Season Town
GIRIDHARI CONSTRUCTIONS PRIVATE LIMITED · Mahabubnagar · RERA P01400002666
SEASON TOWN is a plotted development in Bureddipalle, Jadcherla mandal, Mahabubnagar district, developed by registered promoter Giridhari Constructions Private Limited. The layout covers **90,649.58 sq m** and provides for **245 plots**; building or tower and floor configurations are not stated. It is registered under TG-RERA registration **P01400002666**, and the promoter’s Form-B declaration states completion by **28-10-2022**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SEASON TOWN RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration concerns the layout on Survey Nos. 106/P, 107/P, 113/P, 114/P and 115/P |
| TG-RERA registration | P01400002666 |
| Registration validity | 06/03/2021 to 28/10/2022; the certificate states that extension would be subject to Authority approval. Registration validity is distinct from the project completion deadline. |
| Registered promoter | Giridhari Constructions Private Limited |
| RERA status | The supplied registration certificate records registration under section 5. It lists validity through 28/10/2022; no extension is recorded in the supplied certificate. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Bureddypally / Bureddipalle, as recorded in the project materials RERA record |
| Revenue village | Bureddipalle (also written Bureddypally in project documents) RERA record |
| Mandal / district / PIN | Jadcherla / Mahabubnagar / 509125 RERA record |
| Project survey numbers and subdivisions | 106/P, 107/P, 113/P, 114/P and 115/P RERA record |
| Layout approval extent | Ac.22.40 Cents, as stated in the DTCP layout approval |
| RERA-filed site area | 90,649.58 sq m total and net area RERA filing |
| Boundaries (RERA filing) | North: ROAD; South: OTHER LAND; East: OTHER LAND; West: OTHERLAND RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); approval document states delegation to Badepally Municipality Approvals record |
| Principal layout approval | Technical Layout Pattern TLP No239 /2019/H, approved 28-10-2019 Approvals record |
| Other approval references | File DTCP-HT2/OTH/61/2019-HYD Sec-DTCP; Lr. D.Dis.No. 3420/2019/H; reference Lr.Roc.No. G1/LP/1701/2019 Approvals record |
| Approved built-up area | 50,221.49 sq m is the RERA-filed figure; the supplied layout approval extraction does not state a built-up area. RERA filing |
| Plots | 245 plots, stated in the DTCP layout approval |
| Building/tower and floor configuration | Not disclosed in the supplied evidence; this is a plotted layout, and no apartment building configuration is established here. |
| Approved layout land allocation | 2.24 acres reserved for open space (10 %); 7.75 acres for roads (34,59 %), as recorded in the approval extraction |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; the DTCP approval specifies residential dwelling-house use for sites in the sanctioned layout. |
| Plot count / size range | 245 plots are stated in the approval. Plot-wise dimensions or a verified size range are not available in the supplied RERA or approval extracts. |
| Booked / available | Not established by the supplied data. |
| Construction stage | RERA-derived completeness is 70%; this is a declared/recorded figure, not an independent site inspection. RERA record |
| Completion dates | RERA Form-B declares completion by 28-10-2022; the registration certificate is valid through 28/10/2022. |
| Occupancy / completion certificate | No project occupancy or completion certificate is included in the supplied evidence. |
The project story
SEASON TOWN is registered as a plotted development at Bureddipalle village, Jadcherla mandal, Mahabubnagar district. Its approved layout covers Survey Nos. 106/P, 107/P, 113/P, 114/P and 115/P and provides for 245 residential plots. The DTCP approval identifies open-space and road reservations and sets out infrastructure works for the layout. RERA record
The RERA record gives a 70% completeness figure, but the supplied material does not identify which individual roads, plots or facilities are complete, nor does it provide an independently verified site-progress report. The promoter’s Form-B declaration undertakes completion by 28-10-2022; the supplied certificate records registration validity through that date. No revised completion date, extension order, or occupancy/completion certificate is supplied. RERA record
Master plan, architecture & building design
The development is a plotted layout rather than an evidenced apartment or villa-building scheme. The DTCP Technical Layout Pattern approval covers Ac.22.40 Cents and records 245 plots, with Ac. 2.24Cents reserved for open space and Ac.7.75 Cents for roads. The RERA filing separately records total/net land area of 90,649.58 sq m and approved built-up area of 50,221.49 sq m; the supplied extracts do not clarify the measurement basis for the built-up-area figure. RERA filing RERA filing
The approval requires roads, drains and nala channelization, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, sewerage disposal and protected water supply. It also states that the public-purpose roads and open space are to be handed over to the municipality through a registered Gift Deed. The supplied evidence does not include the detailed stamped layout drawing needed to describe individual plot arrangement, road widths, utility parcels or site circulation.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 245 approved plots | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Three drawing records are listed, but all are scans pending measurement; no software-measured carpet or room areas are available. The vendor records include plot-size claims, but these are not used as RERA-filed measurements. The supplied RERA extract does not provide plot-wise dimensions, saleable areas, or inventory/bookings. Floor plans Promoter website
