Sign in

Harshini Elite

SHREEVEN BUILDERS AND DEVELOPERS LLP · Medchal-Malkajgiri · RERA P02200006090

HARSHINI ELITE is a residential apartment project in Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, on Plot Nos. 8 and 9. The registered promoter is SHREEVEN BUILDERS AND DEVELOPERS LLP. The project covers 418.83 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 homes: five 2BHK and five 3BHK, each configuration filed at 135.0 sqm saleable area. Its TG-RERA registration number is P02200006090, and its proposed completion date is 26/11/2025.

More from Shreeven Builders And Developers LLP · 5 projects →

01What we found

Period endedTG-RERA registration ran to 26 Nov 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered name and typeHARSHINI ELITE — residential apartment project. RERA record RERA filing
Phase / registered portionA single registered apartment project is identified; the record does not name a separate phase. The registration is for the project at Plot Nos. 8 and 9. RERA record
TG-RERA numberP02200006090. RERA record
Registration validityCertificate states validity from 18/04/2023 to 26/11/2025; no extension is recorded in the supplied evidence. This is registration validity, not an occupancy certificate.
Registered promoterSHREEVEN BUILDERS AND DEVELOPERS LLP. RERA record Corporate record
RERA status in supplied recordRegistered; the recorded validity end date has passed. The record supplied here does not establish the project’s current registration status. RERA record

Land and geographic identity

ItemProject record
Locality / plotKompally; PLOT NOS 8 AND 9. RERA record RERA filing
Revenue-village identityRERA identifies Kompally -Shivalayam; the HMDA permit and OC identify Kompally. The supplied records do not establish whether these names denote the same revenue village. RERA record
Mandal / district / PINDundigal Gandimaisamma; Medchal-Malkajgiri; 500014. RERA record
Survey number(s)Survey No. 66; no subdivision is disclosed in the supplied project identity or approval extracts. RERA record
Registered site extentRERA filing: 418.83 sq. m total and 414.37 sq. m net, with 4.46 sq. m affected by road widening/FTL/nala widening. RERA filing
Boundary descriptionsEast: 30 FEET WIDE ROAD; west: NEIGHBOURS LAND; north: PLOT No 10; south: PLOT No 7. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA). Approvals record
Principal building approvalBuilding Permit Order 006851/BP/HMDA/1367/MED/2022, dated 26 November, 2022; proceedings 001853/BP/HMDA/MED/2022. Approvals record
Approved built-up areaHMDA permit: 1,108.70 Sq.mts; the permit extract separately records Total Built up Area 1,371.33 Sq.mts. These are distinct figures as labelled in the document.
Building and floorsOne residential building, 1 Stilt + 5 upper floors. The OC extract records Stilt 1; Upper Floor 5. RERA record
Height14.99 (the permit and OC extracts label the unit as metres).
Parking / mortgage provisionThe permit records 112.12 Sq.mts as provided mortgage area, described as 10% of built-up area in favour of MC, HMDA. The OC extract lists Parking Area (m2) 221.7. No parking-space count or unit-wise allocation is supplied.
UnitsOne building; 10 units in the RERA unit record, comprising five 2BHK and five 3BHK. The approval extract does not state an approved unit count for comparison. RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK; five of each, with 135.0 sqm RERA saleable area recorded for each configuration. RERA unit table RERA unit table
Booking / availabilityPortal-derived counts last read: 4 booked and 6 available (2 booked and 3 available in each configuration). The record has no as-of date, so counts are indicative. RERA unit table
Declared completion deadline26/11/2025. The supplied Form B states that the project shall be completed by 26l% November 2025 (as transcribed in the extraction); the registration certificate gives 26/11/2025 as its validity end date. RERA record
Occupancy certificateHMDA OC 007686/OC/HMDA/MED/2025, dated 28 March, 2025, records occupancy approval for the residential building at Plot Nos. 8 and 9, Survey No. 66. Approvals record
Construction stageThe OC document records inspection and fitness for occupation; the supplied evidence does not provide a separate independently verified current site-progress assessment.

