MANYA RESIDENCY is a residential apartment project in Alkapuri Colony, Karimnagar, District Karimnagar; the mandal is not disclosed. It is being developed by the registered promoter MANYA CONSTRUCTIONS, a partnership, on a registered site extent of 1120.85 sq.m., with one residential building and one block recorded, configured as 1 Stilt + 5 upper floors. The TG-RERA unit record lists 25 2BHK apartments, each with a RERA-filed saleable area of 40.02 sq.m. The project is registered under TG-RERA P02700006764, with a proposed completion date of 20/04/2028.

01What we found

RegisteredTG-RERA - valid till 20 Apr 2028
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered projectMANYA RESIDENCY RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionThe registration is for one building; the architect’s certificate identifies “Building /Wing Number 1 OF 1.” The record describes its construction progress as the first phase.
TG-RERA registrationP02700006764
Registration validity24/08/2023 to 20/04/2028; the certificate states four years. This is the registration period, not a statement that construction is complete.
Registered promoterMANYA CONSTRUCTIONS; partnership RERA filing Corporate record
RERA statusThe supplied registration certificate grants registration. The project record labels the status “New Project.” RERA filing

Land and geographic identity

FieldProject record
LocalityAlkapuri Colony, Karimnagar RERA filing
Revenue villageNot disclosed in the project identity record. The building-permit extraction labels the location “WARD 26”; the architect’s certificate labels it “ALKAPURI COLONY.” Land records
MandalNot disclosed Land records
District / PINKarimnagar / 505001 RERA record
Survey number(s)Survey No. 848; no subdivision is stated in the RERA identity record. RERA filing
Plots12, 13, 14, 31, 32 RERA filing
Registered site extent1120.85 sq.m. RERA filing
Total / net land areaRERA fields report total and net area as 1120.85 sq.m.; the building-permit extraction separately lists net area as 1116.99 m². RERA filing
Road-affected areaRERA fields report 0 sq.m.; the permit lists road-affected area as 0 m² and also records a condition concerning surrender of any road-affected portion. RERA filing
Boundaries in RERA recordEast: 12M ROAD; West: LAND OF OTHERS; North: 9M ROAD; South: 9M ROAD RERA filing

Development identity

FieldProject record
Sanctioning authorityKarimnagar Municipal Corporation Approvals record
Principal approvalBuilding Permit Order No. 3011/W26/2019/4786, approved 20 April, 2022 Approvals record
Approved built-up area2,363.85 sq.m. in the RERA fields RERA filing
Building arrangementOne residential building; one block/tower is recorded. RERA filing RERA unit table
Sanctioned configuration1 Stilt + 5 upper floors; permit extraction states residential upper floors: 5 and height: 14.95 m.
Parking levelsStilt is approved for parking; the supplied permit extraction gives no parking-space count.
Approved versus RERA-declared units25 units are listed in the RERA unit record; the project fields report one building unit. The supplied evidence does not establish a separate sanctioned apartment count. RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configuration2BHK; 25 units RERA unit table
RERA-filed saleable area40.02 sq.m. per listed unit RERA unit table
Booked / available0 booked / 25 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageAn architect’s certificate dated 08/04/2026 reports construction progress as of 31/03/2026 but does not certify completion or an occupancy certificate. The supplied extract does not state a percentage.
Completion datePromoter’s Form B undertaking: 20/04/2028. The registration certificate is also valid through 20/04/2028.
Occupancy certificateNo occupancy certificate is supplied. The building permit requires one before occupation; the architect’s certificate does not certify one. The available evidence does not establish OC status for the building.

2. The project story

MANYA RESIDENCY is registered as a residential apartment project in Alkapuri Colony, Karimnagar, on Survey No. 848, covering plots 12, 13, 14, 31 and 32 in the RERA filing. The registration and architect’s certificate describe a single building, with one block recorded and a sanctioned configuration of one stilt level plus five upper floors. RERA filing

The RERA unit record lists 25 2BHK apartments. The project’s completion deadline is 20/04/2028. An architect’s certificate dated 08/04/2026 reports work figures as of 31/03/2026, but the supplied extract does not provide a completion percentage; it also states that it is based on client-provided information and does not certify project completion or an OC. These are filed records, not an independent site inspection. RERA unit table

3. Master plan, architecture & building design

The building permit approves a residential building of 1 Stilt + 5 upper floors on a site recorded as 1120.85 m². It reports a building height of 14.95 m and residential upper-floor area of 2,351.30 m²; the stilt area is listed as 527.16 m². The project fields separately state approved built-up area of 2,363.85 sq.m. RERA filing

The architect’s certificate describes six slabs of superstructure, no basement/plinth count and no podiums. It names one building/wing, but the supplied extracts do not provide a readable floor plan from which to establish flats per floor, apartment layouts, lifts, stairs, entrances, circulation or building footprint.

The permit identifies a tot-lot of 56.51 m² and requires peripheral tree planting and greenery. The RERA amenity record lists recreational open space, but provides no area in its supplied extract. RERA amenities

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2502540.02 sq.m.Not available from the supplied drawing measurementsNot supplied

The unit count, booking figures and saleable area are from the TG-RERA unit record; the portal record has no as-of date for the booking status. The supplied floor-plan review reports no measured flat designs for this configuration. Accordingly, no software-measured carpet area or room dimensions can be stated. Saleable area is the RERA-filed figure; the supplied materials do not establish a carpet-area figure or a separate balcony, utility or common-area loading breakdown. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The building permit designates the stilt for parking and requires the approved parking areas not to be partitioned or used for another purpose. No sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, ramp arrangement, or parking allocation by apartment is available in the supplied evidence. The permit condition does not by itself establish exclusive parking rights for a particular buyer.

