Green Park City
MD MISKIN BABA AND OTHERS · Mahabubnagar · RERA P01400007565
GREEN PARK CITY is a residential plotted development in Polepalle, Jadcherla mandal, Mahabubnagar district. The registered promoter is Md Miskin Baba and Others. The project covers 10,343.65 sq.m and the approved layout lists 42 residential plots; building count, floors and plot configurations are not disclosed in the supplied project record. It is registered with TG-RERA as P01400007565, with a proposed completion date of 24/06/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | GREEN PARK CITY |
| Project type | Plotted development / residential layout RERA record |
| Phase or registered portion | Phase not separately identified; registration is for the project on Survey Nos. 415/P and 417/P |
| TG-RERA registration | P01400007565 |
| Registration validity | 13/01/2024 to 24/06/2025, as stated on the certificate. This is the registration period; it is separate from the completion deadline. |
| Registered promoter | Md Miskin Baba and Others; the filing also identifies the promoter as MD MISKIN BABA AND OTHERS. RERA filing |
| RERA project status | New Project RERA filing |
| Completion deadline | 24/06/2025, as declared by the promoter in Form B. |
| Occupancy/completion certificate | Not identified in the supplied project record. The project is a plotted layout; no phase- or plot-specific occupancy/completion certificate is provided here. Document index |
Land and geographic identity
| Item | Record |
|---|---|
| Locality and revenue village | Polepalle; also rendered as Polepally in the layout approval documents. Revenue village: Polepalle. |
| Mandal / district / PIN | Jadcherla / Mahabubnagar / 509301 RERA record |
| Project survey numbers | 415/P and 417/P |
| Registered site extent | 10,343.65 sq.m in the RERA land details. RERA filing |
| Layout drawing area | 10,343.56 sq.m, described in the drawing extraction as both the minimum plot area and net plot area. |
| Boundaries in the RERA land details | East: open land of Rajapur Village; West: open land of neighbours; North: open land of neighbours; South: existing 30 feet wide road. RERA filing |
| Road-widening/FTL/nala-widening area in RERA land details | 0 sq.m RERA filing |
Development identity
| Item | Record |
|---|---|
| Principal layout approval | Tentative Layout Plan approval 288189/LP/GP/205292/0005/2023, by MUDA Urban Development Authority; approved 24-06-2023. |
| Layout drawing reference | Permit_Number TS/034594/2023, dated 18-05-2023; drawing identifies Polepally Grampanchayat as the delegated authority. |
| Plots in the approved layout | 42, according to the layout plan and tentative approval record. |
| Approved built-up area | 0.00 sq.m in the supplied layout-plan parameters; this is a plotted layout, not a recorded building scheme. |
| Building, floor and parking-level configuration | Not disclosed in the supplied project record; no buildings, floors, or parking levels are identified. |
| Mortgaged area | 974.32 sq.m in the layout drawing extraction. The tentative approval separately describes Plot Nos. 21–27, stated as 1,165.287 sq.yds, as mortgaged. |
Offering and status
| Item | Record |
|---|---|
| Offering | Residential plots; the approved layout drawing lists 42 plots. |
| Plot count and size information | The drawing-derived layout record identifies 42 plots with sizes read from the drawing; see “Homes, configurations & floor plans.” These are software-measured drawing figures, not a RERA-filed plot-size schedule. Layout record |
| Booked / available plots | Not established by the supplied record. Document index |
| Declared project progress | RERA project information lists 70% completeness; this is a declared record value, not independent site verification. RERA filing |
| Construction stage | No independently verified site-stage evidence supplied. The approval requires development works and a work-completion certificate before final layout approval. |
2. The project story
GREEN PARK CITY is a residential plotted layout registered with TG-RERA as P01400007565, covering land identified as Survey Nos. 415/P and 417/P in Polepalle revenue village, Jadcherla mandal, Mahabubnagar district. The layout approval record describes 42 residential plots, with land set aside for roads, open space/park, utilities and social infrastructure. It does not describe an apartment, villa or commercial building scheme.