2. The project story

HARSHINI ELITE is a residential apartment development registered with TG-RERA for Plot Nos. 8 and 9 in Survey No. 66 at Kompally, in the Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA filing describes a single building and ten homes: five 2BHK and five 3BHK apartments. RERA record RERA filing RERA unit table

HMDA’s building permit describes a residential building with a stilt level and five upper floors. HMDA subsequently issued an occupancy certificate for the building, recording completion on 06 February, 2025 and issuance on 28 March, 2025. These are documentary approvals for the identified building; the supplied evidence does not independently verify its present physical condition or the current status of individual apartments.

3. Master plan, architecture & building design

The supplied HMDA permit extract describes one residential building on Plot Nos. 8 and 9, with 1 Stilt + 5 upper floors and a stated height of 14.99. It records Built up Area 1,108.70 Sq.mts and, separately, Total Built up Area 1,371.33 Sq.mts; the OC extract reports the floor area as 1,108.7 m2 for both the sanctioned and completed building plan.

The HMDA OC records a 414.37 m2 site area and the same building height as the sanctioned plan. The RERA filing separately reports total land area 418.83 sq. m, net area 414.37 sq. m, and 4.46 sq. m affected area. RERA filing

The permit lists a transformer, garbage house, STP and rainwater-harvesting structures. It also requires a developed, maintained black-topped approach road of the indicated plan width before release of occupancy. The supplied material does not provide enough drawing-derived information to describe the building footprint, apartment layout by floor, number of flats per floor, lifts, stairs, internal circulation or landscaped/open-space arrangement.

4. Homes, configurations & floor plans

The TG-RERA unit record lists ten homes: five 2BHK and five 3BHK, each configuration filed at 135.0 sqm saleable area. The booking counts are indicative because the supplied portal record has no as-of date. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK523135.0 sqm61.9 sqm (software-measured)54%
3BHK523135.0 sqm80.5 sqm (software-measured)40%

The carpet-area measurements are software-measured from the filed floor-plan drawing, not RERA-filed carpet-area disclosures, and are marked for review. The drawing extract shows bedrooms, living/dining, kitchen, toilets, balcony and utility areas; balconies and utilities are excluded from the measured carpet area. Saleable area is a separate RERA-filed figure and is not interchangeable with carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The OC extract lists Parking Area (m2) 221.7. The building permit also records 112.12 Sq.mts as provided mortgage area in favour of MC, HMDA, describing it as 10% of built-up area. The permit states that parking or construction is not allowed in setback areas.

No sanctioned car- or two-wheeler-space count, visitor or accessible parking provision, parking layout, ramp or driveway arrangement, EV provision, or unit-specific parking allocation is established by the supplied records. The recorded parking area should not be read as proof of exclusive parking rights for a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenities record marks the listed services below as available at 100%; it does not establish independent inspection or completion status. The HMDA permit separately specifies certain site provisions and conditions. RERA amenities

Water supply
Description / sizeNo source, storage or treatment capacity stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; independent completion verification not supplied
Sewerage and sewage treatment
Description / sizeSewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage water
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; permit requires an STP; independent completion verification not supplied
Storm-water drainage
Description / sizeNo size or capacity stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; independent completion verification not supplied
Green strip / tot lot / park
Description / sizeNo area or facility detail stated in the amenities record
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; independent completion verification not supplied
Rainwater harvesting
Description / sizeStructure required by HMDA permit; no capacity stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; permit condition; independent completion verification not supplied
Electrical meter room / sub-station / receiving station
Description / sizeNo capacity stated; permit separately lists a transformer
Evidence sourceRERA amenities
Declared progress / verified statusRERA record: YES, 100%; independent completion verification not supplied
Parking area
Description / size221.7 m2 recorded in the OC; no space count stated
Declared progress / verified statusRecorded in OC; unit allocation not supplied

The RERA amenities record shows 0% for internal roads and footpaths, street lighting, community buildings, solid-waste management and disposal, energy management, fire protection and fire-safety requirements, and aggregate recreational open space. These entries report the supplied record only; no further facility detail is available here. RERA amenities

