Meher Heights
VHR CONSTRUCTIONS · Karimnagar · RERA P02700001158
MEHER HEIGHTS is a residential apartment project in BANK COLONY (VAVILALAPALLI), Karimnagar urban, Karimnagar. The registered promoter is VHR CONSTRUCTIONS. The project covers 2006.16 sq.m and comprises two residential blocks, each described as 1 Stilt + 5 upper floors, with 50 2BHK apartments of 99.36 sq.m saleable area. It is registered under TG-RERA number P02700001158, granted on 14/09/2019, with a proposed completion date of 16/02/2025.
More from Vhr Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name and type | MEHER HEIGHTS; residential apartment project. RERA record |
| Phase / registered portion | The registration and building-permit records describe two residential blocks; no separately named phase is disclosed. |
| TG-RERA registration | P02700001158, granted on 14/09/2019. |
| Registration validity | The certificate states validity from 14/09/2019 to 16/02/2025 and records no extension. This is the registration period, not a statement that the project has an occupancy certificate. |
| Registered promoter | VHR CONSTRUCTIONS; entity type recorded as partnership. Corporate record RERA filing |
| RERA status in supplied record | The supplied certificate records registration through 16/02/2025 and no extension; the project record identifies 16/02/2025 as the proposed completion date. Current registration status is not independently verified here. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | BANK COLONY (VAVILALAPALLI); the building-permit document also describes the site as Vavilala Pally_W50. RERA record |
| Revenue village | Bank colony(50th ward), as recorded in the project filing. RERA record |
| Mandal / district / PIN | Karimnagar urban / Karimnagar / 505001. RERA record |
| Survey number(s) and subdivision(s) | Survey No. 1357; no subdivision is disclosed in the supplied project identity. RERA filing |
| Plot | Plot No. 01. RERA filing |
| Site area | 2006.16 sq.m total; 92.81 sq.m road-affected area; 1913.35 sq.m net area, as stated in the building permit. |
| Boundaries | North: 30 FEET WIDE ROAD; south: SY NO 1356; east: HOUSE OF MURALI MOHAN; west: OPEN PLOT OF OTHERS. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Karimnagar Municipal Corporation. |
| Principal building-permit number / date | 3011/W50/2018/3100, approved 16 February, 2019. |
| Other plan reference recorded | G2/411/50/LRS/2015/KNR. |
| Approved built-up area | The permit lists Block A upper floors at 2,245.29 m2 and stilt at 495.89 m2, and Block B upper floors at 2,243.70 m2 and stilt at 494.39 m2. The project filing separately records 4489.02 sq.m as approved built-up area. RERA filing |
| Buildings and floors | Two residential blocks, Block A and Block B, each sanctioned with 1 Stilt + 5 upper floors in the block description. The permit’s extracted sanctioned parameters also list 6 upper floors in each block; the supplied record does not resolve this internal floor-count ambiguity. |
| Heights | Permit parameters state 14.25 m (Block A) and 14.29 m (Block B). |
| Parking levels / count | The permit identifies stilt parking and requires the approved cellar and stilts to be used exclusively for vehicle parking. A parking-space count is not supplied. |
| Unit count | The RERA filing records 50 apartments: 2BHK, across two blocks. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration and saleable area | 2BHK; 99.36 sq.m saleable area recorded for the configuration. RERA unit table RERA unit details |
| Booked / available | 0 booked / 50 available, as last read from the TG-RERA portal; the portal extract has no as-of date, so these counts are indicative rather than a current availability confirmation. RERA unit table |
| RERA-filed proposed completion | 16/02/2025. The Form-B declaration also undertakes completion by 16* February 2025. RERA record |
| Construction stage | No independently verified current construction-stage evidence is supplied. The RERA amenities record reports 0% for each listed item; this is a portal-reported status, not a site inspection. RERA amenities |
| Occupancy / completion certificate | The supplied building-permit extraction says completion is not certified and requires a completion notice and occupancy certificate before occupation. No occupancy or completion certificate is supplied. |
The project story
MEHER HEIGHTS is registered as a residential apartment project in Survey No. 1357, Plot 01, at Bank colony(50th ward), Karimnagar urban, Karimnagar. The building-permit record describes two residential blocks, Block A and Block B, intended for residential use. The approved permit describes each block as 1 Stilt + 5 upper floors; its extracted parameters also refer to six upper floors per block, so the exact floor count requires confirmation against the sanctioned plan. RERA record RERA filing
The RERA filing lists 50 2BHK apartments and reports all 50 as available, with no units booked in the portal snapshot; the snapshot is undated. Those are filing figures, not a present-day sales confirmation. No independently verified construction progress is available in the supplied evidence. The RERA amenities record lists 0% progress for its 14 entries, which should be understood as reported portal data rather than a physical-site assessment. RERA unit table RERA amenities
The building permit requires submission of a completion notice and obtaining an occupancy certificate before occupation. The supplied record contains no such certificate, so completion, occupancy and delivery of facilities are not established by the documents reviewed here.
