Abhiram Nivas
M/S AVKV Constructions · Hanamkonda · RERA P00300000877
Abhiram Nivas is a residential apartment project in Hasanparthy W56, Hasanparthy mandal, Warangal Urban district, developed by registered promoter M/S AVKV Constructions. The registered site area is 505.57 sq. m, and the project comprises one residential building sanctioned as Stilt + 4 floors, with 16 homes: 8 1BHK and 8 2BHK. Its TG-RERA registration number is P00300000877, and its proposed completion date is 31 December 2019.
More from Avkv Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | Abhiram Nivas RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | One building is identified in the supplied building-permit record; a separate phase name is not disclosed |
| TG-RERA registration | P00300000877 |
| Registration validity | 12 June 2019 to 31 December 2019; the supplied certificate says registration was not extended |
| Registered promoter | M/S AVKV Constructions |
| RERA status | The project record labels it “On-Going Project”; the registration period above is distinct from the promoter’s completion undertaking RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Hasanparthy W56 RERA record |
| Revenue village | Hasanparthy Revenue Village Land records |
| Mandal / district / PIN | Hasanparthy / Warangal Urban / 506371 RERA record |
| Survey number and subdivision | Sy No. 172 of Hasanparthy Revenue Village; the supplied records do not state a subdivision Land records |
| Plot identifier | Plot No. 32 |
| Registered site extent | The registration record lists total area 505.57 sq. m, affected area 38.21 sq. m and net area 467.36 sq. m RERA filing |
| Building-permit site figures | The permit extraction records site area 505.57 sq. m, road-affected area 38.21 sq. m and net area 467.35 sq. m |
| Boundaries | East: Plot No. 29; west: 30 ft wide road; north: 20 ft wide road; south: Plot No. 31 RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation (GWMC) |
| Principal building approval | Building Permit Order No. 3006/8375/W56/2017, dated 17 April 2018 |
| Building configuration | One residential building, sanctioned as Stilt + 4 floors; sanctioned height 12 m |
| Approved built-up area | 1,067.64 sq. m, as stated in the permit extraction |
| Parking-area figure in permit | 257.83 sq. m; a separate sanctioned parking-space count is not supplied |
| Sanctioned versus RERA-declared homes | The permit extraction records “No. 5 Residential”; the RERA unit schedule lists 16 homes. The permit extract does not clarify the meaning or scope of “No. 5 Residential,” so it is not treated here as a comparable unit count. RERA unit table |
| Approved floor-area detail | The supplied permit extraction does not separately set out the floor-by-floor configuration beyond Stilt + 4 |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 1BHK and 2BHK; 8 of each, 16 homes total RERA unit table |
| RERA-filed saleable areas | 1BHK: 52.33 sq. m; 2BHK: 44.15 sq. m RERA unit table |
| Booked / available | 1BHK: 1 booked, 7 available; 2BHK: 1 booked, 7 available. These portal counts have no supplied as-of date and are indicative. RERA unit table |
| Construction stage | The project is labelled “On-Going Project” in the RERA record. No independently verified current construction percentage or site inspection result is supplied. RERA filing RERA record |
| Completion dates | Original and revised proposed completion dates: 31 December 2019; the Form B declaration also undertakes completion by that date RERA record |
| Occupancy / completion certificate | The supplied building-permit extraction says completion certification is false and requires an occupancy certificate before occupation. No occupancy or completion certificate is included in the evidence reviewed. |
2. The project story
Abhiram Nivas is recorded with TG-RERA as a residential apartment project on Plot No. 32 in Sy No. 172 of Hasanparthy Revenue Village, Hasanparthy mandal, Warangal Urban district. Its building permit describes one Stilt + 4 residential apartment building. The RERA unit schedule records sixteen homes across 1BHK and 2BHK configurations. RERA record Land records RERA unit table
The promoter’s RERA-filed Form B undertakes completion by 31 December 2019. That date is a declared completion deadline, not evidence of physical completion. The project record describes the project as ongoing, and the supplied permit extraction does not certify completion; no occupancy certificate is supplied. There is no independent, current site-progress assessment in the materials reviewed. RERA filing
3. Master plan, architecture & building design
The GWMC Building Permit Order identifies one residential building, “Building - GWMC (AVKV APARTMENT),” on the project site and sanctions a Stilt + 4 configuration with a stated height of 12 m. The permit extraction gives an approved built-up area of 1,067.64 sq. m and records 257.83 sq. m as parking-floor area. These are permit figures; no separate FSI-counted area, gross built-up area, floor-by-floor area schedule, or building-footprint measurement is supplied.
