RK Meadows
RK BUILDERS & CONSTRUCTIONS · Hanamkonda · RERA P00300003541
RK Meadows is a residential apartment project located at VIKASNAGAR W47, GMH Hanmakonda, Hanamkonda mandal, Warangal Urban district. The registered promoter is RK BUILDERS & CONSTRUCTIONS. The project occupies 738.58 m² and comprises one residential building identified as Building - A (RK CONSTRUCTIONS), described as 1 Stilt + 5 upper floors, with 15 apartments: 5 2BHK and 10 3BHK. It is registered under TG-RERA number P00300003541, issued 20/11/2021, with a proposed completion date of 16/04/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | RK Meadows RERA record |
| Project type / registered portion | Residential apartment project; phase or separately registered portion is not identified in the supplied records. The building permit identifies Building - A (RK CONSTRUCTIONS). RERA record |
| TG-RERA registration | P00300003541, issued 20/11/2021; certificate states a three-year validity period ending 16/04/2025, and records no extension. Registration validity is distinct from the completion deadline. Approvals record |
| Registered promoter | RK BUILDERS & CONSTRUCTIONS; the RERA record identifies the organization type as Proprietorship. RERA record RERA filing |
| RERA status in supplied record | The certificate records the registration period above. Current registration status after 16/04/2025 is not established by the supplied documents. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / recorded project location | VIKASNAGAR W47; the registration certificate gives GMH Hanmakonda, Hanamkonda. RERA record |
| Revenue village | GMH Hanmakonda in the project identity record. The title documents also describe the land as Waddepally Revenue Village and/or Vikasnagar, Waddepally; confirm the parcel-to-revenue-village description against the title records. RERA record Land records |
| Mandal / district / PIN | Hanamkonda / Warangal Urban / 506002. RERA record |
| Survey numbers | 63, 64, 65, 66 and 67; no subdivision is supplied. Land records |
| Plot identifiers | 34, 35 and 36. RERA record |
| Site area | 738.58 m²; the filed land record reports total area and net area each as 738.58 m² and road-widening/FTL/nala-widening affected area as 0. RERA filing |
| Boundaries | East: road width 9m; west: existing building; north: plot no 33; south: plot no 37. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation (GWMC). Approvals record |
| Principal building permission | Approval/file no. 3006/15743/W47/2018, approved 16 April, 2019. Approvals record |
| Sanctioned building | One residential building, identified as Building - A (RK CONSTRUCTIONS); the permit describes 1 Stilt + 5 upper floors. |
| Sanctioned parameters | Permit extract lists height 14.95 m, residential upper floors: 6 with area 1,755.30 m², and stilt: 1 with area 336.90 m². The permit’s floor description and parameter summary are reproduced as recorded; the approved drawing set should be consulted for floor-by-floor interpretation. |
| Approved built-up area | 2,126.97 m² in the RERA project fields. This is the filed approved built-up-area figure, not a carpet or saleable-area figure. RERA filing |
| Units | 15 apartments in the RERA filing: 5 2BHK and 10 3BHK. The building permit extract does not state an approved unit count. RERA unit table RERA unit details |
| Parking | Permit states that cellar and stilt approved in the plan are to be used exclusively for vehicle parking; the supplied extract does not give a parking-space count. |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations and saleable area | 2BHK: 107.3 m²; 3BHK: 139.12 m². RERA unit table RERA unit details |
| Booked / available | Portal-derived figures show 0 booked and 5 available 2BHK, and 0 booked and 10 available 3BHK. The portal record has no as-of date, so counts are indicative rather than a current inventory confirmation. RERA unit table RERA unit details |
| Completion deadline | Promoter’s Form B undertaking states 16/04/2025; the building permit also states construction must be completed before 16 April, 2025. |
| Construction stage | No independently verified site-progress assessment is supplied. RERA amenity entries show 0% for the listed progress fields; these entries do not establish overall building completion. RERA amenities |
| Occupancy certificate (OC) | No OC is included in the supplied project documents. The permit requires an OC before occupation. OC status is therefore not established in this record. Document index |
2. The project story
RK Meadows is a single-building residential apartment development recorded at VIKASNAGAR W47, Hanamkonda, on land identified in the project filing as Survey Nos. 63, 64, 65, 66 and 67, with plot identifiers 34, 35 and 36. The RERA registration certificate identifies the location as GMH Hanmakonda, Hanamkonda, and records 15 apartments across two configurations. RERA record Land records RERA unit table
The municipal building permit sanctions one residential building with a stilt and upper floors. The RERA inventory records 5 two-bedroom and 10 three-bedroom apartments. The supplied records do not establish independently verified construction progress, current sales availability, or an issued OC; the promoter’s stated completion date is 16/04/2025. RERA unit table
