Nandanavanam

K P R PROJETS & OTHERS · Sangareddy · RERA P01100009087

NANDANAVANAM is a residential plotted development in JOGIPET, Andole Mandal, Sangareddy District. It is being developed by the registered promoter K P R Projets & Others on a registered site extent of 58,654.33 sq.m, with 209 residential plots. No plot-size configurations are stated in the supplied RERA-filed offering. The project is registered with TG-RERA under P01100009087, and its proposed completion date is 10.09.2026.

01What we found

Period endedTG-RERA registration ran to 10 Sep 2026 - check its extension on TG-RERA
44documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameNANDANAVANAM RERA record
Project typePlotted development / residential open-plot layout RERA record RERA filing
Phase or registered portionPhase not separately identified; RERA registration is for the project RERA record
TG-RERA registrationP01100009087; granted under section 5
Registration validity10/09/2024–10/09/2026; certificate states two years and no extension is recorded in the supplied data. This is the registration period, not the completion deadline. Approvals record
Registered promoterK P R Projets & Others (also rendered in project records as “K P R PROJETS & OTHERS”) RERA record
RERA statusRegistered project; the supplied record does not state a current RERA status beyond the registration particulars.

Land and geographic identity

FieldRecord
LocalityJOGIPET; certificate locality: JOGIPET, ANDOLE RERA record
Revenue villagesJogipet Village and Andole Village RERA record
MandalRERA identity lists Masaipet; the tentative layout approval identifies Andole Mandal. RERA record
District / PINSangareddy / 502270 RERA record
Project survey numbersJogipet (V): 544, 571/P, 572/P, 578/P, 579, 586/P, 587/P, 589/P, 590/P, 591/P; Andole (V): 1687/P, 1689/P, 1690. RERA record
Registered site extentRERA land record: 58,654.33 sq.m. The tentative layout approval describes the layout as 14 Acer 19.74 Gts / 70,150 Sq. Yds. RERA filing
Net/total areaRERA land record gives total and net area as 58,654.33 sq.m. The filed layout drawing separately states a total site area of 58,652.30 sq.mt. and net layout area of 57,784.37 sq.m. RERA filing Layout record
Boundaries in RERA land recordEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: 18 MT WIDE EXISTING ROAD. RERA filing

Development identity

FieldRecord
Sanctioning authorityAndole-Jogipet Municipality/Municipal Corporation; RERA authority field: DTCP RERA record
Principal project approval0002/LO/3050/2024, tentative layout approval dated 10 September, 2024 Approvals record
Drawing referenceLayout Plan Details sheet identifies TS-DTCP, file G1/1480/2015, dated 27-02-2024, and LTP licence TS/011773/2024.
Approved built-up areaNot disclosed in the supplied plotted-layout record.
Buildings / floorsNot applicable to the recorded offering as a plotted layout; no building count or floor configuration is supplied.
Plot count209 plots in the tentative layout approval; the layout drawing schedule also records 209 individual subplots.
ParkingNo project parking count or parking allocation is supplied.

Offering and status

FieldRecord
Unit typeResidential plots; no RERA-filed plot-size schedule is included in the supplied overview data. RERA record
Booked / availableNot disclosed in the supplied evidence.
Construction stageNo independently verified site-progress evidence is supplied. RERA amenity fields show 0% against the listed items; this is a filed progress figure, not independent site verification. RERA amenities
Completion deadlineThe Form B declaration states 10.09.2026; the tentative layout approval requires infrastructure and amenities within two years of approval, to 10 September, 2026. This is separate from RERA registration validity.
Occupancy/completion certificateNot applicable to the plotted-layout offering as described in the supplied records; no project OC or completion certificate is supplied. RERA record

2. The project story

  • NANDANAVANAM is registered with TG-RERA as a residential plotted development on land identified in Jogipet and Andole villages, Sangareddy District. The RERA land record lists the Jogipet survey numbers 544, 571/P, 572/P, 578/P, 579, 586/P, 587/P, 589/P, 590/P and 591/P, and the Andole survey numbers 1687/P, 1689/P and 1690. RERA record
  • The filed tentative layout approval describes 209 plots and reserves land for roads, open space, social infrastructure, utilities and a municipal mortgage. Its stated condition requires the developer to complete layout infrastructure and amenities by 10 September, 2026; the supplied materials do not establish how much work has been completed on site. The RERA amenity progress fields report 0% for the listed infrastructure items, which should be read as the filed progress record rather than an independent inspection. RERA amenities