Master plan, architecture & building design
The sanctioned building permit identifies a 2006.16 sq.m site, a 92.81 sq.m road-affected portion and 1913.35 sq.m net area. It records two residential blocks and lists 96.5 sq.m as tot-lot area. The permit’s extracted area schedule gives Block A upper-floor area of 2,245.29 m2 and stilt area of 495.89 m2; for Block B it gives 2,243.70 m2 and 494.39 m2, respectively. These are permit-extracted figures; they are not presented here as carpet area or FSI-counted area.
The block descriptions state 1 Stilt + 5 upper floors and the permit parameters separately say 6 upper floors in each block. The permit lists heights of 14.25 m for Block A and 14.29 m for Block B. The supplied material does not include a readable architectural drawing from which to establish building footprints, flats per floor, lift or stair arrangement, entries, circulation, internal roads or the residential/common-area distribution.
The building permit records a 96.5 sq.m tot-lot and requires tree planting along the site periphery and maintenance of a greenery strip. It also requires a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. These are permit conditions or listed provisions; the evidence does not establish their completion.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 50 | 0 | 50 | 99.36 sq.m | Software-measured: median 71.9 sq.m; range 65.3–75.9 sq.m | 28% |
RERA configuration, unit counts, booking counts and saleable area are filing data; the booking snapshot is undated. The carpet-area figures and loading are software measurements from floor-plan drawing geometry, not RERA disclosures, and are noted as requiring review. The supplied drawing record says 20 2BHK flat designs were measured. RERA unit details Floor plans RERA unit table
For one measured 2BHK on the “SECOND FLOOR PLAN,” flat 03, the extracted room list includes a hall, kitchen, two bedrooms, two toilets and a wash area. The supplied drawing extraction gives individual room dimensions, but does not establish that this is the layout of every 2BHK. Carpet-area measurement from drawings, balcony or utility area, and the RERA-filed saleable area are distinct measures; the saleable figure may include the home’s share of common areas. RERA unit details
Parking & vehicle circulation
The building permit identifies the stilt level for parking and states that the approved cellar and stilts are to be used exclusively for vehicle parking without partition walls or rolling shutters. The RERA filing also marks the 2BHK units as mortgaged, but the supplied material does not establish unit-by-unit parking allocation or ownership. RERA unit table
No sanctioned parking-space count, visitor or accessible-space provision, two-wheeler count, mechanical parking, EV charging, ramp arrangement, driveway plan or pedestrian separation is established in the supplied evidence. A current parking inventory and the buyer’s specific allocation should be confirmed from the sanctioned plan and transaction documents. Document index
Amenities, recreation & open spaces
| Description / size | No clubhouse or indoor recreational facility identified in the supplied project record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established. |
| Description / size | Tot-lot: 96.5 m2 in the building permit. |
|---|---|
| Declared progress / verified status | Permit-listed; RERA amenities record reports 0% for Green Strip/TOT LOT/Park; completion not independently verified. RERA amenities |
| Description / size | The permit requires perimeter tree planting and a greenery strip; no aggregate recreational open-space figure is supplied beyond the 96.5 m2 tot-lot. |
|---|---|
| Declared progress / verified status | Required by permit; completion not independently verified. |
| Description / size | Community Buildings appears in the RERA amenities list; no description or size is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA portal record reports 0%; no delivery verification supplied. |
The RERA amenities record contains 14 entries, including internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station and aggregate recreational open space. It marks Water Conservation, Rain water Harvesting and Electrical Meter Room, Sub-Station, Receiving Station as “YES”; the listed progress for each entry is 0%. These are portal-recorded disclosures, not evidence of completed facilities. RERA amenities