The promoter’s Form B declares a completion deadline of 24 June 2025, while the RERA project information records 70% completeness. Neither item is independent evidence of on-site completion. The supplied record does not establish which infrastructure works have been completed or whether a final layout approval or completion certificate has subsequently been issued. RERA filing
3. Master plan, architecture & building design
The project is organized as a plotted layout rather than a building development. The supplied layout drawing reports a net layout area of 10,343.56 sq.m and allocates it as follows. These figures are taken from the drawing extraction; they are not building floor areas.
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 6,096.11 sq.m | 58.94% |
| Road area | 2,944.33 sq.m | 28.47% |
| Organized open space/park | 931.30 sq.m | 9.00% |
| Social infrastructure | 266.94 sq.m | 2.58% |
| Utility area | 105.07 sq.m | 1.02% |
| Amenity area | 0.00 sq.m | 0.00% |
| Common parking area | 0.00 sq.m | 0.00% |
The approval drawing lists internal road widths of 7.62m, 9.14MT, 9.00MT and 18.00MT, and also gives road widths as 33'-0", 40'-0" and 50'-0".
No approved built-up area, building footprints, building count, floor configuration or building circulation details are disclosed in the supplied layout record. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site.
4. Homes, configurations & floor plans
This is a plotted project, so apartment configurations, carpet areas and apartment saleable areas do not apply. The layout drawing extraction identifies 42 plots. Its plot schedule was read by software and should be checked against the drawing; plot sizes below are not RERA-filed measurements. Layout record
| Plot-size band (sq.yd) | Plots |
|---|---|
| 100–150 | 10 |
| 150–200 | 28 |
| 250–300 | 3 |
| 300–400 | 1 |
The software-measured plot-size range is 101.45–332.55 sq.m (121.3–397.7 sq.yd), with a median of 139.14 sq.m (166.4 sq.yd). The most frequent sizes identified from the drawing are 139.14 sq.m (10 plots), 120.77 sq.m (8 plots) and 130.15 sq.m (7 plots). These are plot areas, not house floor areas. Layout record
No plot-wise booking or availability count is established in the supplied evidence. Document index
5. Parking & vehicle circulation
The layout drawing records 0 proposed parkings and 0.00 sq.m of common parking area. The supplied record does not establish visitor, accessible, two-wheeler or EV parking, nor any parking allotment arrangement.
Roads are shown in the layout plan, with widths listed as 7.62m, 9.14MT, 9.00MT and 18.00MT, and also as 33'-0", 40'-0" and 50'-0". The tentative approval requires roads to remain open for access to neighbouring sites. No separate vehicle-entry, ramp or pedestrian-separation design is evidenced.
6. Amenities, recreation & open spaces
The RERA amenity record identifies a number of layout infrastructure categories, but records 0% progress for the listed items. The approval document also specifies infrastructure and handover requirements. These records describe provisions or requirements; they do not establish independent completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor — no facility specifically identified | Not disclosed | RERA amenities | Not established |
| Sports / recreation — Green Strip/TOT LOT/Park | Park/open-space allocation: 931.30 sq.m in layout drawing; the tentative approval states Ac 0.23 cents, 1,113.835 sq.yds for open space. | RERA amenity record shows 0%; completion not independently verified. RERA amenities | |
| Landscape / open space — organized open space/park | 931.30 sq.m; 9.00% in the layout drawing | Completion not independently verified | |
| Convenience / community — social infrastructure | 266.94 sq.m; 2.58% in the layout drawing | Completion not independently verified | |
| Convenience / community — utility area | 105.07 sq.m; 1.02% in the layout drawing | Completion not independently verified |
The tentative approval names possible facilities—including a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management—and lists pharmacy, clinic, school, play school, creche, dispensary and convenience shops. These are approval-document references, not evidence that those facilities are built or operating.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage infrastructure (chamber, lines, septic tank/STP), water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. It also lists storm-water drains, street lighting, sewage and sullage treatment, solid-waste management, energy management and fire protection/safety requirements. The record shows 0% progress against each listed item; no completion verification, system capacities or operating details are supplied. RERA amenities
The tentative layout approval requires the applicant to construct an overhead tank or sump and septic tank, as applicable, and sufficient harvesting pits. It also identifies a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management among the utility provisions to be handed over. These are approval requirements or stated provisions, not proof of installation or statutory compliance.