3. Master plan, architecture & building design

  • This is a plotted layout, not a multi-storey building scheme in the supplied RERA records. The layout drawing records 209 individual subplots and a net layout area of 57,784.37 sq.m. Its land-use statement lists 30,272.05 sq.m of plotted area, 17,968.21 sq.m of roads, 5,369.08 sq.m of organized open space/park, 1,548.54 sq.m of social infrastructure, 585.59 sq.m of utility land and 2,039.92 sq.m of buffer-zone area. The drawing also records WaterBodies Area 411.17 and Nala Area 456.76. These are layout-plan figures, not building floor areas. Layout record
  • The tentative approval identifies the layout extent as 14 Acer 19.74 Gts / 70,150 Sq. Yds, with 209 plots. It reserves 1 Acer 13.07 Gts (9.29%) for open space, 0 Acer 15.31 Gts (2.68%) for social infrastructure, 0 Acer 5.79 Gts (1.01%) for utilities and 4 Acer 17.6 Gts (31.1%) for roads. It states that 0 Acer 49.52 Gts / 5,992 Sq. Yds is mortgaged to the Municipality/Municipal Corporation.
  • The layout drawing shows existing and proposed 18.28 MT roads, internal roads of 10.14 mt. and 9.14 mt., and a 3.00MT NALA. No tower, building footprint, floor, or parking-level information is provided.

4. Homes, configurations & floor plans

  • The RERA-filed offering is plots, not apartments. A software-read schedule from the layout drawing identifies 209 plots, all with a size read from the drawing. These measurements should be checked against the source drawing; they are not a substitute for the legal plot schedule or the RERA-filed allotment particulars. Layout record
Plot-size band (sq yd; corresponding supplied sq m band)Plots
0–100 (0–84 sq.m)3
100–150 (84–125 sq.m)84
150–200 (125–167 sq.m)68
200–250 (167–209 sq.m)46
250–300 (209–251 sq.m)4
300–400 (251–334 sq.m)3
500–1000 (418–836 sq.m)1
  • The software-measured smallest, median and largest plot areas are 53.26 sq.m, 131.8 sq.m and 483.22 sq.m respectively (approximately 63.7 sq yd, 157.6 sq yd and 577.9 sq yd as supplied). The drawing data says the plot-area sum matches its own area statement. No RERA-filed booked/available count or plot-by-plot saleable-area schedule is supplied here. Layout record

5. Parking & vehicle circulation

  • The supplied project records do not establish parking spaces, visitor or accessible parking, parking allocation to individual plots, or EV charging. The layout drawing shows the road network, including 18.28 MT existing/proposed roads and 10.14 mt. and 9.14 mt. internal roads; it does not establish parking entitlement or exclusive ownership of any drawn area.

6. Amenities, recreation & open spaces

  • The layout records open-space/park land, social-infrastructure land and utility land as separate land-use categories. The approval also describes infrastructure and amenities to be developed as part of the layout. RERA’s amenity fields mark the listed items at 0%; no independent completion verification is supplied. RERA amenities
Landscape/open space
FacilityOrganized open space / park
Description / size5,369.08 sq.m in the layout drawing; approval describes 1 Acer 13.07 Gts (9.29%)
Declared progress / verified statusAmenity progress field: 0%; completion not independently verified. RERA amenities
Landscape/open space
FacilityGreen strip / tot lot / park
Description / sizeListed as available “YES” in RERA amenity data; no dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; not independently verified.
Convenience/community
FacilitySocial infrastructure
Description / size1,548.54 sq.m in the layout drawing; approval states 0 Acer 15.31 Gts (2.68%)
Declared progress / verified status0% progress recorded for “Community Buildings”; no completed facility verified. RERA amenities
Convenience/community
FacilityUtility land
Description / size585.59 sq.m in the layout drawing; approval states 0 Acer 5.79 Gts (1.01%)
Declared progress / verified statusNo completion verification supplied.
Convenience/community
FacilitySolid-waste / garbage area
Description / sizeThe RERA-filed layout drawing identifies 800.17 sq.m as utility-area allocation; the approval identifies solid-waste management as a layout development item.
Evidence sourceLayout record
Declared progress / verified status0% recorded for solid-waste management; not independently verified.
Convenience/community
FacilityInternal roads, footpaths and street lighting
Description / sizeRoad area 17,968.21 sq.m in the layout drawing; road widths include 18.28 MT, 10.14 mt. and 9.14 mt.
Declared progress / verified statusAmenity fields mark internal roads/footpaths and street lighting “YES”; progress recorded as 0%. RERA amenities
Convenience/community
FacilityCommunity buildings
Description / sizeListed in RERA amenity data; no facility size or design detail supplied
Evidence sourceRERA amenities
Declared progress / verified status0%; no completed facility verified.

