Narsimha Swamy Colony
NARSIMHA SWAMY COLONY · Yadadri Bhuvanagiri · RERA P02000008508
NARSIMHA SWAMY COLONY is a plotted development in Alair, Alair mandal, Yadadri Bhuvanagiri district. The registered promoter developing it is NARSIMHA SWAMY COLONY. The layout covers 17,517.58 sq m and comprises 77 plots; no towers, blocks or floors are stated. It is registered with TG-RERA under P02000008508, with a proposed completion date of 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | NARSIMHA SWAMY COLONY RERA record RERA filing |
| Project type / status | Plotted development; recorded as a new project RERA record RERA filing |
| Registered portion / phase | Not separately identified; the registration is for a plotted layout RERA record |
| TG-RERA registration | P02000008508 RERA record |
| Registration validity | 15 July 2024 to 20 April 2026, subject to any extension by the Authority RERA record |
| Registered promoter | NARSIMHA SWAMY COLONY RERA record |
| RERA status | The supplied certificate records registration; current status is not established by the supplied record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue-village references | RERA header: SY NO.1023; registration certificate: ALER; the filed tentative-layout approval identifies Alair Revenue Village, while the certificate’s “said land” field says Manthapuri. Revenue-village identity should therefore be confirmed from the underlying revenue records. RERA record |
| Mandal / district / PIN | Alair; Yadadri Bhuvanagiri; 508101 RERA record |
| Project survey numbers and subdivisions in tentative-layout approval | 1023/AA1/1/1/1/2; 1023/AA2/1/1/1; 1023/AA2/2/2; 1023/AA1/1/1/2; 1023/AA2/1/1/2/1; 1023/AA2/1/2/2; 1023/AA1/1/2; 1023/AA2/1/2/1; 1023/AA2/2/1; 1023/AA1/2; 1023/AA2/1/1/2/2. The RERA land record also identifies Survey No. 1023. Land records |
| Site extent | RERA land record: total and net area 17,517.58 sq m. The filed layout records 17,517.77 sq m; the tentative-layout approval states 4 Acer 13.15 Gts (20,952 Sq. Yds). Land records |
| Boundaries recorded in RERA land details | East: OTHERS LAND; West: 60 FEET WIDE ROAD; North: LAND OF PANTHAM VENKATESHWARLU AND M BONDAIAH; South: OTHERS LAND RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal approval | ALAIR Municipality/Municipal Corporation; tentative layout approval No. 0001/LO/3102/2024, dated 20 April 2024 Approvals record |
| Application and associated references | Application No. 001470/LO/DTCP/3102/0001/2024; TS-DTCP file No. TS/006692/2024 Approvals record |
| Approved development type and plot count | Layout with open plots; 77 individual sub-plots |
| Built-up area | Proposed built-up area excluding parking: 0.00; including parking: 0.00, in the filed layout details. This is a plotted layout, not an apartment-building plan. |
| Buildings, floors and parking levels | No building count, floor configuration or parking levels are established in the supplied project record. The layout details report common parking area as 0.00. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; 77 plots are stated in the approved-layout records |
| Plot sizes | Drawing-derived schedule: 77 plots with sizes read; smallest 112.88 sq m, median 124.82 sq m, largest 248.85 sq m. These are software-measured from the approved layout drawing, not RERA-filed unit-area disclosures. Layout record |
| Booked / available counts | Not established in the supplied evidence RERA record Document index |
| Construction / development stage | The layout approval requires infrastructure and amenities to be completed; no independently verified site-progress status is supplied. RERA-listed amenity percentages are 10% where marked available and 0% for other listed categories; these are not independent site-verification findings. RERA amenities |
| Completion dates | Form B declares completion by 20-04-2026; the RERA header records proposed completion as 30/11/2026. The supplied material does not establish a revised completion order. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. Document index |
2. The project story
NARSIMHA SWAMY COLONY is registered as a plotted development, rather than an apartment or multi-storey residential building. The RERA record locates it at Survey No. 1023 in the Alair area of Yadadri Bhuvanagiri district; the filed layout approval identifies Alair Revenue Village, while the registration certificate also records Manthapuri as the village for the “said land.” The village identity merits confirmation against revenue records. RERA record
The layout approval describes 77 plots and reserves land for roads, open space/park, social infrastructure and utilities. Its stated development works include road formation, drainage, underground drainage lines and common septic tank/STP, internal water-supply pipelines, an overhead tank and assured water supply, electrical lines and street lights, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions of required works, not evidence that the works have been completed.