Utilities, building services & safety
The building permit requires a rainwater-harvesting structure (percolation pit), identifies space for a transformer, and requires a garbage house within the premises. It also lists water supply and electricity connections among public amenities to be provided only on production of an occupancy certificate. The RERA amenities record marks rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” with 0% progress recorded. RERA amenities
The RERA amenities list also includes water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, energy management, and fire protection and fire-safety requirements; the record reports 0% progress for those entries. No capacities, treatment specifications, water source or storage details, reuse arrangements, backup-power provision, lift count or capacity, fire-system specifications, CCTV, access-control details, or accessibility arrangements are established in the supplied project evidence. The permit requires relevant services, including sanitation, plumbing, fire safety, lifts and electrical installations, to be executed under qualified technical personnel supervision; this condition does not itself establish completion or compliance. RERA amenities
Location, access & connectivity
The registered location is Bank colony(50th ward), in Karimnagar urban mandal, Karimnagar district, PIN 505001. The project record describes the locality as BANK COLONY (VAVILALAPALLI), and the building permit locates the site at Vavilala Pally_W50. The stated site boundaries include a 30 FEET WIDE ROAD to the north. RERA record RERA filing
The supplied location data contains no verified public-transport, landmark or measured-distance information for this site. Accordingly, no travel-time or connectivity claim is made here. Location record
Developer & development status
The registered promoter is VHR CONSTRUCTIONS, recorded as a partnership. The project filing identifies VEERA HANUMAN REDDY SINGIREDDY as authorized signatory and RAJA REDDY SINGIREDDY, SATHYAMMA SINGIREDDY and RUKMINI SINGIREDDY as partners. The Form-B declaration is made by Singireddy Veera Hanuman Reddy as authorized signatory and managing partner and undertakes completion by 16* February 2025. These are promoter-record and promoter-declaration details. Corporate record Parties record
The filed completion date is 16/02/2025; the TG-RERA certificate records registration validity to the same date and no extension. The supplied material does not establish current construction progress or an occupancy/completion certificate. The permit concerns two blocks, but no separate phase-wise completion or occupancy status is supplied. RERA record
Approvals, official records & documents
| Record | What it establishes in the supplied evidence |
|---|---|
| TG-RERA registration certificate, P02700001158 | Form C registration for MEHER HEIGHTS, granted 14/09/2019, with stated validity through 16/02/2025 and no extension recorded. |
| Karimnagar Municipal Corporation building permit, 3011/W50/2018/3100 | Building permit dated 16 February, 2019 for two residential blocks at Survey No. 1357, with permit conditions including completion notice and occupancy certificate before occupation. |
| Form-B declaration | Promoter declaration dated 10* day of July 2019, including the stated completion undertaking and RERA-account, audit and approvals commitments. |
| Project-filed floor-plan material | A layout-plan document is listed as document 65114; software measurements were made from the supplied floor-plan drawings. The materials supplied here do not establish the full set of approved architectural sheets or their details. Floor plans |
| Occupancy / completion certificate | None supplied; the building-permit extraction states that completion is not certified and requires an occupancy certificate before occupation. |
The permit also lists layout/subdivision reference G2/411/50/LRS/2015/KNR. Its conditions require compliance with the sanctioned plan, separate approval for modifications, a completion notice, and an occupancy certificate before occupation. This overview indexes those records; it does not reproduce the full set of permit conditions.