Parking & vehicle circulation
The supplied evidence does not establish sanctioned parking counts, visitor or accessible parking, or plot-wise parking allocations. The approval extract identifies roads as a layout component but does not provide road widths, access points, or detailed circulation drawing information. A vendor specification mentions “40 ft wide internal BT road”; this is a vendor statement, not a verified RERA-filed or approval-drawing measurement. Promoter website
Amenities, recreation & open spaces
| Description / size | Approval reserves Ac. 2.24Cents (10 %) for open space; individual park facilities or sizes are not specified in the extract. |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Approval allocation recorded; delivery status not independently verified. |
| Description / size | Greenery in the layout, including avenue plantation in public open spaces. |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Required by approval; completion not independently verified. |
| Description / size | Fencing is specified as an approval condition. |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Required by approval; completion not independently verified. |
| Description / size | Listed in vendor amenities; no size or capacity supplied. |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | Marketing/vendor listing; not established as delivered. |
| Description / size | Listed in vendor amenities; no sizes or capacities supplied. |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | Marketing/vendor listing; not established as sanctioned or delivered. |
The RERA amenities record marks Internal Roads & Footpaths and Green Strip/TOT LOT/Park as “YES” at 100%; the other listed amenities do not have a positive completion percentage in the supplied record. This is recorded progress information, not independent verification. RERA amenities
Utilities, building services & safety
The DTCP approval requires the layout developer to provide road formation, side drains, stormwater drainage and nala channelization, greenery, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal, and protected water supply. These are approval requirements; the supplied evidence does not establish that they have been completed or provide capacities, network plans, treatment specifications, or commissioning records.
The RERA amenities record includes water supply, sewerage, stormwater drains, street lighting, sewage treatment/disposal, solid-waste management, energy management, fire protection, and electrical meter/substation facilities, but does not show a positive completion percentage for these items in the supplied data. The vendor also lists water connections to plots, underground drainage, underground power cabling and rainwater harvesting; these remain vendor claims in this evidence set. No project-specific fire-system design, emergency access plan, or accessibility details are supplied. RERA amenities Promoter website
Location, access & connectivity
The registered location is Bureddipalle village, Jadcherla mandal, Mahabubnagar district, PIN 509125; the DTCP approval describes the site as being at Bureddypally, Badepally Municipality. The supplied location record gives a cadastral parcel-centroid coordinate of 16.770270234170503, 78.1191281550185. RERA record Location record
The nearest sampled Outer Ring Road interchange is listed at 60.9 km (approx.). The vendor describes Jadcherla as the nearest landmark and says bus stops and railway stations are in close proximity, but supplies no measured distances or travel times for those claims. Location record Promoter website
Developer & development status
The RERA-registered promoter is Giridhari Constructions Private Limited, a company. The RERA record lists Sampath Raghupathi Reddy as authorized signatory and Sampath Vijaya Reddy as director. The supplied address associated with the promoter is B, Road No 70, Bureddypally, Jadcherla, Mahabubnagar, 509125; the RERA certificate separately records the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” The supplied evidence lists the company website as https://www.giridhariconstructions.com/. Corporate record Parties record Document index
Approvals, official records & documents
| Details | Form C; project SEASON TOWN, registration P01400002666, promoter Giridhari Constructions Private Limited; valid 06/03/2021–28/10/2022. |
|---|
| Details | DTCP Technical Layout Pattern TLP No239 /2019/H, dated 28-10-2019; file DTCP-HT2/OTH/61/2019-HYD Sec-DTCP; layout in Survey Nos. 106/P, 107/P, 113/P, 114/P and 115/P. |
|---|
| Details | Lr. D.Dis.No. 3420/2019/H; reference Lr.Roc.No. G1/LP/1701/2019; reference Lr.Roc. No. 980/2019/HRO/H1 dated 29-09-2019; Technical Layout Pattern No. 342066/2019/H. |
|---|---|
| Source | Approvals record |
| Details | Dated 01-12-2019; declares title and no encumbrances, and undertakes completion by 28-10-2022. These are promoter declarations. |
|---|
| Details | RERA document entry 155344 is described as commencement certificates, but its OCR is illegible and does not establish approval, parties, land or terms. |
|---|
| Details | No such certificate is included in the supplied evidence. |
|---|---|
| Source | Document index |
Project at a glance
Project identity
Registered project name: SEASON TOWN
Project type: Plotted development / plotted layout
Phase / registered portion: Phase not separately identified; the registration concerns the layout on Survey Nos. 106/P, 107/P, 113/P, 114/P and 115/P
TG-RERA registration: P01400002666
Registration validity: 06/03/2021 to 28/10/2022; the certificate states that extension would be subject to Authority approval. Registration validity is distinct from the project completion deadline.