3. Master plan, architecture & building design
- The sanctioned record is for one residential building on a site area of 738.58 m², with approved built-up area recorded in the RERA fields as 2,126.97 m². The building-permit extract describes 1 Stilt + 5 upper floors and lists a height of 14.95 m. Its sanctioned-parameters summary separately records six residential upper floors and a stilt; refer to the approved plan for the detailed floor configuration. RERA filing RERA filing
- The permit lists a stilt area of 336.90 m² and residential upper-floor area of 1,755.30 m². It does not provide a separate FSI-counted-area figure in the supplied extract. These figures should not be treated as carpet area or saleable area. RERA unit table Floor plans
- The supplied extract does not establish a building footprint, flats per floor, lift count, stair arrangement, internal circulation plan, or residential/common-area split. The permit requires a tot-lot to be fenced and maintained as greenery, peripheral greenery, a rainwater-harvesting percolation pit, transformer space and a garbage house; these are permit conditions, not evidence that the facilities have been completed.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are presented below. Drawing-based carpet measurements were software-measured from the supplied floor-plan drawing record; they are not RERA-filed measurements and require verification against the drawings. The RERA saleable area is a separate figure and must not be read as carpet area. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 107.3 m² | 66.3–66.4 m² (median 66.3 m²; software-measured) | 38% |
| 3BHK | 10 | 0 | 10 | 139.12 m² | 94.6–96.8 m² (median 95.5 m²; software-measured) | 31% |
- The measured 2BHK drawing sample includes a living room, dining area, kitchen, two bedrooms, two toilets and a balcony. The sampled 3BHK plan includes living and dining areas, a kitchen, three bedrooms, three toilets and balconies. Room dimensions are drawing-derived software measurements, not RERA disclosures; verify them against the plan before relying on them. RERA unit details
- The reported carpet measurements exclude balconies. Saleable area and carpet area describe different measurement bases; the supplied records do not provide a separate RERA-filed balcony-area schedule. RERA unit details Floor plans
5. Parking & vehicle circulation
- The building permit states that the cellar and stilt approved in the plan are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, or the parking allocation for individual apartments.
- The RERA-filed land details report a mortgage area of 192.86 m², while the permit parameters identify the SECOND FLOOR handed over Area as 192.86 m². This is an area designation in the supplied records, not a parking allocation. No parking-space count or exclusive unit-wise parking right can be established from the supplied evidence. RERA filing
6. Amenities, recreation & open spaces
The RERA amenity record contains 14 entries. It lists several services or facilities as available (“YES”), but records 0% progress for every listed entry; these entries do not verify delivery. The building permit also specifies certain site features as conditions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit requires a fenced tot-lot maintained as greenery and a strip of greenery around the site; no size is supplied. | RERA amenities | RERA entry: 0%; permit condition, completion not verified. |
| Community buildings | No description or size supplied. | RERA amenities | 0% recorded; completion not verified. |
| Internal roads and footpaths | No dimensions supplied. | RERA amenities | 0% recorded; completion not verified. |
| Water supply | RERA amenity entry marked YES; no source, storage or capacity stated here. | RERA amenities | 0% recorded; operational status not verified. |
| Sewerage | RERA entry for “Sewerage (Chamber, Lines, Septic Tank, STP)” marked YES; no system detail or capacity supplied. | RERA amenities | 0% recorded; operational status not verified. |
| Storm-water drains | No layout or capacity supplied. | RERA amenities | 0% recorded; completion not verified. |
| Water conservation / rainwater harvesting | RERA entry marked YES; permit requires a rainwater-harvesting percolation pit. | RERA amenities | 0% recorded; installation not verified. |
| Electrical meter room / sub-station / receiving station | RERA entry marked YES; permit requires transformer space. | RERA amenities | 0% recorded; installation not verified. |
| Street lighting | No specification supplied. | RERA amenities | 0% recorded; completion not verified. |
| Sewage and sullage treatment/disposal | No treatment details or capacity supplied. | RERA amenities | 0% recorded; completion not verified. |
| Solid-waste management and disposal | Permit requires a garbage house within the premises. | RERA amenities | 0% recorded; completion not verified. |
| Energy management | No system details supplied. | RERA amenities | 0% recorded; completion not verified. |
