Ragidi Smart City
Kankadurga Avenues Pvt Ltd · Hanamkonda · RERA P00300002718
Ragidi Smart City is a plotted development in Elkathurthi, Elkathurthy mandal, Warangal Urban district, developed by registered promoter Kankadurga Avenues Pvt Ltd. The layout covers 13 acres and comprises 150 residential plots stated as 33' × 55'; towers and floors are not disclosed. It is registered under TG-RERA number P00300002718, with proposed completion listed as 31/03/2021.
More from Kankadurga Avenues Pvt Ltd · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Ragidi Smart City RERA record |
| Project type | Plotted development / open-plots layout RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed; the registration identifies the project across the listed survey numbers. |
| TG-RERA registration | P00300002718 |
| Registration validity | Certificate states 30/03/2021 to 31/03/2021 and “0 years”; it records no extension. This is the registration period, not the project completion deadline. |
| Registered promoter | Kankadurga Avenues Pvt Ltd, a company RERA record Corporate record |
| RERA status in supplied record | Registration certificate issued under section 5; current registration status beyond the certificate’s stated period is not established by the supplied record. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Elkathurthi RERA record |
| Mandal | Elkathurthy in the project and sanction records; the registration certificate also lists Warangal Urban as the mandal. RERA record |
| District | Warangal Urban; the layout proceedings say Warangal (U) District. RERA record |
| PIN | 506330 RERA record |
| Project survey numbers / subdivisions | Sy.No. 312/1A, 312/1B, 351/B and 351/C. The sanction extraction renders 351/B as “351/8”; the RERA registration and project land record use 351/B. Land records |
| Sanction-record extent | Ac.13.0 gts. (52,609.13 sq. m.) |
| RERA land record | Total area 52,609 sq. m.; net area 30,186.00 sq. m.; area affected by road widening/FTL of tanks/nala widening 22,423 sq. m. RERA filing Land records |
| Boundaries | North: agriculture land of vendor; South: vagu and agriculture land of Chikati Cheralu; East: agriculture land of Katkuri Radhamma; West: agriculture land of Govardhan Reddy, Kumaraswamy and Shalini. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Kakatiya Urban Development Authority (KUDA) Approvals record |
| Principal layout approval | D.P.No. 62 of 2019; approval date is transcribed in the record as “28, Dec,20l9.” Approvals record |
| Layout plan references in proceedings | D.P.No.62 of 2019 and D.P.No.52/2019 are both referenced in the filed proceedings. |
| Approved plot count and stated plot size | 150 plots; 33' × 55' |
| Approved built-up area | 30,186 sq. m. is listed as “Approved Built up Area” in the RERA fields; the supplied layout evidence describes an open-plots layout and does not identify a project-wide building programme. RERA filing |
| Buildings, floors and parking levels | Not disclosed for this plotted layout. |
| Infrastructure and land-use elements in sanction record | Roads, net plotted area, open space, mortgaged plots, garbage station and local amenities area are identified; the extracted area figures are not consistently legible. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Residential plots; the layout proceedings state “Only detached dwelling house designed for the occupation of a single family shall be built.” |
| Plot count | 150 sanctioned plots; booked and available plot counts are not supplied. |
| Plot size | 33' × 55' in the layout sanction extraction. Plot-wise schedule or dimensions are not supplied. |
| Construction / development stage | RERA fields state 70% completeness; this is a record disclosure, not an independently verified site inspection. RERA record |
| Completion dates | RERA project information lists proposed completion as 31/03/2021. The filed Form B declaration states the project shall be completed by 31/03/2027. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The project is a plotted layout; certificate status for the layout or any individual dwelling is not established. Document index |
2. The project story
Ragidi Smart City is registered as a plotted development at Elkathurthi, in the Warangal Urban district. Its filed layout sanction describes an open-plots layout over 13 acres, with 150 plots stated as 33' × 55'. The sanction conditions contemplate individual detached, single-family dwelling houses; the supplied record does not describe apartment blocks or promoter-built homes. RERA record
The layout proceedings identify roads, open space, a garbage transmission station and a local amenities area. They also state that infrastructure works include road formation and surfacing, drainage, lighting and culverts. The proceedings make sale or construction on sites conditional on demarcation of sites and streets and completion of specified street works.