Project at a glance
Project identity
Registered name and type: MEHER HEIGHTS; residential apartment project.
Phase / registered portion: The registration and building-permit records describe two residential blocks; no separately named phase is disclosed.
TG-RERA registration: P02700001158, granted on 14/09/2019.
Registration validity: The certificate states validity from 14/09/2019 to 16/02/2025 and records no extension. This is the registration period, not a statement that the project has an occupancy certificate.
Registered promoter: VHR CONSTRUCTIONS; entity type recorded as partnership.
RERA status in supplied record: The supplied certificate records registration through 16/02/2025 and no extension; the project record identifies 16/02/2025 as the proposed completion date. Current registration status is not independently verified here.
Land and geographic identity
Locality: BANK COLONY (VAVILALAPALLI); the building-permit document also describes the site as Vavilala Pally_W50.
Revenue village: Bank colony(50th ward), as recorded in the project filing.
Mandal / district / PIN: Karimnagar urban / Karimnagar / 505001.
Survey number(s) and subdivision(s): Survey No. 1357; no subdivision is disclosed in the supplied project identity.
Plot: Plot No. 01.
Site area: 2006.16 sq.m total; 92.81 sq.m road-affected area; 1913.35 sq.m net area, as stated in the building permit.
Boundaries: North: 30 FEET WIDE ROAD; south: SY NO 1356; east: HOUSE OF MURALI MOHAN; west: OPEN PLOT OF OTHERS.
Development identity
Sanctioning authority: Karimnagar Municipal Corporation.
Principal building-permit number / date: 3011/W50/2018/3100, approved 16 February, 2019.
Other plan reference recorded: G2/411/50/LRS/2015/KNR.
Approved built-up area: The permit lists Block A upper floors at 2,245.29 m2 and stilt at 495.89 m2, and Block B upper floors at 2,243.70 m2 and stilt at 494.39 m2. The project filing separately records 4489.02 sq.m as approved built-up area.
Buildings and floors: Two residential blocks, Block A and Block B, each sanctioned with 1 Stilt + 5 upper floors in the block description. The permit’s extracted sanctioned parameters also list 6 upper floors in each block; the supplied record does not resolve this internal floor-count ambiguity.
Heights: Permit parameters state 14.25 m (Block A) and 14.29 m (Block B).
Parking levels / count: The permit identifies stilt parking and requires the approved cellar and stilts to be used exclusively for vehicle parking. A parking-space count is not supplied.
Unit count: The RERA filing records 50 apartments: 2BHK, across two blocks.
Offering and status
RERA-filed configuration and saleable area: 2BHK; 99.36 sq.m saleable area recorded for the configuration.
Booked / available: 0 booked / 50 available, as last read from the TG-RERA portal; the portal extract has no as-of date, so these counts are indicative rather than a current availability confirmation.
RERA-filed proposed completion: 16/02/2025. The Form-B declaration also undertakes completion by 16* February 2025.
Construction stage: No independently verified current construction-stage evidence is supplied. The RERA amenities record reports 0% for each listed item; this is a portal-reported status, not a site inspection.
Occupancy / completion certificate: The supplied building-permit extraction says completion is not certified and requires a completion notice and occupancy certificate before occupation. No occupancy or completion certificate is supplied.
The project story
MEHER HEIGHTS is registered as a residential apartment project in Survey No. 1357, Plot 01, at Bank colony(50th ward), Karimnagar urban, Karimnagar. The building-permit record describes two residential blocks, Block A and Block B, intended for residential use. The approved permit describes each block as 1 Stilt + 5 upper floors; its extracted parameters also refer to six upper floors per block, so the exact floor count requires confirmation against the sanctioned plan.