No evidence is supplied for water source or storage capacity, sewage-treatment capacity, reuse arrangements, electrical backup, lifts, fire-system specifications, CCTV, access control or accessible circulation. RERA amenities Document index
8. Location, access & connectivity
The registered location is Polepalle, Jadcherla, Mahabubnagar, Telangana 509301, on Survey Nos. 415/P and 417/P. The RERA land record states that the southern boundary is an existing 30 feet wide road; the layout approval also records internal road widths. RERA filing
A cadastral parcel-centroid location is recorded at 16.81633, 78.11087. The nearest sampled Outer Ring Road interchange is listed at approximately 57.2 km; the supplied record does not provide a route, travel time or public-transport details. Cadastral map Location record
9. Developer & development status
The registered promoter is MD MISKIN BABA AND OTHERS; the registration certificate renders the name as Md Miskin Baba and Others. The RERA record describes the organization type as “Others” and its description as “Partnership.” No corporate registration number, registered-office address, official website or project contact details are established in the supplied evidence. RERA filing
MOHAMMED KHASIM signed the Form B declaration as the promoter’s authorized signatory. In that declaration, the promoter states that the project would be completed by 24 June 2025 and reports the land as free from encumbrances. The RERA project information records 70% completeness; no independent site inspection or verified construction-progress report is supplied here. RERA filing
10. Approvals, official records & documents
| Record | Available evidence |
|---|---|
| TG-RERA registration | Form C certificate for GREEN PARK CITY, registration P01400007565, valid 13/01/2024–24/06/2025. |
| Principal layout approval | MUDA Urban Development Authority Tentative Layout Plan approval 288189/LP/GP/205292/0005/2023, dated 24-06-2023, for land in Survey Nos. 415/P and 417/P at Polepalle. The approval states that it is not proof of land title. |
| Layout drawing | Proposed residential-plot layout for Survey Nos. 415/P and 417/P; drawing reference TS/034594/2023, dated 18-05-2023, with 42 plots and land-use allocations. |
| Promoter declaration | Form B, signed by MOHAMMED KHASIM as authorized signatory, containing the promoter’s title/encumbrance statements, 70% separate-account undertaking and completion declaration. |
| Final layout / completion evidence | The tentative approval requires a licensed technical person’s work-completion certificate for approval of the final layout. No final layout approval or such certificate is included in the supplied evidence. |
| Occupancy/completion certificate | None identified in the supplied project documents. Document index |
1. Project at a glance
Project identity
Registered project name: GREEN PARK CITY
Project type: Plotted development / residential layout
Phase or registered portion: Phase not separately identified; registration is for the project on Survey Nos. 415/P and 417/P
TG-RERA registration: P01400007565
Registration validity: 13/01/2024 to 24/06/2025, as stated on the certificate. This is the registration period; it is separate from the completion deadline.
Registered promoter: Md Miskin Baba and Others; the filing also identifies the promoter as MD MISKIN BABA AND OTHERS.
RERA project status: New Project
Completion deadline: 24/06/2025, as declared by the promoter in Form B.
Occupancy/completion certificate: Not identified in the supplied project record. The project is a plotted layout; no phase- or plot-specific occupancy/completion certificate is provided here.
Land and geographic identity
Locality and revenue village: Polepalle; also rendered as Polepally in the layout approval documents. Revenue village: Polepalle.
Mandal / district / PIN: Jadcherla / Mahabubnagar / 509301
Project survey numbers: 415/P and 417/P
Registered site extent: 10,343.65 sq.m in the RERA land details.
Layout drawing area: 10,343.56 sq.m, described in the drawing extraction as both the minimum plot area and net plot area.
Boundaries in the RERA land details: East: open land of Rajapur Village; West: open land of neighbours; North: open land of neighbours; South: existing 30 feet wide road.
Road-widening/FTL/nala-widening area in RERA land details: 0 sq.m
Development identity
Principal layout approval: Tentative Layout Plan approval 288189/LP/GP/205292/0005/2023, by MUDA Urban Development Authority; approved 24-06-2023.
Layout drawing reference: Permit_Number TS/034594/2023, dated 18-05-2023; drawing identifies Polepally Grampanchayat as the delegated authority.
Plots in the approved layout: 42, according to the layout plan and tentative approval record.