Registered promoter: Giridhari Constructions Private Limited
RERA status: The supplied registration certificate records registration under section 5. It lists validity through 28/10/2022; no extension is recorded in the supplied certificate.
Land and geographic identity
Locality: Bureddypally / Bureddipalle, as recorded in the project materials
Revenue village: Bureddipalle (also written Bureddypally in project documents)
Mandal / district / PIN: Jadcherla / Mahabubnagar / 509125
Project survey numbers and subdivisions: 106/P, 107/P, 113/P, 114/P and 115/P
Layout approval extent: Ac.22.40 Cents, as stated in the DTCP layout approval
RERA-filed site area: 90,649.58 sq m total and net area
Boundaries (RERA filing): North: ROAD; South: OTHER LAND; East: OTHER LAND; West: OTHERLAND
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); approval document states delegation to Badepally Municipality
Principal layout approval: Technical Layout Pattern TLP No239 /2019/H, approved 28-10-2019
Other approval references: File DTCP-HT2/OTH/61/2019-HYD Sec-DTCP; Lr. D.Dis.No. 3420/2019/H; reference Lr.Roc.No. G1/LP/1701/2019
Approved built-up area: 50,221.49 sq m is the RERA-filed figure; the supplied layout approval extraction does not state a built-up area.
Plots: 245 plots, stated in the DTCP layout approval
Building/tower and floor configuration: Not disclosed in the supplied evidence; this is a plotted layout, and no apartment building configuration is established here.
Approved layout land allocation: 2.24 acres reserved for open space (10 %); 7.75 acres for roads (34,59 %), as recorded in the approval extraction
Offering and status
Unit type: Plots; the DTCP approval specifies residential dwelling-house use for sites in the sanctioned layout.
Plot count / size range: 245 plots are stated in the approval. Plot-wise dimensions or a verified size range are not available in the supplied RERA or approval extracts.
Booked / available: Not established by the supplied data.
Construction stage: RERA-derived completeness is 70%; this is a declared/recorded figure, not an independent site inspection.
Completion dates: RERA Form-B declares completion by 28-10-2022; the registration certificate is valid through 28/10/2022.
Occupancy / completion certificate: No project occupancy or completion certificate is included in the supplied evidence.
The project story
SEASON TOWN is registered as a plotted development at Bureddipalle village, Jadcherla mandal, Mahabubnagar district. Its approved layout covers Survey Nos. 106/P, 107/P, 113/P, 114/P and 115/P and provides for 245 residential plots. The DTCP approval identifies open-space and road reservations and sets out infrastructure works for the layout.
The RERA record gives a 70% completeness figure, but the supplied material does not identify which individual roads, plots or facilities are complete, nor does it provide an independently verified site-progress report. The promoter’s Form-B declaration undertakes completion by 28-10-2022; the supplied certificate records registration validity through that date. No revised completion date, extension order, or occupancy/completion certificate is supplied.
Master plan, architecture & building design
The development is a plotted layout rather than an evidenced apartment or villa-building scheme. The DTCP Technical Layout Pattern approval covers Ac.22.40 Cents and records 245 plots, with Ac. 2.24Cents reserved for open space and Ac.7.75 Cents for roads. The RERA filing separately records total/net land area of 90,649.58 sq m and approved built-up area of 50,221.49 sq m; the supplied extracts do not clarify the measurement basis for the built-up-area figure.
The approval requires roads, drains and nala channelization, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, sewerage disposal and protected water supply. It also states that the public-purpose roads and open space are to be handed over to the municipality through a registered Gift Deed. The supplied evidence does not include the detailed stamped layout drawing needed to describe individual plot arrangement, road widths, utility parcels or site circulation.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 245 approved plots | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Three drawing records are listed, but all are scans pending measurement; no software-measured carpet or room areas are available. The vendor records include plot-size claims, but these are not used as RERA-filed measurements. The supplied RERA extract does not provide plot-wise dimensions, saleable areas, or inventory/bookings.
Parking & vehicle circulation
The supplied evidence does not establish sanctioned parking counts, visitor or accessible parking, or plot-wise parking allocations. The approval extract identifies roads as a layout component but does not provide road widths, access points, or detailed circulation drawing information. A vendor specification mentions “40 ft wide internal BT road”; this is a vendor statement, not a verified RERA-filed or approval-drawing measurement.