The approval is for a tentative layout. It states that infrastructure and amenities are to be completed within two years of approval, i.e. by 20 April 2026, and that final layout release follows completion and the applicable release process. The RERA header separately records a proposed completion date of 30 November 2026. No site inspection, independently verified construction-progress report, or completion/occupancy certificate is included in the supplied evidence. RERA record Document index
3. Master plan, architecture & building design
The layout drawing records a total/net layout area of 17,517.77 sq m and the following land-use schedule. The allocation is for a plotted layout; the filed plan records no proposed built-up area or common parking area.
| Layout use | Area | Share |
|---|---|---|
| Plotted Area | 10,310.27 sq mt. | 58.86% |
| Road Area | 5,016.81 sq mt. | 28.64% |
| Organized open space/park Area | 1,577.34 sq mt. | 9.00% |
| Social Infrastructure Area | 438.13 sq mt. | 2.50% |
| Utility Area | 175.21 sq mt. | 1.00% |
| Total net layout | 17,517.76 sq mt. | 100.00% |
The tentative-layout approval separately describes 77 plots and records open space, social-infrastructure, utility and road reservations as 9%, 2.5%, 1% and 28.64%, respectively. It lists the plotted area as 58.86%.
Road information in the filed layout includes a 9.14 mt. wide internal road, an 18.00 MT wide existing road, an 18.00 MT wide proposed road, a 100'-00" wide Alair to Manthapuri Road and a 30'-0" wide road. The tentative-layout approval also specifies road widths of 18 mts and above.
The approved-layout drawing is not a building or floor-plan set. No apartment arrangement, building footprint, floor configuration, building height, or residential/commercial built-up distribution is established by the supplied records. The recorded layout is for plots, with no proposed built-up area in the filed layout details.
4. Homes, configurations & floor plans
The RERA record and layout approval identify a plotted offering of 77 plots. The supplied evidence does not provide a RERA-filed plot-by-plot saleable-area table, booked inventory, or available inventory. The size figures below are software-measured from the approved layout drawing and should be checked against the drawing and plot schedule. Layout record
| Plot information | Record |
|---|---|
| Total plot count | 77 |
| Plots with size read from drawing | 77 Layout record |
| Smallest measured plot | 112.88 sq m (135.0 sq yd) Layout record |
| Median measured plot | 124.82 sq m (149.3 sq yd) Layout record |
| Largest measured plot | 248.85 sq m (297.6 sq yd) Layout record |
| Drawing-derived size band | Plot count |
|---|---|
| 100–150 sq yd (84–125 sq m) | 41 |
| 150–200 sq yd (125–167 sq m) | 30 |
| 200–250 sq yd (167–209 sq m) | 4 |
| 250–300 sq yd (209–251 sq m) | 2 |
The layout record’s plot-area schedule sums to the plotted area stated in its own area statement. Plot-area measurements above are not apartment carpet-area or RERA saleable-area disclosures. No apartment configurations, carpet areas, balcony/utility areas or common-area loading are applicable or established in the supplied plotted-layout record. Layout record
5. Parking & vehicle circulation
The filed layout details report common parking area as 0.00; no count of resident or visitor parking spaces, parking levels, vehicle ramps, accessible spaces, EV charging, or plot-specific parking allocation is supplied.
The tentative-layout conditions require roads to remain open for access to neighbouring sites and prohibit a compound wall or fencing around the site. They also require road formation as part of the layout development works. These conditions describe planned access and circulation requirements, not verified completed works or an exclusive parking entitlement for any plot buyer.
6. Amenities, recreation & open spaces
The approval describes facilities and infrastructure to be provided as part of layout development. The RERA amenity record separately shows listed progress percentages, which should not be read as independent verification of on-site completion. RERA amenities
| Description / size | No community-building facility is established in the supplied approval details |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent verification supplied |
| Description / size | The plan reserves organized open space/park Area of 1,577.34 sq mt. (9.00%); tentative approval states 0 Acer 15.59 Gts (9%) |
|---|---|
| Declared progress / verified status | “Green Strip/TOT LOT/Park” is listed at 10%; not independently verified complete RERA amenities |
| Description / size | Required layout works; no separate size or quantity for planting is stated |
|---|---|
| Declared progress / verified status | No independent completion verification supplied |
| Description / size | 438.13 sq mt. (2.50%) in the layout area statement |
|---|---|
| Declared progress / verified status | No facility-specific completion status supplied |
| Description / size | 175.21 sq mt. (1.00%); approval describes provision for items including water reservoir, septic tank/STP, electric transformer and solid-waste management |
|---|---|
| Declared progress / verified status | Utility land is reserved; completed facilities are not independently verified |
| Description / size | 5,016.81 sq mt. (28.64%) in the layout area statement |
|---|---|
| Declared progress / verified status | “Internal Roads & Footpaths” is listed at 10%; not independently verified complete RERA amenities |
The tentative approval requires open space, utilities and roads to be handed over to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout, after the applicable fees and charges are collected. The supplied evidence does not establish that these handovers have occurred.