The RERA filing lists 50 2BHK apartments and reports all 50 as available, with no units booked in the portal snapshot; the snapshot is undated. Those are filing figures, not a present-day sales confirmation. No independently verified construction progress is available in the supplied evidence. The RERA amenities record lists 0% progress for its 14 entries, which should be understood as reported portal data rather than a physical-site assessment.
The building permit requires submission of a completion notice and obtaining an occupancy certificate before occupation. The supplied record contains no such certificate, so completion, occupancy and delivery of facilities are not established by the documents reviewed here.
Master plan, architecture & building design
The sanctioned building permit identifies a 2006.16 sq.m site, a 92.81 sq.m road-affected portion and 1913.35 sq.m net area. It records two residential blocks and lists 96.5 sq.m as tot-lot area. The permit’s extracted area schedule gives Block A upper-floor area of 2,245.29 m2 and stilt area of 495.89 m2; for Block B it gives 2,243.70 m2 and 494.39 m2, respectively. These are permit-extracted figures; they are not presented here as carpet area or FSI-counted area.
The block descriptions state 1 Stilt + 5 upper floors and the permit parameters separately say 6 upper floors in each block. The permit lists heights of 14.25 m for Block A and 14.29 m for Block B. The supplied material does not include a readable architectural drawing from which to establish building footprints, flats per floor, lift or stair arrangement, entries, circulation, internal roads or the residential/common-area distribution.
The building permit records a 96.5 sq.m tot-lot and requires tree planting along the site periphery and maintenance of a greenery strip. It also requires a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. These are permit conditions or listed provisions; the evidence does not establish their completion.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 50 | 0 | 50 | 99.36 sq.m | Software-measured: median 71.9 sq.m; range 65.3–75.9 sq.m | 28% |
RERA configuration, unit counts, booking counts and saleable area are filing data; the booking snapshot is undated. The carpet-area figures and loading are software measurements from floor-plan drawing geometry, not RERA disclosures, and are noted as requiring review. The supplied drawing record says 20 2BHK flat designs were measured.
For one measured 2BHK on the “SECOND FLOOR PLAN,” flat 03, the extracted room list includes a hall, kitchen, two bedrooms, two toilets and a wash area. The supplied drawing extraction gives individual room dimensions, but does not establish that this is the layout of every 2BHK. Carpet-area measurement from drawings, balcony or utility area, and the RERA-filed saleable area are distinct measures; the saleable figure may include the home’s share of common areas.
Parking & vehicle circulation
The building permit identifies the stilt level for parking and states that the approved cellar and stilts are to be used exclusively for vehicle parking without partition walls or rolling shutters. The RERA filing also marks the 2BHK units as mortgaged, but the supplied material does not establish unit-by-unit parking allocation or ownership.
No sanctioned parking-space count, visitor or accessible-space provision, two-wheeler count, mechanical parking, EV charging, ramp arrangement, driveway plan or pedestrian separation is established in the supplied evidence. A current parking inventory and the buyer’s specific allocation should be confirmed from the sanctioned plan and transaction documents.
Amenities, recreation & open spaces
| Description / size | No clubhouse or indoor recreational facility identified in the supplied project record. |
|---|---|
| Declared progress / verified status | Not established. |
| Description / size | Tot-lot: 96.5 m2 in the building permit. |
|---|---|
| Declared progress / verified status | Permit-listed; RERA amenities record reports 0% for Green Strip/TOT LOT/Park; completion not independently verified. |
| Description / size | The permit requires perimeter tree planting and a greenery strip; no aggregate recreational open-space figure is supplied beyond the 96.5 m2 tot-lot. |
|---|---|
| Declared progress / verified status | Required by permit; completion not independently verified. |
| Description / size | Community Buildings appears in the RERA amenities list; no description or size is supplied. |
|---|---|
| Declared progress / verified status | RERA portal record reports 0%; no delivery verification supplied. |
The RERA amenities record contains 14 entries, including internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station and aggregate recreational open space. It marks Water Conservation, Rain water Harvesting and Electrical Meter Room, Sub-Station, Receiving Station as “YES”; the listed progress for each entry is 0%. These are portal-recorded disclosures, not evidence of completed facilities.