The permit extraction records a road-affected area of 38.21 sq. m and requires the affected portion to be surrendered to the municipal authority without compensation. It also specifies 2.5 m front, rear and side setbacks. A separate approved layout drawing and detailed architectural floor plans are not available in the supplied materials, so internal circulation, flat positions by floor, common-area distribution and open-space arrangement cannot be described from drawings here. Document index
4. Homes, configurations & floor plans
The following counts and saleable areas are from the TG-RERA unit schedule. Booked and available counts are the last portal figures supplied and have no as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 8 | 1 | 7 | 52.33 sq. m | Not supplied | Not supplied |
| 2BHK | 8 | 1 | 7 | 44.15 sq. m | Not supplied | Not supplied |
Two floor-plan drawings were reviewed by the supplied software-measurement process, but no usable carpet-area measurement is reported for the configurations; the 2BHK drawing measurement is listed as zero designs measured. No room dimensions, room arrangement, orientation, balcony or utility measurements are supplied. Any drawing-derived carpet area would be a software measurement, not a RERA-filed area, and would require review against the drawings. Saleable area and carpet area are different measures; no loading figure is available here. Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit records 257.83 sq. m of parking-floor area and states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction does not give a count of car or two-wheeler spaces, identify visitor or accessible bays, or establish parking allocation to particular homes. A drawn or approved parking area alone does not establish exclusive ownership or a unit-specific allocation.
No information is supplied on ramps, vehicle entries and exits, internal driveways, pedestrian separation, mechanical parking or EV charging. The vendor record mentions surface-car parking, but does not provide a project-specific count or a filed unit-allocation arrangement. Promoter website
6. Amenities, recreation & open spaces
The RERA amenity record lists project infrastructure and facilities, but does not establish that they are all complete. Its percentages are reproduced as recorded; a listed availability entry is not treated as independent verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Size not supplied | RERA amenity record; building permit | Listed as available, 100% in the RERA record; permit requires a fenced tot-lot maintained as greenery. Completion not independently verified. RERA amenities |
| Community buildings | Size or facility description not supplied | RERA amenity record | 0% recorded; no completion verification supplied. RERA amenities |
| Recreational open space | Aggregate area not supplied | RERA amenity record | 0% recorded. RERA amenities |
The vendor record also lists facilities such as a gym, swimming pool, library, party hall, indoor games, sports facilities and community garden. These are vendor-listed, not established as sanctioned or delivered by the project-specific RERA and permit material supplied. Promoter website
7. Utilities, building services & safety
The project’s RERA amenity record lists sewerage infrastructure as available at 100%, rainwater harvesting at 100%, and an electrical meter room/sub-station/receiving station at 100%. Those figures are RERA-record declarations, not independent verification. The same record lists water supply at 0%, storm-water drains at 0%, treatment and disposal of sewage and sullage water at 0%, solid-waste management at 0%, energy management at 0% and fire protection/fire-safety requirements at 0%. RERA amenities
The building permit requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house. It also makes structural and fire-safety requirements the responsibility of the owner, builder/developer, architect and site engineer. The permit states that an occupancy certificate is compulsory before occupation; the supplied materials do not establish that one was issued.