7. Utilities, building services & safety
The tentative-layout approval lists required infrastructure works including storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines, an overhead tank and assured water-supply source, electrical supply lines, street lights, an electric transformer, solid-waste management and rainwater-harvesting pits. It also specifies that the applicant is responsible for constructing an overhead tank/sump and septic tank as applicable, together with sufficient harvesting pits. These are stated development requirements; the supplied evidence does not independently confirm installation, capacity or operation.
The RERA amenity record lists water supply, sewerage (chamber, lines, septic tank, STP), storm-water drains, water conservation/rainwater harvesting, street lighting and an electrical meter room/sub-station/receiving station at 10% each. It lists treatment and disposal of sewage and sullage water, solid-waste management and energy management at 0%. No capacities or independently verified completion evidence are supplied. RERA amenities
No project-specific fire-protection or fire-safety facility, lift, backup-power system, CCTV/access-control system, accessibility provision, or water-treatment capacity is established in the supplied layout evidence. RERA amenities Document index
8. Location, access & connectivity
The registered project is associated with Survey No. 1023, Alair mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508101. The RERA record uses ALER as the village/city entry; the tentative-layout approval identifies Alair Revenue Village, while the registration certificate lists Manthapuri in its “said land” particulars. The official revenue location should be confirmed against parcel-level revenue records. RERA record
The layout record names a 100'-00" wide Alair to Manthapuri Road, an 18.00 MT wide existing road, an 18.00 MT wide proposed road, a 9.14 mt. wide internal road and a 30'-0" wide road. A location record gives the Outer Ring Road nearest sampled interchange as approximately 44.8 km; no other measured access or public-transport distances are supplied. Location record
9. Developer & development status
The registered promoter is NARSIMHA SWAMY COLONY. The supplied records classify the organisation type as “Others” and describe it as “JOINT DEVELOPMENT”; a more specific legal-entity type and corporate identifier are not established in the supplied material. The registration certificate gives the promoter address as Village: Manthapuri, Mandal: Alair, District: Yadadri Bhuvanagiri, PIN 508101. RERA record RERA filing
A Form B affidavit dated 14 May 2024 and made by PADIGELA RAJESHWAR declares a legal-title basis and an agreement for development, states that the land is free from encumbrances, and undertakes completion by 20-04-2026. These are promoter declarations. The supplied records do not establish current construction progress or a revised completion order.
The project is a 77-plot layout with no building or phase-wise construction status established in the supplied evidence. No completion or occupancy certificate is supplied. The RERA registration certificate records validity from 15/07/2024 to 20/04/2026 unless extended by the Authority; registration validity is distinct from the completion dates declared in the project record. RERA record
10. Approvals, official records & documents
| Evidence supplied | Form C registration certificate, P02000008508 |
|---|---|
| Scope / note | Project name: NARSIMHA SWAMY COLONY; records promoter and registration validity |
| Evidence supplied | Approval No. 0001/LO/3102/2024, dated 20 April 2024 |
|---|---|
| Scope / note | Issued by ALAIR Municipality/Municipal Corporation; approval describes 77 plots and conditions for infrastructure, mortgage and eventual final-layout release |
| Evidence supplied | File No. TS/006692/2024 |
|---|---|
| Scope / note | TS-DTCP delegated record; includes survey number 1023, site-area and land-use schedule, road details and 77 sub-plots |
| Evidence supplied | Mortgage Deed No. 5570, dated 10 April 2024 |
|---|---|
| Scope / note | Approval identifies plots 69, 68, 67, 66, 65, 74, 77, 78, 79, 80, 81, 76 and 75 as mortgaged in favour of the Municipality/Municipal Corporation |
| Evidence supplied | Promoter affidavit dated 14 May 2024 |
|---|---|
| Scope / note | Includes promoter declarations on title basis, encumbrances, completion and fund handling |
| Evidence supplied | Not supplied Document index |
|---|---|
| Scope / note | No certificate is established by the supplied material |
1. Project at a glance
Project identity
Registered project name: NARSIMHA SWAMY COLONY
Project type / status: Plotted development; recorded as a new project
Registered portion / phase: Not separately identified; the registration is for a plotted layout
TG-RERA registration: P02000008508
Registration validity: 15 July 2024 to 20 April 2026, subject to any extension by the Authority
Registered promoter: NARSIMHA SWAMY COLONY
RERA status: The supplied certificate records registration; current status is not established by the supplied record
Land and geographic identity
Locality / revenue-village references: RERA header: SY NO.1023; registration certificate: ALER; the filed tentative-layout approval identifies Alair Revenue Village, while the certificate’s “said land” field says Manthapuri. Revenue-village identity should therefore be confirmed from the underlying revenue records.
