Sign in

Nandi Residency

NANDI DEVELOPERS · Hanamkonda · RERA P00300000772

NANDI RESIDENCY is a residential apartment project in Advocates Colony, Srinivasa Nagar, Hanamkonda, Hanamkonda mandal, Warangal Urban district, developed by registered promoter NANDI DEVELOPERS. The project occupies 594.38 sq. m and comprises one building with stilt and 5 upper floors, containing 15 homes: 10 2BHK and 5 3BHK apartments. It is registered under TG-RERA number P00300000772, with a proposed completion date of 01/04/2024.

More from Nandi Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 1 Apr 2024 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameNANDI RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name or phase-wise boundary is disclosed; registration is for the project identified as NANDI RESIDENCY. RERA record
TG-RERA registrationP00300000772 RERA record
Registration validity25 May 2019 to 1 April 2024; the supplied certificate records no extension. This is registration validity, not the completion deadline. RERA record
Registered promoterNANDI DEVELOPERS RERA record RERA filing
RERA statusThe supplied project record labels the project “On-Going Project.” The registration certificate’s stated validity ended on 1 April 2024. RERA record

Land and geographic identity

FieldProject record
Locality / site addressAdvocates Colony, Srinivasa Nagar, Hanamkonda RERA record RERA filing
Revenue villageTG-RERA identity records GMH Hanmakonda; the municipal approval documents identify HANAMKONDA / HANAMKONDA [R V]. RERA record RERA filing
MandalHanamkonda RERA record
DistrictWarangal Urban RERA record
PIN506001 RERA record
Survey number(s)1022; the building permit specifies 1022 OF HANAMKONDA. No subdivision is disclosed. RERA filing
Registered site extent594.38 sq. m; the municipal plan also records net area 594.38 and road-affected area 0. RERA filing
Boundaries in TG-RERA filingEast: BUILDING; West: PLOT; North: BUILDING; South: ROAD. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Warangal Municipal Corporation (GWMC) Approvals record
Principal building-permit reference / date3006/8500/W38/2017, approved 01 April, 2018 Approvals record
Approved built-up areaMunicipal plan records 1481.18; RERA land details record approved built-up area 1481.19 sq. m. RERA filing
Building countOne building in the municipal plan.
Sanctioned configurationStilt + 5 upper floors, height 15.00 MT.
Approved parking provisionThe plan extraction states “Proposed Number of Parkings 0”; the permit conditions say the cellar and stilts approved for parking must be used exclusively for vehicle parking. A specific number of parking spaces is not established in the supplied record.
Unit count15 units in the building-plan record; RERA unit schedule also lists 15 units. RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2BHK: 10 units; 3BHK: 5 units RERA unit table
RERA-filed saleable areas2BHK: 52.28 sq. m; 3BHK: 147.51 sq. m RERA unit table
Booked / availablePortal-derived schedule records 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. The portal record has no as-of date, so these counts are indicative. RERA unit table
Construction stageProject record says “On-Going Project”; no independently verified site-progress measurement is supplied. RERA record
Completion deadlinePromoter’s Form B declaration states 01/04/2024; the RERA record gives the same proposed and revised proposed completion date. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building-permit documents require an occupancy certificate before occupation. This statement concerns the supplied record, not a separate authority-register verification.

2. The project story

NANDI RESIDENCY is registered as a residential apartment project on a 594.38 sq. m site in Advocates Colony, Srinivasa Nagar, Hanamkonda, on Survey No. 1022. The project is described in the municipal records as one residential building with stilt parking and five upper floors. The filed offering comprises 15 homes: ten 2BHK and five 3BHK apartments. RERA record RERA filing RERA unit table

The promoter’s RERA-filed completion undertaking gives 01/04/2024. The project is still labelled “On-Going Project” in the supplied RERA record, but no independent construction inspection or verified percentage-complete evidence is supplied here. The supplied file set also contains no occupancy or completion certificate; the permit materials state that an occupancy certificate is to be obtained after completion and before occupation. RERA record

3. Master plan, architecture & building design

The municipal building permit describes a single residential building on Survey No. 1022 OF HANAMKONDA, with a site area and net area of 594.38 m². The plan records proposed coverage of 296.35 (49.86 %) and residential built-up area of 1481.18; the RERA filing separately records approved built-up area of 1481.19 sq. m. These are the figures recorded in their respective documents, not carpet or saleable areas. RERA filing

The approved building form is described as Stilt + 5 upper floors, with a stated building height of 15.00 MT. The plan lists accessory-use area 9.01, mortgage area 187.72, and extra installment mortgage area 0.00. The supplied extracts do not establish floor-by-floor unit distribution, lifts or stair counts, building footprint dimensions, internal circulation details, or a phase breakdown.

