Sattoor Kistamma Colony
R K DEVELOPERS · Mahabubnagar · RERA P01400007424
SATTOOR KISTAMMA COLONY is a plotted development in Gangapur Revenue Village, Jadcherla Mandal, Mahabubnagar District. The registered promoter is R K DEVELOPERS, a partnership. The tentative layout covers a site extent of Ac. 6.742 cents; 32631.257 Sq.Yds and includes 121 plots; buildings, floors and plot configurations are not disclosed in the registered project record. It is registered under TG-RERA number P01400007424, and the promoter’s Form B undertaking states a completion date of 12/10/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SATTOOR KISTAMMA COLONY RERA record |
| Project type | Plotted development / tentative layout RERA record |
| Phase / registered portion | No phase name or phase-specific scope separately disclosed; the registration identifies the layout on Sy. Nos. 609/P, 610/P and 611/P |
| TG-RERA registration | P01400007424 |
| Registration validity | 21/12/2023 to 12/10/2025; the certificate states that it may be extended by the Authority under the Act and Rules. The supplied certificate records no extension |
| RERA status | The supplied registration record shows the stated validity ended on 12/10/2025. Current registration status after that date is not established by the supplied records |
| Registered promoter | R K DEVELOPERS, a partnership RERA record Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Gangapur Revenue Village; locality also recorded as Gangapur, Jadcherla Mandal |
| Mandal / district / PIN | Jadcherla Mandal; Mahabubnagar District; PIN 509301 |
| Project survey numbers and subdivisions | 609/P, 610/P and 611/P |
| Site extent | Tentative layout approval states Ac. 6.742 cents; 32631.257 Sq.Yds |
| RERA land-area record | Total area 27283.88 sq.m; net area 27283.88 sq.m; road-widening/FTL/nala-widening affected area recorded as 0 sq.m RERA filing |
| Boundaries | East: others land; West: road; North: others land; South: road RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | MUDA Urban Development Authority; approval record notes delegation to Gangapoor Grampanchayat |
| Principal approval | Tentative Layout Plan approval 326018/LP/GP/205277/0020/2023, dated 13-10-2023 |
| Approved built-up area | Not disclosed in the supplied layout approval; this is a plotted layout rather than a building scheme RERA filing |
| Plot count | 121 plots, stated in the tentative layout approval |
| Buildings, floors and parking levels | Building count, floor configuration and parking levels are not disclosed in the supplied project records |
| Layout area allocation | The approval records plotted area Ac4.374 cents 21171.042 Sq.Yds, roads Ac1.524 cents 7376.581 Sq.Yds, open-space park Ac0.607 cents 2939.684 Sq.Yds, utilities Ac0.068cents 327.13 Sq.Yds, and social infrastructure Ac 0.169 cents 816.82 Sq.Yds |
Offering and status
| Item | Project record |
|---|---|
| Offered unit type | Plots; the approval states 121 plots RERA record |
| Plot size range | Drawing-derived schedule: smallest 63.16 sq.m, median 111.48 sq.m, largest 567.43 sq.m; software-read measurements that should be checked against the layout drawing Layout record |
| Booked / available counts | Not established in the supplied records RERA filing |
| Construction / development stage | No independently verified site-progress record is supplied. The layout approval requires infrastructure and amenity works and subsequent final layout approval |
| Completion date | Promoter’s Form B undertaking states 12/10/2025 |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The approval is for a tentative layout; it calls for a work-completion certificate and final layout approval |
2. The project story
SATTOOR KISTAMMA COLONY is registered as a plotted development in Gangapur Revenue Village, Jadcherla Mandal, Mahabubnagar District, on survey subdivisions 609/P, 610/P and 611/P. Its project-specific approval is a MUDA tentative layout plan for 121 plots. The approval allocates land to plots, roads, a park/open space, utilities and social infrastructure, and sets out development works required before final layout approval. RERA record
The supplied layout drawing’s plot schedule was read by software as showing 121 plots, with areas from 63.16 sq.m to 567.43 sq.m; those drawing-based readings are not RERA unit disclosures and should be verified against the drawing. No unit booking or availability schedule, site-progress certification, or final layout/completion certificate is included in the supplied evidence. Accordingly, the records establish the approved tentative layout and promoter’s stated completion undertaking—not independently confirmed construction progress or completed, occupancy-certified development. Layout record
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey building scheme in the supplied approval record. The tentative layout approval identifies 121 plots across the approved layout area and assigns land to plots, roads, park/open space, utilities and social infrastructure. It does not provide building elevations, dwelling designs, floor configurations, building footprints, or a building-by-building phase schedule.
