MR RESIDENCY is a residential apartment project at Plot Nos. 13 and 14, Survey No. 58, Karmanghat, Saroornagar mandal, Ranga Reddy district. The registered promoter is JNRCONSTRRUCTIONS. The project has a total land area of 616 sq. m and one residential building with 1 Stilt + 5 upper floors, comprising 10 3BHK apartments. It is registered under TG-RERA number P02400001607, with proposed completion of 08/09/2024.

01What we found

Period endedTG-RERA registration ran to 8 Sep 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
21court cases on this project's land (survey 58, Karmanghat)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameMR RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified. The registration covers the project at Plot Nos. 13 and 14, Survey No. 58; the documents describe one residential building.
TG-RERA registrationP02400001607; registered promoter name recorded as Jnrconstrructions.
Registration validity09/02/2020–08/09/2024, for four years; certificate records no extension. This is the registration period, not the completion deadline or OC status.
RERA status shown by available recordRegistration validity ended 08/09/2024; no extension is recorded in the supplied certificate.
Registered promoterJNRCONSTRRUCTIONS; the Form B identifies M/s JNR CONSTRUCTIONS. Entity type recorded as partnership. RERA record RERA filing

Land and geographic identity

ItemRecord
LocalityKarmanghat; the GHMC permit and OC also describe the site as Anupama Nagar. RERA record
Revenue villageKarmanghat / KARMAN GHAT. RERA record Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500035. RERA record RERA filing
Project survey identitySurvey No. 58; title and approval documents specify Survey No. 58 Part. The RERA filing does not provide a further subdivision. Land records
PlotsPlot Nos. 13 and 14. RERA filing
Filed land areaTotal area 616 sq. m; net area 601.00 sq. m; road-widening/affected area 15 sq. m. RERA filing
GHMC OC land figuresExtent 616.20 m2; road-widening area 15.11 m2; net area 601.09 m2.
Boundaries in RERA filingNorth: 25 FEET WIDE ROAD; South: 30 FEET WIDE ROAD; East: PLOT NO 11; West: PLOT NO 15 AND 15 FEET WIDE ROAD. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permit2/C3/13466/2019, dated 09 September, 2019. Approvals record
Occupancy certificateGHMC OC 2460/GHMC/LBN/2022-OC, approved 26 July, 2022; records a residential building at Plot Nos. 13 and 14, Survey No. 58 Part.
Building configurationOne residential building, 1 Stilt + 5 upper floors, height 14.95 m, as stated in the permit. RERA record
Approved built-up area1263 sq. m in the RERA filing. The OC records floor area 1263.45 m2. RERA filing
Unit count10 units in the RERA unit record; the filing lists one building unit, so the available evidence does not establish a reconciled building-versus-apartment count. RERA unit table RERA filing
ParkingThe OC records parking area 223.53 m2. A parking-space count, level-by-level allocation and buyer-specific allocation are not established by the supplied evidence.

Offering and status

ItemRecord
RERA-filed configuration3BHK, 10 units; booked 0, available 10 as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative. RERA unit table
RERA-filed saleable area140.5 sq. m per unit. RERA unit table
Construction-stage evidenceThe GHMC OC states the building was inspected and fit for occupation; an architect’s Form 1A dated 20-07-2024 certifies MR RESIDENCY complete in all aspects. These are documentary certifications, not an independent current site inspection.
Completion datesForm B promoter undertaking: 08/12/2021. The RERA header gives proposed completion 08/09/2024. The architect’s Form 1A is dated 20-07-2024. RERA record
OC scopeGHMC OC is for the residential building at Plot Nos. 13 and 14, Survey No. 58 Part; the architect’s certificate identifies the same GHMC OC reference and certifies project completion.

2. The project story

MR RESIDENCY is a single-building residential apartment project recorded at Plot Nos. 13 and 14 in Survey No. 58 Part, Karmanghat village, Saroornagar mandal, Ranga Reddy district. The site is described in the project record as Karmanghat and in GHMC documents as Anupama Nagar. The RERA filing records a total site area of 616 sq. m and net area of 601.00 sq. m. RERA record RERA filing

The filed offering is ten 3BHK apartments in a building sanctioned as stilt plus five upper floors. The RERA unit record reports no units booked and ten available, but provides no as-of date for that inventory snapshot. RERA unit table

For completion, see Construction-stage evidence and Completion dates above. The architect’s statement is a professional certification filed with RERA; no current independent site inspection is supplied.