Approved built-up area: 0.00 sq.m in the supplied layout-plan parameters; this is a plotted layout, not a recorded building scheme.
Building, floor and parking-level configuration: Not disclosed in the supplied project record; no buildings, floors, or parking levels are identified.
Mortgaged area: 974.32 sq.m in the layout drawing extraction. The tentative approval separately describes Plot Nos. 21–27, stated as 1,165.287 sq.yds, as mortgaged.
Offering and status
Offering: Residential plots; the approved layout drawing lists 42 plots.
Plot count and size information: The drawing-derived layout record identifies 42 plots with sizes read from the drawing; see “Homes, configurations & floor plans.” These are software-measured drawing figures, not a RERA-filed plot-size schedule.
Booked / available plots: Not established by the supplied record.
Declared project progress: RERA project information lists 70% completeness; this is a declared record value, not independent site verification.
Construction stage: No independently verified site-stage evidence supplied. The approval requires development works and a work-completion certificate before final layout approval.
2. The project story
GREEN PARK CITY is a residential plotted layout registered with TG-RERA as P01400007565, covering land identified as Survey Nos. 415/P and 417/P in Polepalle revenue village, Jadcherla mandal, Mahabubnagar district. The layout approval record describes 42 residential plots, with land set aside for roads, open space/park, utilities and social infrastructure. It does not describe an apartment, villa or commercial building scheme.
The promoter’s Form B declares a completion deadline of 24 June 2025, while the RERA project information records 70% completeness. Neither item is independent evidence of on-site completion. The supplied record does not establish which infrastructure works have been completed or whether a final layout approval or completion certificate has subsequently been issued.
3. Master plan, architecture & building design
The project is organized as a plotted layout rather than a building development. The supplied layout drawing reports a net layout area of 10,343.56 sq.m and allocates it as follows. These figures are taken from the drawing extraction; they are not building floor areas.
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 6,096.11 sq.m | 58.94% |
| Road area | 2,944.33 sq.m | 28.47% |
| Organized open space/park | 931.30 sq.m | 9.00% |
| Social infrastructure | 266.94 sq.m | 2.58% |
| Utility area | 105.07 sq.m | 1.02% |
| Amenity area | 0.00 sq.m | 0.00% |
| Common parking area | 0.00 sq.m | 0.00% |
The approval drawing lists internal road widths of 7.62m, 9.14MT, 9.00MT and 18.00MT, and also gives road widths as 33'-0", 40'-0" and 50'-0".
No approved built-up area, building footprints, building count, floor configuration or building circulation details are disclosed in the supplied layout record. The tentative approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site.
4. Homes, configurations & floor plans
This is a plotted project, so apartment configurations, carpet areas and apartment saleable areas do not apply. The layout drawing extraction identifies 42 plots. Its plot schedule was read by software and should be checked against the drawing; plot sizes below are not RERA-filed measurements.
100–150: 10
150–200: 28
250–300: 3
300–400: 1
The software-measured plot-size range is 101.45–332.55 sq.m (121.3–397.7 sq.yd), with a median of 139.14 sq.m (166.4 sq.yd). The most frequent sizes identified from the drawing are 139.14 sq.m (10 plots), 120.77 sq.m (8 plots) and 130.15 sq.m (7 plots). These are plot areas, not house floor areas.
No plot-wise booking or availability count is established in the supplied evidence.
5. Parking & vehicle circulation
The layout drawing records 0 proposed parkings and 0.00 sq.m of common parking area. The supplied record does not establish visitor, accessible, two-wheeler or EV parking, nor any parking allotment arrangement.
Roads are shown in the layout plan, with widths listed as 7.62m, 9.14MT, 9.00MT and 18.00MT, and also as 33'-0", 40'-0" and 50'-0". The tentative approval requires roads to remain open for access to neighbouring sites. No separate vehicle-entry, ramp or pedestrian-separation design is evidenced.