Utilities, building services & safety
The building permit requires a rainwater-harvesting structure (percolation pit), identifies space for a transformer, and requires a garbage house within the premises. It also lists water supply and electricity connections among public amenities to be provided only on production of an occupancy certificate. The RERA amenities record marks rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” with 0% progress recorded.
The RERA amenities list also includes water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, energy management, and fire protection and fire-safety requirements; the record reports 0% progress for those entries. No capacities, treatment specifications, water source or storage details, reuse arrangements, backup-power provision, lift count or capacity, fire-system specifications, CCTV, access-control details, or accessibility arrangements are established in the supplied project evidence. The permit requires relevant services, including sanitation, plumbing, fire safety, lifts and electrical installations, to be executed under qualified technical personnel supervision; this condition does not itself establish completion or compliance.
Location, access & connectivity
The registered location is Bank colony(50th ward), in Karimnagar urban mandal, Karimnagar district, PIN 505001. The project record describes the locality as BANK COLONY (VAVILALAPALLI), and the building permit locates the site at Vavilala Pally_W50. The stated site boundaries include a 30 FEET WIDE ROAD to the north.
The supplied location data contains no verified public-transport, landmark or measured-distance information for this site. Accordingly, no travel-time or connectivity claim is made here.
Developer & development status
The registered promoter is VHR CONSTRUCTIONS, recorded as a partnership. The project filing identifies VEERA HANUMAN REDDY SINGIREDDY as authorized signatory and RAJA REDDY SINGIREDDY, SATHYAMMA SINGIREDDY and RUKMINI SINGIREDDY as partners. The Form-B declaration is made by Singireddy Veera Hanuman Reddy as authorized signatory and managing partner and undertakes completion by 16* February 2025. These are promoter-record and promoter-declaration details.
The filed completion date is 16/02/2025; the TG-RERA certificate records registration validity to the same date and no extension. The supplied material does not establish current construction progress or an occupancy/completion certificate. The permit concerns two blocks, but no separate phase-wise completion or occupancy status is supplied.
Approvals, official records & documents
TG-RERA registration certificate, P02700001158: Form C registration for MEHER HEIGHTS, granted 14/09/2019, with stated validity through 16/02/2025 and no extension recorded.
Karimnagar Municipal Corporation building permit, 3011/W50/2018/3100: Building permit dated 16 February, 2019 for two residential blocks at Survey No. 1357, with permit conditions including completion notice and occupancy certificate before occupation.
Form-B declaration: Promoter declaration dated 10* day of July 2019, including the stated completion undertaking and RERA-account, audit and approvals commitments.
Project-filed floor-plan material: A layout-plan document is listed as document 65114; software measurements were made from the supplied floor-plan drawings. The materials supplied here do not establish the full set of approved architectural sheets or their details.
Occupancy / completion certificate: None supplied; the building-permit extraction states that completion is not certified and requires an occupancy certificate before occupation.
The permit also lists layout/subdivision reference G2/411/50/LRS/2015/KNR. Its conditions require compliance with the sanctioned plan, separate approval for modifications, a completion notice, and an occupancy certificate before occupation. This overview indexes those records; it does not reproduce the full set of permit conditions.
Frequently asked questions
Is MEHER HEIGHTS registered with Telangana RERA?
Yes. MEHER HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02700001158; the registration status is New Project.
Who is the developer of MEHER HEIGHTS?
The promoter named in the RERA registration is VHR CONSTRUCTIONS.
Where is MEHER HEIGHTS located?
MEHER HEIGHTS is in BANK COLONY (VAVILALAPALLI), Bank colony(50th ward), Karimnagar urban, Karimnagar, Telangana (505001).
When will MEHER HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 16/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Bank Colony