| Fire protection and fire-safety requirements | Permit lists fire-safety conditions; see Utilities, building services & safety. | RERA amenities | 0% recorded; completion not verified. |
| Aggregate recreational open space | No area supplied. | RERA amenities | 0% recorded; completion not verified. |
7. Utilities, building services & safety
- Water and drainage: The RERA amenity record marks water supply, sewerage and storm-water drains as “YES” but records 0% progress for each. The permit requires a rainwater-harvesting percolation pit, a separate underground static water storage tank of 25,000L, and a separate residential terrace tank of 25,000lits. These are recorded provisions or conditions; the supplied documents do not verify installation or operation. RERA amenities
- Electrical and backup: The permit requires transformer space, a generator as an alternate electricity source and emergency lighting in corridors/common passages and staircases. The RERA amenity record marks the electrical meter room/sub-station/receiving-station entry “YES” but records 0% progress. No generator capacity or electrical-supply details are supplied. RERA amenities
- Lifts, fire and life safety: The permit requires fire-resistant swing doors for collapsible lifts, fire extinguishers, a manual alarm system, hose reel and down-comer provisions; it also specifies an automatic sprinkler system if the basement area exceeds 200 Sq.mts. The extract does not state lift count or capacity, basement area, installation status, or an independent fire-clearance record. These permit conditions alone do not establish completed systems or statutory compliance.
- Waste and accessibility: A garbage house is required by the permit, but no waste segregation or processing details are supplied. The permit’s accessibility condition refers to public and semi-public buildings above 300Sq.mts.; the supplied record does not establish whether or how that condition applies to this residential building, or document ramps or accessible circulation.
8. Location, access & connectivity
- The project is recorded at VIKASNAGAR W47, with the registration certificate identifying GMH Hanmakonda, Hanamkonda, Warangal Urban, 506002. The project filing’s site boundaries identify a 9m road on the east. The building-permit extract also references 18M road width in its conditions, but no project access-road map or measured route is supplied here. RERA record RERA filing
- The location record provides a sampled Outer Ring Road interchange distance of 112.5 km. No other verified distances, public-transport details or project access route are supplied. Location record
9. Developer & development status
- The registered promoter is RK BUILDERS & CONSTRUCTIONS, identified in the RERA record as a Proprietorship. Its authorized signatory is recorded as Ramakrishna Reddy Dasari; the Form B declaration is executed by Dasari Ramakrishna Reddy on behalf of the promoter. The supplied data do not establish a corporate registration identifier, official website, or complete official contact details. RERA filing Parties record
- The promoter’s Form B declaration, dated 07th August, 2021, undertakes completion by 16/04/2025 and states that land is free from encumbrances and that project funds will be handled through the stated separate-account and certification process. Those are promoter declarations. The supplied record does not independently establish current construction progress, whether the deadline was met, or whether an OC has issued. RERA amenities Document index
10. Approvals, official records & documents
| Identifier / date | P00300003541; issued 20/11/2021; validity stated through 16/04/2025 |
|---|---|
| Scope and record status | Form C for RK Meadows; certificate records no extension. |
| Identifier / date | 3006/15743/W47/2018; approved 16 April, 2019 |
|---|---|
| Scope and record status | Building permit for the residential building on Survey Nos. 63, 64, 65, 66 and 67; extract identifies one stilt plus upper floors and includes site and safety conditions. |
| Identifier / date | 07th August, 2021 |
|---|---|
| Scope and record status | Promoter declaration covering title basis, encumbrance statement, completion undertaking and fund-use/audit commitments. |
| Identifier / date | Title report dated 13.08.2019; underlying title documents cited in the report |
|---|---|
| Scope and record status | Title-report material and deeds are available in the filed project documents; see Land & Title for the complete instrument register and record-specific analysis. |
| Identifier / date | Drawing record 89151 |
|---|---|
| Scope and record status | Drawing-based unit measurements are software-measured; the supplied record does not establish a separate OC or verified construction status. |
| Identifier / date | Not present in supplied documents |
|---|---|
| Scope and record status | The building permit requires an OC before occupation; whether an OC has subsequently issued is not established here. |
1. Project at a glance
Project identity
Registered project name: RK Meadows
Project type / registered portion: Residential apartment project; phase or separately registered portion is not identified in the supplied records. The building permit identifies Building - A (RK CONSTRUCTIONS).
