RAMJITHA RESIDENCY is a residential apartment project in Hayathnagar, Abdullapurmet, Ranga Reddy. It is being developed by the registered promoter M/S TMR CONSTRUCTIONS. The project covers 500.79 sq m and comprises one building with a stilt and 5 upper floors, with 10 3BHK units. Its TG-RERA registration number is P02400001713, and the registration record states proposed completion by 27/08/2025.

More from Tmr Constructions · 4 projects →

01What we found

Period endedTG-RERA registration ran to 27 Aug 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameRAMJITHA RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not stated. The RERA record describes one building and the approvals identify Plot Nos. 16 & 17 in Sy. No. 610. RERA filing
TG-RERA registrationP02400001713; granted 18/02/2020, valid through 27/08/2025; the supplied registration certificate says it was not extended. Registration validity is separate from the project completion date. RERA record
Registered promoterM/S TMR CONSTRUCTIONS; entity type recorded as proprietorship. RERA record RERA filing Corporate record
RERA status in supplied recordThe stated registration validity has ended; no extension is recorded in the supplied certificate.

Land and geographic identity

ItemRecord
LocalityHayathnagar RERA record RERA filing
Revenue villageRERA identity records Hayathnagar; the filed title and approval documents describe Laxmareddy Palem / Pedda Amberpet and Pedda Amberpet (Kalan). The supplied records do not establish these names as one identical revenue-village designation. RERA record Land records
Mandal / district / PINAbdullapurmet / Ranga Reddy / 501505 RERA record RERA filing
Survey number(s) and subdivisionsSy. No. 610; no subdivision is stated. Plot Nos. 16 and 17 are identified in the RERA record and building approvals. RERA filing
Site extentRERA-filed total and net area: 500.79 sq m. RERA filing
BoundariesNorth: Plot No. 18; South: Plot No. 15; East: neighbour’s land; West: 30 ft road. RERA filing

Development identity

ItemRecord
Principal sanctioning authority / approvalHMDA technical approval No. 019314/GHT/R1/U6/HMDA/19012019, dated 27-08-2019; subsequent building permit order issued by Pedda Amberpet Municipality on 25.09.2019, file No. OSC No.G1/3624/TPS/PAM/2019-20. Approvals record
Development formOne residential building, sanctioned as Stilt + 5 upper floors. RERA filing
Approved area figuresThe plan records 1212.85 sq m as proposed net built-up area; it separately records 1455.42 sq m as total built-up area. The RERA record gives approved built-up area as 1212.86 sq m. These are retained as labelled in their respective records. RERA filing
Approved versus RERA-filed unitsApproval documents state 10 dwelling units; RERA lists 10 units. RERA unit table
ParkingStilt is designated for parking. No verified parking-space count or individual unit allocation is supplied.
Building heightApproval extraction records 14.90 m; the plan also records 20.35 m total height and 17.85 m from ground level.

Offering and status

ItemRecord
RERA-filed configuration3BHK; 10 units; saleable area 121.28 sq m per unit. RERA unit table RERA unit details
Booked / available10 booked; 0 available, as last read from the TG-RERA portal. The portal record supplied has no as-of date, so counts are indicative. RERA unit table RERA unit details
Completion datesRERA registration header states proposed completion by 27/08/2025. Form B declares completion by 19th July 2021. RERA record
Construction stageNo current construction-progress evidence or independent site verification is supplied. Document index RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. This is not a statement that none has since been issued. Document index

2. The project story

RAMJITHA RESIDENCY is recorded with TG-RERA as a residential apartment development in the Hayathnagar / Abdullapurmet area of Ranga Reddy district. The RERA record and building-permit documents describe Plot Nos. 16 and 17 in Sy. No. 610, with a site extent of 500.79 sq m and one stilt-plus-five-upper-floor building. RERA record RERA filing

The approval documents provide for 10 dwellings, and the RERA filing lists ten 3BHK units. The portal’s last-read inventory shows all ten booked, but has no stated as-of date. RERA unit details RERA unit table No verified current construction stage is available in the supplied evidence; the completion dates stated in the registration record and promoter’s Form B are disclosed separately above, and no occupancy certificate is identified in the documents reviewed. RERA record Document index

3. Master plan, architecture & building design

The filed approval plan describes a single residential building on a 500.79 sq m plot, with proposed coverage of 242.57 sq m (48.44%) and vacant plot area of 258.21 sq m. It lists 1212.86 sq m as residential net built-up area and 1217.39 sq m as total proposed net built-up area; the approval parameters separately state total built-up area of 1455.42 sq m. These labels are preserved rather than treated as interchangeable area measures.

The approved configuration is Stilt + 5 upper floors. The plan shows a 9 m wide road and a 4.5 m wide driveway; the stilt is designated for parking. One lift is listed in the plan. The supplied material does not provide a reliable floor-by-floor apartment arrangement, flats-per-floor count, stair arrangement, or detailed circulation drawing for this Overview.