6. Amenities, recreation & open spaces
The RERA amenity record identifies a number of layout infrastructure categories, but records 0% progress for the listed items. The approval document also specifies infrastructure and handover requirements. These records describe provisions or requirements; they do not establish independent completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor — no facility specifically identified | Not disclosed | Not established | |
| Sports / recreation — Green Strip/TOT LOT/Park | Park/open-space allocation: 931.30 sq.m in layout drawing; the tentative approval states Ac 0.23 cents, 1,113.835 sq.yds for open space. | RERA amenity record shows 0%; completion not independently verified. | |
| Landscape / open space — organized open space/park | 931.30 sq.m; 9.00% in the layout drawing | Completion not independently verified | |
| Convenience / community — social infrastructure | 266.94 sq.m; 2.58% in the layout drawing | Completion not independently verified | |
| Convenience / community — utility area | 105.07 sq.m; 1.02% in the layout drawing | Completion not independently verified |
The tentative approval names possible facilities—including a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management—and lists pharmacy, clinic, school, play school, creche, dispensary and convenience shops. These are approval-document references, not evidence that those facilities are built or operating.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage infrastructure (chamber, lines, septic tank/STP), water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. It also lists storm-water drains, street lighting, sewage and sullage treatment, solid-waste management, energy management and fire protection/safety requirements. The record shows 0% progress against each listed item; no completion verification, system capacities or operating details are supplied.
The tentative layout approval requires the applicant to construct an overhead tank or sump and septic tank, as applicable, and sufficient harvesting pits. It also identifies a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management among the utility provisions to be handed over. These are approval requirements or stated provisions, not proof of installation or statutory compliance.
No evidence is supplied for water source or storage capacity, sewage-treatment capacity, reuse arrangements, electrical backup, lifts, fire-system specifications, CCTV, access control or accessible circulation.
8. Location, access & connectivity
The registered location is Polepalle, Jadcherla, Mahabubnagar, Telangana 509301, on Survey Nos. 415/P and 417/P. The RERA land record states that the southern boundary is an existing 30 feet wide road; the layout approval also records internal road widths.
A cadastral parcel-centroid location is recorded at 16.81633, 78.11087. The nearest sampled Outer Ring Road interchange is listed at approximately 57.2 km; the supplied record does not provide a route, travel time or public-transport details.
9. Developer & development status
The registered promoter is MD MISKIN BABA AND OTHERS; the registration certificate renders the name as Md Miskin Baba and Others. The RERA record describes the organization type as “Others” and its description as “Partnership.” No corporate registration number, registered-office address, official website or project contact details are established in the supplied evidence.
MOHAMMED KHASIM signed the Form B declaration as the promoter’s authorized signatory. In that declaration, the promoter states that the project would be completed by 24 June 2025 and reports the land as free from encumbrances. The RERA project information records 70% completeness; no independent site inspection or verified construction-progress report is supplied here.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for GREEN PARK CITY, registration P01400007565, valid 13/01/2024–24/06/2025.
Principal layout approval: MUDA Urban Development Authority Tentative Layout Plan approval 288189/LP/GP/205292/0005/2023, dated 24-06-2023, for land in Survey Nos. 415/P and 417/P at Polepalle. The approval states that it is not proof of land title.
Layout drawing: Proposed residential-plot layout for Survey Nos. 415/P and 417/P; drawing reference TS/034594/2023, dated 18-05-2023, with 42 plots and land-use allocations.
Promoter declaration: Form B, signed by MOHAMMED KHASIM as authorized signatory, containing the promoter’s title/encumbrance statements, 70% separate-account undertaking and completion declaration.
Final layout / completion evidence: The tentative approval requires a licensed technical person’s work-completion certificate for approval of the final layout. No final layout approval or such certificate is included in the supplied evidence.
Occupancy/completion certificate: None identified in the supplied project documents.
Frequently asked questions
Is GREEN PARK CITY registered with Telangana RERA?
Yes. GREEN PARK CITY is registered with the Telangana Real Estate Regulatory Authority as P01400007565; the registration status is New Project.
Who is the developer of GREEN PARK CITY?
The promoter named in the RERA registration is MD MISKIN BABA AND OTHERS.
Where is GREEN PARK CITY located?
GREEN PARK CITY is in Polepalle, Jadcherla, Mahabubnagar, Telangana (509301).
When will GREEN PARK CITY be completed?
The promoter's proposed date of completion filed with RERA is 24/06/2025. This is the promoter's declaration, not a guarantee.