The vendor lists overhead and underground water tanks, lifts, pumps and fire-fighting equipment in its specifications, but the supplied project-specific permit and RERA amenity data do not establish their capacities, installed status or completion. No project-specific details are supplied for water sources or treatment, STP capacity or reuse, electrical backup, lift count or capacity, CCTV/access control, waste segregation, accessibility ramps or other accessible circulation. Promoter website RERA amenities
8. Location, access & connectivity
The registered project location is Hasanparthy W56, Hasanparthy Revenue Village, Hasanparthy mandal, Warangal Urban district, PIN 506371. The permit identifies Plot No. 32 in Sy No. 172 and records a 20 ft wide road to the north and a 30 ft wide road to the west. RERA record Land records
The supplied location record gives an approximate distance of 112.9 km to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport information or verified travel times are supplied. Location record
9. Developer & development status
The registered promoter is M/S AVKV Constructions, identified in the RERA filing as a partnership. The supplied promoter address is Lalitha Residency, Road No-1, Professors Colony–Hasanparthy–Hanamkonda, Hasanparthy W56, Hasanparthy, Warangal Urban, 506371. The Form B declaration is made by Dr. D. Laxminarsaiah as an authorised signatory and identifies AVKV Constructions as promoter. Parties record Corporate record
The RERA record names Danthanapally Lalitha and Ponnala Arundhathi as landowners under an area-share arrangement. It also names Dantanapally Lalitha and Veena N Pujari as promoter partners. These are the roles recorded in the supplied project material. Parties record
The supplied records show one building and do not describe separate construction phases. The RERA completion undertaking and proposed completion date are 31 December 2019; the available record does not provide an independently verified current progress percentage or a project-specific occupancy certificate. No official contact details, promoter website or corporate registration number are supplied. RERA record Parties record Document index
10. Approvals, official records & documents
| Reference and scope | Form C; P00300000877, Abhiram Nivas; issued 12 June 2019; valid through 31 December 2019 |
|---|---|
| Evidence available | Certificate records project, promoter and registration conditions. |
| Reference and scope | GWMC Building Permit Order No. 3006/8375/W56/2017, dated 17 April 2018; Sy No. 172, Hasanparthy Revenue Village |
|---|---|
| Evidence available | Permit extraction identifies a Stilt + 4 residential building and site parameters. |
| Reference and scope | Form B, Abhiram Nivas |
|---|---|
| Evidence available | Declares the promoter’s title basis and undertakes completion by 31 December 2019. |
| Reference and scope | Advocate’s title search report dated 20 April 2018 concerning Plot No. 32, measuring 605 sq. yards in Sy No. 172 |
|---|---|
| Evidence available | Report is included in the RERA-filed documents; title analysis is addressed in the Land & Title section. |
| Reference and scope | Project-filed encumbrance information |
|---|---|
| Evidence available | Statement is included in the RERA-filed documents; the detailed entry register is addressed in the Land & Title section. |
| Reference and scope | Layout-plan submission listed in the project record |
|---|---|
| Evidence available | The supplied item is not extracted, so its drawing contents cannot be described here. Document index |
| Reference and scope | No completion certificate or occupancy certificate supplied; permit extraction records completion certification as false |
|---|---|
| Evidence available | The permit requires an occupancy certificate before occupation. |
1. Project at a glance
Project identity
Registered name: Abhiram Nivas
Project type: Residential apartment project
Phase / registered portion: One building is identified in the supplied building-permit record; a separate phase name is not disclosed
TG-RERA registration: P00300000877
Registration validity: 12 June 2019 to 31 December 2019; the supplied certificate says registration was not extended
Registered promoter: M/S AVKV Constructions
RERA status: The project record labels it “On-Going Project”; the registration period above is distinct from the promoter’s completion undertaking
Land and geographic identity
Locality: Hasanparthy W56
Revenue village: Hasanparthy Revenue Village
Mandal / district / PIN: Hasanparthy / Warangal Urban / 506371
Survey number and subdivision: Sy No. 172 of Hasanparthy Revenue Village; the supplied records do not state a subdivision
Plot identifier: Plot No. 32
Registered site extent: The registration record lists total area 505.57 sq. m, affected area 38.21 sq. m and net area 467.36 sq. m
Building-permit site figures: The permit extraction records site area 505.57 sq. m, road-affected area 38.21 sq. m and net area 467.35 sq. m
Boundaries: East: Plot No. 29; west: 30 ft wide road; north: 20 ft wide road; south: Plot No. 31
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation (GWMC)
Principal building approval: Building Permit Order No. 3006/8375/W56/2017, dated 17 April 2018
Building configuration: One residential building, sanctioned as Stilt + 4 floors; sanctioned height 12 m
Approved built-up area: 1,067.64 sq. m, as stated in the permit extraction
Parking-area figure in permit: 257.83 sq. m; a separate sanctioned parking-space count is not supplied
Sanctioned versus RERA-declared homes: The permit extraction records “No. 5 Residential”; the RERA unit schedule lists 16 homes. The permit extract does not clarify the meaning or scope of “No. 5 Residential,” so it is not treated here as a comparable unit count.