The drawing-derived area statement records 27,283.43 sq.m as net layout area: plots 17,701.54 sq.m (64.9%), roads 6,167.71 sq.m (22.6%), parks/open space 2,457.93 sq.m (9.0%), utilities 273.52 sq.m (1.0%), and social infrastructure 682.96 sq.m (2.5%). These are software-read values from the layout drawing’s area statement, not separately verified site measurements. Layout record
The tentative approval requires roads to be formed and open spaces, social infrastructure, utilities and roads to be handed over by registered gift deed before final layout release. It also requires infrastructure works, including roads, drains and nala channelisation, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply; the approval does not establish that these works have been completed.
4. Homes, configurations & floor plans
The registered offering is plots, not apartment configurations. The supplied layout drawing’s plot schedule gives the following software-measured size bands; the approval states 121 plots in total. Layout record
| Plot size band | Plots |
|---|---|
| 0–100 sq.yd (0–84 sq.m) | 6 |
| 100–150 sq.yd (84–125 sq.m) | 74 |
| 150–200 sq.yd (125–167 sq.m) | 30 |
| 200–250 sq.yd (167–209 sq.m) | 2 |
| 500–1000 sq.yd (418–836 sq.m) | 9 |
The drawing-derived smallest, median and largest plot sizes are 63.16 sq.m (75.5 sq.yd), 111.48 sq.m (133.3 sq.yd) and 567.43 sq.m (678.6 sq.yd) respectively. Plot-size readings were extracted from drawing text and should be checked against the approved drawing. No RERA-filed unit-by-unit saleable-area schedule, booking/availability counts, or apartment floor plans are supplied. Layout record
5. Parking & vehicle circulation
The supplied records do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a dedicated parking area. The layout approval requires internal roads and access, and directs that roads be opened for accessibility to neighbouring sites; it does not provide road widths, entry/exit details, or a vehicle-circulation plan in the extracted material.
6. Amenities, recreation & open spaces
| Description / size | Tentative approval: Ac 0.607 cents 2939.684 Sq.Yds; drawing-derived area statement: 2,457.93 sq.m |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Allocated in the tentative plan; approval requires development and handover by registered gift deed. Completion is not established |
| Description / size | Tentative approval: Ac 0.169 cents 816.82 Sq.Yds |
|---|---|
| Declared progress / verified status | Allocated in the tentative plan; required handover is not evidence of completion |
| Description / size | Tentative approval: Ac 0.068cents 327.13 Sq.Yds; described as including utility infrastructure such as water reservoir, septic tank/STP, electric transformer and solid-waste management |
|---|---|
| Declared progress / verified status | Identified in approval; installed or operating status is not established |
| Description / size | Tentative approval: Ac1.524 cents 7376.581 Sq.Yds |
|---|---|
| Declared progress / verified status | Road formation and access are required works; completion is not established |
| Description / size | Approval requires greenery and rainwater-harvesting pits |
|---|---|
| Declared progress / verified status | Required works; completed status is not established |
The approval describes the required layout development works and land allocations; it does not establish that these facilities have been delivered or independently inspected.
7. Utilities, building services & safety
The tentative layout approval lists utility provisions including a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management. It also requires protected water supply, sewerage disposal, drains and nala channelisation, rainwater-harvesting pits, street lighting and associated infrastructure. The documents supplied do not state capacities or establish that these systems are installed, operating or independently verified.
The approval further requires the applicant to undertake development works under the Executive Authority’s supervision and to be responsible for workmanship quality and safety during development. No separate fire-safety clearance, emergency-access plan, accessibility details, or operational waste-management evidence is supplied.