The RERA record reports 70% completeness, but the supplied material does not provide a dated, independently verified site assessment. The registration certificate records a short validity period ending 31/03/2021; separately, the promoter’s Form B declaration states a completion date of 31/03/2027. No occupancy or completion certificate is supplied. RERA record
3. Master plan, architecture & building design
The filed sanction is for a plotted layout, not a tower or apartment-building scheme. It identifies 150 plots, stated as 33' × 55', and names roads, open space, a garbage station area and a local amenities area. The RERA land record separately reports 52,609 sq. m. total area, 30,186.00 sq. m. net area and 22,423 sq. m. affected by road widening/FTL of tanks/nala widening. RERA filing
The sanction extraction lists proposed roads at 30,185.36 sq. m. (31.93%) and net plotted area at 5,352.28 sq. m. (57.38%); the remaining extracted component values are not consistently legible. The proceedings also identify open space as 10.17% and mortgaged area as “15.3e%.” These are transcribed sanction-record figures, not independently measured site areas.
The layout conditions specify minimum building lines of 3.00 m on 12 m roads, 4.00 m on roads of 12–18 m, and 6.00 m on roads above 18 m; rear open space is stated as not less than 10'. Another condition says at least 50% of the extent of a site is to remain vacant open space.
Two drawing records are listed for floor-plan review, but both are scans pending; no software-measured plans or layout sheets are available in the supplied data. Building footprints, individual plot schedule, detailed road-and-plot arrangement, and dwelling designs are therefore not established here. Floor plans
4. Homes, configurations & floor plans
The offering recorded in the layout sanction is residential plots rather than a RERA-filed apartment configuration. The sanction extraction states 150 plots at 33' × 55'; no booked or available plot counts or plot-wise schedule are supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots; stated size 33' × 55' | 150 sanctioned | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
The floor-plan record says two drawings are pending scan review and none have been measured. Consequently, there are no software-measured carpet areas or room dimensions to report. Floor plans
5. Parking & vehicle circulation
The supplied layout evidence does not provide a parking-space count, parking allocation, parking levels, visitor or accessible spaces, EV charging provision, or vehicle-entry arrangement. It identifies roads and street works, including drainage, lighting and culverts, but does not establish plot-specific parking rights or arrangements. RERA amenities
6. Amenities, recreation & open spaces
The RERA amenities list marks several infrastructure items “YES,” but shows 0% progress for every listed item. The layout sanction separately identifies open space, a garbage station and local amenities area, and describes street and drainage works. No supplied evidence establishes that these facilities are complete or independently inspected. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | RERA-listed; no dimensions supplied in the amenities record | RERA amenities | Listed “YES”; 0% recorded |
| Green strip / tot lot / park | RERA-listed; layout proceedings also identify open space (10.17% in the extraction) | RERA amenities | Listed “YES”; 0% recorded; completion not independently verified |
| Aggregate recreational open space | RERA-listed; no additional size supplied | RERA amenities | Listed “YES”; 0% recorded |
| Community buildings | RERA-listed without a “YES” entry, size or description | RERA amenities | 0% recorded; provision and completion not established |
| Garbage station / solid waste management | Sanction proceedings identify a garbage station / garbage transmission station area; RERA also lists solid waste management and disposal | RERA amenities | Sanction-record element; RERA progress 0%; completion not verified |
| Local amenities area | Named in the layout sanction; size not supplied | Sanction-record element; completion not established |
7. Utilities, building services & safety
The RERA amenities list names water supply, sewerage (chambers, lines, septic tank, STP), storm-water drains, street lighting, sewage and sullage treatment, water conservation/rainwater harvesting, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. Water supply, sewerage, storm-water drains, street lighting and electrical facilities are marked “YES”; the list records 0% progress across all items. The record does not provide capacities, specifications, source arrangements or completion evidence. RERA amenities
The layout proceedings describe drainage, lighting and culverts as infrastructure works and make release of mortgaged plots conditional on completion of infrastructure amenities. They do not provide engineering details or establish that the works have been completed.