Approved floor-area detail: The supplied permit extraction does not separately set out the floor-by-floor configuration beyond Stilt + 4
Offering and status
RERA-filed configurations: 1BHK and 2BHK; 8 of each, 16 homes total
RERA-filed saleable areas: 1BHK: 52.33 sq. m; 2BHK: 44.15 sq. m
Booked / available: 1BHK: 1 booked, 7 available; 2BHK: 1 booked, 7 available. These portal counts have no supplied as-of date and are indicative.
Construction stage: The project is labelled “On-Going Project” in the RERA record. No independently verified current construction percentage or site inspection result is supplied.
Completion dates: Original and revised proposed completion dates: 31 December 2019; the Form B declaration also undertakes completion by that date
Occupancy / completion certificate: The supplied building-permit extraction says completion certification is false and requires an occupancy certificate before occupation. No occupancy or completion certificate is included in the evidence reviewed.
2. The project story
Abhiram Nivas is recorded with TG-RERA as a residential apartment project on Plot No. 32 in Sy No. 172 of Hasanparthy Revenue Village, Hasanparthy mandal, Warangal Urban district. Its building permit describes one Stilt + 4 residential apartment building. The RERA unit schedule records sixteen homes across 1BHK and 2BHK configurations.
The promoter’s RERA-filed Form B undertakes completion by 31 December 2019. That date is a declared completion deadline, not evidence of physical completion. The project record describes the project as ongoing, and the supplied permit extraction does not certify completion; no occupancy certificate is supplied. There is no independent, current site-progress assessment in the materials reviewed.
3. Master plan, architecture & building design
The GWMC Building Permit Order identifies one residential building, “Building - GWMC (AVKV APARTMENT),” on the project site and sanctions a Stilt + 4 configuration with a stated height of 12 m. The permit extraction gives an approved built-up area of 1,067.64 sq. m and records 257.83 sq. m as parking-floor area. These are permit figures; no separate FSI-counted area, gross built-up area, floor-by-floor area schedule, or building-footprint measurement is supplied.
The permit extraction records a road-affected area of 38.21 sq. m and requires the affected portion to be surrendered to the municipal authority without compensation. It also specifies 2.5 m front, rear and side setbacks. A separate approved layout drawing and detailed architectural floor plans are not available in the supplied materials, so internal circulation, flat positions by floor, common-area distribution and open-space arrangement cannot be described from drawings here.
4. Homes, configurations & floor plans
The following counts and saleable areas are from the TG-RERA unit schedule. Booked and available counts are the last portal figures supplied and have no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 8 | 1 | 7 | 52.33 sq. m | Not supplied | Not supplied |
| 2BHK | 8 | 1 | 7 | 44.15 sq. m | Not supplied | Not supplied |
Two floor-plan drawings were reviewed by the supplied software-measurement process, but no usable carpet-area measurement is reported for the configurations; the 2BHK drawing measurement is listed as zero designs measured. No room dimensions, room arrangement, orientation, balcony or utility measurements are supplied. Any drawing-derived carpet area would be a software measurement, not a RERA-filed area, and would require review against the drawings. Saleable area and carpet area are different measures; no loading figure is available here.
5. Parking & vehicle circulation
The building permit records 257.83 sq. m of parking-floor area and states that the cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction does not give a count of car or two-wheeler spaces, identify visitor or accessible bays, or establish parking allocation to particular homes. A drawn or approved parking area alone does not establish exclusive ownership or a unit-specific allocation.
No information is supplied on ramps, vehicle entries and exits, internal driveways, pedestrian separation, mechanical parking or EV charging. The vendor record mentions surface-car parking, but does not provide a project-specific count or a filed unit-allocation arrangement.
6. Amenities, recreation & open spaces
The RERA amenity record lists project infrastructure and facilities, but does not establish that they are all complete. Its percentages are reproduced as recorded; a listed availability entry is not treated as independent verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Size not supplied | RERA amenity record; building permit | Listed as available, 100% in the RERA record; permit requires a fenced tot-lot maintained as greenery. Completion not independently verified. |
| Community buildings | Size or facility description not supplied | RERA amenity record | 0% recorded; no completion verification supplied. |
| Recreational open space | Aggregate area not supplied | RERA amenity record | 0% recorded. |
The vendor record also lists facilities such as a gym, swimming pool, library, party hall, indoor games, sports facilities and community garden. These are vendor-listed, not established as sanctioned or delivered by the project-specific RERA and permit material supplied.