The plan and permit also identify two second-floor built-up-area portions mortgaged in favour of HMDA: 139.91 sq m under document No. 8736/19 and 63.00 sq m under document No. 8735/19. The development is recorded as one building; no separate phase or tower arrangement is identified. RERA filing

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100121.28 sq mNot availableNot supplied
  • The configuration, counts, booking status and saleable area are from the RERA filing; the booking figures have no supplied as-of date. RERA unit details RERA unit table
  • The drawing-measurement record does not provide a usable carpet-area figure matched to this RERA configuration: it records no measured flat designs for 5BHK, which is not matched to the RERA configuration. Accordingly, no drawing-derived carpet or room measurements are reported. Floor plans
  • RERA saleable area and carpet area are different measures: the supplied measurement note explains that saleable area includes the home’s share of common areas and is larger than carpet area. No carpet-area, balcony, utility, room-dimension or loading figure is established here. Floor plans RERA unit details

5. Parking & vehicle circulation

  • The sanctioned documents designate the stilt floor for parking. They do not establish a reliable number of parking spaces, visitor or accessible parking provision, or parking allocations to individual apartments.
  • No evidence of basement, podium, mechanical or surface parking, EV charging, or a documented unit-wise parking entitlement is supplied. A parking space shown or permitted in the building record should not be treated as proof of exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The RERA amenities record supplies progress percentages but does not state whether these are independently inspected or verified. The building-permit documents separately specify some site features and conditions.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkNo size statedRERA amenities record; building permit requires the tot-lot to be fenced and maintained as greeneryRERA record: 100%; independent completion verification not supplied. RERA amenities
Community buildingsNo details statedRERA amenities record0%; no independent site verification supplied. RERA amenities
Aggregate recreational open spaceNo area statedRERA amenities record0%; no independent site verification supplied. RERA amenities
Internal roads and footpathsNo dimensions stated in the amenities recordRERA amenities record100% declared; independent completion verification not supplied. RERA amenities
Street lightingNo details statedRERA amenities record100% declared; independent completion verification not supplied. RERA amenities

No clubhouse or indoor recreation facilities are evidenced in the supplied project material. RERA amenities Site utilities and services are addressed below.

7. Utilities, building services & safety

  • The RERA amenities record declares water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room / sub-station / receiving station at 100%; it gives no capacity or independent completion verification. RERA amenities
  • The building-plan materials list a sump tank, overhead water tank and septic tank; the approval conditions call for underground drainage and a rainwater-harvesting structure. The permit also requires a transformer and garbage house within the premises. These are approval-record items or conditions, not evidence that the facilities have been completed or commissioned.
  • The approval conditions include fire-safety provisions, including extinguisher requirements and a sprinkler condition if basement area exceeds 200 sq m; they also refer to fire-vehicle manoeuvrability and fire-resistant transformer construction. The documents do not establish completed fire systems, an occupancy clearance, or independent statutory-compliance verification.
  • One lift is listed, without capacity or service-lift details.
  • The RERA amenities record shows solid-waste management and disposal, energy management, and fire protection / fire-safety requirements at 0%. RERA amenities
  • No evidence is supplied for backup power, water-treatment capacity, accessibility features, CCTV or access-control systems.

8. Location, access & connectivity

The registered project location is in Hayathnagar, Abdullapurmet mandal, Ranga Reddy district, PIN 501505; the RERA land record identifies Sy. No. 610 and Plot Nos. 16 and 17. The boundaries name a 30 ft road on the west, and the approval material also records a 9 m wide road and a 4.5 m wide driveway. RERA record RERA filing RERA filing

The supplied location data lists Financial District (Nanakramguda) at 1.2 km as an anchor. The project location is represented by a cadastral parcel centroid; no public-transport details or independently verified journey times are supplied. Location record

9. Developer & development status

  • The registered promoter is M/S TMR CONSTRUCTIONS, recorded as a proprietorship. The RERA record names THUMMALAPALLY MANIPAL REDDY as an authorized signatory. The promoter address on file is Plot No. 89, Road 2, Rock Town Colony, Pedda Amberpet, Hayathnagar, Abdullapurmet, Ranga Reddy, PIN 501505. No corporate registration identifier, official website, or contact details are established in the supplied overview data. Corporate record Parties record RERA filing
  • The promoter’s Form B, dated 25th day of July 2019, declares completion by 19th July 2021. The RERA header separately gives a proposed completion date of 27/08/2025. No current site-progress report or independently verified construction status is supplied; neither declared date establishes completion or occupancy. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001713; 18/02/2020 to 27/08/2025
What the supplied record establishesForm C records registration of RAMJITHA RESIDENCY, survey number 610, Plot Nos. 16 and 17; certificate states no extension.
HMDA technical approval and plan
Identifier / date019314/GHT/R1/U6/HMDA/19012019; 27-08-2019
What the supplied record establishesTechnical approval for a residential Stilt + 5 upper-floor building; plan records 10 dwellings and approval conditions.
Pedda Amberpet Municipality building permit
Identifier / dateOSC No.G1/3624/TPS/PAM/2019-20; 25.09.2019
What the supplied record establishesBuilding permit order for Stilt + 5 upper floors on Plot Nos. 16 and 17, Sy. No. 610.
RERA Form B declaration
Identifier / date25th day of July 2019
What the supplied record establishesPromoter declaration covering title documentation, separate-account obligations and the stated completion undertaking.
Project title report and sale-deed material
Identifier / dateDocuments 78055, 78056, 78060, 78061 and 78062
What the supplied record establishesFiled title-opinion and deed materials are present in the project record.
Occupancy / completion certificate
Identifier / dateNot identified in supplied documents
What the supplied record establishesNo such certificate is available in the evidence supplied for this Overview. Document index

Frequently asked questions

Is RAMJITHA RESIDENCY registered with Telangana RERA?

Yes. RAMJITHA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400001713; the registration status is New Project.

Who is the developer of RAMJITHA RESIDENCY?

The promoter named in the RERA registration is M/S TMR CONSTRUCTIONS.

Where is RAMJITHA RESIDENCY located?

RAMJITHA RESIDENCY is in hayathnagar, Abdullapurmet, Rangareddy, Telangana (501505).

When will RAMJITHA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 27/08/2025. This is the promoter's declaration, not a guarantee.

More projects in Hayathnagar