3. Master plan, architecture & building design

GHMC’s permit identifies the building as MPL-1 (V MAHESHWARI) and sanctions 1 Stilt + 5 upper floors, with a stated height of 14.95 m.

The RERA filing gives approved built-up area as 1263 sq. m; GHMC’s OC records floor area as 1263.45 m2. The OC records a site extent of 616.20 m2, road-widening area of 15.11 m2, net area of 601.09 m2, and parking area of 223.53 m2. These figures are reported as labelled in their respective records; the supplied evidence does not provide a drawing-derived breakdown of gross, FSI-counted, saleable or carpet area for the whole building. RERA filing

The RERA record identifies ten apartments, but the supplied plan material does not establish a complete building arrangement, flats per floor, footprint, lift or stair layout, common-area distribution, or the number and layout of parking bays. A layout-plan document is listed in the project file, but its extracted content is unavailable. RERA unit table Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010140.5 sq. m99.1–99.4 sq. m; median 99.2 sq. m29%

RERA records ten 3BHK units and a saleable area of 140.5 sq. m per unit. The booked and available figures are the portal snapshot supplied, which has no as-of date. RERA unit table RERA unit details

The carpet-area figures are software-measured from the approved floor-plan drawing geometry, not RERA-filed measurements, and should be checked against the drawing. Two 3BHK designs were measured; reported carpet area ranges from 99.1 to 99.4 sq. m (median 99.2 sq. m, or 1068 sq. ft median). The supplied measurement record reports loading of 29%. Carpet area and RERA saleable area are different measures; the drawing review notes that saleable area also counts the home’s share of common areas. Floor plans RERA unit details

A typical-plan panel labelled “TYPICAL - 1,3,4&5 FLOOR PLAN” includes a flat identified as “02,” with bedrooms, hall, foyer, toilets, puja, kitchen and utility. The room dimensions shown in the software measurement record are drawing-derived, not RERA disclosures. RERA unit details

5. Parking & vehicle circulation

GHMC’s OC records 223.53 m2 of parking area. The RERA record also declares a mortgage area of 128 sq. m; the title documents describe a 10% area associated with the second-floor built-up area and corresponding undivided land share, with a later release of the simple mortgage. RERA filing

The supplied evidence does not establish the number of car or two-wheeler spaces, parking levels or bay dimensions, visitor or accessible parking, ramp and driveway arrangements, EV charging, or an individual allotment of parking to any apartment. The recorded parking area alone does not establish exclusive ownership or allocation of a particular bay. RERA unit table

6. Amenities, recreation & open spaces

The RERA-filed amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%; several other listed items are recorded at 0%. These are filed status figures, not independent verification of current operation. RERA amenities

Water supply
Description / sizeNo source or capacity stated in the RERA amenities record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; not independently verified.
Sewerage
Description / size“Sewerage (Chamber, Lines, Septic Tank, STP)” is listed. No capacity or treatment details supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; not independently verified.
Storm-water drains
Description / sizeNo dimensions or system details supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; not independently verified.
Rainwater harvesting
Description / sizeRERA lists water conservation/rainwater harvesting; GHMC OC lists RWH.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; OC lists the facility; current operation not independently verified.
Electrical meter room / sub-station / receiving station
Description / sizeNo capacity or equipment details supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; not independently verified.
Park / green space and other recreation
Description / sizeRERA record lists “Green Strip/TOT LOT/Park” and aggregate recreational open space at 0%.
Evidence sourceRERA amenities
Declared progress / verified statusNo completed facility established by the supplied RERA record.

Third-party vendor material lists facilities including a swimming pool, gym, clubhouse, children’s play area, indoor games, jogging track and badminton court. These are vendor-listed claims, not established here as RERA-filed or delivered project facilities. Promoter website

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%. It does not give water source, storage or treatment capacity; STP capacity or reuse arrangements; drainage or harvesting specifications; or electrical supply, backup or substation capacity. RERA amenities

GHMC’s OC lists rainwater harvesting. The building permit includes conditions concerning construction-worker safety, insurance and hygienic temporary shelter with drinking water and sanitary measures where workers are housed on site; these are permit conditions and do not, by themselves, establish the present condition of the building.

