJARAM; North: AGRICULTURAL LAND OF OTHERS; South: AGRICULTURAL LAND OF N MOGILI AND LINGAIAH.
Road-widening / FTL / nala-widening area in RERA land details: 0 sq.mts recorded as affected area.
Development identity
Sanctioning authority: GWMC Municipality/Municipal Corporation. The RERA record separately names DTCP as the Authority Name.
Principal layout approval: Tentative Layout Plan approval 0231/LO/3006/2023, dated 25 October, 2023. Application number 004223/LO/DTCP/3006/0164/2023.
Approved layout scale and plots: Approval records a plotted layout of 89 No’s and identifies the development as a tentative layout.
Land-use schedule in the drawing extraction: Plotted Area: 18002.39 sq.m; Road Area: 6967.28 sq.m; Organized open space/park Area: 2603.78 sq.m; Utility Area: 289.59 sq.m; Social Infrastructure Area: 716.75 sq.m; Amenity Area: 0.00 sq.m. These are drawing-derived figures.
Buildings / floors / approved built-up area: Not disclosed as a building scheme in the supplied project record. RERA fields list approved built-up area 18002.66 sqmts; the approved plan is for a plotted layout, not a set of apartment floors.
Parking: The supplied project record does not establish a count or arrangement of purchaser parking spaces.
Offering and status
Unit type and count: Plots; 89 plots in the approved tentative-layout record.
Plot-size range: Drawing-derived plot schedule: 127.77–425.5 sq.m (software-measured from the layout drawing; the source notes the schedule should be verified against the drawing).
Booked / available counts: Not disclosed in the supplied evidence.
Construction / development progress: RERA header records 70% completeness; this is a filed progress figure, not an independently verified site inspection.
Completion deadline: Promoter’s Form B declaration states 25/10/2025. The RERA certificate’s registration validity is a separate date range.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout; no phase- or plot-specific certificate status is established here.
2. The project story
SHESHADRI NIVAS is registered as a plotted development in Pegadapally Revenue Village, Hasanparthy Mandal, Warangal Urban District, on survey numbers 410/D4/3 and 410/D/4/2. The filed tentative-layout approval describes 89 plots, with internal roads, reserved park/open-space, utility and social-infrastructure land.
The RERA header records 70% completeness, while the promoter’s Form B declaration gives 25/10/2025 as the completion deadline. The supplied material does not identify which individual layout works are complete, provide an independently verified progress inspection, or include a completion/occupancy certificate. Accordingly, the percentage is reported as a RERA-filed progress figure rather than a verified description of on-site condition.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey residential building scheme. The approved tentative-layout drawing is recorded for 89 plots. The drawing-derived area schedule allocates land to plots, roads, park/open space, utilities and social infrastructure; it records no separate amenity area.
| Layout component | Area in drawing extraction | Share shown in source |
|---|---|---|
| Plotted Area | 18002.39 sq.m | 62.99% |
| Road Area | 6967.28 sq.m | 24.38% |
| Organized open space/park Area | 2603.78 sq.m | 9.11% |
| Utility Area | 289.59 sq.m | 1.01% |
| Social Infrastructure Area | 716.75 sq.m | 2.51% |
| Amenity Area | 0.00 sq.m | 0.00% |
The layout drawing’s plot schedule was read by software; the supplied record states that plot count and sizes should be verified against the drawing. It records 89 plots with sizes from 127.77 sq.m to 425.5 sq.m. The TG-RERA fields separately state approved built-up area of 18002.66 sqmts; this is reported as filed and is not treated here as plot saleable area or as a building-floor area.
The tentative approval records a mortgage area of 0 Acer 28.95 Gts 3503 Sq. Yds, identified as 16.19 % of plotted area and comprising Plot Nos. 75, 64, 76, 63, 62, 74, 65, 73, 66, 72, 67, 71, 68, 70 and 69. The approval describes these plots as mortgaged to the Municipality/Municipal Corporation in connection with layout development conditions.
4. Homes, configurations & floor plans
The offering shown in the RERA-filed layout is plots, not apartments. The layout schedule records 89 plots. The drawing extraction reports the following size bands; areas are software-measured from the approved layout drawing, not RERA-filed unit saleable areas.
150–200 sq.yd (125–167 sq.m): 5
200–250 sq.yd (167–209 sq.m): 65
250–300 sq.yd (209–251 sq.m): 8
300–400 sq.yd (251–334 sq.m): 3
400–500 sq.yd (334–418 sq.m): 7
500–1000 sq.yd (418–836 sq.m): 1
The drawing-derived sizes range from 127.77 sq.m to 425.5 sq.m; the source notes that the schedule should be checked against the drawing. No booked/available plot counts, plot-specific price, or plot-level saleable-area schedule is provided in the supplied evidence. The RERA-filed allotment letter and agreement-for-sale documents are templates with transaction-specific fields blank, so they do not establish a particular buyer’s plot or terms.
5. Parking & vehicle circulation
The tentative-layout approval provides for a road network and requires roads to remain open for accessibility to neighbouring sites. It also records a mortgaged group of plots pending completion of layout conditions. The supplied evidence does not state the number of purchaser or visitor parking spaces, identify marked parking bays, or establish any exclusive parking allocation to a plot.