TG-RERA registration: P00300003541, issued 20/11/2021; certificate states a three-year validity period ending 16/04/2025, and records no extension. Registration validity is distinct from the completion deadline.
Registered promoter: RK BUILDERS & CONSTRUCTIONS; the RERA record identifies the organization type as Proprietorship.
RERA status in supplied record: The certificate records the registration period above. Current registration status after 16/04/2025 is not established by the supplied documents.
Land and geographic identity
Locality / recorded project location: VIKASNAGAR W47; the registration certificate gives GMH Hanmakonda, Hanamkonda.
Revenue village: GMH Hanmakonda in the project identity record. The title documents also describe the land as Waddepally Revenue Village and/or Vikasnagar, Waddepally; confirm the parcel-to-revenue-village description against the title records.
Mandal / district / PIN: Hanamkonda / Warangal Urban / 506002.
Survey numbers: 63, 64, 65, 66 and 67; no subdivision is supplied.
Plot identifiers: 34, 35 and 36.
Site area: 738.58 m²; the filed land record reports total area and net area each as 738.58 m² and road-widening/FTL/nala-widening affected area as 0.
Boundaries: East: road width 9m; west: existing building; north: plot no 33; south: plot no 37.
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation (GWMC).
Principal building permission: Approval/file no. 3006/15743/W47/2018, approved 16 April, 2019.
Sanctioned building: One residential building, identified as Building - A (RK CONSTRUCTIONS); the permit describes 1 Stilt + 5 upper floors.
Sanctioned parameters: Permit extract lists height 14.95 m, residential upper floors: 6 with area 1,755.30 m², and stilt: 1 with area 336.90 m². The permit’s floor description and parameter summary are reproduced as recorded; the approved drawing set should be consulted for floor-by-floor interpretation.
Approved built-up area: 2,126.97 m² in the RERA project fields. This is the filed approved built-up-area figure, not a carpet or saleable-area figure.
Units: 15 apartments in the RERA filing: 5 2BHK and 10 3BHK. The building permit extract does not state an approved unit count.
Parking: Permit states that cellar and stilt approved in the plan are to be used exclusively for vehicle parking; the supplied extract does not give a parking-space count.
Offering and status
RERA-filed configurations and saleable area: 2BHK: 107.3 m²; 3BHK: 139.12 m².
Booked / available: Portal-derived figures show 0 booked and 5 available 2BHK, and 0 booked and 10 available 3BHK. The portal record has no as-of date, so counts are indicative rather than a current inventory confirmation.
Completion deadline: Promoter’s Form B undertaking states 16/04/2025; the building permit also states construction must be completed before 16 April, 2025.
Construction stage: No independently verified site-progress assessment is supplied. RERA amenity entries show 0% for the listed progress fields; these entries do not establish overall building completion.
Occupancy certificate (OC): No OC is included in the supplied project documents. The permit requires an OC before occupation. OC status is therefore not established in this record.
2. The project story
RK Meadows is a single-building residential apartment development recorded at VIKASNAGAR W47, Hanamkonda, on land identified in the project filing as Survey Nos. 63, 64, 65, 66 and 67, with plot identifiers 34, 35 and 36. The RERA registration certificate identifies the location as GMH Hanmakonda, Hanamkonda, and records 15 apartments across two configurations.
The municipal building permit sanctions one residential building with a stilt and upper floors. The RERA inventory records 5 two-bedroom and 10 three-bedroom apartments. The supplied records do not establish independently verified construction progress, current sales availability, or an issued OC; the promoter’s stated completion date is 16/04/2025.