8. Location, access & connectivity
The registered location is Gangapur Revenue Village, Jadcherla Mandal, Mahabubnagar District, PIN 509301; the project is identified on survey subdivisions 609/P, 610/P and 611/P. The RERA record gives the site boundaries as others’ land to the east and north and roads to the west and south. RERA filing
A supplied location record gives a cadastral parcel-centroid coordinate of 16.766884328598557, 78.16646977687044 and one approximate connectivity measurement: the nearest sampled Outer Ring Road interchange is 58.6 km away. No other measured distances, public-transport details or local landmark information are supplied. Location record Cadastral map
9. Developer & development status
The registered promoter is R K DEVELOPERS, recorded as a partnership, with GSTIN 36ABHFR6487L1ZD. The project records identify SATTOOR KISTAIAH and GAYATHRI SATTOOR as partners and SATTOOR KISTAIAH as authorised signatory. The supplied address record places the promoter at 2ND FLOOR 204, PADMAVATHI ENCLAVE, BADEPALLY, Jadcherla, Mahabubnagar, Telangana, PIN 509301. Corporate record RERA filing Parties record
The promoter’s Form B declaration states a completion undertaking of 12/10/2025. The registration certificate records validity through 12/10/2025 and no extension in the supplied certificate. No progress certificate, current completion update, or final layout approval is supplied, so the present development stage and post-validity registration position cannot be confirmed from this evidence.
10. Approvals, official records & documents
| What the supplied document establishes | Registration of SATTOOR KISTAMMA COLONY under P01400007424, valid from 21/12/2023 through 12/10/2025 as stated in the certificate |
|---|
| What the supplied document establishes | MUDA Urban Development Authority approval 326018/LP/GP/205277/0020/2023, dated 13-10-2023, for the 121-plot tentative layout on 609/P, 610/P and 611/P at Gangapur Revenue Village |
|---|
| What the supplied document establishes | Promoter’s affidavit-cum-declaration, including title and encumbrance assertions and the stated completion undertaking |
|---|
| What the supplied document establishes | The tentative approval calls for completion certification and final layout approval. Neither is included in the supplied documents |
|---|
| What the supplied document establishes | No such certificate is supplied for the plotted layout |
|---|---|
| Reference | Document index |
The supplied approval is expressly for a tentative layout and includes conditions concerning infrastructure works, handover of designated areas and subsequent final layout approval. This overview records the approval’s scope; it does not establish completion of those conditions.
1. Project at a glance
Project identity
Registered project name: SATTOOR KISTAMMA COLONY
Project type: Plotted development / tentative layout
Phase / registered portion: No phase name or phase-specific scope separately disclosed; the registration identifies the layout on Sy. Nos. 609/P, 610/P and 611/P
TG-RERA registration: P01400007424
Registration validity: 21/12/2023 to 12/10/2025; the certificate states that it may be extended by the Authority under the Act and Rules. The supplied certificate records no extension
RERA status: The supplied registration record shows the stated validity ended on 12/10/2025. Current registration status after that date is not established by the supplied records
Registered promoter: R K DEVELOPERS, a partnership
Land and geographic identity
Locality / revenue village: Gangapur Revenue Village; locality also recorded as Gangapur, Jadcherla Mandal
Mandal / district / PIN: Jadcherla Mandal; Mahabubnagar District; PIN 509301
Project survey numbers and subdivisions: 609/P, 610/P and 611/P
Site extent: Tentative layout approval states Ac. 6.742 cents; 32631.257 Sq.Yds
RERA land-area record: Total area 27283.88 sq.m; net area 27283.88 sq.m; road-widening/FTL/nala-widening affected area recorded as 0 sq.m
Boundaries: East: others land; West: road; North: others land; South: road
Development identity
Sanctioning authority: MUDA Urban Development Authority; approval record notes delegation to Gangapoor Grampanchayat
Principal approval: Tentative Layout Plan approval 326018/LP/GP/205277/0020/2023, dated 13-10-2023
Approved built-up area: Not disclosed in the supplied layout approval; this is a plotted layout rather than a building scheme
Plot count: 121 plots, stated in the tentative layout approval
Buildings, floors and parking levels: Building count, floor configuration and parking levels are not disclosed in the supplied project records
Layout area allocation: The approval records plotted area Ac4.374 cents 21171.042 Sq.Yds, roads Ac1.524 cents 7376.581 Sq.Yds, open-space park Ac0.607 cents 2939.684 Sq.Yds, utilities Ac0.068cents 327.13 Sq.Yds, and social infrastructure Ac 0.169 cents 816.82 Sq.Yds
Offering and status
Offered unit type: Plots; the approval states 121 plots
Plot size range: Drawing-derived schedule: smallest 63.16 sq.m, median 111.48 sq.m, largest 567.43 sq.m; software-read measurements that should be checked against the layout drawing
Booked / available counts: Not established in the supplied records
Construction / development stage: No independently verified site-progress record is supplied. The layout approval requires infrastructure and amenity works and subsequent final layout approval
Completion date: Promoter’s Form B undertaking states 12/10/2025
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The approval is for a tentative layout; it calls for a work-completion certificate and final layout approval
2. The project story
SATTOOR KISTAMMA COLONY is registered as a plotted development in Gangapur Revenue Village, Jadcherla Mandal, Mahabubnagar District, on survey subdivisions 609/P, 610/P and 611/P. Its project-specific approval is a MUDA tentative layout plan for 121 plots. The approval allocates land to plots, roads, a park/open space, utilities and social infrastructure, and sets out development works required before final layout approval.
