Sign in

Lake Front Apartments

M/s. SRI KALYANA DEVELOPERS · Hanamkonda · RERA P00300006442

LAKE FRONT APARTMENTS is a residential apartment project in BHEEMARAM, Hasanparthy mandal, Warangal Urban district. It is being developed by the registered promoter, M/s. SRI KALYANA DEVELOPERS. The project occupies 953.23 sq. m and comprises one proposed residential building with 1 Stilt + 5 upper floors and 15 3BHK units, each with a saleable area of 157.46 sq. m. Its TG-RERA registration number is P00300006442, and its proposed completion date is 23/04/2025.

01What we found

Period endedTG-RERA registration ran to 23 Apr 2025 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameLAKE FRONT APARTMENTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionThe record identifies one building and does not separately identify a phase; registration covers the project on Survey Nos. 188/3, 188/1, 185/B and 186/A. RERA filing
TG-RERA registrationP00300006442 Approvals record
Registration validity07/07/2023 to 23/04/2025; the certificate records no extension. This is registration validity, not an occupancy certificate or evidence of current construction status. Approvals record
Registered promoterM/s. SRI KALYANA DEVELOPERS, partnership firm RERA filing Corporate record
RERA project statusListed as On-Going Project in the project record. RERA filing

Land and geographic identity

ItemProject record
LocalityBHEEMARAM RERA record RERA filing
Revenue villageBheemaram; the building approval describes the location as “Bheemaram ( Includes Komatipally).” RERA record
Mandal / district / PINHasanparthy / Warangal Urban / 506015 RERA record
Survey numbers and subdivisions188/3, 188/1, 185/B and 186/A Land records
Registered site extent953.23 sq. m in the building approval
Total / net land area953.23 sq. m / 953.23 sq. m in the RERA land record; approved road-affected area is recorded as 0. Land records
Boundaries recorded in RERAEast: HNO 55 1 125 OF SADULA BABA; West: 55 1 127 BY 1 OF S PRABHAKAR REDDY; North: 55 1 127 OF SAMBHAMURTHY AND LAND OF OTHERS; South: 33 FEET WIDE ROAD. RERA filing

Development identity

ItemProject record
Sanctioning authorityGWMC Municipality/Municipal Corporation Approvals record
Principal building approval0059/BP/3006/2022, approved 23 April, 2022; file no. 000756/BP/DTCP/3006/0027/2022. Approvals record
Approved built-up area2367.08 sq. m in the RERA project record RERA filing
Building count and sanctioned configurationOne proposed residential building; 1 Stilt + 5 upper floors. The approval records height 14.9 m, one stilt parking floor, no cellar, and five residential upper floors. RERA filing
Approved versus RERA-declared unitsBuilding approval states that the sanctioned unit count must not be increased without prior approval, but the supplied approval extraction does not give the numeric sanctioned count. RERA records 15 proposed units. RERA unit table
Parking provisionStilt is approved for parking; the plan records 382.20 for stilt area. A parking-space count is not established in the supplied approval extraction.

Offering and status

ItemProject record
RERA-filed configuration3BHK, 15 units RERA unit table
RERA-filed saleable area157.46 sq. m per unit RERA unit table
Booked / available0 booked / 15 available as read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative. RERA unit table
Construction stageThe header reports 80% completeness; the supplied data does not identify the reporting date or independently verify this progress. RERA record
Promoter-declared completion date23/04/2025; revised proposed date is also 23/04/2025. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project records. The building approval requires completion notice and an occupancy certificate before occupation. Document index

2. The project story

LAKE FRONT APARTMENTS is a single-building residential apartment project recorded in Bheemaram, Hasanparthy mandal, on Survey Nos. 188/3, 188/1, 185/B and 186/A. The RERA record describes a 953.23 sq. m site and one proposed building, with a residential use sanctioned over five upper floors above a stilt. RERA record Land records