No project-specific evidence is supplied for lifts, fire-system design or clearance, backup power, CCTV, security access control, accessibility features, or utility capacities. RERA amenities Document index
8. Location, access & connectivity
The registered project location is Elkathurthi, PIN 506330, in the Warangal Urban district; the project and layout records identify Elkathurthy mandal. The registration certificate also lists Warangal Urban as the mandal. RERA record
The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No approach-road description, public transport information or other verified landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is Kankadurga Avenues Pvt Ltd, a company. The RERA record lists its address as Flat No. 107, Royal Enclave, NH563, Primary Health Center, Elkathurthi, Elkathurthy, Warangal Urban, 506330. The registration certificate separately records the promoter office as “Village: Mandal: Hanamkonda, District: Warangal Urban, Pin: 506001.” No official website or contact details are supplied here. Corporate record RERA filing
The registration materials name Kondam Kamalakar and Anitha Ragidi as directors and Thirupathaiah Ragidi as authorized signatory. The filed Form B is signed by Thirupathaiah Ragidi and declares completion by 31/03/2027; the RERA project-information record lists proposed completion as 31/03/2021. The RERA record reports 70% completeness, without independent verification in the supplied evidence. Parties record RERA filing RERA record
10. Approvals, official records & documents
| Evidence in supplied file | Form C, P00300002718, issued 30/03/2021; stated validity 30/03/2021–31/03/2021. |
|---|---|
| Scope / note | Ragidi Smart City; listed surveys: 351/C, 351/B, 312/1A and 312/1B |
| Evidence in supplied file | KUDA proceedings, D.P.No. 62 of 2019; application/file references and layout conditions included. |
|---|---|
| Scope / note | Open-plots layout in Elkathurthy; the proceedings also refer to D.P.No.52/2019 |
| Evidence in supplied file | Filed affidavit by Thirupathaiah Ragidi. |
|---|---|
| Scope / note | Declares title report, statutory undertakings and completion by 31/03/2027 |
| Evidence in supplied file | Two drawings listed; both scans pending review. Floor plans |
|---|---|
| Scope / note | No measured floor-plan outputs or layout sheets supplied |
| Evidence in supplied file | Not included in the supplied documents. Document index |
|---|---|
| Scope / note | Certificate status is not established by this evidence set |
1. Project at a glance
Project identity
Registered project name: Ragidi Smart City
Project type: Plotted development / open-plots layout
Phase / registered portion: No separate phase name is disclosed; the registration identifies the project across the listed survey numbers.
TG-RERA registration: P00300002718
Registration validity: Certificate states 30/03/2021 to 31/03/2021 and “0 years”; it records no extension. This is the registration period, not the project completion deadline.
Registered promoter: Kankadurga Avenues Pvt Ltd, a company
RERA status in supplied record: Registration certificate issued under section 5; current registration status beyond the certificate’s stated period is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Elkathurthi
Mandal: Elkathurthy in the project and sanction records; the registration certificate also lists Warangal Urban as the mandal.
District: Warangal Urban; the layout proceedings say Warangal (U) District.
PIN: 506330
Project survey numbers / subdivisions: Sy.No. 312/1A, 312/1B, 351/B and 351/C. The sanction extraction renders 351/B as “351/8”; the RERA registration and project land record use 351/B.
Sanction-record extent: Ac.13.0 gts. (52,609.13 sq. m.)
RERA land record: Total area 52,609 sq. m.; net area 30,186.00 sq. m.; area affected by road widening/FTL of tanks/nala widening 22,423 sq. m.
Boundaries: North: agriculture land of vendor; South: vagu and agriculture land of Chikati Cheralu; East: agriculture land of Katkuri Radhamma; West: agriculture land of Govardhan Reddy, Kumaraswamy and Shalini.
Development identity
Sanctioning authority: Kakatiya Urban Development Authority (KUDA)
Principal layout approval: D.P.No. 62 of 2019; approval date is transcribed in the record as “28, Dec,20l9.”
Layout plan references in proceedings: D.P.No.62 of 2019 and D.P.No.52/2019 are both referenced in the filed proceedings.
