Nirvana Homes

CHEGURI · Rangareddy · RERA P02400007317

NIRVANA HOMES is an open plotted layout in Koheda Village, Abdullapurmet Mandal, Ranga Reddy District, developed by registered promoter Cheguri Amarender Reddy. The layout covers a total site area of 11,854.78 sq.m and includes 42 plots, with plot sizes from 111.48 sq.m to 302.88 sq.m. It is registered with TG-RERA under P02400007317, and the promoter’s Form-B declaration gives a proposed completion date of 10TH September 2027.

01What we found

RegisteredTG-RERA - valid till 10 Sep 2027
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Koheda, Abdullapurmet, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameNIRVANA HOMES RERA record
Project typePlotted development / open plotted layout RERA record
Phase or registered portionThe RERA record identifies the project as a plotted development; a separate phase designation is not disclosed. RERA filing
TG-RERA registrationP02400007317; registered from 08/12/2023 to 10/09/2027 (certificate states a three-year validity period). Registration validity is not the same as the project completion deadline. RERA record
Registered promoterCHEGURI in the project identity record; the registration certificate names Mr./Ms. Cheguri Amarender Reddy. RERA record Corporate record
RERA statusRegistration certificate on file; the project record labels it “New Project.” Current registration validity is stated through 10/09/2027. RERA filing

Land and geographic identity

ItemRecord
Locality / revenue villageKOHEDA / Koheda Village RERA record RERA filing
MandalAbdullapurmet RERA record RERA filing
District / PINRanga Reddy / 501511 RERA record RERA filing
Project survey number(s) and subdivision(s)Survey No. 20/A (also printed as 20/A); no further project subdivision is disclosed. RERA record RERA filing
Site areaTotal site area 11,854.78 sq.m; master-plan road-affected area 883.98 sq.m; net site area is stated in the layout record as 10,970.81 sq.m.
RERA land-area disclosureTotal area 11,854.78 sq.m; affected area 883.98 sq.m; net area 10,970.80 sq.m. RERA filing
Boundaries (RERA filing)East: NEIGHBORS PROPERTY; West: SY NO 19; North: SY NO 20AA; South: WIDE ROAD. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalDraft Layout Letter / approval 007327/LO/HMDA/1583/GHT/2023, dated 11 September, 2023. Approvals record
Approved layout area statementPlotted area 7,119.51 sq.m; layout roads 2,689.9 sq.m (24.52%); open space 828.01 sq.m (7.55%); social infrastructure 275.19 sq.m (2.51%); utilities 58.14 sq.m.
Approved plots42 plots, as stated in the HMDA draft layout letter.
Approved built-up area / buildings and floorsNot applicable to the filed open plotted layout; no building count, floor configuration, or approved built-up area for buildings is disclosed in the supplied project evidence. RERA record
ParkingNo project-wide parking count or parking allocation is disclosed in the supplied RERA/layout evidence. Document index

Offering and status

ItemRecord
Purchasable offeringPlots in an open plotted layout; the HMDA draft layout letter records 42 plots.
Plot count and sizesDrawing-based schedule extraction reports 42 plots with sizes from 111.48 sq.m to 302.88 sq.m; median 148.22 sq.m. These are software-read from the layout drawing and should be checked against it. Layout record
Booked / available plotsNot disclosed in the supplied evidence. RERA filing Document index
Completion deadlinePromoter’s Form-B declaration gives 10TH September 2027 as the project completion date.
Construction / development stageNo independently verified site-progress percentage or current construction-stage report is supplied. The HMDA letter sets out layout-development works and a five-year period for those works.
Occupancy / completion certificateNo occupancy or completion certificate for this plotted layout is identified in the supplied project evidence. Document index

2. The project story

NIRVANA HOMES is registered as a plotted development at Koheda Village, Abdullapurmet Mandal, Ranga Reddy District, on Survey No. 20/A. The HMDA draft layout letter describes an open layout with 42 plots and an area statement dividing the net site into plots, roads, open space, social infrastructure and utilities. RERA record

The layout approval records required infrastructure works including road formation and surfacing, storm-water drainage, underground drainage and a common septic tank/STP, internal water-supply pipelines and overhead tank, electrical lines and street lighting, avenue planting, park development and rainwater-harvesting pits. These are approval requirements and descriptions of intended layout works; the supplied evidence does not independently verify their present completion.

The promoter’s Form-B declaration states a completion deadline of 10TH September 2027. The RERA certificate separately states that registration runs through 10/09/2027. No current site inspection or verified progress percentage is supplied.

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey building project in the supplied records. The HMDA draft layout letter states a total site area of 11,854.78 sq.m, a master-plan road-affected area of 883.98 sq.m, and a net site area of 10,970.81 sq.m. The RERA land-details record gives net area as 10,970.80 sq.m. RERA filing

The layout drawing’s software-read area statement reports 7,119.51 sq.m for plots, 2,689.9 sq.m (24.52%) for layout roads, 828.01 sq.m (7.55%) for open space, 275.19 sq.m (2.51%) for social infrastructure and 58.14 sq.m for utilities. The drawing extraction also reports no separate amenity area. Layout record

The draft letter requires eight plots—Nos. 12, 22, 21, 27, 28, 33, 15 and 16, totaling 1,088.95 sq.m—to be mortgaged in favour of the Metropolitan Commissioner, HMDA. It also states that roads, open space, social infrastructure and utilities are to be handed over to the local body by registered gift deed before release of the final layout.