The supplied project evidence does not establish lift count or capacity, service lifts, fire-protection equipment or clearances, escape-stair arrangement, waste segregation, CCTV or access-control systems, or accessible circulation. Vendor listings mention a lift, service/goods lift, fire safety, security and power backup, but those claims are not confirmed as project-filed or completed facilities. Promoter website

8. Location, access & connectivity

The registered location is Karmanghat, Saroornagar mandal, Ranga Reddy district, Telangana, PIN 500035; the GHMC permit and OC identify the locality as Anupama Nagar. The RERA-filed boundaries identify roads on the north, south and west sides, and Plot Nos. 11 and 15 on the east and west boundaries respectively. RERA record RERA filing RERA filing

A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 9.3 km. This is a supplied measured-distance result, not a travel-time claim. Location record

The supplied evidence does not establish public-transport services or a broader road-access description. Vendor material lists Pudami School at 0.3 km, Samala Pappi Reddy Garden at 2.4 km, Citi Hospital at 0.3 km, and Nagarjuna Sagar Road at approximately 5.5 Kms; these are vendor-attributed distances, not TG-RERA disclosures. Promoter website

9. Developer & development status

The registered promoter is JNRCONSTRRUCTIONS, recorded as a partnership. The RERA record names B JITHENDER REDDY as an authorized signatory and lists the promoter’s address at New SBI Colony Road No. 2, Anupama Nagar, Karmanghat, Saroornagar, Ranga Reddy, 500035. The Form B affidavit identifies M/s JNR CONSTRUCTIONS, signed by B. Jithender Reddy as managing partner. RERA record RERA filing Parties record

The RERA header gives proposed completion 08/09/2024; the Form B undertaking gives 08/12/2021. The architect’s Form 1A, dated 20-07-2024, certifies project completion in all aspects and cites GHMC OC 2460/GHMC/LBN/2022-26, dated 26 July 2022. The GHMC OC itself identifies the inspected building as fit for occupation. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001607, issued 09/02/2020; valid through 08/09/2024
Scope and sourceForm C for MR RESIDENCY; records four-year validity and project conditions.
GHMC building permit order
Identifier / date2/C3/13466/2019, 09 September, 2019
Scope and sourceBuilding permit for residential building MPL-1, 1 Stilt + 5 upper floors.
GHMC occupancy certificate
Identifier / date2460/GHMC/LBN/2022-OC, approved 26 July, 2022
Scope and sourceOC for the residential building at Plot Nos. 13 and 14, Survey No. 58 Part; states inspected building is fit for occupation.
Architect’s completion certificate
Identifier / dateForm 1A, dated 20-07-2024
Scope and sourceCertifies MR RESIDENCY complete in all aspects and identifies GHMC OC reference 2460/GHMC/LBN/2022-26, dated 26 July 2022.
Promoter Form B affidavit
Identifier / dateDated 29/12/2019
Scope and sourceIncludes title and encumbrance declarations and a promoter-stated completion deadline of 08/12/2021.
Title scrutiny report
Identifier / dateDated 19.11.2019
Scope and sourceLegal scrutiny report for Plot Nos. 13 and 14 in Survey No. 58 Part, Karmanghat village.
Layout plan record
Identifier / dateListed as document 89057
Scope and sourceThe supplied document listing says the layout-plan extraction is unavailable; drawing-derived 3BHK measurements are separately reported from this document. Document index Floor plans

Frequently asked questions

Is MR RESIDENCY registered with Telangana RERA?

Yes. MR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400001607; the registration status is New Project.

Who is the developer of MR RESIDENCY?

The promoter named in the RERA registration is JNRCONSTRRUCTIONS.

Where is MR RESIDENCY located?

MR RESIDENCY is in KARMANGHAT, Saroornagar, Rangareddy, Telangana (500035).

When will MR RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 08/09/2024. This is the promoter's declaration, not a guarantee.