3. Master plan, architecture & building design
- The sanctioned record is for one residential building on a site area of 738.58 m², with approved built-up area recorded in the RERA fields as 2,126.97 m². The building-permit extract describes 1 Stilt + 5 upper floors and lists a height of 14.95 m. Its sanctioned-parameters summary separately records six residential upper floors and a stilt; refer to the approved plan for the detailed floor configuration.
- The permit lists a stilt area of 336.90 m² and residential upper-floor area of 1,755.30 m². It does not provide a separate FSI-counted-area figure in the supplied extract. These figures should not be treated as carpet area or saleable area.
- The supplied extract does not establish a building footprint, flats per floor, lift count, stair arrangement, internal circulation plan, or residential/common-area split. The permit requires a tot-lot to be fenced and maintained as greenery, peripheral greenery, a rainwater-harvesting percolation pit, transformer space and a garbage house; these are permit conditions, not evidence that the facilities have been completed.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are presented below. Drawing-based carpet measurements were software-measured from the supplied floor-plan drawing record; they are not RERA-filed measurements and require verification against the drawings. The RERA saleable area is a separate figure and must not be read as carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 107.3 m² | 66.3–66.4 m² (median 66.3 m²; software-measured) | 38% |
| 3BHK | 10 | 0 | 10 | 139.12 m² | 94.6–96.8 m² (median 95.5 m²; software-measured) | 31% |
- The measured 2BHK drawing sample includes a living room, dining area, kitchen, two bedrooms, two toilets and a balcony. The sampled 3BHK plan includes living and dining areas, a kitchen, three bedrooms, three toilets and balconies. Room dimensions are drawing-derived software measurements, not RERA disclosures; verify them against the plan before relying on them.
- The reported carpet measurements exclude balconies. Saleable area and carpet area describe different measurement bases; the supplied records do not provide a separate RERA-filed balcony-area schedule.
5. Parking & vehicle circulation
- The building permit states that the cellar and stilt approved in the plan are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, or the parking allocation for individual apartments.
- The RERA-filed land details report a mortgage area of 192.86 m², while the permit parameters identify the SECOND FLOOR handed over Area as 192.86 m². This is an area designation in the supplied records, not a parking allocation. No parking-space count or exclusive unit-wise parking right can be established from the supplied evidence.
6. Amenities, recreation & open spaces
The RERA amenity record contains 14 entries. It lists several services or facilities as available (“YES”), but records 0% progress for every listed entry; these entries do not verify delivery. The building permit also specifies certain site features as conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit requires a fenced tot-lot maintained as greenery and a strip of greenery around the site; no size is supplied. | RERA entry: 0%; permit condition, completion not verified. | |
| Community buildings | No description or size supplied. | 0% recorded; completion not verified. | |
| Internal roads and footpaths | No dimensions supplied. | 0% recorded; completion not verified. | |
| Water supply | RERA amenity entry marked YES; no source, storage or capacity stated here. | 0% recorded; operational status not verified. | |
| Sewerage | RERA entry for “Sewerage (Chamber, Lines, Septic Tank, STP)” marked YES; no system detail or capacity supplied. | 0% recorded; operational status not verified. | |
| Storm-water drains | No layout or capacity supplied. | 0% recorded; completion not verified. | |
| Water conservation / rainwater harvesting | RERA entry marked YES; permit requires a rainwater-harvesting percolation pit. | 0% recorded; installation not verified. | |
| Electrical meter room / sub-station / receiving station | RERA entry marked YES; permit requires transformer space. | 0% recorded; installation not verified. | |
| Street lighting | No specification supplied. | 0% recorded; completion not verified. | |
| Sewage and sullage treatment/disposal | No treatment details or capacity supplied. | 0% recorded; completion not verified. | |
| Solid-waste management and disposal | Permit requires a garbage house within the premises. | 0% recorded; completion not verified. | |
| Energy management | No system details supplied. | 0% recorded; completion not verified. | |
| Fire protection and fire-safety requirements | Permit lists fire-safety conditions; see Utilities, building services & safety. | 0% recorded; completion not verified. | |
| Aggregate recreational open space | No area supplied. | 0% recorded; completion not verified. |
7. Utilities, building services & safety
- Water and drainage: The RERA amenity record marks water supply, sewerage and storm-water drains as “YES” but records 0% progress for each. The permit requires a rainwater-harvesting percolation pit, a separate underground static water storage tank of 25,000L, and a separate residential terrace tank of 25,000lits. These are recorded provisions or conditions; the supplied documents do not verify installation or operation.