No building footprints, floors, towers, apartment arrangements, or building design features are evidenced for this plotted project. Document index

4. Homes, configurations & floor plans

The offering is plots, not apartments or villas. The HMDA draft layout letter records 42 plots. A software extraction from the layout drawing identifies these size bands and common printed sizes; these are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record

Plot-size bandPlot count
100–150 sq.yd (84–125 sq.m)3
150–200 sq.yd (125–167 sq.m)28
250–300 sq.yd (209–251 sq.m)5
300–400 sq.yd (251–334 sq.m)6
Common printed plot sizeNumber of plots
139.35 sq.m10
150.50 sq.m6
111.48 sq.m2

The extracted schedule reports the smallest plot as 111.48 sq.m, the median as 148.22 sq.m, and the largest as 302.88 sq.m. The supplied floor-plan record contains two layout sheets and no home floor plans with measurable carpet areas. Layout record Floor plans

5. Parking & vehicle circulation

The supplied HMDA layout and RERA records do not establish a project-wide parking-space count, visitor or accessible parking provision, or individual plot parking allocation. The HMDA letter does require internal roads and access to neighbouring sites, but this does not establish plot-specific parking rights. Document index

6. Amenities, recreation & open spaces

The HMDA draft layout letter describes required layout facilities and land allocations. The supplied RERA amenity record reports infrastructure status fields, but those fields do not provide independent verification of on-site completion. RERA amenities

CategoryFacility / areaDescription / sizeEvidence and status
Landscape / open spaceOpen space828.01 sq.m (7.55%) in the HMDA area statementHMDA draft layout approval; development and handover required before final layout release.
Landscape / open spacePark development and avenue plantationSize not separately statedRequired in the HMDA draft layout conditions; completion not independently verified.
Convenience / communitySocial infrastructure area275.19 sq.m (2.51%)HMDA draft layout approval; handover to local body required before final layout release.
Convenience / communityUtilities area58.14 sq.mHMDA draft layout area statement; handover to local body required before final layout release.
Convenience / communityAmenities area0 sq.m in the HMDA area statementHMDA draft layout approval.
Sports / recreationNo specific sports facility identifiedNot disclosedNo project-specific facility is evidenced in the supplied RERA/layout records. RERA amenities

The RERA amenities record marks internal roads and footpaths, water supply, sewerage, green strip/tot lot/park, street lighting and water conservation/rainwater harvesting as “YES” at 100%. Other listed fields—including storm-water drains, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety, electrical meter/sub-station facilities and aggregate recreational open space—show 0% in that record. These are recorded status values, not an independent site-completion verification. RERA amenities

7. Utilities, building services & safety

The HMDA draft layout conditions specify infrastructure including internal water-supply pipelines and an overhead tank, an assured water-supply source, storm-water drains, underground drainage lines, a common septic tank/STP, electrical supply lines, transformers, street lighting, rainwater-harvesting pits, solid-waste disposal space and a bio-compost unit. The letter also requires a protected water-supply arrangement and directs the applicant to arrange potable-water connectivity to an approved main pipeline. These are conditions or intended works; the supplied evidence does not verify their current installation, capacity, or operation.

The layout conditions also call for underground ducting of utilities, paved footpaths, cycling tracks, LED street lighting, source segregation of garbage and development of green planting. No capacities, technical drawings, fire-safety systems, emergency access specifications, security systems, or accessibility features are supplied.

8. Location, access & connectivity

The registered project location is KOHEDA, Koheda Village, Abdullapurmet Mandal, Ranga Reddy District, Telangana, PIN 501511. The cadastral parcel centroid is recorded as 17.282405718703433, 78.64574198332981. RERA record RERA filing Cadastral map

The layout letter requires the layout roads to be opened for access to neighbouring sites and refers to road widths of 18 mts and above and 60 feet and above in its development conditions. The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 5.0 km. Location record

9. Developer & development status

The project identity record lists the registered promoter as CHEGURI; the RERA certificate and project documents identify Cheguri Amarender Reddy / C. AMARENDER REDDY. The legal entity type, corporate identifiers, registered office details and official contact information are not established in the supplied project evidence. RERA record Corporate record

The promoter’s Form-B affidavit declares that the project will be completed by 10TH September 2027. No independently verified construction-progress report is supplied. The HMDA draft layout letter requires the specified development works to be completed within FIVE (5) YEARS and requires a requisition for final layout approval and release of the mortgage plots after the works and required local-body handover.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400007317, issued 08/12/2023
What it recordsForm ‘C’ registration for NIRVANA HOMES, valid through 10/09/2027, subject to its stated conditions.
HMDA draft layout approval
Identifier / date007327/LO/HMDA/1583/GHT/2023, dated 11 September, 2023
What it recordsDraft permission for an open plotted layout on Survey No. 20/A, Koheda Village; records 42 plots and layout conditions.
Promoter Form-B declaration
Identifier / dateDated 11 September 2023 (as recited in the supplied extraction)
What it recordsPromoter’s declaration concerning the project, including the stated completion date 10TH September 2027.
Layout drawing
Identifier / dateDocument 369852
What it recordsTwo layout sheets; the supplied drawing extraction provides the plot schedule and area statement. Layout record
HMDA approval’s registered mortgage reference
Identifier / dateDocument No. 6772/2023, dated 26 August, 2023
What it recordsThe draft layout letter identifies eight plots totaling 1,088.95 sq.m as mortgaged in favour of the Metropolitan Commissioner, HMDA.

Frequently asked questions

Is NIRVANA HOMES registered with Telangana RERA?

Yes. NIRVANA HOMES is registered with the Telangana Real Estate Regulatory Authority as P02400007317; the registration status is New Project.

Who is the developer of NIRVANA HOMES?

The promoter named in the RERA registration is CHEGURI.

Where is NIRVANA HOMES located?

NIRVANA HOMES is in KOHEDA, Abdullapurmet, Rangareddy, Telangana (501511).

When will NIRVANA HOMES be completed?

The promoter's proposed date of completion filed with RERA is 10/09/2027. This is the promoter's declaration, not a guarantee.