Mandal / district / PIN: Alair; Yadadri Bhuvanagiri; 508101
Project survey numbers and subdivisions in tentative-layout approval: 1023/AA1/1/1/1/2; 1023/AA2/1/1/1; 1023/AA2/2/2; 1023/AA1/1/1/2; 1023/AA2/1/1/2/1; 1023/AA2/1/2/2; 1023/AA1/1/2; 1023/AA2/1/2/1; 1023/AA2/2/1; 1023/AA1/2; 1023/AA2/1/1/2/2. The RERA land record also identifies Survey No. 1023.
Site extent: RERA land record: total and net area 17,517.58 sq m. The filed layout records 17,517.77 sq m; the tentative-layout approval states 4 Acer 13.15 Gts (20,952 Sq. Yds).
Boundaries recorded in RERA land details: East: OTHERS LAND; West: 60 FEET WIDE ROAD; North: LAND OF PANTHAM VENKATESHWARLU AND M BONDAIAH; South: OTHERS LAND
Development identity
Sanctioning authority / principal approval: ALAIR Municipality/Municipal Corporation; tentative layout approval No. 0001/LO/3102/2024, dated 20 April 2024
Application and associated references: Application No. 001470/LO/DTCP/3102/0001/2024; TS-DTCP file No. TS/006692/2024
Approved development type and plot count: Layout with open plots; 77 individual sub-plots
Built-up area: Proposed built-up area excluding parking: 0.00; including parking: 0.00, in the filed layout details. This is a plotted layout, not an apartment-building plan.
Buildings, floors and parking levels: No building count, floor configuration or parking levels are established in the supplied project record. The layout details report common parking area as 0.00.
Offering and status
Unit type: Plots; 77 plots are stated in the approved-layout records
Plot sizes: Drawing-derived schedule: 77 plots with sizes read; smallest 112.88 sq m, median 124.82 sq m, largest 248.85 sq m. These are software-measured from the approved layout drawing, not RERA-filed unit-area disclosures.
Booked / available counts: Not established in the supplied evidence
Construction / development stage: The layout approval requires infrastructure and amenities to be completed; no independently verified site-progress status is supplied. RERA-listed amenity percentages are 10% where marked available and 0% for other listed categories; these are not independent site-verification findings.
Completion dates: Form B declares completion by 20-04-2026; the RERA header records proposed completion as 30/11/2026. The supplied material does not establish a revised completion order.
Occupancy / completion certificate: No occupancy or completion certificate is supplied.
2. The project story
NARSIMHA SWAMY COLONY is registered as a plotted development, rather than an apartment or multi-storey residential building. The RERA record locates it at Survey No. 1023 in the Alair area of Yadadri Bhuvanagiri district; the filed layout approval identifies Alair Revenue Village, while the registration certificate also records Manthapuri as the village for the “said land.” The village identity merits confirmation against revenue records.
The layout approval describes 77 plots and reserves land for roads, open space/park, social infrastructure and utilities. Its stated development works include road formation, drainage, underground drainage lines and common septic tank/STP, internal water-supply pipelines, an overhead tank and assured water supply, electrical lines and street lights, avenue plantation, park development and rainwater-harvesting pits. These are approval-condition descriptions of required works, not evidence that the works have been completed.
The approval is for a tentative layout. It states that infrastructure and amenities are to be completed within two years of approval, i.e. by 20 April 2026, and that final layout release follows completion and the applicable release process. The RERA header separately records a proposed completion date of 30 November 2026. No site inspection, independently verified construction-progress report, or completion/occupancy certificate is included in the supplied evidence.