- Electrical and backup: The permit requires transformer space, a generator as an alternate electricity source and emergency lighting in corridors/common passages and staircases. The RERA amenity record marks the electrical meter room/sub-station/receiving-station entry “YES” but records 0% progress. No generator capacity or electrical-supply details are supplied.
- Lifts, fire and life safety: The permit requires fire-resistant swing doors for collapsible lifts, fire extinguishers, a manual alarm system, hose reel and down-comer provisions; it also specifies an automatic sprinkler system if the basement area exceeds 200 Sq.mts. The extract does not state lift count or capacity, basement area, installation status, or an independent fire-clearance record. These permit conditions alone do not establish completed systems or statutory compliance.
- Waste and accessibility: A garbage house is required by the permit, but no waste segregation or processing details are supplied. The permit’s accessibility condition refers to public and semi-public buildings above 300Sq.mts.; the supplied record does not establish whether or how that condition applies to this residential building, or document ramps or accessible circulation.
8. Location, access & connectivity
- The project is recorded at VIKASNAGAR W47, with the registration certificate identifying GMH Hanmakonda, Hanamkonda, Warangal Urban, 506002. The project filing’s site boundaries identify a 9m road on the east. The building-permit extract also references 18M road width in its conditions, but no project access-road map or measured route is supplied here.
- The location record provides a sampled Outer Ring Road interchange distance of 112.5 km. No other verified distances, public-transport details or project access route are supplied.
9. Developer & development status
- The registered promoter is RK BUILDERS & CONSTRUCTIONS, identified in the RERA record as a Proprietorship. Its authorized signatory is recorded as Ramakrishna Reddy Dasari; the Form B declaration is executed by Dasari Ramakrishna Reddy on behalf of the promoter. The supplied data do not establish a corporate registration identifier, official website, or complete official contact details.
- The promoter’s Form B declaration, dated 07th August, 2021, undertakes completion by 16/04/2025 and states that land is free from encumbrances and that project funds will be handled through the stated separate-account and certification process. Those are promoter declarations. The supplied record does not independently establish current construction progress, whether the deadline was met, or whether an OC has issued.
10. Approvals, official records & documents
| Identifier / date | P00300003541; issued 20/11/2021; validity stated through 16/04/2025 |
|---|---|
| Scope and record status | Form C for RK Meadows; certificate records no extension. |
| Identifier / date | 3006/15743/W47/2018; approved 16 April, 2019 |
|---|---|
| Scope and record status | Building permit for the residential building on Survey Nos. 63, 64, 65, 66 and 67; extract identifies one stilt plus upper floors and includes site and safety conditions. |
| Identifier / date | 07th August, 2021 |
|---|---|
| Scope and record status | Promoter declaration covering title basis, encumbrance statement, completion undertaking and fund-use/audit commitments. |
| Identifier / date | Title report dated 13.08.2019; underlying title documents cited in the report |
|---|---|
| Scope and record status | Title-report material and deeds are available in the filed project documents; see Land & Title for the complete instrument register and record-specific analysis. |
| Identifier / date | Drawing record 89151 |
|---|---|
| Scope and record status | Drawing-based unit measurements are software-measured; the supplied record does not establish a separate OC or verified construction status. |
| Identifier / date | Not present in supplied documents |
|---|---|
| Scope and record status | The building permit requires an OC before occupation; whether an OC has subsequently issued is not established here. |
Frequently asked questions
Is RK Meadows registered with Telangana RERA?
Yes. RK Meadows is registered with the Telangana Real Estate Regulatory Authority as P00300003541; the registration status is New Project.
Who is the developer of RK Meadows?
The promoter named in the RERA registration is RK BUILDERS & CONSTRUCTIONS.
Where is RK Meadows located?
RK Meadows is in VIKASNAGAR W47, GMH Hanmakonda, Hanamkonda, Telangana (506002).
When will RK Meadows be completed?
The promoter's proposed date of completion filed with RERA is 16/04/2025. This is the promoter's declaration, not a guarantee.
More projects in Gmh Hanmakonda