Approved plot count and stated plot size: 150 plots; 33' × 55'
Approved built-up area: 30,186 sq. m. is listed as “Approved Built up Area” in the RERA fields; the supplied layout evidence describes an open-plots layout and does not identify a project-wide building programme.
Buildings, floors and parking levels: Not disclosed for this plotted layout.
Infrastructure and land-use elements in sanction record: Roads, net plotted area, open space, mortgaged plots, garbage station and local amenities area are identified; the extracted area figures are not consistently legible.
Offering and status
Unit type: Residential plots; the layout proceedings state “Only detached dwelling house designed for the occupation of a single family shall be built.”
Plot count: 150 sanctioned plots; booked and available plot counts are not supplied.
Plot size: 33' × 55' in the layout sanction extraction. Plot-wise schedule or dimensions are not supplied.
Construction / development stage: RERA fields state 70% completeness; this is a record disclosure, not an independently verified site inspection.
Completion dates: RERA project information lists proposed completion as 31/03/2021. The filed Form B declaration states the project shall be completed by 31/03/2027.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The project is a plotted layout; certificate status for the layout or any individual dwelling is not established.
2. The project story
Ragidi Smart City is registered as a plotted development at Elkathurthi, in the Warangal Urban district. Its filed layout sanction describes an open-plots layout over 13 acres, with 150 plots stated as 33' × 55'. The sanction conditions contemplate individual detached, single-family dwelling houses; the supplied record does not describe apartment blocks or promoter-built homes.
The layout proceedings identify roads, open space, a garbage transmission station and a local amenities area. They also state that infrastructure works include road formation and surfacing, drainage, lighting and culverts. The proceedings make sale or construction on sites conditional on demarcation of sites and streets and completion of specified street works.
The RERA record reports 70% completeness, but the supplied material does not provide a dated, independently verified site assessment. The registration certificate records a short validity period ending 31/03/2021; separately, the promoter’s Form B declaration states a completion date of 31/03/2027. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The filed sanction is for a plotted layout, not a tower or apartment-building scheme. It identifies 150 plots, stated as 33' × 55', and names roads, open space, a garbage station area and a local amenities area. The RERA land record separately reports 52,609 sq. m. total area, 30,186.00 sq. m. net area and 22,423 sq. m. affected by road widening/FTL of tanks/nala widening.
The sanction extraction lists proposed roads at 30,185.36 sq. m. (31.93%) and net plotted area at 5,352.28 sq. m. (57.38%); the remaining extracted component values are not consistently legible. The proceedings also identify open space as 10.17% and mortgaged area as “15.3e%.” These are transcribed sanction-record figures, not independently measured site areas.
The layout conditions specify minimum building lines of 3.00 m on 12 m roads, 4.00 m on roads of 12–18 m, and 6.00 m on roads above 18 m; rear open space is stated as not less than 10'. Another condition says at least 50% of the extent of a site is to remain vacant open space.
Two drawing records are listed for floor-plan review, but both are scans pending; no software-measured plans or layout sheets are available in the supplied data. Building footprints, individual plot schedule, detailed road-and-plot arrangement, and dwelling designs are therefore not established here.
4. Homes, configurations & floor plans
The offering recorded in the layout sanction is residential plots rather than a RERA-filed apartment configuration. The sanction extraction states 150 plots at 33' × 55'; no booked or available plot counts or plot-wise schedule are supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots; stated size 33' × 55' | 150 sanctioned | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
The floor-plan record says two drawings are pending scan review and none have been measured. Consequently, there are no software-measured carpet areas or room dimensions to report.
5. Parking & vehicle circulation
The supplied layout evidence does not provide a parking-space count, parking allocation, parking levels, visitor or accessible spaces, EV charging provision, or vehicle-entry arrangement. It identifies roads and street works, including drainage, lighting and culverts, but does not establish plot-specific parking rights or arrangements.