The supplied layout drawing’s plot schedule was read by software as showing 121 plots, with areas from 63.16 sq.m to 567.43 sq.m; those drawing-based readings are not RERA unit disclosures and should be verified against the drawing. No unit booking or availability schedule, site-progress certification, or final layout/completion certificate is included in the supplied evidence. Accordingly, the records establish the approved tentative layout and promoter’s stated completion undertaking—not independently confirmed construction progress or completed, occupancy-certified development.
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey building scheme in the supplied approval record. The tentative layout approval identifies 121 plots across the approved layout area and assigns land to plots, roads, park/open space, utilities and social infrastructure. It does not provide building elevations, dwelling designs, floor configurations, building footprints, or a building-by-building phase schedule.
The drawing-derived area statement records 27,283.43 sq.m as net layout area: plots 17,701.54 sq.m (64.9%), roads 6,167.71 sq.m (22.6%), parks/open space 2,457.93 sq.m (9.0%), utilities 273.52 sq.m (1.0%), and social infrastructure 682.96 sq.m (2.5%). These are software-read values from the layout drawing’s area statement, not separately verified site measurements.
The tentative approval requires roads to be formed and open spaces, social infrastructure, utilities and roads to be handed over by registered gift deed before final layout release. It also requires infrastructure works, including roads, drains and nala channelisation, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply; the approval does not establish that these works have been completed.
4. Homes, configurations & floor plans
The registered offering is plots, not apartment configurations. The supplied layout drawing’s plot schedule gives the following software-measured size bands; the approval states 121 plots in total.
0–100 sq.yd (0–84 sq.m): 6
100–150 sq.yd (84–125 sq.m): 74
150–200 sq.yd (125–167 sq.m): 30
200–250 sq.yd (167–209 sq.m): 2
500–1000 sq.yd (418–836 sq.m): 9
The drawing-derived smallest, median and largest plot sizes are 63.16 sq.m (75.5 sq.yd), 111.48 sq.m (133.3 sq.yd) and 567.43 sq.m (678.6 sq.yd) respectively. Plot-size readings were extracted from drawing text and should be checked against the approved drawing. No RERA-filed unit-by-unit saleable-area schedule, booking/availability counts, or apartment floor plans are supplied.
5. Parking & vehicle circulation
The supplied records do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a dedicated parking area. The layout approval requires internal roads and access, and directs that roads be opened for accessibility to neighbouring sites; it does not provide road widths, entry/exit details, or a vehicle-circulation plan in the extracted material.
6. Amenities, recreation & open spaces
| Description / size | Tentative approval: Ac 0.607 cents 2939.684 Sq.Yds; drawing-derived area statement: 2,457.93 sq.m |
|---|---|
| Declared progress / verified status | Allocated in the tentative plan; approval requires development and handover by registered gift deed. Completion is not established |
| Description / size | Tentative approval: Ac 0.169 cents 816.82 Sq.Yds |
|---|---|
| Declared progress / verified status | Allocated in the tentative plan; required handover is not evidence of completion |
| Description / size | Tentative approval: Ac 0.068cents 327.13 Sq.Yds; described as including utility infrastructure such as water reservoir, septic tank/STP, electric transformer and solid-waste management |
|---|---|
| Declared progress / verified status | Identified in approval; installed or operating status is not established |
| Description / size | Tentative approval: Ac1.524 cents 7376.581 Sq.Yds |
|---|---|
| Declared progress / verified status | Road formation and access are required works; completion is not established |
| Description / size | Approval requires greenery and rainwater-harvesting pits |
|---|---|
| Declared progress / verified status | Required works; completed status is not established |
The approval describes the required layout development works and land allocations; it does not establish that these facilities have been delivered or independently inspected.