The municipal permit conditions mention a tot-lot to be fenced and maintained as greenery, a rainwater-harvesting structure, transformer space and a garbage house. These are permit-condition descriptions; the supplied evidence does not independently verify installation or completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001052.28 sq. mNot measured in supplied drawingsNot supplied
3BHK505147.51 sq. mMedian 98.7 sq. m; range 98.4–98.8 sq. m33%

RERA configuration counts, bookings and saleable areas come from the project’s unit schedule; the booking record has no as-of date. RERA unit table RERA unit details

For the 3BHK, the carpet figures are software-measured from three flat designs on the supplied approved-plan drawing, not RERA-filed carpet-area disclosures. The drawing-based room record for one first-floor flat (flat ID 02) includes living, kitchen, bedrooms, toilets, puja and balconies; balcony areas are excluded from the measured carpet area. The supplied material does not provide a comparable measured 2BHK plan. Carpet area is a drawing-based measurement of the home’s internal area; saleable area is the separate RERA-filed figure and may include the home’s share of common areas. The supplied evidence does not give a separate balcony-area total for each configuration. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

The building-permit conditions state that the cellar and stilts approved for parking are to be used exclusively for vehicle parking. The building-plan extraction also records “Proposed Number of Parkings 0,” so the supplied documents do not establish a sanctioned parking-space count or a unit-by-unit parking allocation. No verified information is supplied on visitor or accessible parking, ramps, parking entrances and exits, two-wheeler spaces, EV charging, pedestrian separation, or parking allotment in sale agreements. The permit’s parking-use condition does not itself establish exclusive ownership of any bay.

6. Amenities, recreation & open spaces

The following facilities appear in the municipal-plan extracts or RERA amenity schedule. The schedule contains availability labels and percentage fields but does not provide independent completion verification; the recorded percentage values are 0 where shown. RERA amenities

Green strip / tot-lot
Description / sizePlan lists “Green Strip” and “TOT - LOT”; permit condition requires the tot-lot to be fenced and maintained as greenery. No size is stated.
Evidence sourceMunicipal permit and plan
Declared progress / verified statusPermit/plan evidence; completion not independently verified
Community buildings
Description / sizeListed in RERA amenity schedule; no size or facility detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Internal roads & footpaths
Description / sizeListed as available in the RERA schedule; no dimensions supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Street lighting
Description / sizeListed in the RERA schedule; no specification supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusPercentage recorded as 0; not independently verified
Other recreation facilities
Description / sizeNo further RERA-filed recreation facility or size is established in the supplied project evidence.
Evidence sourceSupplied project records RERA amenities
Declared progress / verified statusNot established

7. Utilities, building services & safety

Water
Evidence in project recordsThe RERA schedule lists water supply; the plan lists a bore and rainwater harvesting (“RWH” / “RWHDISTRIBUTION”).
Status / limitationPlan and schedule evidence; source capacity, storage and completion are not verified. RERA amenities
Sewerage and drainage
Evidence in project recordsRERA schedule lists sewerage, storm-water drains and treatment/disposal of sewage and sullage water; the plan lists a septic tank.
Status / limitationNo STP details, capacity, reuse arrangements or completion evidence supplied. RERA amenities
Rainwater harvesting
Evidence in project recordsPermit requires a rainwater-harvesting structure/percolation pit; plan lists RWH and distribution.
Status / limitationRequired/listed in documents; installation not independently verified.
Electrical
Evidence in project recordsPlan lists a transformer and RERA schedule lists an electrical meter room, sub-station or receiving station.
Status / limitationNo capacity or completion verification supplied. RERA amenities
Vertical transportation
Evidence in project recordsPlan lists a lift and staircase.
Status / limitationLift count, capacity and completion status are not supplied.
Fire and life safety
Evidence in project recordsFire protection and fire-safety requirements appear in the RERA amenity schedule.
Status / limitationNo system specifications, clearance or completion evidence supplied. RERA amenities
Waste
Evidence in project recordsPermit requires a garbage house; RERA schedule lists solid-waste management and disposal.
Status / limitationNo system details or completion verification supplied. RERA amenities
Energy management / accessibility
Evidence in project recordsEnergy management is listed in the RERA schedule. No project-specific accessibility feature is described in the supplied material.
Status / limitationNo technical details or completion status established. RERA amenities