7. Utilities, building services & safety

  • The tentative layout approval specifies development works including internal water-supply pipelines, a water reservoir/overhead tank, underground drainage lines and a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer, solid-waste management, avenue planting, park development and rainwater-harvesting pits. These are approval-described requirements or proposed works; the supplied evidence does not establish their installed capacities or completion.
Water
Evidence in project recordApproval lists internal water-supply pipelines, an assured water-supply source, water reservoir and overhead tank.
Status limitationNo source details, storage capacity or independent completion evidence supplied.
Sewerage and drainage
Evidence in project recordApproval lists underground drainage lines, common septic tank/STP and storm-water drains; RERA amenity data includes sewerage and treatment/disposal items.
Status limitationNo capacity or completion verification supplied; RERA amenity progress is 0%. RERA amenities
Electrical
Evidence in project recordApproval lists electrical supply lines, street lights and transformer; RERA amenity data includes an electrical meter room/sub-station/receiving station.
Status limitationNo capacity or completed-installation evidence supplied; RERA amenity progress is 0%. RERA amenities
Rainwater
Evidence in project recordApproval and RERA amenity data refer to rainwater-harvesting pits/conservation.
Status limitationNo capacity or independent completion verification supplied; RERA progress is 0%. RERA amenities
Solid waste
Evidence in project recordApproval lists solid-waste management; the layout drawing identifies garbage/utility land.
Status limitationNo operational details or completion verification supplied. Layout record
Fire/life safety and accessibility
Evidence in project recordRERA amenity fields include fire protection/fire safety; no detailed fire systems, access provisions or accessibility design are supplied.
Status limitationA listed field alone does not establish installed systems or compliance; progress is 0%. RERA amenities

8. Location, access & connectivity

  • The project is identified in the RERA record at JOGIPET, Sangareddy District, PIN 502270, across Jogipet and Andole revenue villages. The tentative layout approval describes the site as Jogipet/Andole, Andole Mandal, and records the southern boundary as an existing 18 MT wide road in the RERA land details. RERA record RERA filing
  • The supplied location data contains a coordinate described as a cadastral parcel centroid (17.41528, 78.35459) and one connectivity entry: Financial District (Nanakramguda), 1.2 km. The supplied evidence does not establish that distance as a verified route distance or provide public-transport details, approach-road descriptions beyond the layout records, or additional landmark distances. Location record

9. Developer & development status

  • The registered promoter is K P R Projets & Others. The RERA record describes the organization type as “Others”; the legal entity type is not established in the supplied data. The corporate identifier supplied is GSTIN 36AAXFK3526G1ZZ. RERA record RERA filing Corporate record
  • The registration certificate lists the promoter office as Village: MUTHANGI, Mandal: PATANCHERU, District: Sangareddy, Pin: 502300. The RERA project record separately lists an address at JOGIPET REVENUE VILLAGE, Masaipet, Sangareddy, 502270. RERA filing
  • The Form B declaration attributed to K PR PROJECTS states a completion date of 10.09.2026. The supplied RERA amenity fields show 0% progress for the listed infrastructure and amenities; there is no independent construction-progress inspection or evidence of a completion/occupancy certificate in this pack. RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate, P01100009087Form C registration under section 5 for NANDANAVANAM; validity 10/09/2024–10/09/2026; certificate includes conditions on agreement for sale, conveyance, separate-account deposits and quarterly updates.
Tentative layout approval, 0002/LO/3050/2024Andole-Jogipet Municipality/Municipal Corporation approval dated 10 September, 2024 for a 209-plot layout, subject to stated infrastructure, open-space, utility, road and mortgage conditions.
Layout Plan Details sheet, file G1/1480/2015TS-DTCP-attributed drawing dated 27-02-2024, with LTP licence TS/011773/2024, survey list, land-use statement and 209 individual subplots.
Form B declarationK PR PROJECTS’ declaration dated 26*h day of Oct 2024 states a completion undertaking of 10.09.2026 and includes a promoter declaration concerning title and encumbrances.
Layout drawing and measurement recordPlot count and plot-size measurements are software-read from the drawing; the supplied record notes that plot sizes should be verified against the drawing. Layout record
Occupancy/completion certificateNo project OC or completion certificate is included in the supplied evidence.

Frequently asked questions

Is NANDANAVANAM registered with Telangana RERA?

Yes. NANDANAVANAM is registered with the Telangana Real Estate Regulatory Authority as P01100009087; the registration status is New Project.

Who is the developer of NANDANAVANAM?

The promoter named in the RERA registration is K P R PROJETS & OTHERS.

Where is NANDANAVANAM located?

NANDANAVANAM is in JOGIPET, Masaipet, Sangareddy, Telangana (502270).

When will NANDANAVANAM be completed?

The promoter's proposed date of completion filed with RERA is 10/01/2027. This is the promoter's declaration, not a guarantee.