7. Utilities, building services & safety
The tentative layout approval lists utility provisions including a water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management. It also requires protected water supply, sewerage disposal, drains and nala channelisation, rainwater-harvesting pits, street lighting and associated infrastructure. The documents supplied do not state capacities or establish that these systems are installed, operating or independently verified.
The approval further requires the applicant to undertake development works under the Executive Authority’s supervision and to be responsible for workmanship quality and safety during development. No separate fire-safety clearance, emergency-access plan, accessibility details, or operational waste-management evidence is supplied.
8. Location, access & connectivity
The registered location is Gangapur Revenue Village, Jadcherla Mandal, Mahabubnagar District, PIN 509301; the project is identified on survey subdivisions 609/P, 610/P and 611/P. The RERA record gives the site boundaries as others’ land to the east and north and roads to the west and south.
A supplied location record gives a cadastral parcel-centroid coordinate of 16.766884328598557, 78.16646977687044 and one approximate connectivity measurement: the nearest sampled Outer Ring Road interchange is 58.6 km away. No other measured distances, public-transport details or local landmark information are supplied.
9. Developer & development status
The registered promoter is R K DEVELOPERS, recorded as a partnership, with GSTIN 36ABHFR6487L1ZD. The project records identify SATTOOR KISTAIAH and GAYATHRI SATTOOR as partners and SATTOOR KISTAIAH as authorised signatory. The supplied address record places the promoter at 2ND FLOOR 204, PADMAVATHI ENCLAVE, BADEPALLY, Jadcherla, Mahabubnagar, Telangana, PIN 509301.
The promoter’s Form B declaration states a completion undertaking of 12/10/2025. The registration certificate records validity through 12/10/2025 and no extension in the supplied certificate. No progress certificate, current completion update, or final layout approval is supplied, so the present development stage and post-validity registration position cannot be confirmed from this evidence.
10. Approvals, official records & documents
| What the supplied document establishes | Registration of SATTOOR KISTAMMA COLONY under P01400007424, valid from 21/12/2023 through 12/10/2025 as stated in the certificate |
|---|
| What the supplied document establishes | MUDA Urban Development Authority approval 326018/LP/GP/205277/0020/2023, dated 13-10-2023, for the 121-plot tentative layout on 609/P, 610/P and 611/P at Gangapur Revenue Village |
|---|
| What the supplied document establishes | Promoter’s affidavit-cum-declaration, including title and encumbrance assertions and the stated completion undertaking |
|---|
| What the supplied document establishes | The tentative approval calls for completion certification and final layout approval. Neither is included in the supplied documents |
|---|
| What the supplied document establishes | No such certificate is supplied for the plotted layout |
|---|
The supplied approval is expressly for a tentative layout and includes conditions concerning infrastructure works, handover of designated areas and subsequent final layout approval. This overview records the approval’s scope; it does not establish completion of those conditions.
Frequently asked questions
Is SATTOOR KISTAMMA COLONY registered with Telangana RERA?
Yes. SATTOOR KISTAMMA COLONY is registered with the Telangana Real Estate Regulatory Authority as P01400007424; the registration status is New Project.
Who is the developer of SATTOOR KISTAMMA COLONY?
The promoter named in the RERA registration is R K DEVELOPERS.
Where is SATTOOR KISTAMMA COLONY located?
SATTOOR KISTAMMA COLONY is in MUDA · Urban Development ·Authority . , Gangapoor GP Jadcherla Mandal MahaboobNagar District, Gangapur, Jadcherla, Mahabubnagar, Telangana (509301).
When will SATTOOR KISTAMMA COLONY be completed?
The promoter's proposed date of completion filed with RERA is 12/10/2025. This is the promoter's declaration, not a guarantee.