6. Amenities, recreation & open spaces

The following are facilities or works recorded in RERA and the building-permit or architect-certificate material. The amenity record shows 0% for each listed item; this is a filed progress field, not independent verification of site condition. RERA amenities

Tot-lot / green strip
Description / sizePermit lists Tot-lot: 56.51 m²; requires fencing and maintenance as greenery before OC.
Declared progress / verified statusRequired by permit; completion not established.
Landscaping and tree planting
Description / sizeArchitect’s certificate lists landscaping and tree planting; permit requires peripheral planting and greenery.
Declared progress / verified statusRERA amenity record: 0%; independently completed status not supplied.
Aggregate recreational open space
Description / sizeListed in RERA amenities; no area stated in the supplied extract.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; completion not established.
Community buildings
Description / sizeListed in RERA amenities; no size or facility details supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; completion not established.

No project-specific RERA evidence in the supplied material confirms a clubhouse, swimming pool, gym, indoor games or other recreational facilities. Those items are not treated here as approved or delivered project amenities.

7. Utilities, building services & safety

ServiceSupplied project record
WaterWater supply is listed in the architect’s certificate and RERA amenities. The permit states public water connections are to be provided only on production of an OC. No source, storage or treatment capacity is supplied. RERA amenities
Sewerage and drainageSewerage, including chambers, lines, septic tank/STP, and storm-water drains are listed in the architect’s certificate and RERA amenities. The extract supplies no capacities or reuse details. RERA amenities
RainwaterThe permit requires a rainwater-harvesting percolation pit and lists four RWHPs; the architect’s certificate also lists water conservation and rainwater harvesting. Completion is not established.
ElectricalElectrical meter room, sub-station and receiving station are listed in the architect’s certificate and RERA amenities. The permit requires space for a transformer. No supply or backup capacity is stated. RERA amenities
Lifts and circulationThe permit refers to lifts as services to be executed under qualified technical supervision; the supplied evidence does not specify lift count, capacity or whether lifts are installed.
Fire and life safetyFire protection and fire-safety requirements appear in the RERA amenity list. The permit makes fire safety the responsibility of the owner, builder/developer, architect and site engineer and refers to necessary firefighting installations. Supplied extracts do not establish installed systems or completed clearances. RERA amenities
WasteThe RERA amenity record lists solid-waste management and disposal. The permit requires a garbage house within the premises. Completion and operating arrangements are not supplied. RERA amenities
AccessibilityThe supplied permit condition concerning facilities for physically handicapped persons applies to public and semi-public buildings above 300 sq.m.; the record does not establish the project’s accessibility design or completed accessible circulation.

8. Location, access & connectivity

The registered project location is Alkapuri Colony, Karimnagar, District Karimnagar, PIN 505001. The permit identifies Ward 26 and boundaries adjoining 12M and 9M roads; the RERA land record gives the adjoining-road boundaries but does not identify an approach route or public-transport service. RERA record RERA filing

The supplied location dataset includes a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The dataset does not provide a verified project entrance route or travel-time estimate. Location record

9. Developer & development status

The registered promoter is MANYA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ABKFM5701F1ZD. The RERA record gives its address as Sri Nilayam, Bhagath Nagar, Alkapuri Colony, Karimnagar, Karimnagar District, 505001. Authorized signatories named in the project record are Hari Kishan Gaddam and Jaya Sena Reddy Narra. Corporate record RERA filing Parties record

The promoter’s Form B declares a completion undertaking of 20/04/2028. The architect’s certificate dated 08/04/2026 records the project as one building/wing and reports construction information as of 31/03/2026, without certifying completion or an OC. The supplied project evidence does not establish an issued occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration
Reference and scopeP02700006764; MANYA RESIDENCY; Survey No. 848; registration certificate dated 24/08/2023, valid through 20/04/2028.
Supplied evidenceForm C registration certificate
Building permit
Reference and scopeKarimnagar Municipal Corporation, Building Permit Order No. 3011/W26/2019/4786, dated 20 April, 2022; one residential building, 1 Stilt + 5 upper floors.
Supplied evidenceBuilding permit extraction
RERA completion-progress filing
Reference and scopeArchitect’s certificate dated 08/04/2026; work figures stated as of 31/03/2026; does not certify completion or OC.
Promoter declaration
Reference and scopeForm B affidavit by SRI GADDAM HARI KISHAN; declares title and no encumbrances and undertakes completion by 20/04/2028.
Layout plan
Reference and scopeA layout-plan document is listed, but the supplied record is not extracted as an approved layout drawing.
Supplied evidenceDocument index
Occupancy / completion certificate
Reference and scopeNot supplied. The building-permit conditions require an OC before occupation.

Frequently asked questions

Is MANYA RESIDENCY registered with Telangana RERA?

Yes. MANYA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02700006764; the registration status is New Project.

Who is the developer of MANYA RESIDENCY?

The promoter named in the RERA registration is MANYA CONSTRUCTIONS.

Where is MANYA RESIDENCY located?

MANYA RESIDENCY is in KARIMNAGAR, Telangana (505001).

When will MANYA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 20/04/2028. This is the promoter's declaration, not a guarantee.