6. Amenities, recreation & open spaces
The RERA amenities list marks several infrastructure items “YES,” but shows 0% progress for every listed item. The layout sanction separately identifies open space, a garbage station and local amenities area, and describes street and drainage works. No supplied evidence establishes that these facilities are complete or independently inspected.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | RERA-listed; no dimensions supplied in the amenities record | Listed “YES”; 0% recorded | |
| Green strip / tot lot / park | RERA-listed; layout proceedings also identify open space (10.17% in the extraction) | Listed “YES”; 0% recorded; completion not independently verified | |
| Aggregate recreational open space | RERA-listed; no additional size supplied | Listed “YES”; 0% recorded | |
| Community buildings | RERA-listed without a “YES” entry, size or description | 0% recorded; provision and completion not established | |
| Garbage station / solid waste management | Sanction proceedings identify a garbage station / garbage transmission station area; RERA also lists solid waste management and disposal | Sanction-record element; RERA progress 0%; completion not verified | |
| Local amenities area | Named in the layout sanction; size not supplied | Sanction-record element; completion not established |
7. Utilities, building services & safety
The RERA amenities list names water supply, sewerage (chambers, lines, septic tank, STP), storm-water drains, street lighting, sewage and sullage treatment, water conservation/rainwater harvesting, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. Water supply, sewerage, storm-water drains, street lighting and electrical facilities are marked “YES”; the list records 0% progress across all items. The record does not provide capacities, specifications, source arrangements or completion evidence.
The layout proceedings describe drainage, lighting and culverts as infrastructure works and make release of mortgaged plots conditional on completion of infrastructure amenities. They do not provide engineering details or establish that the works have been completed.
No project-specific evidence is supplied for lifts, fire-system design or clearance, backup power, CCTV, security access control, accessibility features, or utility capacities.
8. Location, access & connectivity
The registered project location is Elkathurthi, PIN 506330, in the Warangal Urban district; the project and layout records identify Elkathurthy mandal. The registration certificate also lists Warangal Urban as the mandal.
The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No approach-road description, public transport information or other verified landmark distances are supplied.
9. Developer & development status
The registered promoter is Kankadurga Avenues Pvt Ltd, a company. The RERA record lists its address as Flat No. 107, Royal Enclave, NH563, Primary Health Center, Elkathurthi, Elkathurthy, Warangal Urban, 506330. The registration certificate separately records the promoter office as “Village: Mandal: Hanamkonda, District: Warangal Urban, Pin: 506001.” No official website or contact details are supplied here.
The registration materials name Kondam Kamalakar and Anitha Ragidi as directors and Thirupathaiah Ragidi as authorized signatory. The filed Form B is signed by Thirupathaiah Ragidi and declares completion by 31/03/2027; the RERA project-information record lists proposed completion as 31/03/2021. The RERA record reports 70% completeness, without independent verification in the supplied evidence.
10. Approvals, official records & documents
| Evidence in supplied file | Form C, P00300002718, issued 30/03/2021; stated validity 30/03/2021–31/03/2021. |
|---|---|
| Scope / note | Ragidi Smart City; listed surveys: 351/C, 351/B, 312/1A and 312/1B |
| Evidence in supplied file | KUDA proceedings, D.P.No. 62 of 2019; application/file references and layout conditions included. |
|---|---|
| Scope / note | Open-plots layout in Elkathurthy; the proceedings also refer to D.P.No.52/2019 |
| Evidence in supplied file | Filed affidavit by Thirupathaiah Ragidi. |
|---|---|
| Scope / note | Declares title report, statutory undertakings and completion by 31/03/2027 |
| Evidence in supplied file | Two drawings listed; both scans pending review. |
|---|---|
| Scope / note | No measured floor-plan outputs or layout sheets supplied |
| Evidence in supplied file | Not included in the supplied documents. |
|---|---|
| Scope / note | Certificate status is not established by this evidence set |
Frequently asked questions
Is Ragidi Smart City registered with Telangana RERA?
Yes. Ragidi Smart City is registered with the Telangana Real Estate Regulatory Authority as P00300002718; the registration status is New Project.
Who is the developer of Ragidi Smart City?
The promoter named in the RERA registration is Kankadurga Avenues Pvt Ltd.
Where is Ragidi Smart City located?
Ragidi Smart City is in Elkathurthi, Elkathurthy, Hanamkonda, Telangana (506330).
When will Ragidi Smart City be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2021. This is the promoter's declaration, not a guarantee.