The building-plan conditions also require construction-related dust and debris controls, worker safety measures, and greenery around the site. These are recorded conditions, not evidence of present implementation.

8. Location, access & connectivity

The project’s RERA-filed location is Advocates Colony, Srinivasa Nagar, Hanamkonda, in GMH Hanmakonda, Hanamkonda mandal, Warangal Urban district, PIN 506001. The municipal permit also identifies the locality as “SRINIVASA NAGAR - ADVOCATES COLONY - HANAMKONDA.” RERA record RERA filing

The municipal plan records abutting road widths of 9.00 and 30' 0" [9.00 M ]; the building-permit extract separately records 18M. No approach-road route or project-specific public-transport information is supplied.

A location dataset gives the nearest sampled Outer Ring Road interchange as 112.5 km (approx.). This is a supplied sampled-distance figure, not a travel-time claim. Location record

9. Developer & development status

The registered promoter is NANDI DEVELOPERS, identified in the RERA record as a partnership. Its listed address is A, NANDI HILLS, SRINIVASA NAGAR, ADVOCATES COLONY, Hanamkonda, Warangal Urban, 506001. The supplied corporate identifier is GSTIN 36AAOFN0603N2Z1. The RERA record names CHINTHAKUNTLA SUDHEER REDDY as authorized signatory and lists UMA DEVI TOGARU and VANI RAVULA as partners. No official promoter website, telephone number or email address is supplied in the evidence. RERA filing Parties record Corporate record

The project record retains “On-Going Project” status and the promoter-declared completion date of 01/04/2024. No independent construction-progress assessment is provided, and the supplied documents do not include an occupancy or completion certificate. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300000772; issued 25 May 2019; stated validity to 1 April 2024
What the supplied document establishesForm C records registration of NANDI RESIDENCY and its stated validity period.
GWMC building permit order
Identifier / date3006/8500/W38/2017; approved 01 April 2018
What the supplied document establishesPermit for a Stilt + 5 residential building on Survey No. 1022, Hanamkonda, on a 594.38 m² site; includes conditions and an occupancy-certificate requirement.
Building-plan sheet
Identifier / dateProceeding / inward reference 3006/8500/W38/2017
What the supplied document establishesProposed residential apartment plan recording one building and 15 units, with Stilt + 5 upper floors described in the plan record.
Additional municipal plan record
Identifier / dateProceeding 3006/8500/W38/2017
What the supplied document establishesRecords the proposed building form and site/building-area particulars.
Form B promoter declaration
Identifier / dateDated 28 February 2019
What the supplied document establishesPromoter declaration, including the undertaking to complete by 01/04/2024.
Occupancy / completion certificate
Identifier / dateNot included in supplied documents
What the supplied document establishesThe permit documents require an occupancy certificate before occupation; the supplied file set does not establish that one has been issued.

The building permit also lists previous permit 160 B.A.NO. 201/ 96 and previous proceedings G3/9441/96. These are identifiers cited in the municipal plan records.

Other registrations of Nandi Residency

Frequently asked questions

Is NANDI RESIDENCY registered with Telangana RERA?

Yes. NANDI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P00300000772; the registration status is On-Going Project.

Who is the developer of NANDI RESIDENCY?

The promoter named in the RERA registration is NANDI DEVELOPERS.

Where is NANDI RESIDENCY located?

NANDI RESIDENCY is in ADVOCATES COLONY, GMH Hanmakonda, Hanamkonda, Telangana (506001).

When will NANDI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 01/04/2024. This is the promoter's declaration, not a guarantee.