7. Utilities, building services & safety
The project’s RERA amenity record lists sewerage infrastructure as available at 100%, rainwater harvesting at 100%, and an electrical meter room/sub-station/receiving station at 100%. Those figures are RERA-record declarations, not independent verification. The same record lists water supply at 0%, storm-water drains at 0%, treatment and disposal of sewage and sullage water at 0%, solid-waste management at 0%, energy management at 0% and fire protection/fire-safety requirements at 0%.
The building permit requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house. It also makes structural and fire-safety requirements the responsibility of the owner, builder/developer, architect and site engineer. The permit states that an occupancy certificate is compulsory before occupation; the supplied materials do not establish that one was issued.
The vendor lists overhead and underground water tanks, lifts, pumps and fire-fighting equipment in its specifications, but the supplied project-specific permit and RERA amenity data do not establish their capacities, installed status or completion. No project-specific details are supplied for water sources or treatment, STP capacity or reuse, electrical backup, lift count or capacity, CCTV/access control, waste segregation, accessibility ramps or other accessible circulation.
8. Location, access & connectivity
The registered project location is Hasanparthy W56, Hasanparthy Revenue Village, Hasanparthy mandal, Warangal Urban district, PIN 506371. The permit identifies Plot No. 32 in Sy No. 172 and records a 20 ft wide road to the north and a 30 ft wide road to the west.
The supplied location record gives an approximate distance of 112.9 km to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport information or verified travel times are supplied.
9. Developer & development status
The registered promoter is M/S AVKV Constructions, identified in the RERA filing as a partnership. The supplied promoter address is Lalitha Residency, Road No-1, Professors Colony–Hasanparthy–Hanamkonda, Hasanparthy W56, Hasanparthy, Warangal Urban, 506371. The Form B declaration is made by Dr. D. Laxminarsaiah as an authorised signatory and identifies AVKV Constructions as promoter.
The RERA record names Danthanapally Lalitha and Ponnala Arundhathi as landowners under an area-share arrangement. It also names Dantanapally Lalitha and Veena N Pujari as promoter partners. These are the roles recorded in the supplied project material.
The supplied records show one building and do not describe separate construction phases. The RERA completion undertaking and proposed completion date are 31 December 2019; the available record does not provide an independently verified current progress percentage or a project-specific occupancy certificate. No official contact details, promoter website or corporate registration number are supplied.
10. Approvals, official records & documents
| Reference and scope | Form C; P00300000877, Abhiram Nivas; issued 12 June 2019; valid through 31 December 2019 |
|---|---|
| Evidence available | Certificate records project, promoter and registration conditions. |
| Reference and scope | GWMC Building Permit Order No. 3006/8375/W56/2017, dated 17 April 2018; Sy No. 172, Hasanparthy Revenue Village |
|---|---|
| Evidence available | Permit extraction identifies a Stilt + 4 residential building and site parameters. |
| Reference and scope | Form B, Abhiram Nivas |
|---|---|
| Evidence available | Declares the promoter’s title basis and undertakes completion by 31 December 2019. |
| Reference and scope | Advocate’s title search report dated 20 April 2018 concerning Plot No. 32, measuring 605 sq. yards in Sy No. 172 |
|---|---|
| Evidence available | Report is included in the RERA-filed documents; title analysis is addressed in the Land & Title section. |
| Reference and scope | Project-filed encumbrance information |
|---|---|
| Evidence available | Statement is included in the RERA-filed documents; the detailed entry register is addressed in the Land & Title section. |
| Reference and scope | Layout-plan submission listed in the project record |
|---|---|
| Evidence available | The supplied item is not extracted, so its drawing contents cannot be described here. |
| Reference and scope | No completion certificate or occupancy certificate supplied; permit extraction records completion certification as false |
|---|---|
| Evidence available | The permit requires an occupancy certificate before occupation. |
Frequently asked questions
Is Abhiram Nivas registered with Telangana RERA?
Yes. Abhiram Nivas is registered with the Telangana Real Estate Regulatory Authority as P00300000877; the registration status is On-Going Project.
Who is the developer of Abhiram Nivas?
The promoter named in the RERA registration is M/S AVKV Constructions.
Where is Abhiram Nivas located?
Abhiram Nivas is in Hasanparthy W56, Hasanparthy, Hanamkonda, Telangana (506371).
When will Abhiram Nivas be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2019. This is the promoter's declaration, not a guarantee.