Amenities, recreation & open spaces
| Description / size | Approval reserves Ac. 2.24Cents (10 %) for open space; individual park facilities or sizes are not specified in the extract. |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Approval allocation recorded; delivery status not independently verified. |
| Description / size | Greenery in the layout, including avenue plantation in public open spaces. |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Required by approval; completion not independently verified. |
| Description / size | Fencing is specified as an approval condition. |
|---|---|
| Evidence source | DTCP layout approval |
| Declared progress / verified status | Required by approval; completion not independently verified. |
| Description / size | Listed in vendor amenities; no size or capacity supplied. |
|---|---|
| Evidence source | Vendor |
| Declared progress / verified status | Marketing/vendor listing; not established as delivered. |
| Description / size | Listed in vendor amenities; no sizes or capacities supplied. |
|---|---|
| Evidence source | Vendor |
| Declared progress / verified status | Marketing/vendor listing; not established as sanctioned or delivered. |
The RERA amenities record marks Internal Roads & Footpaths and Green Strip/TOT LOT/Park as “YES” at 100%; the other listed amenities do not have a positive completion percentage in the supplied record. This is recorded progress information, not independent verification.
Utilities, building services & safety
The DTCP approval requires the layout developer to provide road formation, side drains, stormwater drainage and nala channelization, greenery, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal, and protected water supply. These are approval requirements; the supplied evidence does not establish that they have been completed or provide capacities, network plans, treatment specifications, or commissioning records.
The RERA amenities record includes water supply, sewerage, stormwater drains, street lighting, sewage treatment/disposal, solid-waste management, energy management, fire protection, and electrical meter/substation facilities, but does not show a positive completion percentage for these items in the supplied data. The vendor also lists water connections to plots, underground drainage, underground power cabling and rainwater harvesting; these remain vendor claims in this evidence set. No project-specific fire-system design, emergency access plan, or accessibility details are supplied.
Location, access & connectivity
The registered location is Bureddipalle village, Jadcherla mandal, Mahabubnagar district, PIN 509125; the DTCP approval describes the site as being at Bureddypally, Badepally Municipality. The supplied location record gives a cadastral parcel-centroid coordinate of 16.770270234170503, 78.1191281550185.
The nearest sampled Outer Ring Road interchange is listed at 60.9 km (approx.). The vendor describes Jadcherla as the nearest landmark and says bus stops and railway stations are in close proximity, but supplies no measured distances or travel times for those claims.
Developer & development status
The RERA-registered promoter is Giridhari Constructions Private Limited, a company. The RERA record lists Sampath Raghupathi Reddy as authorized signatory and Sampath Vijaya Reddy as director. The supplied address associated with the promoter is B, Road No 70, Bureddypally, Jadcherla, Mahabubnagar, 509125; the RERA certificate separately records the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” The supplied evidence lists the company website as https://www.giridhariconstructions.com/.
Approvals, official records & documents
| Details | Form C; project SEASON TOWN, registration P01400002666, promoter Giridhari Constructions Private Limited; valid 06/03/2021–28/10/2022. |
|---|
| Details | DTCP Technical Layout Pattern TLP No239 /2019/H, dated 28-10-2019; file DTCP-HT2/OTH/61/2019-HYD Sec-DTCP; layout in Survey Nos. 106/P, 107/P, 113/P, 114/P and 115/P. |
|---|
| Details | Lr. D.Dis.No. 3420/2019/H; reference Lr.Roc.No. G1/LP/1701/2019; reference Lr.Roc. No. 980/2019/HRO/H1 dated 29-09-2019; Technical Layout Pattern No. 342066/2019/H. |
|---|
| Details | Dated 01-12-2019; declares title and no encumbrances, and undertakes completion by 28-10-2022. These are promoter declarations. |
|---|
| Details | RERA document entry 155344 is described as commencement certificates, but its OCR is illegible and does not establish approval, parties, land or terms. |
|---|
| Details | No such certificate is included in the supplied evidence. |
|---|
Frequently asked questions
Is SEASON TOWN registered with Telangana RERA?
Yes. SEASON TOWN is registered with the Telangana Real Estate Regulatory Authority as P01400002666; the registration status is New Project.
Who is the developer of SEASON TOWN?
The promoter named in the RERA registration is GIRIDHARI CONSTRUCTIONS PRIVATE LIMITED.
Where is SEASON TOWN located?
SEASON TOWN is in BUREDDYPALLY, Bureddipalle, Jadcherla, Mahabubnagar, Telangana (509125).
When will SEASON TOWN be completed?
The promoter's proposed date of completion filed with RERA is 28/10/2022. This is the promoter's declaration, not a guarantee.