7. Utilities, building services & safety

The supplied RERA amenities record marks water supply, sewerage/STP, storm-water drains, sewage treatment/disposal, rainwater harvesting and electrical meter room/sub-station/receiving station as available at 100%. HMDA’s permit specifies an STP and rainwater-harvesting structures, and lists a transformer. These are recorded provisions; capacities, operational test results and independent verification are not supplied. RERA amenities

The permit also requires CCTV cameras, greenery and a black-topped approach road of the width indicated in the plan before release of occupancy. It states that an occupancy certificate is compulsory before occupation and that the proposed building is to be used only after HMDA issues a fit-for-occupancy certificate. The supplied documents do not detail lifts, backup power, fire systems, escape stairs, accessible routes, waste segregation or security operations.

8. Location, access & connectivity

The registered location is Kompally -Shivalayam, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500014; the site is identified as Plot Nos. 8 and 9 in Survey No. 66. The RERA boundary record identifies a 30 FEET WIDE ROAD along the east side. RERA record RERA filing

The HMDA permit requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of occupancy. A supplied geospatial record gives the nearest sampled Outer Ring Road interchange as approximately 42.8 km away; this is a sampled distance, not a stated travel time. No other independently measured transport or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is SHREEVEN BUILDERS AND DEVELOPERS LLP, an LLP, with GSTIN 36AEOFS2262J1ZM. The RERA promoter address is 1-1-380/10, Ashok Nagar Extension, Kompally, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500014. Corporate record Parties record

The RERA record names SRIKANTH REDDY RAMALA as authorized signatory and VENKATANARAHAR RAO JAIGIRI, SHARMILA JAIGIRI and MADHAV BHOORATHNAM ALUGADDALA as partners. The Form B is dated December 2022 (day not stated) and records the promoter’s completion undertaking of 26l% November 2025 in the extracted text. Parties record

HMDA’s OC records the building as completed on 06 February, 2025 and issues occupancy approval on 28 March, 2025. No separate current construction-progress report or verified status for individual units is included in the supplied evidence.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200006090; issued 18/04/2023; valid to 26/11/2025
What the supplied record establishesForm C registration for HARSHINI ELITE and its stated registration conditions.
HMDA building permit
Identifier / date006851/BP/HMDA/1367/MED/2022; 26 November, 2022; proceedings 001853/BP/HMDA/MED/2022
What the supplied record establishesBuilding Permit Order for a residential building at Plot Nos. 8 and 9, Survey No. 66.
HMDA occupancy certificate
Identifier / date007686/OC/HMDA/MED/2025; 28 March, 2025; application 002295/OC/HMDA/0642/MED/2025
What the supplied record establishesOccupancy certificate for the residential building at Plot Nos. 8 and 9, Survey No. 66; records completion on 06 February, 2025.
Development Agreement-cum-GPA
Identifier / date14619/2022; dated 14-10-2022
What the supplied record establishesRERA-filed agreement identifying the landowners and promoter’s development arrangement.
Form B declaration
Identifier / dateDecember 2022 (day not stated)
What the supplied record establishesPromoter declaration, including the stated land and project undertakings.
Legal title report
Identifier / dateDated 06 January 2023
What the supplied record establishesAdvocate’s report concerning the project’s title history.
HMDA DPMS approved-layout lookup
Identifier / dateNot available through the supplied public lookup
What the supplied record establishesThe supplied record gives no public HMDA DPMS result for an approved-layout lookup; this is an unavailable lookup, not evidence of refusal. HMDA

Frequently asked questions

Is HARSHINI ELITE registered with Telangana RERA?

Yes. HARSHINI ELITE is registered with the Telangana Real Estate Regulatory Authority as P02200006090; the registration status is New Project.

Who is the developer of HARSHINI ELITE?

The promoter named in the RERA registration is SHREEVEN BUILDERS AND DEVELOPERS LLP.

Where is HARSHINI ELITE located?

HARSHINI ELITE is in Kompally, Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500014).

When will HARSHINI ELITE be completed?

The promoter's proposed date of completion filed with RERA is 26/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Kompally Shivalayam