3. Master plan, architecture & building design
The layout drawing records a total/net layout area of 17,517.77 sq m and the following land-use schedule. The allocation is for a plotted layout; the filed plan records no proposed built-up area or common parking area.
| Layout use | Area | Share |
|---|---|---|
| Plotted Area | 10,310.27 sq mt. | 58.86% |
| Road Area | 5,016.81 sq mt. | 28.64% |
| Organized open space/park Area | 1,577.34 sq mt. | 9.00% |
| Social Infrastructure Area | 438.13 sq mt. | 2.50% |
| Utility Area | 175.21 sq mt. | 1.00% |
| Total net layout | 17,517.76 sq mt. | 100.00% |
The tentative-layout approval separately describes 77 plots and records open space, social-infrastructure, utility and road reservations as 9%, 2.5%, 1% and 28.64%, respectively. It lists the plotted area as 58.86%.
Road information in the filed layout includes a 9.14 mt. wide internal road, an 18.00 MT wide existing road, an 18.00 MT wide proposed road, a 100'-00" wide Alair to Manthapuri Road and a 30'-0" wide road. The tentative-layout approval also specifies road widths of 18 mts and above.
The approved-layout drawing is not a building or floor-plan set. No apartment arrangement, building footprint, floor configuration, building height, or residential/commercial built-up distribution is established by the supplied records. The recorded layout is for plots, with no proposed built-up area in the filed layout details.
4. Homes, configurations & floor plans
The RERA record and layout approval identify a plotted offering of 77 plots. The supplied evidence does not provide a RERA-filed plot-by-plot saleable-area table, booked inventory, or available inventory. The size figures below are software-measured from the approved layout drawing and should be checked against the drawing and plot schedule.
Total plot count: 77
Plots with size read from drawing: 77
Smallest measured plot: 112.88 sq m (135.0 sq yd)
Median measured plot: 124.82 sq m (149.3 sq yd)
Largest measured plot: 248.85 sq m (297.6 sq yd)
100–150 sq yd (84–125 sq m): 41
150–200 sq yd (125–167 sq m): 30
200–250 sq yd (167–209 sq m): 4
250–300 sq yd (209–251 sq m): 2
The layout record’s plot-area schedule sums to the plotted area stated in its own area statement. Plot-area measurements above are not apartment carpet-area or RERA saleable-area disclosures. No apartment configurations, carpet areas, balcony/utility areas or common-area loading are applicable or established in the supplied plotted-layout record.
5. Parking & vehicle circulation
The filed layout details report common parking area as 0.00; no count of resident or visitor parking spaces, parking levels, vehicle ramps, accessible spaces, EV charging, or plot-specific parking allocation is supplied.
The tentative-layout conditions require roads to remain open for access to neighbouring sites and prohibit a compound wall or fencing around the site. They also require road formation as part of the layout development works. These conditions describe planned access and circulation requirements, not verified completed works or an exclusive parking entitlement for any plot buyer.
6. Amenities, recreation & open spaces
The approval describes facilities and infrastructure to be provided as part of layout development. The RERA amenity record separately shows listed progress percentages, which should not be read as independent verification of on-site completion.
| Description / size | No community-building facility is established in the supplied approval details |
|---|---|
| Declared progress / verified status | 0%; no independent verification supplied |
| Description / size | The plan reserves organized open space/park Area of 1,577.34 sq mt. (9.00%); tentative approval states 0 Acer 15.59 Gts (9%) |
|---|---|
| Declared progress / verified status | “Green Strip/TOT LOT/Park” is listed at 10%; not independently verified complete |
| Description / size | Required layout works; no separate size or quantity for planting is stated |
|---|---|
| Declared progress / verified status | No independent completion verification supplied |
| Description / size | 438.13 sq mt. (2.50%) in the layout area statement |
|---|---|
| Declared progress / verified status | No facility-specific completion status supplied |
| Description / size | 175.21 sq mt. (1.00%); approval describes provision for items including water reservoir, septic tank/STP, electric transformer and solid-waste management |
|---|---|
| Declared progress / verified status | Utility land is reserved; completed facilities are not independently verified |
| Description / size | 5,016.81 sq mt. (28.64%) in the layout area statement |
|---|---|
| Declared progress / verified status | “Internal Roads & Footpaths” is listed at 10%; not independently verified complete |
The tentative approval requires open space, utilities and roads to be handed over to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout, after the applicable fees and charges are collected. The supplied evidence does not establish that these handovers have occurred.