6. Amenities, recreation & open spaces
The approved tentative-layout conditions describe infrastructure and amenities to be carried out by the applicant. The supplied RERA amenity register marks selected items “YES” and shows 0% progress; that figure is a filed status, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2603.78 sq.m in the drawing-derived area statement; approval records 0 Acer 25.74 Gts (9.11%). | Reserved in the layout; completion not independently verified. | |
| Social infrastructure site | 716.75 sq.m in the drawing-derived area statement; approval records 0 Acer 7.08 Gts 857 Sq. Yds. | Site reserved; use or facility construction is not specified. | |
| Community buildings | No size or facility detail supplied. | No availability or completion status recorded. | |
| Internal roads and footpaths | Layout-wide circulation; no construction-completion detail supplied. | RERA amenity register marks “YES,” with 0% progress; not independently verified complete. | |
| Avenue plantation / park development | Required in the tentative-layout development conditions. | Required work; completion not independently verified. |
7. Utilities, building services & safety
The tentative-layout approval lists the following infrastructure works for the layout: storm-water drains; underground drainage lines and a common septic tank / STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines, street lights and a transformer; solid-waste management; and rainwater-harvesting pits. It also refers to a water reservoir and septic tank/STP among the reserved utility uses. These are approval-condition descriptions of works to be provided, not evidence that the facilities have been completed or are operating.
| Evidence in project record | Internal water-supply pipelines, overhead tank and assured water-supply source specified in the tentative-layout conditions. |
|---|---|
| Status evidenced | Required/proposed in approval conditions; source, capacity and completion not independently verified. |
| Evidence in project record | Underground drainage, common septic tank/STP and storm-water drains specified. |
|---|---|
| Status evidenced | Required/proposed in approval conditions; capacity and completion not established. |
| Evidence in project record | Electrical supply lines, transformer and street lights specified; the RERA amenity register marks electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status evidenced | Filed/approval description; capacity and completed status not established. |
| Evidence in project record | Harvesting pits specified; the RERA amenity register marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Status evidenced | Filed/approval description; quantity and completion not established. |
| Evidence in project record | Solid-waste management/disposal specified in the approval conditions and RERA amenity register. |
|---|---|
| Status evidenced | Required/listed; operating arrangements and completion not established. |
| Evidence in project record | RERA amenity register includes fire protection and fire-safety requirements but does not mark availability or provide system details. |
|---|---|
| Status evidenced | No system specification, capacity or completion evidence supplied. |
| Evidence in project record | Not applicable to a building configuration established in the supplied record; no project-specific lift or accessible-circulation details supplied. |
|---|---|
| Status evidenced | Not disclosed. |
8. Location, access & connectivity
The registered project location is Pegadapally Revenue Village, Hasanparthy Mandal, Warangal Urban District, Telangana, PIN 506371. The RERA locality field states HASANPARTHY. The project boundaries filed with RERA identify a proposed road to the east and agricultural land on the other three sides.
The approval requires the roads to remain open for access to neighbouring sites. The location record provides one sampled connectivity reference: Outer Ring Road (nearest sampled interchange, approximate) at 112.9 km. No further project approach-road details, public-transport information, or measured distances to local landmarks are supplied.
9. Developer & development status
The registered promoter is SHUBHADA DEVELOPERS, recorded as a partnership with GSTIN 36AEYFS1694A1ZL. The project record lists its address as SRI NILAYAM, NANDHI HILLS, HASANPARTHY, HASANPARTHY, Hasanparthy, Warangal Urban, 506371. The RERA certificate separately prints a promoter-office field as “Village: Mandal: District: Warangal Urban, Pin: 506001”; the supplied evidence does not provide an official contact number, email address or project website.
The promoter’s Form B declaration states a completion deadline of 25/10/2025. The RERA header reports 70% completeness, without a supplied independent site-verification report or breakdown by infrastructure item. No extension is recorded in the supplied registration certificate, and no completion/occupancy certificate is included. These are distinct records: the stated completion deadline does not itself establish completion, and registration validity is recorded separately in section 1.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for SHESHADRI NIVAS, registration P00300009035, granted under section 5; validity recorded as 25/10/2023–25/10/2025.
Tentative layout approval: Approval 0231/LO/3006/2023, dated 25 October, 2023, issued by GWMC Municipality/Municipal Corporation; application 004223/LO/DTCP/3006/0164/2023. The document identifies the survey numbers and 89-plot layout.
Layout drawing: Two layout sheets; software-derived plot schedule and land-use figures are available in the supplied layout record.
Promoter declaration: Form B identifies SHUBHADA DEVELOPERS, states a legal-title basis and declares a completion deadline of 25/10/2025; the printed encumbrance statement is incomplete.
Layout development conditions: The tentative approval sets out infrastructure works, public-area/utility/road handover requirements and mortgage-related conditions.
Occupancy/completion certificate: None supplied.
Other plan / portal records: The supplied record does not establish a separate building plan or a publicly retrievable approved-layout portal record for this project.
Frequently asked questions
Is SHESHADRI NIVAS registered with Telangana RERA?
Yes. SHESHADRI NIVAS is registered with the Telangana Real Estate Regulatory Authority as P00300009035; the registration status is New Project.
Who is the developer of SHESHADRI NIVAS?
The promoter named in the RERA registration is SHUBHADA DEVELOPERS.
Where is SHESHADRI NIVAS located?
SHESHADRI NIVAS is in HASANPARTHY, Pegadapally, Hanamkonda, Telangana (506371).
When will SHESHADRI NIVAS be completed?
The promoter's proposed date of completion filed with RERA is 25/10/2025. This is the promoter's declaration, not a guarantee.
More projects in Hasanparthy