The registered offering is 15 three-bedroom apartments. The TG-RERA record shows all 15 as available and none booked, but gives no as-of date for that inventory snapshot. The project header reports 80% completeness; this is a reported project figure, not an independently verified site inspection. The promoter’s Form B declaration undertakes completion by 23/04/2025. The supplied records do not establish that the project has been completed or that an occupancy certificate has been issued. RERA unit table RERA record Document index

3. Master plan, architecture & building design

The building approval records one residential building on a site and net area of 953.23 sq. m, with no road-affected area. It sanctions one stilt and five residential upper floors, a building height of 14.9 m and a stilt area of 382.20. The approval extraction also records a 48.56 sq. m tot-lot and 5% open space.

The RERA project record lists approved built-up area as 2367.08 sq. m. The building approval separately records 1,969.00 for residential use and 382.20 for stilt; these are the areas as stated in the extracted approval, not a replacement for the RERA-recorded approved built-up area. The supplied extracts do not establish a building footprint, flats per floor, lift or stair count, unit orientation, or detailed internal circulation. RERA filing

4. Homes, configurations & floor plans

The TG-RERA filing records 15 3BHK units, each with a saleable area of 157.46 sq. m. Drawing measurements provide a separate, software-measured estimate of carpet area for four measured 3BHK designs. These drawing-based measurements are not RERA disclosures and should be checked against the drawings. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15015157.46 sq. mMedian 112.3 sq. m; measured range 97.4–127.0 sq. m across 4 designs (software-measured)29% (drawing-measured record)

A typical measured 3BHK drawing labels bedrooms, a living/kitchen area, toilets and a utility. The utility is excluded from the reported drawing-based carpet measurement. Carpet area, saleable area and common-area loading are distinct measures; the drawing-based carpet figure is not the same as the RERA-filed saleable area. Floor plans

5. Parking & vehicle circulation

The sanctioned configuration includes one stilt floor, and the building approval says the stilt approved for parking is to be used exclusively for vehicle parking. It records a stilt area of 382.20, but the supplied approval extraction does not establish a number of parking spaces or allocations to individual apartments.

The building approval also requires the road-affected portion to be surrendered to the local authority without compensation, and refers to an 18M road width in its conditions. The supplied material does not establish parking ramps, visitor or accessible bays, two-wheeler spaces, EV charging, or legally documented unit-specific parking allocations.

6. Amenities, recreation & open spaces

The approval identifies a tot-lot, rainwater-harvesting percolation pits, space for a transformer and a garbage house. The RERA amenities record lists additional infrastructure and community-facility headings, but their progress is shown as 0% or is not recorded; the supplied data does not verify delivery. The approval specifies three rainwater-harvesting structures. RERA amenities

Tot-lot / recreational open space
Description / sizeApproval records 48.56 sq. m tot-lot; condition requires it to be fenced and maintained as greenery.
Evidence sourceSanctioned building approval
Declared progress / verified statusRERA amenities record marks green strip/tot-lot/park available “YES” but progress 0%; completion not independently verified. RERA amenities
Rainwater harvesting
Description / sizePercolation pits; approval records 3 rainwater-harvesting structures.
Evidence sourceSanctioned building approval; RERA amenities record
Declared progress / verified statusRERA record says available “YES” but progress 0%; completion not independently verified. RERA amenities
Internal roads and footpaths
Description / sizeListed in RERA amenities record.
Evidence sourceRERA amenities record
Declared progress / verified statusProgress 0%. RERA amenities
Street lighting
Description / sizeListed as available “YES” in RERA amenities record.
Evidence sourceRERA amenities record
Declared progress / verified statusProgress 0%; completion not independently verified. RERA amenities
Community buildings
Description / sizeListed in RERA amenities record.
Evidence sourceRERA amenities record
Declared progress / verified statusProgress 0%. RERA amenities

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting. It marks water supply, sewerage, green strip/tot-lot/park, street lighting, rainwater harvesting, electrical meter room/sub-station/receiving station and aggregate recreational open space as “YES”; listed progress values are 0%. These are filing entries, not independent confirmation of installed or operational services. RERA amenities

The building approval requires a transformer space, a garbage house and a rainwater-harvesting structure, and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. It also places fire-safety and structural-safety responsibilities on the owner, builder/developer, architect and site engineer. The supplied extracts do not specify water source or storage capacity, STP capacity or reuse arrangements, electrical backup, lift count or capacity, fire-system equipment details, CCTV, access control, or accessibility features.