7. Utilities, building services & safety
The tentative-layout approval lists required infrastructure works including storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines, an overhead tank and assured water-supply source, electrical supply lines, street lights, an electric transformer, solid-waste management and rainwater-harvesting pits. It also specifies that the applicant is responsible for constructing an overhead tank/sump and septic tank as applicable, together with sufficient harvesting pits. These are stated development requirements; the supplied evidence does not independently confirm installation, capacity or operation.
The RERA amenity record lists water supply, sewerage (chamber, lines, septic tank, STP), storm-water drains, water conservation/rainwater harvesting, street lighting and an electrical meter room/sub-station/receiving station at 10% each. It lists treatment and disposal of sewage and sullage water, solid-waste management and energy management at 0%. No capacities or independently verified completion evidence are supplied.
No project-specific fire-protection or fire-safety facility, lift, backup-power system, CCTV/access-control system, accessibility provision, or water-treatment capacity is established in the supplied layout evidence.
8. Location, access & connectivity
The registered project is associated with Survey No. 1023, Alair mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508101. The RERA record uses ALER as the village/city entry; the tentative-layout approval identifies Alair Revenue Village, while the registration certificate lists Manthapuri in its “said land” particulars. The official revenue location should be confirmed against parcel-level revenue records.
The layout record names a 100'-00" wide Alair to Manthapuri Road, an 18.00 MT wide existing road, an 18.00 MT wide proposed road, a 9.14 mt. wide internal road and a 30'-0" wide road. A location record gives the Outer Ring Road nearest sampled interchange as approximately 44.8 km; no other measured access or public-transport distances are supplied.
9. Developer & development status
The registered promoter is NARSIMHA SWAMY COLONY. The supplied records classify the organisation type as “Others” and describe it as “JOINT DEVELOPMENT”; a more specific legal-entity type and corporate identifier are not established in the supplied material. The registration certificate gives the promoter address as Village: Manthapuri, Mandal: Alair, District: Yadadri Bhuvanagiri, PIN 508101.
A Form B affidavit dated 14 May 2024 and made by PADIGELA RAJESHWAR declares a legal-title basis and an agreement for development, states that the land is free from encumbrances, and undertakes completion by 20-04-2026. These are promoter declarations. The supplied records do not establish current construction progress or a revised completion order.
The project is a 77-plot layout with no building or phase-wise construction status established in the supplied evidence. No completion or occupancy certificate is supplied. The RERA registration certificate records validity from 15/07/2024 to 20/04/2026 unless extended by the Authority; registration validity is distinct from the completion dates declared in the project record.
10. Approvals, official records & documents
| Evidence supplied | Form C registration certificate, P02000008508 |
|---|---|
| Scope / note | Project name: NARSIMHA SWAMY COLONY; records promoter and registration validity |
| Evidence supplied | Approval No. 0001/LO/3102/2024, dated 20 April 2024 |
|---|---|
| Scope / note | Issued by ALAIR Municipality/Municipal Corporation; approval describes 77 plots and conditions for infrastructure, mortgage and eventual final-layout release |
| Evidence supplied | File No. TS/006692/2024 |
|---|---|
| Scope / note | TS-DTCP delegated record; includes survey number 1023, site-area and land-use schedule, road details and 77 sub-plots |
| Evidence supplied | Mortgage Deed No. 5570, dated 10 April 2024 |
|---|---|
| Scope / note | Approval identifies plots 69, 68, 67, 66, 65, 74, 77, 78, 79, 80, 81, 76 and 75 as mortgaged in favour of the Municipality/Municipal Corporation |
| Evidence supplied | Promoter affidavit dated 14 May 2024 |
|---|---|
| Scope / note | Includes promoter declarations on title basis, encumbrances, completion and fund handling |
| Evidence supplied | Not supplied |
|---|---|
| Scope / note | No certificate is established by the supplied material |
Frequently asked questions
Is NARSIMHA SWAMY COLONY registered with Telangana RERA?
Yes. NARSIMHA SWAMY COLONY is registered with the Telangana Real Estate Regulatory Authority as P02000008508; the registration status is New Project.
Who is the developer of NARSIMHA SWAMY COLONY?
The promoter named in the RERA registration is NARSIMHA SWAMY COLONY.
Where is NARSIMHA SWAMY COLONY located?
NARSIMHA SWAMY COLONY is in SY NO.1023, ALER, Alair, Yadadri Bhuvanagiri, Telangana (508101).
When will NARSIMHA SWAMY COLONY be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.