8. Location, access & connectivity

The registered project location is BHEEMARAM, Bheemaram village, Hasanparthy mandal, Warangal Urban district, PIN 506015. The RERA boundaries identify a 33 FEET WIDE ROAD on the southern side. RERA record RERA filing

A supplied location record gives a geocoded point for SubCentre Bheemaram and one sampled connectivity distance: the nearest sampled Outer Ring Road interchange is approximately 111.8 km away. No other distances or travel times are supplied. Location record

9. Developer & development status

The registered promoter is M/s. SRI KALYANA DEVELOPERS, identified in the RERA record as a partnership firm, with GSTIN 36ADRFS7403H1ZP. The RERA registration certificate gives the promoter office as Village: Waddepally, Mandal: Hanamkonda, District: Warangal Urban, Pin: 506001. The project record separately lists a Bheemaram address for the organization. Corporate record RERA filing

The RERA record names SARABUDLA PRABHAKARA REDDY as a landowner/promoter and identifies an AreaShare arrangement. The building approval names Sri SARABUDLA PRABHAKAR REDDY as owner and M/s. SRI. KALYANA DEVELOPERS as developer. The promoter’s Form B affidavit, made by GONE THIRUPATHI RAO on 06 May 2023, declares that the project land is free from encumbrances and undertakes completion by 23/04/2025. RERA filing Parties record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300006442; issued 07/07/2023; valid through 23/04/2025
Scope and sourceLAKE FRONT APARTMENTS; records the project survey numbers and registration conditions.
Building construction approval
Identifier / date0059/BP/3006/2022; 23 April, 2022
Scope and sourceGWMC Municipality/Municipal Corporation; building approval for the Bheemaram site and the listed survey numbers. File no. 000756/BP/DTCP/3006/0027/2022.
Title-search report
Identifier / dateDated 03-03-2023
Scope and sourceAdvocate’s title opinion filed for the project land.
Development agreement cum GPA
Identifier / dateRegistration No. 327/2023; 05 January 2023
Scope and sourceDevelopment arrangement between SARABUDLA PRABHAKAR REDDY and M/s SRI KALYANA DEVELOPERS, cited in the filed title material.
Promoter declaration, Form B
Identifier / date06 May 2023
Scope and sourcePromoter declaration including the completion undertaking and project-fund declarations.
Floor-plan drawing record
Identifier / dateDocument 322644
Scope and sourceDrawing source used for the software-measured unit observations; the supplied document record describes a first-floor plan and typical plan for floors 2–5.

The supplied project records do not identify an occupancy or completion certificate. The building approval states that an occupancy certificate is compulsory before occupation and requires a completion notice after building completion.

Frequently asked questions

Is LAKE FRONT APARTMENTS registered with Telangana RERA?

Yes. LAKE FRONT APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P00300006442; the registration status is On-Going Project.

Who is the developer of LAKE FRONT APARTMENTS?

The promoter named in the RERA registration is M/s. SRI KALYANA DEVELOPERS.

Where is LAKE FRONT APARTMENTS located?

LAKE FRONT APARTMENTS is in BHEEMARAM, Hasanparthy, Hanamkonda, Telangana (506015).

When will LAKE FRONT APARTMENTS be completed?

The promoter's proposed date of completion filed with RERA is 23/04/2025. This is the promoter's declaration, not a guarantee.

More projects in Bheemaram